Loading...
HomeMy WebLinkAboutARB202100049 Staff Report 2021-06-02ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2021-49: Umansky Subaru Building Renovation Review Type Preliminary Review of a Site Plan and Architecture Parcel Identification 04500-00-00-068134 Location On the west side of Routh 29 North, at the intersection of Hilton Heights Road and Route 29. Zoned Highway Commercial (HC), Entrance Corridor (EC) Owner/Applicant Umansky Properties TOC LLC/Design Develop LLC (Kevin Schafer) Magisterial District Rio The applicant proposes to renovate the Umansky Subaru showroom building by applying ACM (aluminum composite material) panels on portions of the Rt. 29 elevation Proposal and the majority of the Hilton Heights Road elevation, by painting the existing brick and EIFS gray, by adding elements to the south and east elevations including towers and canopy. The renovation proposal also includes additions to the rear (west) elevation. The Umansky Subaru site is located in the heavily developed Rt. 29 commercial corridor. The Subaru building is located just south of the Umansky Auto Park (previously Context Brown) building. A Walmart is located directly to the south across Hilton Heights Rd. Just beyond the Walmart is the Price Chevrolet auto dealership, including the Hyundai showroom, which received ARB approval in 2011. To the west is Sam's Club, and a Doubletree hotel is located to the north. A variety of commercial buildings stand on the opposite side of Rt. 29. Visibility The south elevation is readily visible from the intersection of Rt. 29 and Hilton Heights Rd. Although there is established landscaping along the Rt. 29 EC that will screen portions of the updated elevations from view, increased visibility is expected during the fall and winter seasons when there is less foliage on the trees. ARB Meeting Date June 7, 2021 Staff Contact Khris Taggart PROJECT HISTORY Two Special Use Permits were approved for this site in 2003. SP-2002-64 was approved for outdoor display of vehicles and SP-2002-65 was approved for structured parking. A condition of SP2002-65 is: "The design of the Phase II building shall be compatible with the Phase I building, as determined by the ARB." The Phase 1 building is the larger, northern building originally called the Brown Auto Park building, with the structured parking. The showroom for Subaru, the smaller, southern building, was completed as Phase 2 of the development. To maintain compliance with the conditions of the approved Special Use Permits, the proposed design for the renovation of the Subaru building must be compatible with the Phase 1 building. ARB-2003-116 received a Certificate of Appropriateness on December 18, 2003 and approved the original design of the Brown Auto Park building (the Phase 1 building at the north). ARB-2005-71 received a Certificate of Appropriateness on December 20, 2005 and approved the original design of the Brown Subaru building (the Phase 2 building at the south). • In 2013, ARB-2013-139 was received as a proposal to renovate the Subaru building. the proposal included the removal of the stone entrance surround, addition of a slate icon tower, and addition of ACM panels over the stucco fascia at the south end of the building. The ARB did not approve this proposal. A Certificate of Appropriateness was issued for a revised design on November 19, 2013, allowing only the replacement of the fieldstone at the entry portal with slate veneer, and a narrow ACM panel and metal cap molding added at the top of the portal. • Several sign applications have been approved for this development since 2005. ANALYSIS REF GUIDELINE ISSUE RECOMMENDATION GENERAL GUIDELINES Purpose, Compatibility with the character of the Entrance Corridor, Compatibility with significant historic sites 1 The goal of the regulation of the design of development within the designated Entrance This portion of the Rt. 29 Entrance Corridor includes a mixture of The proposed design for the Phase II Corridors is to ensure that new development within the corridors reflects the traditional small -and large-scale commercial buildings of varying styles and building is not compatible with the architecture of the area. Therefore, it is the purpose of ARB review and of these forms. The existing Subaru building and the Phase I building to the Phase I building. Revise the proposal Guidelines, that proposed development within the designated Entrance Corridors north, much like the immediate surrounding area, achieve a level of to provide a design that maintains a reflect elements of design characteristic of the significant historical landmarks, compatibility through the use of brick as the primary material. The connection to the historic architecture buildings, and structures of the Charlottesville and Albemarle area, and to promote Subaru renovation proposal would add a slate icon tower to the east of the area and compatibility with the orderly and attractive development within these corridors. Applicants should note that elevation, remove the existing slate entrance element on the south Phase I building. Options include, but replication of historic structures is neither required nor desired. elevation and add a new slate icon tower a short distance to the west, cover substantial portions of the existing brick and EIFS with are not limited to, reducing the size/scale of the pick-up canopy 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites as ensembles of buildings, land, and vegetation. In order to ACM panels, paint the red brick and EIFS that are to remain gray, structure, reducing the amount of ACM accomplish the integration of buildings, land, and vegetation characteristic of these and maintain the blue stripe at the top of the walls. panel used in the design, maintaining sites, the Guidelines require attention to four primary factors: compatibility with the red brick, using earth -tone colors. significant historic sites in the area; the character of the Entrance Corridor; site The forms (tower elements, canopy structure, and windows) development and layout; and landscaping. introduced in the design help break up the length of the EC -facing elevation. However, the size, position and general character of the 3 New structures and substantial additions to existing structures should respect the traditions of the architecture of historically significant buildings in the Charlottesville pick-up canopy result in a monumental element meant to highlight and Albemarle area. Photographs of historic buildings in the area, as well as drawings sold vehicles. A reduced footprint and alternate materials might of architectural features, which provide important examples of this tradition are reduce visual impacts. The existing south tower, which is an contained in Appendix A. "entrance element", is one way the building is visually connected to the north building. The removal and replacement of this element 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility with the area's historic structures is not intended to with an "icon tower" transitions the building to more of a trademark impose a rigid design solution for new development. Replication of the design of the design, which is not supported by the design guidelines and was not important historic sites in the area is neither intended nor desired. The Guideline's supported in the 2013 proposal. The painting of the brick, the standard of compatibility can be met through building scale, materials, and forms substantial use of ACM panels, and the slate icon towers are design which may be embodied in architecture which is contemporary as well as traditional. elements that eliminate the compatibility of the Subaru (Phase II) The Guidelines allow individuality in design to accommodate varying tastes as well as building with the Phase I building that is required by SP2002-65. special functional requirements. These features also remove the connection the Phase 2 design has to the historic architecture of the County and move the building firmly 5 It is also an important objective of the Guidelines to establish a pattern of com atible architectural characteristics throughout the Entrance Corridor in order to achieve unity into the realm of trademark design. and coherence. Building designs should demonstrate sensitivity to other nearby structures within the Entrance Corridor. Where a designated corridor is substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. 10 Buildings should relate to their site and the surrounding context of buildings. 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should be compatible with the forms and features of the significant historic buildings in the area, exemplified by (but not limited to) the buildings described in Appendix A [of the design guidelines]. The standard of compatibility can be met through scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The replication of important historic sites in Albemarle County is not the objective of these guidelines. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a cohesive whole. 15 Trademark buildings and related features should be modified to meet the requirements Overall, the proposal displays a strong connection to Subaru's of the Guidelines. national branding scheme as displayed in the use of gray ACM panels, slate veneer icon towers, and the blue color stripe capping the elevations. As such, the design is about emphasizing corporate identity/trademarking, not compatibility in the EC and with the Auto Park Phase I building to the north. Structure design 11 The overall design of buildings should have human scale. Scale should be integral to The addition of the tower element and windows along the east See recommendation #1 the building and site design. elevation help to enhance human scale but adding a tower element covered in slate emphasizes the trademark appearance of the building. While the addition of the vehicle pick-up canopy structure helps to break up the length of the building, its size, position and eneral character result in a monumental appearance. 13 Any appearance of "blankness" resulting from building design should be relieved using The tower element, canopy structure, and additional windows None. design detail or vegetation, or both. shown along the east elevation, as well as the existing landscaping along the building, help to relieve the blankness that exists in the current building design. 14 Arcades, colonnades, or other architectural connecting devices should be used to unify No connecting devices are proposed in this proposal. None. groups of buildings within a development. 16 Window glass in the Entrance Corridors should not be highly tinted or highly reflective. The standard window glass note is not on the plans. Revise the plans to include the Window glass in the Entrance Corridors should meet the following criteria: Visible standard window glass note. light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30016. Specifications on the proposed window glass should be submitted with the a lication or nal review. Accessory structures and equipment 17 Accessory structures and equipment should be integrated into the overall plan of There are no separate accessory structures proposed, but canopy None. development and shall, to the extent possible, be compatible with the building designs structures are shown at the south end of the east elevation and along used on the site. the west elevation. Changes along the west elevation are not ex ected to have a visual impact on the EC. 18 The following should be located to eliminate visibility from the Entrance Corridor street. The existing roof -mounted mechanical equipment is screened by a Indicate if any roof or ground -mounted If, after appropriate siting, these features will still have a negative visual impact on the parapet wall, and the renovation will not alter this condition. No equipment is proposed with the Entrance Corridor street, screening should be provided to eliminate visibility. a. Loading new mechanical equipment is shown on the plans. renovations to the building. If new areas, b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical equipment, equipment is proposed, show locations f. Above -ground utilities, and g. Chain link fence, barbed wire, razor wire, and similar and show how that equipment will be security fencing devices. screened from the EC. 19 Screening devices should be compatible with the design of the buildings and No screening devices are proposed. None. surrounding natural vegetation and may consist of. a. Walls, b. Plantings, and c. Fencing. 20 Surface runoff structures and detention ponds should be designed to fit into the natural No new stormwater facilities are proposed. None. topography to avoid the need for screening. When visible from the Entrance Corridor street, these features must be frilly integrated into the landscape. They should not have the appearance of engineered features. 21 The following note should be added to the site plan and the architectural plan: "Visibility The note is present on the plans. None. of all mechanical equipment from the Entrance Corridor shall be eliminated." 22-31 Liahfrna There is no new lighting shown for this site. Indicate if any site or building - mounted lighting is proposed with the renovations to the building. If new lighting is proposed, provide complete details. Landscaping The landscape plan proposes a few changes to existing landscaping, Revise the landscape plan to show all and shows some, but not all, of the previously approved previously approved landscaping, and landscaping. further clarify the proposal to identify plants to remain, plants to be removed, and plants to be added. 7 The requirements of the Guidelines regarding landscaping are intended to reflect the Established frontage landscaping is existing and is to remain in this None. landscaping characteristic of many of the area's significant historic sites which is renovation proposal. characterized by large shade trees and lawns. Landscaping should promote visual order within the Entrance Corridor and help to integrate buildings into the existing environment of the corridor. 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that share similar characteristics. Such common elements allow for more flexibility in the design of structures because common landscape features will help to harmonize the appearance of development as seen from the street upon which the Corridor is centered. 32 Landscaping along the frontage of Entrance Corridor streets should include the following: a. Large shade trees should be planted parallel to the Entrance Corridor Street. Such trees should be at least 3% inches caliper (measured 6 inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 35 feet on center. b. Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph. The ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right- of-way and utility easements. 33 Landscaping along interior roads: It appears that some of the approved landscaping along Hilton Revise the landscape plan to provide a. Large trees should be planted parallel to all interior roads. Such trees should be at Heights Road is missing. The approved landscaping successfully show the correct quantity of shade least 2'/z inches caliper (measured six inches above the ground) and should be of a plant mitigated the parking and integrated the development into the trees along the parking area adjacent to species common to the area. Such trees should be located at least every 40 feet on Entrance Corridor. Maintaining the approved landscaping is Hilton Heights Rd. center. important to maintaining orderly, harmonious and attractive development along the corridor. 35 Landscaping of parking areas: a. Large trees should align the perimeter of parking areas, located 40 feet on center. Trees should be planted in the interior of parking areas at the rate of one tree for every 10 parking spaces provided and should be evenly distributed throughout the interior of the parking area. b. Trees required by the preceding paragraph should measure 2% inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 34 Landscaping along interior pedestrian ways: Other than the existing walkways along the east and south ends of None. a. Medium trees should be planted parallel to all interior pedestrian ways. Such trees the building, no interior pedestrian ways are proposed. should be at least 2% inches caliper (measured six inches above the ground) and should be of a species common to the area. Such trees should be located at least every 25 feet on center. 36 Landscaping of buildings and other structures: The plan does not show all of the approved landscaping along the Revise the landscape plan to show all a. Trees or other vegetation should be planted along the front of long buildings as eastern end of the building. The approved landscaping successfully approved landscaping along the eastern necessary to soften the appearance of exterior walls. The spacing, size, and type of such softens the appearance of the long extent of the exterior walls. end of the building. trees or vegetation should be determined by the length,height, and blankness of such Maintaining the approved landscaping is important in mitigating the walls. long building elevations. Shrubs are proposed along the base of the b. Shrubs should be used to integrate the site, buildings, and other structures; canopy that is being added near the southeast comer of the building dumpsters, accessory buildings and structures; "drive thin" windows; service areas; and to screen the low retaining wall there. signs. Shrubs should measure at least 24 inches in height. 37 Plant species: No plant species have been provided on the landscape plan. Revise the landscape plan to include a. Plant species required should be as approved by the Staff based upon but not limited plant species. to the Generic Landscape Plan Recommended Species List and Native Plants for Virginia Landscapes (Appendix D . 38 Plant health: The standard plant health note is on the plans. None. The following note should be added to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of theplant." Site Development and layout Development paftern 39 The relationship of buildings and other structures to the Entrance Corridor street and to No changes are being made to the existing access to the site. The None. other development within the corridor should be as follows: existing building is to remain parallel to the EC and the alterations a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should to the existing on -site circulation patterns remain organized. guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the The site has been previously developed. Some existing interior street. Building groupings should be arranged to parallel the Entrance Corridor street. landscaping is proposed to be removed and replaced to c. Provisions should be made for connections to adjacent pedestrian and vehicular accommodate the changes to the site. Views around the site are not circulation systems. expected to be negatively impacted. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 6 Site development should be sensitive to the existing natural landscape and should The site has been previously developed. Grading and retaining None. contribute to the creation of an organized development plan. This may be walls are proposed to establish the vehicle pick-up canopy. accomplished, to the extent practical, by preserving the trees and rolling terrain typical of the area; planting new trees along streets and pedestrian ways and choosing species that reflect native forest elements; insuring that any grading will blend into the surrounding topography thereby creating a continuous landscape; preserving, to the extent practical, existing significant river and stream valleys which may be located on the site and integrating these features into the design of surrounding development; and limiting the building mass and height to a scale that does not overpower the natural settings of the site, or the Entrance Corridor. 40 Site grading should maintain the basic relationship of the site to surrounding conditions by limiting the use of retaining walls and by shaping the terrain through the use of smooth, rounded landforms that blend with the existing terrain. Steep cut or fill sections are generally unacceptable. Proposed contours on the grading plan shall be rounded with a ten -foot minimum radius where they meet the adjacent condition. Final grading should achieve a natural, rather than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur within the drip line of any trees or other No grading appears to be proposed within the drip line of any None. existing features designated for preservation in the final Certificate of Appropriateness. existing trees or other existing features. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be The site has been previously graded. Drainage patterns are not None. incorporated into the finished site to the extent possible. changing. Signs Signage is reviewed and approved by separate submission. Sign applications are required for all However, the following preliminary comments are provided. proposed signs. The ARB may require that the color and scale of standard templates for trademarks, service marks, corporate logos and graphics be modified. If internally illuminated, the backgrounds of the Subaru "Star Cluster" logos must be opaque. SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The compatibility of the Subaru building with the Phase I building. 2. The design of the Subaru renovation: the addition of trademark elements, the design and scale of the pick-up canopy. Staff offers the following recommendations on the proposal: 1. The proposed design for the Phase II building is not compatible with the Phase I building. Revise the proposal to provide a design that maintains a connection to the historic architecture of the area and compatibility with the Phase I building. Options include, but are not limited to, reducing the size/scale of the pick-up canopy structure, reducing the amount of ACM panel used in the design, maintaining the red brick, using earth -tone colors. 2. Revise the plans to include the standard window glass note: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. 3. Indicate if any roof or ground -mounted equipment is proposed with the renovations to the building. If new equipment is proposed, show locations and show how that equipment will be screened from the EC. 4. Indicate if any site or building -mounted lighting is proposed with the renovations to the building. If new lighting is proposed, provide complete details. 5. Revise the landscape plan to show all previously approved landscaping, and further clarify the proposal to identify plants to remain, plants to be removed, and plants to be added. 6. Revise the landscape plan to provide show the correct quantity of shade trees along the parking area adjacent to Hilton Heights Rd. 7. Revise the landscape plan to show all approved landscaping along the eastern end of the building. 8. Revise the landscape plan to include plant species. 9. Sign applications are required for all proposed signs. ATTACHMENTS • Attach. 1: ARB2021-49: Umanskv Subaru Buildin¢ Renovation Site Plan • Attach. 2: ARB2021-49: Umanskv Subaru Building Renovation Architectural Drawings c ou6 SEM/NOLE TRAIL NS. ROUTE 29 SOUThBOUND LANES! Figure 1: SDP2003-67 Approved Landscape Plan (Phase I) TO - � � I 4If. —_ _ utx IOJa w vR��c (12) VLl P,6RIC A.fPF RS RFLIQII \ � ` _ } �f F fAKVL fOilO, y -__ i (W) IC (7) ce t o ; soD RQIbRM' NM i "Y �: i 1_AAll�CAPEPLAN Figure 2: SDP2005-45 Approved Landscape Plan (Phase 11) 10 TABLE A This report is based on the following submittal items: Sheet # Drawin Name Drawing Date/Revision Date - Umansky Subaru Building Renovation Site Plan - L100 Cover Sheet 04/26/21 1,101 Notes L102 Existing Overall Site Plan L103 Existing Conditions L104 Layout Plan L105 Grading & Utility Plan L106 Landscape Plan L107 Site Details Umansky Subaru Building Renovation Architectural Drawings - 1 Cover 04/25/21 3 Table of Contents 5 Project Description 6 Vicinity Ma 7 Context Photos 8 Entrance Corridor Automobile Dealerships 9 Existing Conditions 10 Visibility from Entrance Corridors 11 Views from Entrance Corridors 12 Metal Panels on Entrance Corridors 13 Nationwide Subaru Design 14 Existing vs. Proposed Elevations South 15 Existing vs. Proposed Elevations East 16 Existing vs. Proposed Elevations West 17 Eastern Rt.29 Elevation 18 Southern Hilton Heights) Elevation 19 Approach: Seminole Trail Rt. 29 n 20 Approach: Seminole Trail Rt. 29 04/25/21 21 View from Hilton Heights Road 22 View from Rt. 29 Entrance Corridor 23 Interior Drive Aisle Perspective 24 Interior Drive Aisle Perspective 25 Interior Drive Aisle Perspective 26 Interior Drive Aisle Perspective 27 Interior Drive Aisle Perspective 28 Exterior Finishes 29 Exterior Finishes 12