Loading...
HomeMy WebLinkAboutWPO202100006 Bond Estimates 2021-05-27Project Name: Foothill Farm Maintenance Building, Virginia Stormwater Management Program (VSMP) Plan, WP0202100006 WPO file number: WP02021-00006 TM P(s): 06200-00-00-073BO Date Estimate Completed: 5/27/21 Erosion and Sediment Control Bond Estimate Item Item Number 1 stablbafion fin, TS) 2 silt far.(Sn 3 safety lerce(W 4 diversion (DO, FD, RWD) 5 6 Level Spreaders 3 total 7 malting, EC-2 EL l I X I 36.OftL 8 mating, EC-2 EL 22120.51 205 ft L 8 E i rip -rap, placed (NA) depth 2.25 ft length 9 an 40.0 (tore) 10 $3 atone, placetl(6R SF) depth 1ft lereth 11 wintb 10.0 (tore) 11 ELSN2 np-mp. Placed (NA) depth 1.66 ft length 12 width 15.0 (tore) 13 93 some, pleoed(150 SF) depth 1 ft length 14 wMlh 10.0 (tore) 12 ELSAY tmatedfimben 6"x6"x42'Lx6pierssaackeea. (Installed=l5v Material Emrnw) 13 (GvVdrVsamh-Home Dapd($71.9$,k2psssmytmateW-Vx 12`,5Y1]/21) 14 ELS$2 tmatedfimben 6"x6"x13'Lx4piecesa ,keea. (Installed=l.Sx Material Emenu) 15 (Googlessamh-Home Depot S7198,k2pmssumheated6"x6'x 12`,5n7/2l) 14 temporary slope drain(TSD) pipe length 0ft pipe diameter 15 radayi for tmpNnin(1Uc,; direct entry) 16 Sediment Trap height of dam at we Oft cM a high side 17 height of fill a face 0ft cM afare 18 Note: trap volume via direcd entry length of dam oft length of cut 19 using M. Myant 5124120214:37 PM email value top width 0 ft witllh of cut 20 (area above trareitlon) oaf (area below banaition) 21 Goal width of dam) oft postal width of aft) 22 (height below transition) oft (depth below trareimin 23 (area below transition) oaf (area above trareinon) 24 Goal fill volume) 0.0, postal M volume) 25 length of spillway 12 ft (TOPL CV mumnale) 26 an of spillway 12 ft (apilMay store tons) 27 saturants for bap; Calc. above 28 we pmteaiod 0 a. -56If material /tree 29 silt fence inlet prolection(IP) 30 store inlet pmrachon(IP) 31 outlet protection (OP) length 0 ft width 32 Ditch 2A channel (SCC, maned) length 56 ft width 33 Ditch 213 channel (SCC, maeea) length 68 ft width 34 Ditch 3 channel (SCC, matt" length 114 ft width 33 cheat dam depth in channal 1.5ft channel width 34 construmbon entrance(CE) 35 wash mat 36 paved construction entrance 37 Ditch, rip -rap, placed depth 1 ft length 38 width 4.0 (tans, 39 Ditch rip -rap, placed depth 1 ft length 40 wimn 4.0 fans, 39 survey add layout (price par 0.1 mi.) acres 0.76 traps and basins 40.0 ft W 15AftW 21.8 ft 146.8125 67,2 ft 504 1L5ft 21,47625 15.0 ft 1125 MO W., MO W., 0 in Oft Oft Oft 0R 0 sf 0R 0R 0 sf 0.0 W 0W 8.3 ons ry 4fl 4fl 4fl 4fl 6R ]2.0 R 16.%tans 56.0 R 12.88 tans 1 No. Unit Unit Cost Cost (installed) OB acres $5.000.00 230.0 ft War, 0.0 ft War, 75 ft $13.00 1M0 ay W.W 3,12 sy MW $3,Bf10.f10 $1,15000 5000 $9]500 $ Odin MM $60.00 $8,808.]5 $35.W $1,] rfn $60.00 $1,288.58 MOO $393]5 21 as $107e7 $2,26]3] 5 ee $107e7 Wt)M $13.00 $1,W400 $50.00 $41500 $13.00 Witt) 205ft $5,00 $1102500 0 $100,00 Witt) 1 $200,00 $200.00 1 $0,00 Witt) $29120 Mt.60 $5,N 80 0 $202,50 $Oo0 1 $2,000,00 $200000 1 $2,000,00 $'isfioA 0 $3,500,00 Witt) $60,00 $993.60 $60 00 $M 80 $88000 5/27/2021 Item Item Number 40 mobiraa0w 41 stream we.i, (wmpuW irtl pe .O,) - irl atl forWWH wsailga, wt pe...M atru Nre; NA 5lrml EW bad a 30Ap 2014_ ,,OM1-C Fg l Fern 052721 x1ax No. Ur„ Ur0 Cost Cost iretalletl $50O.W $O.W wataum $33,323.63 pmj mgmt $4,993.54 wmirgenq $3.M.]2 Total $42,160 527/2021