Loading...
HomeMy WebLinkAboutSDP202100025 Correspondence 2021-05-28a Assaf TIMMONS GROUP May 28, 2021 John Anderson County of Albemarle Community Development 401 McIntire Rd Charlottesville, VA 22902 608 Preston Avenue P 434.295.5624 Suite 200 F 434.295.1800 Charlottesville, VA 22903 www.timmons.com RE: Keswick WWTP Improvements —Minor Amendment Site Plan Review — SDP2021-00025 - Comment Response Letter Dear Mr. Anderson: We have reviewed all of your comments from Revision dated May 5, 2021 and made the necessary revisions. Please find our responses to the comments below in bold lettering. Note: Major revision to review comments. Items 1.-6., below, withdrawn. Ref. Bruce Strickland email, Timmons Group (May 5, 2021 12:56PM): 'This project will not expand the permitted capacity of the central sewer system. This is an enhancement to the existing treatment process for greater reliability and resiliency, so we believe that the requirements of Ch. 16 are not applicable in this case.' 1. If this Application has completed clerk of board of Superviors notification outlined in Ch. 16, please notify Engineering. Also, please include relevant dates of board action relative to this application on plan sheet C0.0, if Albemarle County board of supervisors has considered this WWTP improvement proposal prior to this date. (05/05/2021) Withdrawn; ref. Applicant email, May 5, 2021 12:56PM. Acknowledged 2. Per 16-102, notify the board of supervisors at least (60) days prior to commencing construction of Keswick Wastewater Treatment Plant Improvements. The notice shall include the following: (05/05/2021) Withdrawn; ref. Applicant email, May 5, 2021 12:56PM. Acknowledged a. The location of the proposed central sewerage system. It may be helpful to reference antecedent Keswick WWTP applications, or approved plans, since this plan proposes: i. (Expansion) improvement of an existing central sewerage system, including: ENGINEERING I DESIGN I TECHNOLOGY 1. New blower, pipes, restraints, thrust blocks, new 6" influent pump station ductile iron force main, valve vault, gate valve/s, equalization basin, electrical building, generator, and additional miscellaneous items. 2. In order to provide additional capacity for new or expanded Keswick community facilities, or additional connections (Keswick Hall Spa, for example, though precise capacity or facilities served is not readily apparent with this Application). b. The number of connections proposed to be served by the central sewerage system: i. If no new connections beyond currently -served Keswick facilities or buildings will be served with this WWTP improvement project, please state this. ii. If new Keswick community connections are provided or new buildings served, please list/identify buildings, facilities, etc. iii. If expansion improvement increases WWTP capacity by a measurable amount, please report increased WWTP treatment capacity; if equalization basin, electrical building, and appurtenant structures only enhance wastewater treatment, please state this. c. A statement describing the type of proposed central sewerage system (expansion) and explaining the reasons the system or supply is needed. i. Engineering requests brief narrative that addresses items listed at code Sec. 16-102.1-3. d. Please furnish three (3) copies of the preliminary plans for the central sewerage system to the clerk of Albemarle County board of supervisors with cover letter addressing notification items listed at 16-102 for SDP202100025, Keswick Wastewater Treatment Plant Improvements, d. 03/22/21, Minor Site Plan Amendment SDP199100097. xxxx 3. Engineering Division has received copy of Application as SDP202100025 and is not dependent on transmittal of copy of plans already received to initiate review or consider technical aspects of the proposed WWTP. (Sec. 16-603) (05/05/2021) Withdrawn; ref. Applicant email, May 5, 2021 12:56 PM. Acknowledged 4. Sec. 16-104 requires proposed improvements to Keswick WWTP be placed on the agenda of the board of supervisors for consideration at a regular board meeting. The hearing shall not be conducted until the county engineer has completed a review of the plans submitted by the applicant. Prior to the meeting at which the proposal will be considered, the county engineer shall submit a written recommendation to the board. The applicant shall appear in person (or remotely) when the proposal is considered by the board. (05/05/2021) Withdrawn; ref. Applicant email, May 5, 2021 12:56 PM. Acknowledged 5. Sec. 16-105 states (05/05/2021) Withdrawn; ref. Applicant email, May 5, 2021 12:5613M. a. After consideration of a proposal as provided in section 16-104, the board of supervisors may approve or disapprove the proposal. If the board approves the proposal, it shall specify the number of connections that may be made to the central sewerage system. b. The board may condition its approval of a central sewerage system upon the approval of the applicant's final plans by the county engineer, the health department, and the Virginia Department of Environmental Quality, and wither approval by or proof of notification to, any other applicable state or federal department or agency. xxxx 6. The county engineer anticipates no objection to Matthew R. Miller, PE, WWTP improvements design on a technical basis provided Agencies listed at review item 5.b. have no objection, and applicant finishes evidence of VDH written acceptance of design without objection as sufficient to meet relevant sewage collection and treatment (SCAT) regulations. Engineering will likely, on agency acceptance basis, recommend to the board of supervisors' approval of design intended to meet current or expanded wastewater treatment needs at the Keswick Community. (05/05/2021 Withdrawn; ref. Applicant email, May 5, 2021 12:56PM. Acknowledged 7. Provide evidence of coordination with DEQ/VDH. Provide evidence of design acceptance by VDH. VDH does not have jurisdiction over this type of wastewater project. This wastewater project is governed by the Sewage Collection and Treatment Regulations, 9VAC25-790, over which DEQ has jurisdiction. Please refer to the attached email correspondence regarding the preliminary engineering conference held with DEQ on 2/19/21. 8. Estimate area of land disturbance associated with SDP202100025. Meet water protection Ordinance requirements typically triggered if area of land disturbance is > 10,000 square feet. If WPO Application is required, the Minor Site Plan Amendment cannot be approved prior to WPO Plan approval. Land Disturbance for this project is under 10,000 SF and therefore a WPO Application and plan is not required. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624 or email at ionathan.showaIter(@timmons.com . Sincerely, Jonathan Showalter, PE Project Manager