Loading...
HomeMy WebLinkAboutWPO201800077 Plan - VSMP 2021-06-03SITE DATA OWNER / DEVELOPER: PLAN PREPARER: TAX MAP PARCEL No: PARCEL AREA: ZONING: USE: MARCH MOUNTAIN PROPERTIES LLC CONTACT: DAVE BROCKMAN 1005 HEATHERCROFT CIRCLE, SUITE 400 CELL: (702)-985-9088 CROZET, VA 22932 dove@oldtroilvilloge.com ROUDABUSH, GALE, & ASSOCIATES 172 SOUTH PANTOPS DRIVE, SUITE A CHARLOTTESVILLE, VA. 22902 (434)-979-8121 �;V�yXiII�71Q�Z�II�I�IHy� 23.27 AC NEIGHBORHOOD MODEL DISTRICT IN ACCORDANCE WITH PROFFERS OF ZMA 2015-00001 APPROVED FEBRUARY 1, 2016 ENTRANCE CORRIDOR OVERLAY DISTRICT STEEP SLOPES (MANAGED & PRESERVED) OVERLAY DISTRICT 92 SINGLE FAMILY LOTS (73 SFD, 19 SFA) GROSS RESIDENTIAL DENSITY: 3.95 UNITS/AC. OLD TRAIL VILLAGE BLOCK 32 STORMWATER MANAGEMENT & EROSION CONTROL PLAN MAGISTERIAL DISTRICT: WHITE HALL MAGISTERIAL DISTRICT STORMWATER MANAGEMENT- AS DEFINED BY THE OVERALL STORMWATER MASTER PLAN (WPO20160009), APPROVED 412512016 WATERSHED: LICKINGHOLE CREEK TOPOGRAPHY: LOUISA AERIAL SURVEYS, AUGUST 2012. ROUDABUSH, GALE & ASSOCIATES AUGUST 2018 (ASB) BENCHMARK.- INLET TOP ON OLD TRAIL DRIVE = 653.0 DATUM. VERTICAL - NAVD 88, HORIZONTAL - NAD 83 CRITICAL SLOPES: CRITICAL SLOPES EXIST WITHIN THE PROJECT LIMITS. GRADING ACTIVITY IS PLANNED WITH THIS PROJECT IN ACCORDANCE WITH APPROVED ZMA. THE LIMITS OF THE CRITICAL SLOPES WERE DETERMINED BY THE ANALYSIS OF THE EXISTING TOPOGRAPHY FROM THE AERIAL SURVEY AND GIS CONTOUR DATA. A PORTION OF CRITICAL SLOPES HAS BEEN FIELD VERIFIED TO BE LESS THAN 25% AND EXHIBIT HAS BEEN SUBMITTED UNDER SEPARATE COVER: CRITICAL SLOPE EXHIBIT OLD TRAIL VILLAGE BLOCK 32, APPROVED 08-30-2018. FLOODPLAIN: PORTIONS OF THIS PROJECT ARE LOCATED WITHIN THE FEMA FLOODPLAIN LIMITS AS SHOWN ON FLOOD INSURANCE RATE MAP COMMUNITY PANEL NUMBER 510006 0237 D. EFFECTIVE DATE: FEBRUARY 4, 2005. THERE WILL BE ENTRANCE GRADING OPERATIONS ASSOCIATED WITH THIS PROJECT WITHIN THE FEMA FLOODPLAIN LIMITS. HEC-RAS STUDY HAS BEEN COMPLETED AND SUBMITTED TO THE COUNTY ENGINEER FOR DETERMINATION. FLOODPLAIN DEVELOPMENT PERMIT, FDP201800018, APPROVED 11-06-2018. LANDSCAPING: SEE LANDSCAPING PLAN FOR PLANTINGS, SCHEDULE AND SPECIFICATIONS, NOTES AND DETAILS NO EVIDENCE OF A BURIAL SITE WAS FOUND ON THIS PORTION OF PARCEL Al. THE STREAM BUFFER(S) SHOWN HEREON SHALL BE MANAGED IN ACCORDANCE WITH THE THE ALBEMARLE COUNTY WATER PROTECTION ORDINANCE. THIS SITE IS NOT LOCATED WITHIN AN AGRICULTURAL -FORESTAL DISTRICT. THIS SITE IS LOCATED WITHIN THE SOUTH FORK RIVANNA RESERVOIR WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS),THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES, WHERE APPLICABLE, ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. hL WP02018iiiiiiiiiiiI00077 VICINITY MAP SCALE 111=1000 FEET EROSION & SEDIMENT CONTROL LEGEND SAF F3011 SAFETY FENCE CE F3O o CONSTRUCTION ENTRANCE CONSTRUCTION C R S 3.03 C R S STABILIZATION ROAD SF 3.05 v SILT FENCE F31 DIVERSION DF31 ST SEDIMENT TRAP SB 3.14 SB SEDIMENT BASIN OP 3.18 SR 329 SR T 3.31 TS PS 3.32 PS PERMANENT SEEDING TP 3.38 +P TT TREE PROTECTION &F3 39 DC DUST CONTROL TOTAL DISTURBED AREA = 20.80 ACRES OUTLET PROTECTION SURFACE ROUGHENING TEMPORARY SEEDING APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING / ZONNING ENGINEERING SHEET INDEX SHEET 1---------- COVER SHEET SHEET 2---------- EXISTING CONDITIONS & SOILS/ESC PHASE 1 SHEET 3---------- EROSION CONTROL PHASE 2 SHEET 4---------- EROSION CONTROL PHASE 2 SHEET 5---------- DRAINAGE MAP TO S-1 FACILITY SHEET 6---------- DRAINAGE MAP TO S-13 FACILITY SHEET 7---------- EROSION CONTROL NARRATIVE & DETAILS SHEET 8---------- EROSION CONTROL NOTES & DETAILS/NYLOPLAST DETAIL FOR SWM SHEET 9---------- BMP CONVERSION NOTES & DETAILS SHEET 10--------- BMP CONVERSION NOTES/DETAILS & PROFILE SHEET 11--------- MITIGATION DETAILS SHEET 12--------- MITIGATION PLAN SHEET 13--------- MITIGATION PLAN SHEET 14--------- LANDSCAPE PLAN & CONSTRUCTION RECORD DRAWING REQUIREMENTS GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS (CONT.) 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80 LBS/100SF. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90 LBS/1000SF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000 LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180 LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80 LBS/100SF. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G). 22.PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B). 23.THESE PLANS DO NOT GUARANTEE THE EXISTENCE, NON-EXISTENCE OR LOCATION OF UTILITIES. CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OR THE NON-EXISTENCE OF UTILITIES. AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION OR CONSTRUCTION, CONTRACTOR SHALL NOTIFY MISS UTILITY (1-800-552-7001) AND/OR THE RESPECTIVE UTILITY COMPANIES FOR GAS, WATER, SEWER, POWER, PHONE AND CABLE. CONTRACTOR SHALL TIMELY ARRANGE TO HAVE THE VARIOUS UTILITIES LOCATED, AND TO HAVE THEM REMOVED OR RELOCATED, OR TO DETERMINE THE METHOD OF PROTECTION ACCEPTABLE TO THE RESPECTIVE OWNER, IF THE METHOD OF PROTECTION IS NOT OTHERWISE SPECIFIED. CONTRACTOR SHALL CONDUCT ITS WORK IN THE VICINITY OF EXISTING UTILITIES IN ACCORDANCE WITH THE RESPECTIVE UTILITY'S RULES AND REGULATIONS. ANY COST INCURRED FOR REMOVING, RELOCATING OR PROTECTING UTILITIES SHALL BE BORNE BY CONTRACTOR UNLESS INDICATED OTHERWISE. CONTRACTOR SHALL EXCAVATE TO LOCATE BURIED UTILITIES FAR ENOUGH IN ADVANCE OF ITS WORK TO ALLOW FOR HORIZONTAL AND /OR VERTICAL ADJUSTMENTS TO ITS WORK AND/OR THE UTILITIES. NO ADJUSTMENT IN COMPENSATION OR SCHEDULE WILL BE ALLOWED FOR DELAYS RESULTING FROM CONTRACTOR'S FAILURE TO CONTACT AND COORDINATE WITH UTILITIES. GENERAL EROSION AND SEDIMENT CONTROL N ES-1: UNLESS OTHERWISE INDICATED, AL_ VEGETATiV- AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN REVIEWING AUTHORITY. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN REVIEWING AUTHORITY. ES-7: ALL DISTURBED ARES ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION HAS BEEN ACHIEVED. ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. A m r U 7 w p w 5 �o U ° O Z zaN C•gg �Y� C J f-dt maw U Q T J = OU aC m aZ =w a W O wo 0 UQ M,Q 0 25 J Z v U Qy' Z CE_ W', N w (7 En O Z � o� a w N w Q z > O va w a J } V > =mow Oaz o) •,/ Fil w o aIr m= rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 20111 SCALE AS SHOWN Op pr�� �o{��AyTH � o U y Jimmy L. Taggart Po Uc. No. 2 4 05Z 214121 4�� ��ss�ONAL 061 r O O O 1 00 zo W a_ z w r� Q u- w Q J N> E- z z _j c� ; w Y' �I> JUO w0QO° w w 3:z�m� �OC) w �OJ 111 a oz0 U) O Ir W 06 FILE NUMBER 8053 SHEET 01 OF 14 WRGA\TMPROA8053-OLD TRAIL\Block 32\ENGINEERING 13WG\8053-OLD TRAIL- Block 32 - WPO.dwa CONTRACTOR SEQUENCE OF CONSTRUCTION NOTES: 60 0 60 120 180 1. CONTRACTOR SHALL VERIFY ROUGH GRADES FROM MASS GRADING PLAN AND VERIFY ALL EROSION CONTROL EXISTING CONDITIONS SHOWN HEREON MEASURES ARE INSTALLED PROPERLY AND FUNCTIONING PRIOR TO INSTALLATION OF UTILITIES. SCALE: 1"=60' LEGEND 2. BUILDER LOT PADS ARE PROJECTED TO START ON THE SOUTHEASTERN MOST PART OF THE SITE AND DRAINAGE WILL B E USED A S PHASE 1 EROSION SHALL BE DIVERTED TO EXISTING SEDIMENT TRAP #1 AND SEDIMENT BASIN AS DEEMED NECESSARY. STEEP SLOPES (PRESERVED) 3. DRAINAGE MAY DIFFER ONSITE FROM PROJECTED CONSTRUCTION AREAS AND CONTRACTOR SHALL NOTIFY ENGINEER o \IOR TO TAKG ACT. 4. NO MOREOF THAN 3 AC ESCOF ONSI EL DRAINAGE SHALL GO TO PANOY SDEDIMENTPLANPTRAP DU INGINPHASE 01NOF CONTROL PLAN AND IS TAKEN FROM CONSTRUCTION AND DIVERGENCE TO SEDIMENT BASIN SHALL BE USED TO RELIEVE TRAPS IF NECESSARY. 3;`!:. 100YR FLOODPLAIN �. 5. CONTRACTOR SHALL WORK WITH EROSION CONTROL INSPECTOR ONSIE FOR ACCEPTABLE METHODS OF ADDRESSING APPROVED AMENDMENT TO BORROW SITE RUNOFF AND CLOSURE/MODIFICATIONS OF LOCATIONS TO SEDIMENT TRAPS WHILE LOT PADS ARE BEING GRADED. �+ 6. SEDIMENT TRAPS AND DIVERSIONS SHALL REMAIN ACTIVE THROUGHOUT ALL PHASES OF CONSTRUCTION (REGARDLESS AREA E S C PLAN (WP 0 2 018 0 010) \ \ OF LOCATION AND MODIFICATIONS) UNTIL FULL STABILIZATION AND BUILDOUT IS COMPLETED ONSIE. ♦ 7. THE LOCATION OF THE FUTURE BIOFILTER SWM FACILITY SHALL BE ROUGH GRADED SO THAT ONCE STABILIZATION IS � g -S— S S S S ♦ COMPLETE, THE NECESSARY BIOFILTER PARAMETERS CAN BE CUT IN ACCORDING TO THE APPROVED SWM PLAN. - e. '� 8. THE BIOFILTER SHALL COINCIDE WITH THE EXISTING SEDIMENT BASIN SO THAT IT CAN FUNCTION AS AN EXTENDED PARCEL A ♦ N ~ SoR ze ° tzsx ` MARCH MOUNTAIN PROPERTIES, LLC o DETENTION FACILITY AS SHOWN ON THE APPROVED SWM PLAN. ♦ \ \ AeccD Pie CCNet i3o DB 4945 PG 413-414 PLAT ep 9. THE PROPOSED ORIFICES SHALL BE CORED INTO SEDIMENT BASIN RISER AND DEWAERING ORIFICE REMOVED SO THAT � . '� � � 6 —6 6 a— a— a— s— s � THE SEDIMENT BASIN CAN FUNCTION AS AN EXTENDED DETENTION FACILITY WITH THE BIOFILTER. ♦ 10. UPON COMPLETION OF SWM CONVERSION, THE SITE SHALL BE SEEDED AND STABILIZED FOR A FULLY FUNCTIONING ow SWM FACILITY. ♦, ` m ♦,.►- ►,_ ` \ NSPpck \ ♦ _ ' \ �DEM STREAM _ \\�\ ////STABILIZATION AND RIPRARIAN BUFFER }p \ \ _— RDBT3665 PG 606RATION E 6E ST \ •tS ; P \\ \ ' 7Y +\\ 0.0'N`SR\ UACOE TT B \ui ACOE \ WETLANDS— WETLANDS \\ REMAINING DRAINAGE AREA—Z TO SF SECTION= 1.13AC TREgM BUFF m �`F*A 1P LF OF SF=1375 1 REING BI2AINAGE AREA (DOES NOT EXCEED ALLOWAB SF T 1 1 TO SF SECTION= d 1 1 0.25 ACRES PER 100 IF' ♦ 1/ � � 1 1.13AC I m n�� 1 1 0 Oj �NO�p1nt ,. ._ oExoTEs $%6_ 1° " \ ♦ - � — R- � LF OF SF=1375 F�MOUN PPRpJP / , / ( ,uewnxSTcou9Tr Pi e A ccNe wo + 1 1 eR * DOES NOT EXCEED ALLOWABLE P6E6E6wo STEEP s �Es s �f s s s s s s �5s TPS\O m'wpOs` E �'%� 0.25 ACRES PER 100 LF) \ TIOpN APPRL(7T EN /2019 J S 1 1 ny M BUF E LOT EN ROACHMENT s s s —� s 1 .SF / I 1p �\y o I TP ` 694 oEx ET N `B•,i`, 69a SEB DRST CIXIN %tE4R4E0 STEEP SL s wl .n M►, �AIN + ®sJs; LIMITS AND DISTURBANCE (20.80 ��� / s OF N9om c 0AOTnT .n5 jp4 �t — �'�-a_� S� - i.�'�./�e✓% \ DI r-- 1 `r NT TMP055E0-01-22-00000 �°'/ / /� oor / v ���A� / �� , _gP=gig=, "" � eccuo 1 e worclo � l s s 'L\ /L� / ry _ .p,� D' PUBLIC STORM "'�• BLOCK 22 \ / / / / no O� \ -- �� DRAT A A \,, DBR2886GPG154ME55 Sg.1 Y Wo `'Ii MARCH MOUNTAIN / / \ - ♦ m ♦ , PROPERTIES, LLC / m / $ \ C9 m m n a \ / ¢ TO ST#2= / \ — DB 4954 PG 15 24 I / c10 $ \ \ \\ g I e N I I (FAA Tc=16.lmin 6fi �sy m Y I 1= v a m . II y So o 96 P qe e c rv C> IL I VIP\ \� / N � \ \ \ N\`\ ,♦ �'" . . I m\ 'm )III a TMPO 5E0-K12000 LOC ° ../ M R H OUN AIN P PE IES, LLC / TI k 2 .267 I DRAINAGE AREA /RAIiY / �1 / / PS / / / / / I I <¢ € ¢ 10.34A TO EIIISTI SB= s ¢ STOOCKKPAILE / / _� � j � DC � DC ' � � I i 1 � 1 (FAA)Tc=1 7minARE � \ n \/---� � a. , Q, ]oa — //.og a�-� // / / � � `\ �/ / sab � / / \� a, � ♦, U sr#� �I/ ........::::: I �' `�., f� D NAGE AREA / z TO ST#3= (FAAM=5.9min \ cT J / / / I IF- \VV/ � � � WASH RACK "VJR" SHALL BE UACOE----'.' WETLANDS vo,3Y / I\ m L �� > / / //, '•/ ", INSTALLED IN ACCORDANCE WITH ,' U z / C16 $� U \ \\ ?e / / / , $F / ATEMPORARV DRAIN PIT AS DEEMED NECESSARY /' s° J / � / BY ALBEMARLE COUNTY EROSION INSPECTOR .. ....... �... ............ 1 /' /\os m\ r s /�/G15\v/'\mot 6 //11 mm� �/ pp /\A1// f�.P'(10TpHi. PIV'�pd P� I �pc tNp. I / A P0X1 \ o I"r L / / i' / / , � — 6sz '6%G ' 0 0\5� / � �j DRAINA E�AREA anti boo 6ae oe€�66 as - \q5 O / / /, TO ST#1= / / / \\M / / �' fa. r . D'V \ 2.85AC / / / / t► ♦ • ! i' ... S ' ' jAA)T6=16.1min , ,♦ AN ►/ _ p cvi' ' .�Pr ~ .e l 7 c OP\-�I 'Vpoy , ... ... . . �.. / / O —REMAINING DRAINAGE AREA s — — m / / / / / / _ �i s...... i. i. r....... . TO SF SECTION= ,� a\ — - -- / �i' / M f ff'.'.'.'.'.'. - \� /// S / ' , �` far/ L' \ p / 0v 0.65AC TMP 005500-00-00-103F0 ♦ a? _ / r. LF OF SF=540 MARCH MOUNTAIN \ — _ — - / ! +• . ' DOES NOT EXCEED ALLOWABLE , `�` \ — — — /, / /, bP A / . �. ; ! we �f; s► ^ ^ .. / oa ( PROPERTIES, LLC _ GOLF COURSE � \. _ �-6eoaje' F. �/ �� i �♦ ; F�po/ s>Y'' - y ♦` �.. ', i I 0.25 ACRES PER 100 LF ,IVs� �_ � �- 6� 6iA eTz- 6]0 fibs b6a 66z ♦ � A �= loiC! � 100� � • pob`NPy ,!! � � ' DB 4964 PG 19 (PLAT) , s 6fifi fi6o / pXIM HA / / o .. . DB 4556 PG 602-609 (PLAT) 2:1 .\\ s''---,1L�� 10 i' F`po�u IN ZE-�' ..✓ ..... DB 4104 PG 701-707 (PLAT) I I 1 ,\ 6]2 s6o — r ■ REMAINING DRAINAGE . '.' '. DB 3628 PG 308-320 (PLAT) sn6 r 75STREAMBUFFERLOT ENCROACHME TO SF SECTION= """" """' $� TMP DB 2886 PG 134-155 (PLAT) � 66 1 /yam: *0 R VARIATION APPROVAL (03/06/2019 0.74AC s ► Nv-in Nor 1 " 1 I.F OF SF=1465 ... ..... ... -' 055EO-01-00-000A5 ! 1 1 2:1 ���1aX�♦ (DOES NOT EXCEED ALLOWABLE '..'. �' ♦ i ' e BLOCK DB 3971PG 300-305 1 1 /� ^ / / P\pCo 0.25 ACRES PER 100 LF) ALL SLOPES GREATER / cP tclf/' ....... �........ i THAN 3:1 MUST BE....... .N _ — STABILIZED WITH LOW PtELOPE N?....'...!.......... ...... ,r,� ..... `f, MAINTENANCE VEGETATIVE i pPPR°�Mi°N GROUND COVER OTHER i�' EI...Vol THAN GRASS / . '. '. '. '... : : / �♦ — 100-Y_FL�OD�IJ.�,� �. ,�— - ►. . -...................................,' ... ... ... .............................., >�,!� _ — .1 _ i ........................y...............y . 1 I \ 1 \1 ............................. r;'t....................................... z: i-- TMP 055E0-01-00 000A3 1 \1 r..... .. 00 1\ \ . r•. ♦ ... BLOCKS 24, 33, AND 34040 7 i! f MARCH MOUNTAIN cST `\ / / I A.... ,.. _... "�✓ ' %�- — — — — —� . — ii. DB 30973 PG 34-139 00, yam. �,� ''0010\ \It 1\ L� m r U 7 w p w U -° O Z zaN Ol0 02 J I-m <aw U Q T J = OU ¢U m dZ =w a o Ow � 0 O OQ 2a J Z v IE ZCE n �rwl w, N W C'3 n > No v d W N V N W Q Z J > O a w w = U v J o J } rn > =Zw Oaz o) •, 04 o w Ua m= rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE 1'=60' AyTH Op pr�� U 9-7 Jimmy L. Taggart Lic2. No. 4 A'Ao OSZ 214121 'Cs'810NAL B�Gl O O O L ry1 r 00 zo W LU z w w d- q Q Qz_j()> W z � a-D JUo WQQOO - W (� �z�m� w w �J m z oz0 �0 w Ir 06 FILE NUMBER 8053 SHEET 02 OF 14 _j Q:\RGA\TMPROJ\8053-OLD TRAIL\Block 32\ENGINEERING\DWG\8053-OLD TRAIL- Block 32 - WPO.dwa r UACOE WETLANDS _ J rREAM BU F 1-ViIATIpNgp RLOTEny. FR `1 (03= 9ME-ALL SLOPES GREATER THAN 3:1 MUST BE eno STABILIZED WITH LOW DENOTES MAINTENANCE VEGETATIVE - ALBEMARLE COUNTY 1 •♦. n -` GROUND COVER OTHER PRESERVED STEEP SLOPES THAN GRASS (TYP) PROPOSED FENCE ♦` �p ��'_ TIP 00 1 -,MOWN OF LAND DISTURBANCE I , " 40 0 40 80 USING 116 VA DEQ DESIGN SPECIFICATION NO.9: / BIORETENTION LEVEL 2 DESIGN STORAGE DEPTH = 1.65 FT SCALE: 1"=40' LEGEND SITE AREA TO BIOFILTER = 156,380 SF = 3.59 ACRES MANAGED TURF = 1.57 ACRES STEEP SLOPES (PRESERVED) " IMPERVIOUS COVER = 2.02 ACRES Rv (FROM VRRM SPREADSHEET) = 0.6 Tv = 1.Oin Rv AREA 12 = 7,819.02 CF ---- BIOFILTER SURFACE AREA REQUIRED = (1.25*Tv)/1.65 FT = 5,923.50 SQ.FT 100YR FLOODPLAIN BIOFILTER SURFACE AREA PROVIDED = 6,465 SQ.-FT " \ pc �o2 1 \ n o µ p9 " v D ^�� �h Pippe AeccNetwor RIPRAP FOR ENERGY 75' STFFEgM BUFFER LOT s s s s s—DISSIPATION s s s w, p VARIATION ENCROACHMENT \ \ p _ 1L (03/06/2019) BIOFILTER PRE-TREATMENT CELL: TIP�-r 16' x 24'x 3' STONE CHECK \ DAM c3UFFER BIOFILTER GRAVEL DIAPHRAGM \ �� o _ a o \ Boa �JI / 120 \ ao Pry _ 0.80 ACRES / rv' \ D, "/ '� PI 1 n�_ 00 M�_j5[ /� /� bPipe (AeccNetwork S�bPi N ork13=N a0 7r/ 00 / aQ ` r ■ L 27' PUBLIC STORM d" m 0�, - _ _ _ ='_!PL X D Lf X / r / �'� UNDERDRAIN C ANOU DRAINAGE EASEMENT E / tl X I \ \ DB 2886 PG 134-155 sO mw� • BIOFILTER _ DU LE � � " � LE TS a I I \ „\ I� ` , BIOFILTER: 6,465 SF a' I - 20' ON CENTER _ \ i GARAGE GARAGE GARAGE GARAGE ' r ' I / / �� \ \ \\\ — — PROVIDED AT ELEVATION p O- - " I GAR,�GE GAGE I D "'"�-' — ���• 656. FILTER MEDIA 36" ^ 0) U PROPOSED y y y BIOFILTER I I 1 "� "• •��'� OUTLET FOR e _.c 5 —Js s s \ �-�� _ ' + J �-'` I / `•� •\ �� \ UNDERDRAINS a II , ---- --- — --- ---- - --- --------- 1 I ' /� �% •� \ w z 4f gl �0. . vq l O IP II I I \ '7\ 1 W � I I v / I WCN 1/ chi- = a \\ I I LL - C / I L y d I OD I . I J " �. P. - 1 NEW V/W SWM I EASEMENT Of M +, N. EXTENDED DETENTION ,. \ \ \ \ I\ BUFFER ZONE (HATCHED)' �� ♦� �' Qw'�".. p'..'.'.'..'.'.'. . PRACTICES TO BE USED IN GENERAL \\- L'W \ r U ^ I \ •I•�• �.a� o.P k'.'...'.'...'.'.'. T HOVER THE PROJECT j 1 \ 1 H �_ �q \ 1 �\� I ma N CID vm Ps .... �. + \� ,r h ........ . �s. .. .......... I- Di I � I \\ , EMERGENCY SPILLWAY C, + / l • r ••� AWASH RACK ("WR") SHALL BE ��• I INSTALLED IN ACCORDANCE WITH / / THE CONSTRUCTION ENTRANCE AND SLOPE TO A TEMPORARY DRAIN PIT AS DEEMED NECESSARY 00 BY ALBEMARLE COUNTY EROSION INSPECTOR f I ' Go 000 00, 00, I — 00 000 '00 00 1100000 1 --- / f/ 1 \ — i / ' / / / // / /-��'-r-�—�i/ • • I �....................................... A ' ' ♦ / A N J �p�\ i / I .. .. .. .. ....ati... .. .. ... ....•.. .. ... ... ... ... ... .'��` l P��J 1 w . pp 1 — / / / / / ♦ �� ........ ............................................ .�............................. / .00,- CX • O s ♦ / i _ • _ . �•• _ _,,, k tl p 1 -- - ice/ %"n��.. •��•• . _�,I� .. / C1>p y I / (j _ w ������• NI BUFFER LOT EN / / yo` ��'. / ww� T k o f _ 000l �.._. .. (3/06/ OHMENT' _ t , Q a� 1 x �X: / �• 1 ALL SLOPES GREATER- CROA _ / TMP p i5'SAREA >o — p 9 0 19 .= / •• �..�,�.�.',. ... .' '... ....' ... / l 055E0-01-00-000A5 o M -�:-�L �^ • I THAN 3:1 MUST BE / �- i ✓ - - BLOCK 25 1 N I ■■ STABILIZED WITH LOW c\ •/ GROUND COVER OTHERIVE �VOOp'�i� �� �� DB 3971 PG 300-305MAINTENANCE 1 / SLABTOWN BRANCH �f' THAN GRASS NOD.i�• ,-�- I I00 IIP CL a N\ N N Q M N I I LO N N r / / / / N m r U 7 w p w U d-° O Z z U) O(0 2 tf)J I —a) Maw U a T J = OU m ¢� D_ Z = w a 0 O� wo 0 Ma o IE J v U 2 ZO n w, N w O Ir�,,yl n 0 i No v D_ w N W a z > 0 va w a J } V > _ ❑ Oaz W ., 04 ° o w U a rn= rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE 1'=40' TH Op pr�� Jimmy L. Taggart Lic2. No. ar A'16 0 214121 ��rs'4IONAL Sl of r r O O O 00 z T wrN W a C\2 2O� z o Q i Q J N > a. z � a-J U o E- Lu LuOQ0WO m� o 0 O fr m (2) O z 0 a w O U) Ir 06 FILE NUMBER 8053 SHEET 03 OF 14 __j Q:\RGA\TMPROJ\8053-OLD TRAIL\Block 32\ENGINEERING\DWG\8053-OLD TRAIL- Block 32 - \NPO.dwa Q:\RGA\TMPROJ\8053-OLD TRAIL\Block 32XENGINEERINGDWGN8053-OLD TRAIL- Block 32 - WPO.dwa Q:\RGA\TMPROJ\8053-OLD TRAIL\Block 32\ENGINEERINGDWG\8053-OLD TRAIL- Block 32 - WPO.dwa rr - ♦ r 100 0 100 200 30 , SCALE: 1 `100' LEGEND 1II'll'll'llI J DRAINAGE AREA FROM APPROVED SWM MASTER PLAN (WP0201600009) ■ENLjmmmLjm PROPOSED DRAINAGEAREA STEEP SLOPES (PRESERVED) JII " 1 � ♦ `, �� r2;> 100YR-FLOODPLAIN 1 e " J 1100' WPO F y'\ pew • h..:: . � / \ 1 � ` PO -DEVELOPMENT 'A\ N w\ DRAINAGE AREA TO BIOFILTER S-13: 3.61 ACRES \I p IMPERVIOUS AREA: 2.02 ACRES'N \1 u (FAA)Tc = 14.5min p u' - CN = 8 I—\ II JI IN I 'oil q D GEBLOC 4, -e � 4t � lu I I I I l l'� 1. � •may �� �i ■ /i I j ,/� I �� PI / / TI - ■ / I I I , \ .� \ ` i / i \ • _ i ' PO T-DEVELOPMENT !,I. / I I \ JI I J \J , \J\ I� \ IJ 1/ / J / i � _� �,�� � ,♦ DRAINAGE AREA TO I EXTENDED DETENTION: 6.77 ACRES / =I FROM MASTER SWM PLAN MM201600009) — - - - - ' - -� IMPERVIOUS AREA: 2.98 ACRES LIMITS OF APPROVED DRAINAGE FOR 13MP S 13 �— PPaox;o ``" (FAA)Tc = 14.3 min i �aoPla"z" I I W F�o , FROM APPROVED MASTER SWM PLAN (WPO 201600009) DRAINAGE NARRATIVE: THE PROPOSED POST -DEVELOPMENT DRAINAGE AREA TO S-13 IS 3.61 ACRES AND THE POST -DEVELOPMENT DRAINAGE AREA TO EXTENDED DETENTION POND IS 6.77 ACRES. THE APPROVED POST -DEVELOPMENT DRAINAGE AREA TO S-13 FROM THE MASTER SWM PLAN WP0201600009 IS 9.68 ACRES. THE DIFFERENCE IS ATTRIBUTED TO THE CHANGE OF THE LOT LAYOUT AND THE FEASIBILITY OF CONSTRUCTING A STORM NETWORK THAT WORKS WITH THE PROPOSED SITE AND ROAD GRADING. THE LAYOUT ALLOWS FOR MORE DRAINAGE TO BE ALLOCATED TO THE S-13 FACILITY AND LESS TO THE S-1 FACILITY, WHICH DIFFERS FROM THE PRELIMINARY DESIGN FROM THE SWM MASTER PLAN. S-13 SUMMARY: PRE -DEVELOPMENT: TOTAL DRAINAGE AREA = 11.86 ACRES APPROXIMATE IMPERVIOUS AREA = 0.00 ACRES POST -DEVELOPMENT: TOTAL DRAINAGE AREA = 9.68 ACRES APPROXIMATE IMPERVIOUS AREA = 6.29 ACRES BMP SIZING: REQUIRED AREA = 6,852 S.F. PROVIDED AREA = 6,854 S.F. WATER QUALITY TREATMENT: POST -DEVELOPMENT POLLUTANT LOAD = 14.01 (LBS-TPNR) POLLUTANT REMOVAL EFFICIENCY = 50% TOTAL ESTIMATED POLLUTANT REMOVAL = 7.01 (LBS-TP/YR) HYDROLOGIC SUMMARY: 2-YEAR 10-YEAR 100-YEAR CFS CFS CFS PRE -DEVELOPMENT 9.28 27.36 71.94 POST-DEVELOPMENT(UNROUTED) 13.79 28.48 58.47 POST-DEVELOPMENT(ROUTED) 1.75 26.15 58.86 ROUTED PEAK ELEVATIONS: 2-YEAR 10-YEAR 100-YEAR FT FT FT POST -DEVELOPMENT 641.77 642.75 644.03 �I r U 7 w p w ^ �o U -° O N O Z Z Oro �Y� � J Ha) maw U Q T J = ILL m aU =W Ir IM o D 0 55 w J 0 OQ 2, J Z v U z� � ¢_ , a) N W(5 x cn n a_ o o w N w Q Z > O va w a J >- V > =Zw OaZ ., 04 S 0 w �Q rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE AyTH Op pr�� Jimmy L. Taggart Lic. No. 4 Ado ToOS4121 ��"`s'470NAL B�Gl o o a o 00 zo z �Ow z (5 (3 Q Q Q J N> z z J c� ; z _j>yz JUOo a Ir LuJ 0° W Q��mQ Q �00 m OC (� J J a Oz0 Q O O Ir o w 06 FILE NUMBER 8053 SHEET 06 OF 14 __j Q:\RGA\TM PROJ\8053-OI IL\BIock 32\ENGINEERINGIDWG\8053-OLD TRAIL- Block 32 - WPO.dwa FA PRIOR TO CONSTRUCTION 1. OWNER SHALL POST SURETY BONDS FOR CONSTRUCTION, EROSION & SEDIMENT CONTROL. 2. CONTRACTOR SHALL OBTAIN PERMITS TO WORK WITHIN STATE RIGHT-OF-WAY VDOT LAND -USE PERMIT). BONDING FOR WORK WITHIN THE VDOT RIGHT-OF-WAY MAY BE REQUIRED TO OBTAIN THE PERMIT. 3. CONTRACTOR SHALL COORDINATE WITH OWNER TO OBTAIN VSMP PERMITS, AS REQUIRED BY THE STATE DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ). 4. CONTRACTOR SHALL OBTAIN LAND DISTURBANCE PERMIT FROM THE COUNTY OF ALBEMARLE PRIOR TO BEGINNING CONSTRUCTION. 5. A PRE -CONSTRUCTION MEETING WITH THE ENGINEER, THE CERTIFIED LAND DISTURBER AND THE ENVIRONMENTAL INSPECTOR MAY ALSO BE REQUIRED. ALLOW 72 HOURS FOR COORDINATION AND SCHEDULING OF PRE -CONSTRUCTION MEETING. PROJECT DESCRIPTION THIS PROJECT PROPOSES TO PROVIDE SWIM FOR THE DEVELOPEMENT OF BLOCK 32 IN OLD TRAIL VILLAGE. THE EXCESS DIRT WILL BE STOCKPILED ON THE WEST SECTION OF THE DEVELOPMENT. GRADING INVOLVED WITH THIS PLAN WILL COINCIDE WITH FINAL SITE PLAN GRADES. LIMITS OF DISTURBANCE WILL INCLUDE APPROX. 20.80 ACRES. EXISTING SITE CONDITIONS THE CURRENT CONDITONS OF BLOCK 32 CONSISTS OF MODERATE TREE COVER WITH VIRGIN SOL TERRAIN WHICH IS BOUNDED BY STREAMS TO THE NORTH AND SOUTH OF THE PROPERTY. ADJACENT AREAS THE SOUTHERN ADJACENT AREAS CONSISTS OF MULTI -FAMILY DEVELOPMENTS OF BLOCKS 19, 24, 25, AND 33 OF OLD TRAIL VILLAGE. TO THE NORTH OF THE PROJECT CONSISTS OF BLOCK 22 AND DENSTOCK APARTMENTS. OLD TRAIL DRIVE RUNS ALONG THE EASTERN SIDE OF THE DEVELOPMENT. OFF -SITE AREAS ALL EXCESS MATERIAL GENERATED AS PART OF THIS PROJECT SHALL BE HAULED TO A LOCATION WITHIN THE OLD TRAIL DEVELOPMENT THAT HAS BEEN APPROVED BY THE COUNTY OF ALBEMARLE COMMUNITY DEVELOPMENT DEPARTMENT. SOILS 36C--HAYESVILLE LOAM. (7% TO 15% SLOPES) DEEP, MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM, CLAY, SANDY CLAY LOAM, AND FINE SANDY LOAM.PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS SLIGHT. 26C3 -DYKE CLAY LOAM. SEVERELY ERODED. (7% TO 15% SLOPE) DEEP, MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF CLAY LOAM, CLAY, AND GRAVELLY CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH TO HIGH. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS SLIGHT. 37D3 - HAYESVILLE CLAY LOAM, SEVERELY ERODED. (15% TO 25% SLOPES) SOIL IS DEEP, STRONGLY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF CLAY LOAM, CLAY, SANDY CLAY LOAM, AND FINE SANDY LOAM. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. SURFACE RUNOFF IS HIGH. HAZARD OF EROSION IS MODERATE. 4E - ASHE LOAM. (25% TO 45% SLOPES) DEEP, STRONGLY SLOPING AND SOMEWHAT EXCESSIVELY DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM SOIL LAYERS CONSIST OF LOAM SANDY LOAM AND BEDROCK PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS LOW. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS MODERATE 25B - DYKE SILT LOAM, 2% TO 7% SLOPES DEEP, NEARLY LEVEL AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF SILT LOAM, CLAY, AND GRAVELLY CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH TO HIGH. HAZARD OF EROSION IS SLIGHT. 7B - BRADDOCK LOAM, (2% TO 7% SLOPES) DEEP NEARLY LEVEL AND WELL DRAINED. STARTING AT SURFACE LAYER TO SUBSTRATUM SOIL LAYERS CONSIST OF LOAM AND CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. HAZARD OF EROSION IS SLIGHT. 77 - RIVERVIEW-CHEWACLA COMPLEX, I TO 2% SLOPES) DEEP, NEARLY LEVEL WELL DRAINED SOILS ON FLOODPLAINS. STARTING AT SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM AND SILT LOAM OR SILT CLAY LOAM. PERMEABILITY IS HIGH WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. OCCASIONAL FREQUENCY OF FLOODING. HAZARD OF EROSION IS SLIGHT. CRITICAL AREAS A. WETLANDS AND STREAM CROSSINGS B. STEEP SLOPES THE CONSTRUCTION OF THE MASS GRADE AREAS WILL DISTURB CRITICAL SLOPE AREAS, WHICH IS SHOWN ON THE OLD TRAIL ZMA. PERMANENT SEEDING AND MATTING SHALL BE USED STABILIZE ALL SLOPES STEEPER THAN 3H:1 V STRUCTURAL PRACTICES 1. SAFETY FENCE 3.01) - A TEMPORARY SAFETY FENCE SHALL BE CONSTRUCTED WHERE DEEMED NECESSARY DURING CONSTRUCTION TO PROTECT THE MANHOLES AND SANITARY LINE FROM CONSTRUCTION TRAFFIC. 2. TEMPORARY CONSTRUCTION ENTRANCE 3.02 - A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT SITE ENTRANCE OFF OF OLD TRAIL DRIVE. 3. ROAD STABILIZATION (3.03) - ACCESS ROADS, PARKING AREAS, AND OTHER ON -SITE VEHICLE TRANSPORTATION ROUTES SHALL BE STABILIZED WITH STONE IMMEDIATELY AFTER GRADING. 4. SILT FENCE BARRIER (3.051 - SILT FENCE BARRIERS WILL BE INSTALLED TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN. 5. SUPER SILT FENCE BARRIER - WIRE -REINFORCED SILT FENCE BARRIER WILL BE INSTALLED TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN. VEGETATIVE PRACTICES 1. SURFACE ROUGHENING (3.29) - ALL AREAS WITH A GRADE STEEPER THAN 3:1 SHALL BE STAIR -STEP GRADED OR GROOVED PLATE 3 29-4 TO AID IN GRASS ESTABLISHMENT, INCREASE INFILTRATION, AND TO SLOW RUNOFF VELOCITIES. 2. TOPSOILING & STOCKPILING (3.30Z - TOPSOIL WILL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILES ARE TO BE STABILIZED WITH TEMPORARY VEGETATION OR TO HAVE SILT FENCE INSTALLED ALONG THE LOWER PERIMETER TO PROTECT DOWNSTREAM AREAS. 3. TEMPORARY SEEDING (3.31) - AREAS NOT BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 14 DAYS SHALL BE STABILIZED WITH A TEMPORARY SEED MIXTURE ACCEPTABLE FOR THAT TIME OF YEAR. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. 4. PERMANENT SEEDING (3.= - AREAS BROUGHT TO FINAL GRADE OR THOSE CONSTRUCTION AREAS THAT WILL REMAIN DORMANT FOR YEAR OR MORE SHALL BE STABILIZED WITH A PERMANENT SEED MIXTURE ACCEPTABLE TO THAT TIME OF YEAR. PREPARE SURFACE WITH APPROVED TREATMENT AND ADDITIVES PRIOR TO APPLYING SEED. 5. MULCH {3.35Z - PLANT RESIDUES OR OTHER SUITABLE MATERIALS SHALL BE APPLIED TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE OVERLAND FLOW VELOCITIES. THIS PRACTICE SHOULD BE APPLIED TO ALL SEEDING OPERATIONS, OTHER PLANTER MATERIALS WHICH DO NOT PROVIDE ADEQUATE SOIL PROTECTION BY THEMSELVES, AND BARE AREAS WHICH hL CANNOT BE SEEDED DUE TO THE SEASON BUT WHICH STILL NEED PROTECTION TO PREVENT SOIL LOSS. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. 6. EROSION CONTROL BLANKETS (3.36) - EROSION CONTROL BLANKETS IN CONJUNCTION WITH PERMANENT SEEDING WILL BE INSTALLED ON ALL SLOPES STEEPER THAN 3:1 FOLLOWING GRADING. EROSION CONTROL BLANKETS WILL ALSO BE INSTALLED IN DITCHES WHERE POTENTIAL EROSIVE VELOCITIES MAY EXIST AS DETERMINED BY ENGINEERING CALCULATIONS. THIS WILL PROTECT FROM RILL AND GULLY EROSION. 7. TREE PROTECTION 3.38)- THE TREE FENCE BARRIER WILL BE INSTALLED TO PROTECT THE TREES OUTSIDE OF THE LIMITS OF DISTURBANCE AS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN. 8. DUST CONTROL (3.39) - DUST CONTROL METHODS MUST BE USED TO REDUCE THE AMOUNT OF AIRBORNE DUST DURING ALL PHASES OF CONSTRUCTION WHERE SOIL IS EXPOSED OR DISTURBED. MANAGEMENT STRATEGIES 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BE SEQUENCED, AND ALSO BEGIN AND END AS QUICKLY AS POSSIBLE. 2. THE CONSTRUCTION ENTRANCE AND PERIMETER EROSION CONTROL MEASURES SUCH AS TREE PROTECTION AND SILT FENCE SHALL BE INSTALLED AS THE FIRST STEP OF DISTURBANCE. 3. SEDIMENT BASIN MEASURES SHALL BE INSTALLED WITH PERIMETER SILT FENCE PRIOR TO ANY GRADING AND SHALL BE SEEDED AND MULCHED IMMEDIATELY FOLLOWING INSTALLATION. 4. THE SEDIMENT BASIN SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE REMOVED WHEN IT REACHES ONE-HALF OF THE DESIGN VOLUME OF THE WET STORAGE. 5. TEMPORARY SEEDING OR OTHER STABILIZATION METHODS, SUCH AS BASE AGGREGATE WILL FOLLOW IMMEDIATELY AFTER REACHING FINAL GRADES. 6. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS NEEDED TO ESTABLISH GROWTH.. 7. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. 8. DURING FINE GRADING OPERATIONS, MAINTAIN ALL DIVERSION DITCHES TO THE SEDIMENT TRAPS. THE SEDIMENT TRAPS SHALL REMAIN FUNCTIONAL THROUGHOUT INSTALLATION OF THE STORM SEWER INLETS, PIPES,OUTFALLS. 9. INSTALL SILT FENCE INLET PROTECTION TRAPPING MEASURES AT EACH INLET LOCATION WITHIN THE DITCH WHERE APPLICABLE. 10. WHILE THE SEDIMENT BASIN REMAINS FUNCTIONAL FOR THE DISTURBED AREA, INSTALL THE PERMANENT EXTENDED DETENTION PONDS AND OUTLET PROTECTION MEASURES PER THE SPECIFICATIONS. 11. AFTER BEING NOTIFIED BY THE EROSION AND SEDIMENT CONTROL ADMINISTRATOR, THE TEMPORARY EROSION AND SEDIMENT CONTROLS CAN BE CLEANED UP OR REMOVED, AND THE SEDIMENT TRAPS CAN BE FILLED IN AND SEEDED, THEREBY REDIRECTING DRAINAGE TO THE PERMANENT FACILITIES. 12. THE STORMWATER MANAGEMENT FACILITIES SHOULD BE CHECKED REGULARLY BY THE HOMEOWNERS ASSOCIATIONS TO ENSURE THAT THEY ARE STRUCTURALLY SOUND AND HAVE NOT BEEN DAMAGED BY EROSION. THE EMERGENCY SPILLWAY SHALL BE CHECKED REGULARLY TO ENSURE THAT ITS LINING IS WELL ESTABLISHED AND EROSION RESISTANT. GRASS SHALL BE KEPT MOWN BELOW A HEIGHT OF 15" AND THE OUTLET SHOULD BE CHECKED FOR CLOGGING. THE DAM SECTION SHALL BE KEPT FREE OF SAPLINGS OR TREES.(REFER TO THE ADDITIONAL MAINTENANCE SPECIFICATIONS) PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH STRAW & SEED IMMEDIATELY FOLLOWING FINISHED GRADE. SEEDING SHALL BE DONE WITH KENTUCKY 31 TALL FESCUE IN ACCORDANCE TO STANDARD AND SPECIFICATION 3.32, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. ANY FERTILIZER AND LIME APPLICATIONS SHALL BE IN ACCORDANCE WITH SOIL TEST RESULTS. ALL SEEDED AREAS WILL BE STRAW MULCHED TO PROTECT AGAINST RILL EROSION AND TO PRESERVE SOIL MOISTURE THAT WILL ENHANCE SEED GERMINATION. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. EROSION CONTROL MAINTENANCE 1. IN GENERAL ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR: 2. THE CONSTRUCTION ENTRANCE SHALL BE CHECKED DAILY FOR SOIL BUILDUP. IF THE ENTRANCE BECOMES CLOGGED WITH SOIL AND FAILS TO PREVENT THE TRANSPORTATION OF SOIL ONTO THE ROADWAY, ADDITIONAL STONE, REPLACEMENT OF STONE, OR A WASH -RACK MAY BE REQUIRED. 3. SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED, AND SEEDED. 4. DIVERSION DIKES SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS MADE TO THE DIKE, FLOW CHANNEL, OUTLET, OR SEDIMENT TRAPPING FACILITY AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING DAY. 5. STORMWATER CONVEYANCE CHANNELS (WHERE APPLICABLE): 5.1. GRASS LINED CHANNELS - DURING THE INITIAL ESTABLISHMENT, GRASS LINED CHANNELS SHOULD BE REPAIRED IMMEDIATELY AND RE-ESTABLISHED IF NECESSARY. AFTER GRASS HAS BECOME ESTABLISHED, THE CHANNEL SHOULD BE CHECKED PERIODICALLY TO DETERMINE IF THE GRASS IS WITHSTANDING FLOW VELOCITIES WITHOUT DAMAGE. IF THE CHANNEL IS TO BE MOWED, IT SHOULD BE DONE IN A MANNER THAT IT WILL NOT DAMAGE THE GRASS. 5.2. RIPRAP-LINED CHANNELS - RIPRAP LINED CHANNELS SHOULD BE CHECKED PERIODICALLY TO ENSURE THE SCOUR IS NOT OCCURRING BENEATH FABRIC UNDERLINING OF THE RIPRAP LAYER. THE CHANNEL SHOULD ALSO BE CHECKED TO DETERMINE THE STONES ARE NOT DISLODGED BY LARGE FLOWS. 5.3. IF SEDIMENT IS DEPOSITED IN A GRASS -LINED CHANNEL, IT SHOULD BE REMOVED PROMPTLY TO PREVENT DAMAGE TO THE GRASS. SEDIMENT DEPOSITED IN A RIPRAP CHANNEL SHOULD BE REMOVED WHEN IT REDUCES THE CAPACITY OF THE CHANNEL. 6. CHECK DAMS SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE REMOVED WHEN IT REACHES ONE-HALF OF THE ORIGINAL HEIGHT OF THE MEASURE. REGULAR INSPECTIONS SHALL BE MADE TO INSURE THE CENTER OF EACH DAM IS LOWER THAN THE EDGES. EROSION CAUSED BY HIGH FLOWS AROUND THE EDGES OF THE DAM SHOULD BE CORRECTED IMMEDIATELY. 7. THE EARTHEN EMBANKMENTS SHALL BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. 8. THE STORMWATER MANAGEMENT FACILITIES SHOULD BE CHECKED REGULARLY BY THE HOMEOWNERS ASSOCIATIONS TO ENSURE THAT THEY ARE STRUCTURALLY SOUND AND HAVE NOT BEEN DAMAGED BY EROSION. 9. THE EMERGENCY SPILLWAY SHALL BE CHECKED REGULARLY TO ENSURE THAT ITS LINING IS WELL ESTABLISHED AND EROSION RESISTANT. GRASS SHALL BE KEPT MOWN BELOW A HEIGHT OF 15" AND THE OUTLET SHOULD BE CHECKED FOR CLOGGING. 10. THE DAM SECTION SHALL BE KEPT FREE OF SAPLINGS OR TREES.(REFER TO THE ADDITIONAL MAINTENANCE SPECIFICATIONS) 11. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS NEEDED. IN THE EVENT THAT THE APPLIED SEEDING FAILS TO TAKE HOLD, BLANKET MATTING SHALL BE PLACED IN APPROPRIATE AREAS DEEMED NECESSARY BY THE ENGINEER OR EROSION CONTROL INSPECTOR. SEQUENCE OF CONSTRUCTION 1. EXISTING CONDITIONS SHOWN ON SHEET 2 WILL BE USED AS PHASE 1 EROSION CONTROL PLAN AND IS TAKEN FROM APPROVED AMENDMENT TO BORROW AREA ESC PLAN (WPO20180010). FOR EXECUTION OF PHASE 2 OF ESC SHOWN ON SHEET 3, CONTRACTOR SHALL COORDINATE A PRE -CONSTRUCTION MEETING AFTER OBTAINING ALL PERMITS, ALLOWING 72 HOURS FOR ITS COORDINATION. 2. CONTRACTOR SHALL VERIFY ROUGH GRADES FROM MASS GRADING PLAN AND VERIFY ALL EROSION CONTROL MEASURES ARE INSTALLED PROPERLY AND FUNCTIONING PRIOR TO INSTALLATION OF UTILITIES. 3. BUILDER LOT PADS ARE PROJECTED TO START ON THE SOUTHEASTERN MOST PART OF THE SITE AND DRAINAGE SHALL BE DIVERTED TO EXISTING SEDIMENT TRAP #1 AND SEDIMENT BASIN AS DEEMED NECESSARY. 4. DRAINAGE MAY DIFFER ONSITE FROM PROJECTED CONSTRUCTION AREAS AND CONTRACTOR SHALL NOTIFY ENGINEER OF RECORD FOR ANY NECESSARY ALTERATIONS FROM THE APPROVED PLAN PRIOR TO TAKING ACTION. 5. NO MORE THAN 3 ACRES OF ONSITE DRAINAGE SHALL GO TO ANY SEDIMENT TRAP DURING PHASE 1 OF CONSTRUCTION AND DIVERGENCE TO SEDIMENT BASIN SHALL BE USED TO RELIEVE TRAPS IF NECESSARY. 6. CONTRACTOR SHALL WORK WITH EROSION CONTROL INSPECTOR ONSITE FOR ACCEPTABLE METHODS OF ADDRESSING SITE RUNOFF AND CLOSURE/MODIFICATIONS OF LOCATIONS TO SEDIMENT TRAPS WHILE LOT PADS ARE BEING GRADED. 7. SEDIMENT TRAPS AND DIVERSIONS SHALL REMAIN ACTIVE THROUGHOUT ALL PHASES OF CONSTRUCTION (REGARDLESS OF LOCATION AND MODIFICATIONS) UNTIL FULL STABILIZATION AND BUILDOUT IS COMPLETED ONSITE. 8. THE LOCATION OF THE FUTURE BIOFILTER SWIM FACILITY SHALL BE ROUGH GRADED SO THAT ONCE STABILIZATION IS COMPLETE, THE NECESSARY BIOFILTER PARAMETERS CAN BE CUT IN ACCORDING TO THE APPROVED SWIM PLAN. 9. THE BIOFILTER SHALL COINCIDE WITH THE EXISTING SEDIMENT BASIN SO THAT IT CAN FUNCTION AS AN EXTENDED DETENTION FACILITY AS SHOWN ON THE APPROVED SWM PLAN. 10. THE PROPOSED ORIFICES SHALL BE CORED INTO SEDIMENT BASIN RISER AND DEWATERING ORIFICE REMOVED SO THAT THE SEDIMENT BASIN CAN FUNCTION AS AN EXTENDED DETENTION FACILITY WITH THE BIOFILTER. 10. UPON COMPLETION OF SWIM CONVERSION, THE SITE SHALL BE SEEDED AND STABILIZED FOR A FULLY FUNCTIONING SWM FACILITY. 11. SHOULD THE TEMPORARY CONSTRUCTION ENTRANCE OFF OF OLD TRAIL DRIVE NOT BE MAINTAINED PROPERLY OR AN EXCESSIVE AMOUNT OF SOIL FOUND TRACKED ONTO THE PUBLIC ROADWAY THEN A PAVED CONSTRUCTION ENTRANCE, WATER TANKER TRUCK WITH TWO (2) PRESSURE WASHERS AND A SETTLING AREA MAY BE REQUIRED BY THE EROSION AND SEDIMENT CONTROL PROGRAM ADMINISTRATOR. 12. STOCKPILE TOPSOIL WITHIN AN AREA ON THE PROPERTY OWNED BY OLD TRAIL AT A LOCATION APPROVED BY ALBEMARLE COUNTY COMMUNITY DEVELOPMENT. INSTALL SILT FENCE AT THE PERIMETER OF STOCKPILES . 13. DENUDED AREAS SHALL DRAIN TO AN APPROVED EROSION CONTROL MEASURE AT ALL TIMES DURING CONSTRUCTION. 14. CONTRACTOR SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE ABLEMARLE COUNTY SERVICE AUTHORITY, PRIOR TO MAKING THE SEWER SYSTEM OPERATIONAL. 15. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 16. LIME, FERTILIZE AND APPLY TEMPORARY OR PERMANENT SEEDING TO ALL DENUDED AREAS IMMEDIATELY AFTER ACHIEVING FINAL GRADES. 17. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL RECEIVE STABILIZATION WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT REQUIRE MOWING. 18. AFTER SITE IS STABILIZED AND PERMISSION IS OBTAINED FROM THE EROSION CONTROL INSPECTOR, REMOVE SILT FENCING AND OTHER REMAINING EROSION CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. CONTRACTOR SHALL ESTABLISH A STABILIZED SITE, AND NOT ALLOW ANY SEDIMENT TO EXIT THE PROJECT LIMITS. 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. CONTRACTOR TO PROTECT STOCKPILE AREAS WITH SILT FENCE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. CONTRACTOR SHALL ESTABLISH A VEGETATIVE COVER ON ALL DENUDED AREAS. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. CONTRACTOR SHALL ESTABLISH THE PERIMETER CONTROLS OF SUPER SILT FENCE AS THE FIRST STEP OF THE LANDS DISTURBANCE FOR THIS PROJECT. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AFTER EACH RAINFALL EVENT. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. THERE ARE NO SEDIMENT TRAPS OR BASINS PROPOSED. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL AT A MINIMUM MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.THERE ARE NO PROPOSED CUT OR FILL SLOPES. HOWEVER, THE CONTRACTOR IS TO RESTORE THE PROJECT AREA TO EXISTING GRADE. IF THE AREAS WITH NATURALLY STEEP SLOPES ARE FOUND TO BE ERODING EXCESSIVELY AFTER ONE YEAR, CONTRACTOR IS TO PROVIDE ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.MAXIMIZE SHEETFLOW AND GROUNDWATER INFILTRATION 9. WHENEVER WATER SEEPS FROM A SLOPE FACE ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.CONTRACTOR TO NOTIFY ENGINEER AND COUNTY EROSION CONTROL INSPECTOR. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.THERE ARE NO STORM SEWER INLETS PROPOSED. 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.THERE ARE NO STORMWATER CONVEYANCE CHANNELS OR PIPES PROPOSED. 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NON -ERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NON -ERODIBLE COVER MATERIALS.CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON -ERODIBLE MATERIAL SHALL BE PROVIDED. CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.CONTRACTOR SHALL FOLLOW FOLLOW ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. CON TRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER. F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.CONTRACTOR TO ADHERE TO THE APPLICABLE STANDARD FOR PRIVATE AND PUBLIC UTILITY INSTALLATION. 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.CONTRACTOR SHALL MAKE PROVISIONS TO KEEP ADJACENT ROADS CLEAN FROM SOIL BUILD-UP. 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDI MEN TATION.CONTRACTOR SHALL STABILIZE SITE AND OBTAIN INSPECTOR APPROVAL PRIOR TO REMOVING EC MEASURES. UPON APPROVAL OF THE ENVIRONMENTAL INSPECTOR, INSTALL INFILTRATION AREAS AND CONNECT ROOF DRAINS. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:THIS PROJECT DOES NOT INCLUDE ANY ADDITIONAL IMPERVIOUS SURFACES AND THE PROJECT AREA WILL BE RESTORED TO ITS EXISTING CONIDTIONS. THEREFORE WILL NOT PRODUCE ANY ADDITIONAL STORMWATER RUNOFF. A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED USING THE VSMP CHANNEL PROTECTION CRITERIA. STORMWATER DISCHARGES ARE CLASSIFIED INTO ONE OF THREE TYPES OF CHANNEL. (1) "MANMADE STORMWATER CONVEYANCE SYSTEM" MEANS A PIPE, DITCH, VEGETATED SWALE, OR OTHER STORMWATER CONVEYANCE SYSTEM CONSTRUCTED BY MAN EXCEPT FOR RESTORED STORMWATER CONVEYANCE SYSTEMS OR, (A)THE MANMADE STORMWATER CONVEYANCE SYSTEM SHALL CONVEY THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE TWO-YEAR EVENT WITHOUT CAUSING EROSION OF THE SYSTEM DETENTION OF THE STORMWATER OR DOWNSTREAM IMPROVEMENTS MAY BE INCORPORATED INTO THE APPROVED LAND -DISTURBING ACTIVITY TO MEET THIS CRITERIA AT THE DISCRETION OF THE STORMWATER PROGRAM ADMINISTRATIVE AUTHORITY. (B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE SYSTEMS SHALL BE MET. QDEVELOPED <= I.F. * (QPRE-DEV. * RVPRE-DEV.) / RVDEVELOPED UNDER NO CONDITION SHALL QDEVELOPED > Q PRE-DEV. NOR SHALL QDEVELOPED BE REQUIRED TO BE LESS THAN THAT QFOREST * RVPRE-DEV.)/RVDEVELOPED OR IN ACCORDANCE WITH ANOTHER METHODOLOGY THAT IS DEMONSTRATED BY THE VSMP AUTHORITY TO ACHIEVE EQUIVALENT RESULTS AND IS APPROVED BY THE BOARD. (2) "NATURAL STORMWATER CONVEYANCE SYSTEM" MEANS THE MAIN CHANNEL OF A NATURAL STREAM AND THE FLOOD -PRONE AREA ADJACENT TO THE MAIN CHANNEL OR, (3) "RESTORED STORMWATER CONVEYANCE SYSTEM" MEANS A STORMWATER CONVEYANCE SYSTEM THAT HAS BEEN DESIGNED AND CONSTRUCTED USING NATURAL CHANNEL DESIGN CONCEPTS. RESTORED STORMWATER CONVEYANCE SYSTEMS INCLUDE THE MAIN CHANNEL AND THE FLOOD -PRONE AREA ADJACENT TO THE MAIN CHANNEL. (A) THE DEVELOPMENT SHALL BE CONSISTENT, IN COMBINATION WITH OTHER STORMWATER RUNOFF, WITH THE DESIGN PARAMETERS OF THE RESTORED STORMWATER CONVEYANCE SYSTEM THAT IS FUNCTIONING IN ACCORDANCE WITH THE DESIGN OBJECTIVES. (B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED I STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE SYSTEMS SHALL BE MET. SEE 19 B 1 B . GENERAL EROSION CONTROL NOTES WORK AREA PROTECTION 8 MAINTENANCE 1. ALL FENCES REQUIRED TO BE REMOVED OR DISTURBED BY CONSTRUCTION SHALL BE SALVAGED, STORED, PROTECTED AND RE -INSTALLED BY CONTRACTOR AT THE DIRECTION OF AND LOCATION DESIGNATED BY THE PROJECT MANAGER. IF SUCH FENCE MATERIAL CANNOT BE REUSED DUE TO DAMAGE CAUSED BY CONTRACTOR, CONTRACTOR SHALL INSTALL NEW FENCE OF THE SAME TYPE OF MATERIAL. TEMPORARY FENCING REQUIRED BY PRIVATE PROPERTY OWNERS SHALL BE PROVIDED BY CONTRACTOR. CONTRACTOR IS ADVISED TO CONTACT PROPERTY OWNERS AT LEAST FORTY-EIGHT (48) HOURS IN ADVANCE OF REMOVING ANY FENCE IN ORDER TO COORDINATE RELOCATION AND/OR PROTECTION OF ANY ANIMALS, AND TO ESTABLISH AND CONFIRM WITH THE OWNER THE PRE -CONSTRUCTION CONDITION OF ANY FENCE TO BE REMOVED, DISTURBED OR REPLACED. 2. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY (FOLLOWING ISSUANCE OF VDOT APPROVAL) AND ANY TEMPORARY OR PERMANENT EASEMENT (FOLLOWING VERIFICATION OF EXISTENCE OF EASEMENT) SHOWN ON THE PLANS. HOWEVER CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO GAIN AND COORDINATE ACCESS AND TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON SHALL BE COORDINATED WITH VDOT AND THE PROJECT MANAGER. CONTRACTORS FAILURE TO SO NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE PROJECT MANAGER MAY RESULT IN DELAYS. 3.CONTRACTOR SHALL, AT HIS EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS MATERIAL COLLECTED SHALL BE DISPOSED OF OFF THE WORK SITE BY CONTRACTOR, AT HIS EXPENSE. 4.EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS, DRIVEWAYS, POLES, SIGNS, RIGHT-OF-WAY MONUMENTS, MAILBOXES AND THE LIKE SHALL BE PROTECTED FROM DAMAGE DURING THE WORK. ANY DAMAGE CAUSED TO SUCH ITEMS SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. PROPERTY PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE DISTURBED SHALL BE RESTORED BY A LICENSED SURVEYOR AT CONTRACTORS EXPENSE. & CONTRACTOR SHALL EMPLOY EROSION CONTROL DEVICES AND METHODS AS REQUIRED TO MEET THE REQUIREMENTS AND INTENT OF THE LOCAL EROSION CONTROL ORDINANCE. CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES OR TEMPORARY CULVERTS REQUIRED TO PREVENT MUD AND DEBRIS FROM BEING WASHED ONTO THE STREETS OR PROPERTY. CONTRACTORS VEHICLES SHALL BE KEPT CLEAN TO PREVENT MUD OR DUST FROM BEING DEPOSITED ON STREETS. NO AREA SHALL BE LEFT DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS. VEGETATION 1. PRIOR TO REMOVING ANY VEGETATION, CONTRACTOR SHALL MEET WITH THE PROPERTY OWNERS AND THE PROJECT MANAGER TO REVIEW THE LIMITS OF CONSTRUCTION AND OBTAIN PERMISSION TO REMOVE VEGETATION REQUIRED TO DO THE WORK. 2.TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE TRIMMED OR CUT ONLY WITH THE APPROVAL OF THE PROJECT MANAGER. ANY TREES OR PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT ARE DAMAGED BY CONTRACTOR OR HIS SUBCONTRACTORS, SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. 3. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF WORK ON EACH SITE. TOPSOIL, SEED, FERTILIZER AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ESC AUTHORITY STANDARDS ON ALL DISTURBED AREAS. A PERMANENT STAND OF GRASS ADEQUATE TO PREVENT EROSION SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE. 4. THE ACT OF RESEEDING SHALL NOT QUALIFY AS "STABILIZED". THE CONTRACTOR SHALL BE RESPONSIBLE TO ESTABLISH VEGETATION, NOT SIMPLY APPLY SEED AND MATERIALS. EROSION & SEDIMENT CONTROL LEGEND S qF❑ �� SAFETY FENCL O❑3.U1 OCE H p CONSTRUCTION ENTRANCE CONSTRUCTION ROAD @AE PS STABILIZATION D3.05 )/� SILT FENCE �/ FDIVERSION O SB 3.14 SB SEDIMENT BASIN O❑ O OQP H o OUTLET PROTECTION OSR 3.29 SR O SURFACE ROUGHENING ❑ OTS El TSTEMPORARY SEEDING E3.32PS PERMANENT SEEDING ❑ OTP F TIP +P TREE PROTECTION DC DUST CONTROL O❑3.3g DC A . M r U a 7 m p w r U o U °'o OZ z c0(0 :::iY!� 2 - rr^ -10 J I-- 0) w 0) tU < vj T J = OIr U ¢U) m aZ =`)) < 0 ❑ W O U) w O °< naIr IE JZ vU I < 3:Z 0 0 > () o W o =j Cn Z � O Z 9 > I� Ir o v o ¢ N W MM N W <� z > O J U U W o_ u) � J r V) > V O a Z w M So W J 14 U)Ir c,= rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE NA 0p pr*. o{��AyTH 0 0� U 97 /!/� y Jimmy L. Taggart Lic2. No. 4 t 05Z 214121 4�' ��&'4ZONAL 0� O O O 1 I- 00 zo WNW < z W a_ (D 3:J 04 Q N> z z _j (Y) ; z o 2_j>Yz JUO E OzWOQ � fr fr J _1 ou � z~m� W CD CE�❑ 0 J D_D o 0 z 0 < w U) O Ir 06 FILE NUMBER 8053 SHEET 07 OF 14 __j QARGA\TMPROJ\8053-OLD TRAIL\Block 32\ENGINEERINGIDWG\8053-OLD TRAIL- Block 32 - WPO.dwa � cE CONSTRUCTION ENTRANCE STONE CONSTRUCTION ACCESS -\ STONE CONSTRUCTION ACCESS - 70' MIN. � 3" SM-2A ASPHALT TOP COURSE 2% `6" M:N, 21A AGGREGATE BASE PROFILE 70' MIN. --^^ %ASPHALT PAVED / WASHRACK EXISTING 2% 2% PAVEMENT 2% 12' MIN.* + I � t�POSITIVE DRAINAGE -V "MUST EXTEND FULL WIDTH TO SEDIMENT OF INGRESS AND EGRESS + TRAPPING DEVICE OPERATION ELAN 12' MIN, POSITIVE DRAINAGE 29 TO SEDIMENT TRAPPING DEVICE FILTER CLOTH) _ SECTION A -A A nvtvtumu water tap of 1 inch rnust be installed with a utininnmt 1 itch ballcock shutoff vahre supplying a wash hose with a diameter of 1,5 itches for adequate constant pressure. Wash water must be carried away from the entrance to an approved settling area to remove sediment. All sediment shall be prevented fi-om enterits storm drains, ditches or watercourses. PAVED WASH RACK NO SCA_F sAF SAFETY FENCE ,SAFETY FENCE PERSPECTIVE VIEW PERSPECTIVE VIEW PLASTIC FENCE SOURCE: CONWED PLASTICS VDOT ROAD AND BRIDGE STANDARDS VA. DSWC �v DIVERSION PERSPECTIVE VIEW METAL FENCE DIVERSION 10% SETTLEMENT �. 0.3' FREE BOARD���'.��' TYPICAL VEE-SHAPED DIVERSION Source: Va. DSWC PLATE. 3.1-1 Plate 3.12-1 TP TREE PROTECTION FENCING AND ARMORING DRIP LINE SNOW FEN BOARD FEI CORRECT METHODS OF TREE FENCING sF SILT FENCE CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 6'MAX. / I FLOW r ® 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. ENCE .a CORRECT TRUNK ARMORING TRIANGULAR BOARD FENCE Source: Va. DSCW Plate 3.38-: TEMPORARY SEEDING MIXTURES FOR Ts THE PIEDMONT AREA TABLE 26 TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES Seeding Rate Planting depth In Seeding zones (Q and Seeding Date Q Species (1) Per Lbs/1000 7a and 7b 6b 6a and 5b acre Sq.It (Inches) 2/1- 5/1- 8/15- 3/1- 5/1- 8/15- 3/15- 6/1- 8/1- 4/30 8/14 11/30 4/30 8/14 11/15 5131 7/31 10/31 Choose one: BY BY BY Barley 2.5 bu. 2.80 1-2 X - 10115 X - 10/15 X - 10/1 Oats 3 bu. 2.21 1-2 X - - X - - X - - Rye (4) 2.5 bu. 3.22 1-2 X - X X - X X - X a5'or Rye lus 150 lbs. 3.45 1 X X 10/15 X X 10/15 X X 10/1 Foxtail X X X X X X X X X millet 5 Weeping 4lbs. 0.09 1/4-1/2 - X - - X - - X - lovegrass Annual ryegrasS 50 lbs. 1.15 1/4-1/2 X - 11/1 X - 11/1 X - 8/15 Millet(7) 50 lbs. 1.15 1/2 - X - - X - - X - (1) Applicable on slopes of 3:1 or flatter (2) Refer to figure A - Adopted from USDA, ARS Miscellaneous Publication #1475, January 1990 (3) Between fall and spring seeding dates, use mulch only if ground is frozen and reseed when thawed (4) May be used as a nurse crop for late fall/early winter permanent seedings, add 56 Ibs/ac. to the permanent seeding mixture (4) Maryland State Highway Administration Temporary Seed Mix (5) May be used as a nurse crop for mid -summer permanent seedings. Add 2 Ibs/ac to permanent seed mix. (6) May be used as a nurse crop for mid -summer permanent seedings. Add 10 Ibs/ac. to the permanent seeding mix. DOZER TREADS CREATE GROOVES PERPENDICULAR TO THE SLOPE. q 5 . 9 4- 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) SF/STONE NOT REQUIRED AFTER SLOPES ARE STABILIZED DOWNSLOPE OF OUTFALL POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SUGGESTED TEMPORARY SEEDING MIXTURE FERTILIZER: 10-20-10: 1,000 LBS/ACRE SEPTEMBER-FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16-APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. SUGGESTED PERMANENT SEEDING MIXTURE LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE MARCH -MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16-AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16-OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER-FEBRUARY. KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE EACH LIFT OF THE FILL IS COMPACTED, BUT THE OUTER FACE OF THE SLOPE IS ALLOWED TO REMAIN LOOSE SO THAT THE ROCKS, CLODS, ETC. REACH THE NATURAL ANGLE OF REPOSE. FILL SLOPE TREA TMENT SOURCE: MICHIGAN SOIL EROSION AND SEDIMENTATION GUIDE PLATE. 3.29-4 SOURCE: VA. DSWC oP OUTLET PROTECTION SPECIFICATIONS PLATE. 3.29-3 OP: INTO EOFILTER OP: INTO S1 POND OP: INTO EX.POND 0 C. . L I RAP 24" MIN. DEPTH F24" PIPE .0 C. . L I RAP o 24" MIN. DEPTH F24" PIPE 3.0 .Y. C I R RAP in 24" MIN. DEPTH F36" PIPE UNDERLYING F.F cO 17 CFS /UNDERLYING F.F 15 CFS UNDERLYING F.F 25 CFS APRON LENGTH = 10' APRON LENGTH = 10' APRON LENGTH = 15' PERMANENT SEEDING MIXTURES FOR DPS THE PIEDMONT AREA TABLE 25 TOTAL LBS. PER ACRE MINIMUM CARE LAWN - COMMERCIAL OR RESIDENTIAL 175-200 LBS. - KENTUCKY 31 OR TURF -TYPE TALL FESCUE 95-100% - IMPROVED PERENNIAL RYE GRASS 0-5% - KENTUCKY BLUEGRASS 0-5% HIGH MAINTENANCE LAWN 200-250 LBS. KENTUCKY 31 OR TURF -TYPE TALL FESCUE 100% GENERAL SLOPE (3:1 OR LESS) - KENTUCKY 31 FESCUE 128 LBS. - RED TOP GRASS 2 LBS. - SEASONAL NURSE CROP* 20 LBS. LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) - KENTUCKY 31 FESCUE 108 LBS. - RED TOP GRASS 2 LBS. SEASONAL NURSE CROP* 20 LBS. CROWN VETCH** 20 LBS. TOTAL 150 LBS. *USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: FEBRUARY 16TH THROUGH APRIL 30TH............ ANNUAL RYE MAY 1ST THROUGH AUGUST 15TH ................ FOXTAIL MILLET AUGUST 16TH THROUGH OCTOBER 31ST........... ANNUAL RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH ........ANNUAL RYE *** SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE UNHULLED SERICEA.) IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE PROPERLY INNOCULATED. WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10- 20 LBS./ACRE IN MIXES. OPs PERMANENT SEEDING FERTILIZATION AND MAINTENANCE TABLE 24 Maintenance Fertilization for Permanent Seedlings Use Soil Test Recommendation or Rates Shown Below Seeding Mixture Formulation Lbs. per Lbs. per Time Mowing Acre 1000 sf Tall fescue makes 10-10-10 500 11.5 Yearly, or as *Not closer than 3" if up 70% or more or 400 9.2 needed fall occasional mowing is of cover. 30-10-10 desired. Crownvetch Spring the year Do not mow crownvetch Service lespedeza 0-20-0 400 9.2 following g establishment Birdsfoot trefoil and every 4-5 years thereafter. Fairly uniform Fall the year Not required. not closer stand of Tall following than 4" if occasional Tescue & Service 5-10-10 500 11.5 establish- ment mowing is desired, and lespedeza, or and every 4-5 then in fall after seed Birdsfoot Trefoil. years thereafter. has matured. Weeping Spring the year Not required. not closer Lovegrass & following than 4" if occasional Service lespedeza 5-10-10 500 11.5 establishment mowing is desired, and fairly uniform plant and every 3-4 fall after sericea has distribution years thereafter. matured. Red & chewin s g 20-10-10 250 5.8 September, 30 Mow no closer than 2" for red fescue and Ky fescue, Kentucky days later December, May bluegrass; and closer bluegrass, hard 20-10-10 100 2.3 20-June-30, if than 3" for fescue. fescue mixture: needed. NYLOPLAST 18" DRAIN BASIN: 2818AG X (1, 2) INTEGRATED DUCTILE IRON FRAME & GRATE TO MATCH BASIN O.D. MINIMUM PIPE BURIAL DEPTH PER PIPE (3) VARIABLE INVERT HEIGHTS MANUFACTURER AVAILABLE (ACCORDING TO RECOMMENDATION PLANSITAKE OFF) (MIN. MANUFACTURING REQ. SAME AS MIN. SUMP) (4) VARIOUS TYPES OF INLET & OUTLET ADAPTERS AVAILABLE: 4" -18" FOR CORRUGATED HDPE (ADS N-12IHANCOR DUAL WALL, ADSMANCOR SINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35), PVC DWV (EX SCH 40), PVC C900/C905, CORRUGATED & RIBBED PVC WATERTIGHT JOINT (CORRUGATED HDPE SHOWN) \�a 18" MIN WIDTH GUIDELINE 8" MIN THICKNESS GUIDELINE (5) ADAPTER ANGLES TRAFFIC LOADS: CONCRETE SLAB DIMENSIONS ARE FOR ARIABLE 0° -360° GUIDELINE PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE ACCORDING TO DESIGNED TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, L��, PLANS TRAFFIC LOADING, & OTHER APPLICABLE DESIGN FACTORS. \N SEE DRAWING NO.7001-110-111 FOR NON TRAFFIC INSTALLATION. (3) VARIABLE SUMP DEPTH ACCORDING TO PLANS (6"MIN. BASED ON MANUFACTURING REQ.) 4 MIN THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I, CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. GRATESISOLID COVER SHALL BE DUCTILE IRON PER ASTM A536 GRADE 7050-05. THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH DRAWN BY EBC MATERIAL 3130 VERONA AVE FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05. NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT BUFORD, GA 30518 DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS. OR POSSESSION OF THIS PRINT DOES NOT CONFER, DATE 04.03.06 PHN (770) 932.2443 RISERS ARE NEEDED FOR BASINS OVER 84' DUE TO SHIPPING RESTRICTIONS. SEE DRAWING NO. TRANSFER, OR LICENSE THE USE OF THE DESIGN OR ; y last° FAX (770) 932-2490 REVISED BY NMH PROJECT NO.MAME STU65. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO CONNECTION TECHNICAL INFORMATION SHOWN HEREIN ,J w .n Ioplast-us.00n y TRUE ASTM D3212 FOR CORRUGATED HOPE (ADS N-121HANCOR DUAL WALL), REPRODUCTION OF THIS PRINT OR ANY INFORMATION N-12 HP, & PVC SEWER. CONTAINED HEREIN, OR MANUFACTURE OF ANY DATE 0344.16 is IN DRAIN BASIN QUICK SPEC INSTALLATION DETAIL ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°. TO DETERMINE MINIMUM ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-012. IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN DWG SIZE A SCALE 1:30 SHEET 1 OF 1 DWG N0. 7001-110.191 REV E PERMISSION FROM NYLOPLAST. ®zoia uvmrusr �I J r U 7 m p w U ° O Z Z U) 0ID �Y� 2 11 - toJ HO) maw 0 Q �t T J = O U ¢ m (L Z =w a ¢o W Ow 0 Ir ° °a �aIE J Z v U ZIr 3:¢_ i �j 0) o W o D) ('3 Fil n r o v I D- Lu N v N W Q z > O IE va w a J } V > =Zw Oaz •,/ Fit C) o w Ua rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE NA 0p pr�� �o{��AyTH Jimmy L. Taggart Lic. No. 2 4 AAo 05Z 214121 4�� ��ssrONAL B�Gl O o O O 00 zo Q W N W Q Q a O r- o Q J N> a Z z J (y) ; H JUo E � J - 0 Q W W m > Z W O W E 0 J Q z 0 Z 0 a �0 x Wco z 0 0 W o 0 O W FILE NUMBER 8053 SHEET 08 OF 14 CIARGA\TMPROA8053-OLD TRAIL\Block 32\ENGINEERINGIDWG\8053-OLD TRAIL- Block 32 - WPO.dwa 8-1 EXISTING RETENTION FACILITY VA DCR SWPP EFF = ( RR+L ca ) x 100 (Equation5-22) Performance Based Water Quality Calculation Procedure where: EFF = required pollutant removal efficiency Project: OTV-Block 32 WP0201800010 (Biofilter & Extended Detention) RR = pollutant removal requirement (pounds per year) Locality Albemarle Co. _ I'm - relative post -development total phosphorous load, Equation 5-21 (pounds per year) Date: 212212019 9:33 Worksheet No. 1 EFF = 1.60 / 5.08 x 100-- 32% Step t Determine the applicable area A and the ostdevelo� impervious cover ([post). Applicable area (A) = 342381.E s.f. or 7.880 acres _2. Select 13111 from Table 5-14 and locate on the site: Drainage Impervious Post -development impervious cover. T Efficient Area (s.f.) Area (s.f.) Descriodom structures = 41579.2869 s.f. or 0.955 acres _ B1: Reterlfion 65 342381.6 88786.96 BNP A MP parking lot = _ s.f. or 0.000 acres roadway = 2B524.1542 s.f. or 0.655 acres 3. Determine the pollutant load entering the proposed BMP) driveways & swlk = 1OW3.5231 s.f. or 0.429 acres s.f. or 0.000 acres ]I = [0.05 + 0.009 x x AP wPBMx 2.28 (Equation 5-23 ) s.f. or 0.000 acres T where: Lamp = relative post -development total phosphorous load entering proposed BMP (pounds per yam) Total = 88786.9642 s.f. or 2.038 acres _ IBMP = post -development percent impervious cover to proposed BMP (percent expressed in whole numbers) 409 - (total post -development impervious cover =A) x 100 = 26%a Ap cp6MP = drainage area to proposed BMP (acres) Step 2 Determine the average land cover condition (I„7ternw) or the existing impervious rover (Iomoeg• Lras i = [0.05 + (0.009 x 26% )] x 7.86 x 2.28 = 5.08 pounds per year Average land cover condition (I.-h.a): If the locality has determined land cover conditions for individual watersheds within its 4. Calculate the pollutant load removed by the proposed BNIP(s): jurisdiction, use the watershed specific value determined by the locality as Iwatershed. Iaatershm 0% Lreawwd = Elf9MP x L11Mp (Equation 5-24) Otherwise, use the Chesapeake Bay default value: Iaatarshm 16% where: L..mor.a kpost-developmem total phosphorous load removed by proposed BMP (pounds per year) EABMP - pollutant removal efficiency of BMP (expressed in decimal form) Iwteri 16% Law - relative post -development total phosphorous load entering proposed BMP, Equation 5-23 (pounds per year) Existing ittiperviors cover (I.- .,): Lrasea,,,i 3.30 Pounds per year removed Determine the existing impervious cover of the development site if present _ 5. Calculate the total pollutant load removed by the BMP(s): Pre -development impervious cover: structures = s.f. or 0.000 acres L,ema.uvwtar = LawovedlEri + L„n,ev,yBMP2+ Lswrxvi l aMPa ... (Equation 5-25) parking lot = _ s.f. or 0.000 acres roadway = s.f. or 0.000 acres where: L--- _..a =total pollutant load removed by proposed BMPs (pounds per year) other s.f. or 0.000 acres Concrete s.f. or 0.000 acres hmnvaaamiq = pollutant load removed by proposed BMP No. 1, Equation 5-24 s.f. or 0.000 acres LnemovedBMPz = pollutant load removed by proposed BMP No. 2, Equation 5-24 Total 0 s.f. or 0.000 acres Lreenvea/sMr3 = 'pollutant load removed by proposed BMP No. 3, Equation 5-24 = Lremmmtaral Ie,;,tms = (total existing impervious cover + A) x 100 = 0% - 3.30 Total Pounds per year removed _ • The area should be the same as used in STEP 1. 6. Verify compliance: I.rea,aeataml >_ RR Lsc.vm/wt9 = 3.30 Total Pounds per year removed Step 3 Determineati _ the appropriate development situon _ Req'd Removal- 1.60 Total Pounds per year removed OK, Removal Rate Exceeded The site information determined in STEP 1 and STEP 2 provide enough information to determine the appropriate development situation under which the performance criteria will apply. Check ( ) the appropriate development situation as follows: Nn Situation 1: This consists of land development where the existing percent impervvious cover (Ted,t.i is less than or S-13 BIOFILTER & EXTENDED DETENTION FACILTY equal to the average land cover coalition (Iwatershed) and the proposed improvements will create a total percent VA DCR SWPP impervious cover Tpost) which is less than or equal to the avera a land cover condition (Iwatershed). False 1poat 26% <Iaaw„nee 1s% Performance Based Water Quality Calculation Procedure Project OTV-Block 32 WP0201800010 (Biofilter & Extended Detention) Yes Situation 2: This consists of land development where the existing percent impervious cover (Ie,a,rv,8) is less than or equal Locality Albemarle Co. to the average land cover condition (Iwatershed) and the proposed improvements will create a total percent Date. 2/22/2019 9:28 _ impervious cover Tpost) which is eater than the aveT over condition ([watershed). Worksheet No. 1 True Ieahang 0°6 <- Imawr,nea Sten 1 Determine the applicable area and the post-develoed im ervious cover (Ipost). and Applicable area (A) = 4521521 s.f. or I 10.380 [acres True Ipaw 26e/6 lama„hea Post -development impervious cover: No Situation 3: This consists of land development where the existing percent impervious cover (lm ir.) is greater than structures = s.f. or 0.000 acres the average land cover condition Iwatershed). parking lot = 239580 s.f. or 5.500 acres False Ia,asenq 0% > laater,haa 16% roadway = s.f. or 0.000 acres other s.f. or 0.000 acres [Sp Situation 4: This consists of lam development where the existing percent impervious cover (lass") is served by an s.f. or 0.000 acress.f. or 0.000 acres existing stormwater management BMP(s) that addresses water quality. If the proposed development meets the criteria for development Situation 1, Total = 239580 s.f. or 5.500 acres than the low density development is considered to be the BMP and no pollutant removal is required. The calculation procedure for Situation 1 stops here. If the proposed development meets the criteria for development Ipn,t = (toil post -development impervious cover =A) x I00 = Situations 2, 3, or 4, then proceed to STEP 4 on the appropriate worksheet. St 2 Determine the averse land cover condition lna r or the existing impervious cover � g ( ea) ting � P (1al,dag)• VA DCR SWPP Average land cover condition (I-s-h.d): Performance Based Water Quality Calculation Procedure SITUATION2 True I-mus, 1 n% s I,,,p„sea 19% If the locality has determined land cover conditions for individual watersheds within its Project: ON-BlockM WPO201800010(61o0Ker&Extended Daemon) am jurisdiction, use the watershed specific value determined bythe locality as [watershed. Locality: abemarle Co. True Ir .. 7 26% >I..re,.e,a 16% lastcri 0% Date: 22-Feb-19 StuapenWarkahead Ni•n Wt rk•h LWyhS v5ii •nwvvkek W 2uY ��2 Otherwise, use the Chesapeake Bay default value: SnnATION3 Iwatenhed 16% Swwnwy cl Silumtion 2 criteria: from calculation procedue STEP l it. STEP 3 Workaheet 1: False La.ars 0% > I„,a,m„a 18% I Area= 7.88 ac. I,a, 26% I - 16% 1,effiasred= 1@b I exietvg= OeA ova eanaa- Existing impervious cover Determine the existing impervious cover of the deveIopmeite if present. Ste" Determine the relative pro-developmert pollutant load au). Based on Existing Impervious C°+ar Pre -development impervious cover: SnnATION 4 False L..a,s BMP CURRENTLY IN PLACE NO VA DCR SWPP Performance Based Water Quality Calculation Procedure Project ON -Block 32 W PO201900010 (Bioriaer & Extended Detention) Locality. Alhemarle Co. Date: 22-Feb-19 Situation WorksEaat No.2 Sunarmry of Situation 2 criteria: f era calculation procedure STEP 1 Lau STEP 3 Worle beet 1: Ares 1038 ac. [post- 53% I ws[eai 16% I eeawni, 0% SITUAn0N 2 True 1-., 0% Lars... 16% and True I,m, m >I..Qa„a 16% s UrIa False lla,ass as; > 1.. a, , I16% SDUADON4 False lea a,e BMP CURRENTLVIN PLACE? NO Ste. 4 ➢et ursine the relative pre-develvpmert p°ll°tard lead (1i Based on Existing In senlc,s Cower ILega,ma [005+(0009xIa•,„,)]xAx2.28 (Equation9-16) where: Lvaas.mil relative pre-develepmer¢ towl phosphorous load (pounds per year) Iasi E,wtiag At mpervm,s cover nerrm, or,anea h mirA am,hem) A - applicable area (acres) LPK®motl=[0.05+(0,009x 0% )I x 10.38 x2.28 1.18 pounds per year 2 LFK m - [0.05+(0.009 x I„.,,,i„a)] x Ax 2.28 (Equation sl6) where: Lv„t ,k,d) relative pre-developrrerk wtal phosphorous load (pounds per year) I.du.hed = av,rexa hid owe orndtiou fwsce wahrehedahrwae Cheaew' Eay d� avab,. c£ld%(p,umecpesaadn vbak mmbem) A = applicable area(aaes) 1,rgr,a.."-[0.05+((I 16% )I x 10.38 x2.28 4.59 pounds per year Step 5 Determine the relattva pent-developmerd poll°tard load O,m,J. Ls,=[0.05+(0.009xi, )]sA,229 (Equation 5-21) relative post -development total phosphorous load (pow ds per year) 1P� post -development impervious cover (percent expressed in whole rnwibers) A = eppboablc won (wres) Lrs,=[0.05+(0.009x 53% )l x 10,38 x2.28 = 12.47 ponds per year Stan 6 Determine the relative pollutant revava] regvnenreat (RR). RR= Lsa-(o 9 xlvafsausa RR = 12,5 - 1.1 RII itpounds per year or RR = L,,, -L,a,k.a,or,m RR = 12.5 - 4.6 RR= 7.88 pounds per year Use RR-7.89 (lesser vane) stem [ Iderdtfy beat manageme st practice (BMP) forthe site. 1. Defermire tics requrired poBudant removal efficiency for fine site: EFF = (RR= Ln,„ ) x 100 (Equation 5-22) where: fEFF = required polhdantremoval efficiency RR = pollatart removal requirement (pounds par year) I,,,, relative post-developmertnetalphospborom load, Equation5-2I(pounds payear) EFF = T 88 / 72.47 x 100= 63% 2. 9e]eotBMP(s) from Table 5-14 and lacetc on Hue site: Drainage Impermous Type Efficiency Area(a.f) Arar(af.)De.npfien: BMP 1: BMP 2: BMP 3: BMP 4: BMP 5: BMP A BMP B BMP C BMP D BMP E 3. Determine this pollute[ load entering the proposed BMP(s): Lear _ [0.05+(01009 x Iay,E)] x A. x 2.28 (Equation 5-23) wlere: L. ' relative post -development total phosphorous load entering proposed BMP (pounds per year) Iase, = post -development percent impervious ewer to proposed BMP (percent expressed in whole rumbas) A,wap - drainage area to proposed BMP (acres) Lasser - [0.05 + (0.009 x 70% )l x 3.61 x2.28 &M ponds per year Lear, =[0.05+(OAO9x 81% )l x 6.77 x2.28 12 O6 pounds per year ]Lawe,=[0.05+OMs)X 0% )l x 0.00 x2.28 OAO ponds per year Lassos =[0.05+(0.009x 0% )l x am x2,28 am, ponds per year Losses =[0.05+(0.009x 0% )l x 0DO x228 aw ponds per year 4. Calculate fine pollutant load removed bytke proposed Bled ): 4- Effwav x L. (Equation 5-24) where Leman= post-developnead total phosphorous load removed by proposed BMP pounds par year) Efli- pollutant remrval e➢icierey o£BMP(expressed in deccimalf ) Lase = relative post-developoeut fowl phosphorous load entering proposed BMP, Equaticri (pounds per }car) Lr,m ,sn 5.02 Pounds per year recrossed L ss ass we 3.01 Pounds per year retuned L,_sa. 0.00 Pounds per year remosed Lrmween 0.00 Pounds per year remo ed 11 000 Pountls per year retuned 11.a,,,mn,mw-[005+(0.009xlw,.,)]x Ax228 (Equation Sl6) structures = s.f. or 0.000 acres wire: iq,e,soon,r=reinvepre-developme 1phosplomlmd(potadsperyear) parking lot- s.f. or 0.000 acres S.Calculate thetotal pollWaid load removed by the BMP(s): roadway - s.f. or 0.000 acres Ev,taera lmprsviomrova(pmrem exmemed n w* ash.) other s.f. or 0.000 acres L.�uaae.M = L..,uerwr+L,•m,.,aarrer+7.,®„yn„�+... (Egvatiov 5-25) A = applicable area (acres) Coni s.f. or 0.000 acres where: L„mo..ao,e• total pollutant loodremoved by proposed BMPs(pounds per yew) Le,Crs o,c=[0.05+(0.009x as )l x 7.86 x2.28 s.f. or 0.000 acres = 0.90 ponds per year _ I,®namws = pollutant load removed by proposed BMP No. 1, Equation 5-24 2 Lr,.,,.a,.n,m = [0.05+(0.009 x I..-,, e)] x A x 2.28 (Eguatiov 5-16) Total = 0 s.f. or 0.000 acres L.,,,,cravr = pollute m lead re ved by prWosed BMP No. 2, Equation 5-24 L--..- pollutm load removed by proposed BMP No. 3, Equation 5-24 where: Iy„ ,,.,,„n.e) relative pre-developn snt total phosphor. load (ponds per year) lade, - (total existing impervious cover - A) x 100 = 0% L,ss_4,.,, 8.04 7Total Pounds l.uersnea - mxmge ima cover covewm re spec'ecw.meseaor breay ormecae.aa.ke Eev eermmvom otre.s (pereea e,ae.aeehwwe m,wnsl par year removatl applicable ea(arrea) * The area should be the same as used in STEP 1. 6. Verify compliance: L,a•„.>- tut Lr,p,,,,,,,km=[0.05+(0.009x 116% )I x 7.86 x2.28 Lmm„eroei= 8.D4 Total Pounds per year removed ponds per year Step 3 Determine the appropriate development situation Read RwroI 7.88 Total Pounds per year removed OK, Removal Rate Exceeded Step-5 Determine the relative post-aevelopa,ent pollutant load (L, I). The site information determined in STEP 1 and STEP 2 provide enough information to determine the appropriate L,.,t-[0.05[0.05+(O.o09 (Equation5-21)development situation under which the performance criteria will apply. Check(_) the appropriate development situation asfollows: EXTENDED DETENTION where: I,o.t - relative poet-developmentrowl phosphorous load (pounds Per year) No Situation 1: This consists of land development where the existing percent impervious cover (Iersting) is less than or • MEASURE SEDIMENT ACCUMULATION LEVELS IN FOREBAY. ;.a = post-developne nTgm rvious cmu (p.c. expressed inwholemubas) A = applicablearea(acres) equal to the avenge land cover condition ([watershed) and the proposed improvements will create a total percent MONITOR THE GROWTH OF WETLANDS, TREES AND SHRUBS PLANTED. impervious cover ([post) which is less than or equal to the avers, a ]and cover condition (Iwatershed). RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE Lvwt [0.05+(0.009x 26% )1 x 7.86 x2.28 I False Ipos1 53% `clvwershetl 16% THE PRESENCE OF ANY INVASIVE PLANT SPECIES. poach p.year, • INSPECT THE CONDITION OF STORMWATER INLETS TO THE POND FOR Si Determine use relative pollsters: remained requirement (RR). Yes Situation 2: This consists of land development where the existing percent impervious cover (Isciatirg) is less than or equal MATERIAL DAMAGE, EROSION OR UNDERCUTTING. to the average land cover condition (Iwaterslwd) and the proposed improvements will create a total percent • INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR RR = L„„- (o.9 L,-(seeose RR 5.1 08 impervious cover (Trost) which is eater than the avers a land cover condition (Iwatershed). EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY RR- 4.27 pounds True Ieds6as 0% <_ Iaatersnea 16% GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT or _ - and INTEGRITY. �= Isom- Ivace,rs,n.at RR = 5.1 - 3.5 - True Ipa,t 53% > Iaater,hea 16% • INSPECT POND OUTFACE CHANNEL FOR EROSION, UNDERCUTTING, RR= 1.60 powdsper,ai I RIP -RAP DISPLACEMENT, WOODY GROWTH, ETC. No Situation 3: This consists of land development where the existing percent impervious cover II is greater than • INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR Uae RR= 1.60 less. value) the average land cover condition Iwatershed). EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION, ETC. Sims Identify best waraesm ad practice (BMP) forthe site. False lemd. 0% > lesawsh st 16% • INSPECT CONDITION OF ALL 'TRASH RACKS, REVERSE SLOPED PIPES OR I. Determim the ream d polntant removal of icienoyfor tho site FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS Situation 4: This consists of land development where the existing percent im,tms) pervious cover (Iedis served by an ACCUMULATION, ETC. EFF - (RR +Lp,,,) x too (Bgmtiems-zz) existing stormwater management BMP(s) that addresses water quality. • INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY where: EFF requiredpolluCarkrerrxrval efficieroy VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND RR = pollumatremwal owurca'ent(pounds par year) If the proposed development meets the criteria for development Situation 1, LOCKS CAN BE OPENED AND OPERATED. Leo„ = relative post-developoentrotal phosphorous lead, Egmtion5-21 (ppinde paryrer) than the low density develo ment is considered to be the BMP and no ollutant removal is re4 uired • INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE POND FOR P P The calculation procedure for Situation 1 stops here. If the proposed development meets the criteria for development EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING, Situations 2, 3, or 4, then proceed to STEP 4 on the appropriate worksheet. AND MAKE NEEDED REPAIRS IMMEDIATELY. aul.r +Doer. k s 1 1 a,_J 4L y - � - - aIL4r iifYF iW[Itr illtl4 •'r•" - - ic z 3 a ffi as .w .11111. AL - aftiller. yIl✓-Illaiiii-,. .: _ sera 1 J i 1 t iYL m =,- 4,lilha _ ;ram _ allYlk ass Jlla JL Jil. r.96 ININFED INORIETUMON Il3A%N TLWOOVM CCMENMTM rADDITUCOM 1IlI... r5rirsiI A E Td _ ADDITIONAL POT11DI - WNCENMTED Ai INFLOWANIM - ' EETENT1i:. P. GC PRE[IREATME[1' T _ -STAEIWZM LINIFLIf r _.... ( - DEATAL FOR OPTION&) FNL;INU AF1EA gg;ACE Ai `AU1LQP1LAYER -. 1-III .•; d 1 111 � f -- - �-ICI-I I-11 11 1 I 31 I 1 I -I I -I I1� � } �Rl -I I - ALL UNDERDFLAINS T() BE IDATLIIfiIFITELI SEC IION VIEW LEVEL 1 NIIN. = 24' 1_FVFIL _ .11'I -itl Ili I � ]TILii1�1_- STONE SUMP (OPEN GRADED) Figure 9.5. Typical Detail of Bioretention with Additional Surface Ponding GRASSED PRETREATMENT FILTER STRIP SHEET FLOW OR PRETREATMENT FILTRATION -------- 4► BIORETENTION CE'_L CONCENTRATED FLOW WITH FOREBAY 2 PLAN VIEW LEVEL 1 OR LEVEL 2 CONTROLLED OVERFLOW SECTION VIEW BIORETENTION IN SHELF OF EXTENDE EXTENDED DETENTION STORAGE "'L STONE SLOPE PROTECTION OR EQUAL FULL EXTENDED DETENTION STORAGE 1•I Figure 9.6. Typical Detail of a Bioretention Basin within the Upper Shelf of an ED Pond ANNUAL BMP MAINTENANCE REOUIREMENTS BIORETENTION • MOWING OF GRASS FILTER STRIPS AND BIORETENTION TURF COVER AT LEAST 4 TIMES A YEAR • SPOT WEEDING, EROSION REPAIR, TRASH REMOVAL, AND MULCH RAKING TWICE DURING GROWING SEASON • ADD REINFORCEMENT PLANTING TO MAINTAIN DESIRED THE VEGETATION DENSITY AS NEEDED • REMOVE INVASIVE PLANTS USING RECOMMENDED CONTROL METHODS AS NEEDED • STABILIZE THE CONTRIBUTING DRAINAGE AREA TO PREVENT EROSION AS NEEDED • SPRING INSPECTION AND CLEANUP • SUPPLEMENT MULCH TO MAINTAIN A 3 INCH LAYER • PRUNE TREES AND SHRUBS • REMOVE SEDIMENT IN PRE-TREATMENT CELLS AND INFLOW POINTSONCE EVERY 2 TO 3 YEARS • REPLACE THE MULCH LAYER EVERY 3 YEARS A • rn r U 7 m p w Go n O Uon Ny OZ z co Oto �Y< 2 J H0) Maui C) (L T J = OU GU) m aZ =w Q W O� wo 0 0 OQ �IE Er IE U IL i to O W o Fit En0 Z Z rn i p V d W N V / "Ix`rl`.r'y4' N w Q > Z O vain a Co J rn > =Zw 0 az j L( C) 0 w Q eo a C) = rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE N/A AyTH 0p pr�� L)7 Jimmy L. Taggart Lic. No. 2 4 OP. OSZ 14121 44" ,�P&810NAL B�Gl O 0xxr� 00 E- W O Q 2O� z Wa_Q (7 Q J CV > O z z J c7 ; E _J>Yz � JUoa Ir J - O WUQ U W �z�m� c) U 0 W 04 U J Q w 0 z 0 z �U o O W 06 FILE NUMBER 8053 SHEET 09 OF 14 CIARGA\TMPROA8053-01-1) TRAIL\Block 32\ENGINEERINGiDWG\8053-OLD TRAIL- Block 32 - WPO.dwo II POST BMP CONVERSION STAGE -STORAGE Elev(Ft) Storage(CF) Storage(CY) Storage(Acre-Ft) Area(SF) Area(Acre) 642.000 0.000 0.000 0.000 195.840 0.004 644.000 831.004 30.778 0.019 661.054 0.015 646.000 2823.802 104.585 0.065 1361.270 0.031 648.000 6453.083 239.003 0.148 2296.149 0.053 650.000 12157.308 450.271 0.279 3438.624 0.079 652.000 20376.829 754.697 0.468 4818.813 0.111 654.000 31584.229 1169.786 0.725 6426.504 0.148 656.000 46234.511 1712.389 1.061 8261.695 0.190 BASIN STORAGE PROVIDED = 1441 CY ® 655.00 (TOP OF DAM) STORM EVENTS FOR BIORETENTION FACILTY EVENT INFLOW (CFS) ROUTED ,CFS) 2-YR 10.95 6.60 10-YR 20.62 8.87 100-YR 39.86 40.63 STORM EVENTS FOR EXTENDED DETENTION FACILITf EVENT INFLOW (CFS) ROUTED (CFS) ELEVATION (ET) STORAGE (CF) 2-YR 14.02 8.83 650.25 13,172 10-YR 26.08 19.49 651.27 17,380 100-YR 89.43 90.60 652.32 22,180 DAM CONSTRUCTION NOTES: 1. GEOTECHNICAL CONSULTANT TO SPECIFY DAM EMBANKMENT MATERIAL, SEEPAGE CONTROL DEVICES, CUT-OFF TRENCH DESIGN, CULVERT BEDDING REQUIREMENTS, AND OTHER APPROPRIATE GEOTECHNICAL DESIGN REQUIREMENTS. 2. IMPERVIOUS CORE SHALL EXTEND TO THE 10-YR WATER SURFACE ELEVATION UNLESS OTHERWISE NOTED. 3. FOUNDATION AND ABUTMENT AREA EXTENDING 10' BEYOND DAM FOOTPRINT SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATION TOPSOIL AND/OR ORGANIC SOIL AND OTHER UNSUITABLE MATERIALS. 4. AFTER CLEARING, GRUBBING, STRIPPING, AND REMOVING ANY OTHER UNSUITABLE MATERIALS, THE SUBGRADE SHALL BE PROOF -ROLLED WITH COMPACTION EQUIPMENT UNDER THE OBSERVATION OF A QUALIFIED ENGINEER. THE COMPACTION EQUIPMENT SHALL CONSIST OF THE HEAVIEST POSSIBLE EQUIPMENT THAT WILL NOT CAUSE DISTURBANCE OF SUITABLE SUBGRADE SOILS. EXCESSIVELY SOFT OR UNSUITABLE MATERIALS SHALL BE REMOVED AND REPLACED WITH COMPACTED FILL. WHERE ROCK IS EXPOSED AFTER STRIPPING OR UNDERCUTTING, ALL LOOSE ROCK MATERIAL SHALL BE REMOVED PRIOR TO PLACING COMPACTED FILL. ROCK SUBGRADES SHALL BE INSPECTED AND APPROVED BY INSPECTOR OR ENGINEER PRIOR TO PLACEMENT OF FILL. 5. COMPACTED FILL SHALL NOT BE PLACED PRIOR TO PERFORMING THE REQUIRED FOUNDATION AND ABUTMENT PREPARATION, OR ON ANY FROZEN SURFACE. COMPACTED FILL SHALL EXTEND TO THE FILL LIMIT LINES AND GRADES INDICATED ON THE APPROVED CONSTRUCTION PLAN. COMPACTED FILL MATERIAL SHALL BE OF THE TYPE CLASSIFICATION SYMBOL SPECIFIED BY THE GEOTECHNICAL CONSULTANT, OR OF A BETTER QUALITY MATERIAL AS DEFINED BY THE UNIFIED SOIL CLASSIFICATION SYSTEM (USCS). RESTRICTIONS ON LIQUID LIMIT AND PLASTICITY INDEX OF MATERIAL MAY BE INCLUDED WHERE APPLICABLE. COMPACTED FILL SHALL CONSIST OF MATERIAL FREE OF ORGANIC MATTER, RUBBISH, FROZEN SOIL, SNOW, ICE, AND PARTICLES WITH SIZES LARGER THAN 3" OR ANY OTHER DELETERIOUS MATERIAL. 6. COMPACTED FILL SHALL BE PLACED IN HORIZONTAL LAYER of 10"-12" IN LOOSE THICKNESS. ACTUAL LIFT THICKNESS SHALL BE SPECIFIED BY THE GEOTECHNICAL CONSULTANT. THE MOISTURE CONTENT SHALL BE CONTROLLED SUCH THAT COMPACTION IS ACHIEVED WITHOUT YEILDING OF THE SURFACE. EACH LAYER SHALL BE UNIFORMLY COMPACTED WITH SUITABLE COMPACTION EQUIPMENT TO AT LEAST 95% OF STANDARD PROCTOR MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D-698, AASHTO T-99, OR VDOT SPECIFICATIONS. ANY LAYER OF FINE GRAINED FILL WHICH BECOMES SMOOTH SHALL BE SACRIFICED TO A DEPTH OF 2" TO ALLOW ADEQUATE BONDING BETWEEN LAYERS. 7. COMPACTED FILL WITH A MOISTURE CONTENT WHICH WILL NOT PERMIT COMPACTION TO THE SPECIFIES DENSITY STANDARD SHALL BE SACRIFICED, DRIED, OR WETTED AS NECESSARY TO PERMIT PROPER COMPACTION. GENERAL BIORETENTION NOTES: 1. ALL DRAINAGE AREAS TO A BIORETENTION FACILITY ARE TO BE STABILIZED PRIOR TO INSTALLATION OF AMENDED SOILS, MULCH OR PLANTINGS. 2. AMENDED SOIL WILL ONLY BE PERMITTED WITH A VALID SOIL ANALYSIS REPORT. NO AMENDED SOIL SHALL BE ALLOWED ON THE SIDE SLOPES. 3. UNDERDRAIN PIPE SHOULD BE MIN. 6" PERFORATED SCHEDULE 40 PVC (PER AASHTO M278) OR DOUBLE WALL HDPE (PER AASHTO M252). PERFORATIONS SHOULD BE 3/8" SPACED 6" ON CENTER ALONG 4 LONGITUDINAL ROWS SPACED 90' APART. 4. UNDERDRAIN CLEANOUTS SHOULD EXTEND A MIN. OF 6" ABOVE MAXIMUM PONDING ELEVATION. ONE CLEANOUT MAY BE FLUSH WITH TOP OF SURFACE TO ALLOW DRAWDOWN. 5. ONLY SMALL MATURING TREES ARE ALLOWED TO BE PLANTED IN THE AMENDED SOILS. 6. A PERMANENT MAINTENANCE ACCESS EASEMENT MUST BE PROVIDED AROUND THE PERIMETER OF ALL BMPS TO ALLOW FOR ADEQUATE MAINTENANCE AND REPAIR. 7. AMENDED SOIL WILL ONLY BE PERMITTED WITH A VALID SOIL ANALYSIS REPORT. 8. INSTALL WIRE SCREENING AS NECESSARY AROUND ALL OUTLET OPENINGS TO PREVENT LOSS OF MULCH. BIORETENTION WITH EXTENDED DETENTIONI 9VAM"ZI0-®7 STREAM CHANNEL EROSION. b. Adequacy of all channels and pipes shall be verified in the following manner: (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. Q2YR PRE -DEVELOPMENT = 9.28 CFS Q2YR POST -DEVELOPMENT = 8.83 CFS Q2YR POST -DEVELOPMENT - 8.83 CFS S Q2YR PRE -DEVELOPMENT - 9.28 CFS 9VAC25-870-8 FLOODING. A. Downstream properties and waterways shall be protected from damages from localized flooding due to changes in runoff rate of flow and hydrologic characteristics, including, but not limited to, changes in volume, velocity, frequency, duration, and peak flow rate of stormwater runoff in accordance with the minimum design standards set out in this section. B. The 10-year postdeveloped peak rate of runoff from the development site shall not exceed the 10-year predeveloped peak rate of runoff. Q10YR PRE -DEVELOPMENT = 27.36 CFS Q10YR POST -DEVELOPMENT = 19.49 CFS Q10YR POST -DEVELOPMENT = 19.49 CFS S Q10YR PRE -DEVELOPMENT = 27.36 CFS STREAM CHANNEL EROSION & FLOODING ANALYSIS A portion of the exisitng creek that will receive site runoff was visually inspected by Roudabush, Gale & Assoc. in order to obtain design information to evaluate existing conditions, as well as post -development conditions. The following observations/evaluations were made: 1. The creek appeared to be a rectangular channel with moderate to steep side slope banks. The banks varied in height but showed consistency of 2 feet or more. Water was present in the channel with a gentle flowing depth of 3-3.5 inches. The width of the creek channel varied between 4-5 feet. The creek appeared in good health and lined with natural earthen cover with some tall grass and weeds present. Soils appeared to be clay loam with natural erosion. 2. Calculations were run using the pre -development and post development conditions for the two and ten year storm events and were evaluated as such. 3. The bmp measures put forth for the proposed development provide a reduction in the runoff velocity exiting the site for both the two and ten year storm events. Projected values for the flow depth in the channel were obtained by forecasted linear trend methods and appear to show no threat of overtopping the banks of the existing channel. By reducing the velocity exiting the site, the measures will be providing additional relief of natural erosion of the exisiting channel banks, thus satisfying 9VAC25-870-97. 4. While the volume of flow will increase naturallty due to the project development, the rounoff from the site will be routed through multiple, complex design measures that will react to the increased volume and account for the peak intensity the hydrograph produces from the two and ten year storm events. No localized flooding is visually present at this time in the existing channel. The bmp measures will decrease the rate of flow that is exiting the site, reduce the velocity, and spread the peak intensity over a longer duration during a storm event, thus decreasing localized flooding satisfying 9VAC25-870-98. /s s N\ \ i BIOFILTER: 6,465 SF \gl PROVIDED AT ELEVATION •� PRETREATMENT CELL: 656. FILTER MEDIA 36" 16'x24'x3' STONE STORAGE TANK BIOFILTER UNDERDRAIN. CLEANOUTS 20' ON CENTER BIOFILTEROUTFALL - y // y � y y % � J +' y '1 ~' a �-yT ++�� v, y y y y : •y` •• \y yy\1 y y y y y \a y � � y_ � y :: " • :. " • ••.� •:. � �' y�"��.� y y y a y "L-a� y y y y• y y "••:•'•:: p� y y y l y y y yy y yy y y� Y/ .vy`,1, y n ..r• � -1 � -�- PRE-TREATMENT CELL:~ STONE DIAPHRAGM, CLASS 1 RIPRAP PROPOSED CLEANOUTS I 1 VEGETATIVE BUFFER t i `` ZONE FOR EXTENDED y y DETENTION PROPOSED V/W SWM EASEMENT r-,� k!_tunnowsmMims* o BIORETENTION AND EXTENDED DETENTION PLAN VIEW .'k 0 I yky \ 45Z'4 9> m r U 7 m p w CO U o U ° 0 Z ZON Q Y !� 02 Cn J H 01 Q w U Q T J = O¢ U � m D_ Z C) w Q o co 0 Ow 0 M, a _J J Z v U Z� ¢_ i �j U) o WW o Fil EFn--� UL Z O Z rn 5;aNo I� v _ W CIDN w Q Z > O J va w a J =Zw 0 az o) •, 04 w o U Q rn = rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE AS SHOWN Op pr�� �o{4$AyTH U 7 9 Jimmy L. Taggart Lic. No. 2 4 Ado OSZ 214121 ��&s'470NAL B�Gl r r O O W O o z0 O a 2Ow Z W a 0 � a Q J N> E- zzJ(y)> W \ _J>YZ JUo Ir LL] _J - O O Q E- E- W z �z�m< O❑ W U J __JJ w oz0 o o U) O 0. W 06 FILE NUMBER 8053 SHEET 10 OF 14 WRGA\TMPROA8053-OLD TRAIL\Block 32\ENGINEERINGIDWG\8053-0LD TRAIL- Block 32 - WPO.dwa STREAM BUFFER MITIGATION RESTORATION REQUIREMENTS STREAM BUFFER AREA DISTURBED AREA A 2,195 SF (0.05 AC) AREA B 11,774 SF (0.27 AC) AREA C 381 SF (0.009 AC) AREA D 195 SF (0.004 AC) AREA E 128 SF (0.003 AC) AREA F 292 SF (0.007 AC) AREA G 2,002 SF (0.05 AC) AREA H 3,293 SF (0.08 AC) TOTAL AREA .4 A STREAM BUFFER MITIGATION/REPLACEMENT RATIO — 2:1 MITIGATION AREA REQUIRED = 40,520 SF (0.93 AC) MITIGATION AREA PROVIDED = 40,537 SF (0.93 AC) STREAM —BUFFER MITIGATION GENERAL PLANTING NOTES SITE PREPARATION SHOULD BEGIN IN THE FALL PRIOR TO THE TREE PLANTING AND SEEDING IF IT IS NECESSARY TO KILL OFF ANY INVASIVE UNDESIRED SPECIES WITH HERBICIDES. UNDESIRED SPECIES MAY INCLUDE MULTIFLORA ROSE, HONEYSUCKLE AND OTHER SPECIES DEEMED TO BE INVASIVE BY THE VIRGINIA DEPARTMENT OF CONSERVATION AND RECREATION. THE HERBICIDE SHOULD BE APPLIED BY A LICENSED SPRAY TECHNICIAN USING A NON —TOXIC, BIODEGRADABLE HERBICIDE TO CONTROL UNDESIRABLE VEGETATION. PRIOR TO TREE PLANTING AND SEEDING AT THE BEGINNING OF THE NEXT GROWING SEASON, THE GROUND SURFACE SHALL BE PREPARED AND ORDERED BY TILLING OR SCARIFYING TO A MINIMUM DEPTH OF 2". TEST SOIL PH; THE PH LEVEL WITHIN THE GENERALIZED ROOT ZONE OF STREAM BUFFER MITIGATION PLANTINGS SHOULD BE TESTED AND BROUGHT TO WITHIN A RANGE OF 6.0 TO 7.0. THE PH ADJUSTMENTS CAN BE MADE USING POWDERED LIME. ALL TREE SEEDLINGS SHALL BE BARE —ROOT, ONE YEAR OF AGE AND GROWN UNDER WET CULTIVATION CONDITION, WHERE PRACTICAL. PLANTING PATTERNS SHALL BE RANDOM AND MIXED FOR THE DIFFERENT TREE SPECIES WITH THE SPACING OF 5-7'. TREES SHALL BE PLANTED NO CLOSER THAN 5 FEET AND NO FURTHER THAN 100 FEET FROM THE TOP OF THE STREAM BANK ON BOTH SIDES OF THE CHANNEL. TREE SEEDLINGS SHOULD BE PLANTED AS SOON AS THE AMBIENT SOIL TEMPERATURE IS ABOVE 41' F THROUGH MAY. PLANTS SHALL REMAIN UPRIGHT DURING TRANSPORT/STORAGE. PLANTS STORED ONSITE MUST BE PLANTED WITHIN THREE DAYS OF DELIVERY. IN ADDITION, THE PLANTS SHOULD BE STORED IN A PROTECTED AREA UPON ARRIVAL IN ORDER TO SHADE THEM FROM EXPOSURE TO THE SUN AND DRYING WIND. PLANTS THAT CANNOT BE PLANTED IMMEDIATELY UPON DELIVERY SHALL BE KEPT WELL SHADED, PROTECTED, AND WATERED. ALL DAMAGED PLANTS SHALL BE REMOVED FROM STORAGE WHEREUPON THEY MAY BE USED AS MULCH UNLESS THEY ARE DISEASED. HOLES EXCAVATED FOR THE TREES SHALL BE 3—TIMES THE CONTAINER DIAMETER OR AT LEAST 6" WIDER THAN THE BARE ROOT DIAMETER. THE HOLES MAY BE EXCAVATED EITHER BY HAND SHOVEL OR BY POWER AUGER. EXCESS SOIL GENERATED FROM THE EXCAVATIONS SHALL BE DISPOSED OF RANDOMLY OVER THE SITE. THE PLANTS SHALL BE SET AT THE SAME DEPTH THAT THEY WERE GROWN IN AND THE TRUNK SHOULD BE SITUATED NEARLY PLUMB. AVOID PLANTING SEEDLINGS IN EXTREMELY DRY, HOT OR WINDING CONDITIONS. HEAT AND WIND CAN QUICKLY DRY OUT LEAVES AND ROOTS. WATER THE SOIL AROUND THE SEEDLINGS IMMEDIATELY AFTER PLANTING. AREAS COMPACTED BY FOOT OR VEHICLE TRAFFIC SHALL BE TILLED OR AERATED PRIOR TO RESEEDING AREA AFTER TREES HAVE BEEN PLANTED. BROADCAST THE SUGGESTED SEED MIX BY HAND OR MACHINE EVENLY OVER THE PLANTING AREA AND COVER THE SEEDS WITH APPROXIMATELY 1/4—INCH OF SOIL USING A DISK OR OTHER IMPLEMENT. AFTER SEEDS ARE COVERED, THE SOIL SHOULD BE LIGHTLY ROLLED TO ENSURE A GOOD SEED TO SOIL CONTACT FOLLOWED BY APPLICATION OF CHOPPED AND BLOWN WHEAT STRAW MULCH. NO STORAGE OF HERBICIDES OR OTHER AGRICULTURAL CHEMICALS SHALL BE PERMITTED NEAR THE PLANT STORAGE OR MITIGATION AREAS. IIL NOTE: FOR BLOCK 32, A PORTION OF THE REQUIRED MITIGATION AREA IS ADDRESSED BY PLANTING AREAS 1 AND 5 IN THE "STREAM BUFFER MITIGATION MASTER PLAN" (WP0201900007). COMBINED THESE AREAS ACCOUNT FOR 40,537 SF OF THE MITIGATION. PLANING AREA #3 FROM WP0201900007 WILL BE HELD IN RESERVE AND WILL NOT BE PLANTED AT THIS TIME A U o m w H ^ s �o U ON Q0',O z zco �Y* 0 Cn Q 0) < J O � Ir 00 a( m 0-z =W pin 0_o D W J O O2 �Q Q v U ZO 001 > o Cf) o w (7 V1 0 z r N � Y-� O a W N N W Q Z O U J a J } 7 > O = 0 W a 00 Fil W O U) o = oO O REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE V=30' Op pr�� �o{��AyTH U 97 Jimmy L. Taggart Lic. No. 4 Ado 052je4121 }�w F�&SIONAL E�Gl r r O O O i 00 ZT O z LU a_ � (� Q O Ems— W Q J N> Q z z _j (y) ; w _j>Yz �JUO o 10QO° z l J _ z O W OTC U J m F Oz0 U O Ir W 06 FILE NUMBER 8053 SHEET 11 OF 14 Q:\RGA\TMPROJ\8053-OLD TRAIL\Block 32\ENGINEERING\DWG\8053-OLD TRAIL- Block 32 - WPO.dwo Q:\RGA\TMPROJ\8053-OLD TRAIL\Block 32\ENGINEERINGDWG\8053-OLD TRAIL- Block 32 - WPO.dwa Q:\RGA\TMPROJ\8053-OLD TRAIL\Block 32\ENGINEERINGDWG\8053-OLD TRAIL- Block 32 - WPO.dwa I, ALBEMARLE COUNTY RECORD DRAWING REQUIREMENTS (AS -BUILT) FOR VSMP • A SIGNED AND DATED PROFESSIONAL SEAL OF THE PREPARING ENGINEER OR SURVEYOR. • THE NAME AND ADDRESS OF THE FIRM AND INDIVIDUAL PREPARING THE DRAWINGS ON THE TITLE SHEET. • THE CONSTRUCTED LOCATION OF ALL ITEMS ASSOCIATED WITH EACH FACILITY, AND THE INSPECTION RECORDS TO VERIFY PROPER DIMENSIONS, MATERIALS AND INSTALLATION. THE ITEMS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: 1. INSPECTION RECORDS AND PHOTOGRAPHS FOR PIPE TRENCHES AND BEDDING, INCLUDING UNDERDRAINS. 2. VIDEO PIPE INSPECTION FOR ANY PIPES WHICH ARE NOT ACCESSIBLE OR VIEWABLE. 3. UPDATED LOCATION WITH GEO-COORDINATES OF ALL FACILITIES. 4. VERIFIED DRAINAGE AREA MAPS FOR THE DRAINAGE AREA TREATED, AND FOR DRAINAGE TO THE FACILITIES. 5. CURRENT PHYSICAL AND TOPOGRAPHIC SURVEY FOR ALL EARTHEN STRUCTURES. PONDS SHOULD INCLUDE A SURVEY OF THE POND BOTTOM. SURVEYS SHOULD VERIFY POND VOLUMES ARE PER DESIGN. CORRECTIONS MAY BE REQUIRED FOR ALTERATIONS FROM THE DESIGN. 6. PLANTS, LOCATION AND TYPE. 7. PLANS AND PROFILES FOR ALL CULVERTS, PIPES, RISERS, WEIRS AND DRAINAGE STRUCTURES - DISPLAY THE INSTALLED TYPE OF DRAINAGE STRUCTURES, CULVERT/PIPE SIZE, WEIRS, MATERIALS, INLETS OR END TREATMENT(S), INLET AND OUTLET PROTECTION, ALIGNMENT AND INVERT ELEVATIONS COMPARED TO DESIGN. 8. COMPUTATIONS: FOR SIGNIFICANT DEVIATIONS FROM DESIGN, PROVIDE SEALED COMPUTATIONS VERIFYING THAT THE AS -BUILT CONDITION IS EQUIVALENT OR BETTER THAN DESIGN. 9. DITCH LINES - DISPLAY THE CONSTRUCTED LOCATION OF ALL DITCH LINES AND CHANNELS, INCLUDING TYPICAL SECTIONS AND LININGS. 10. EASEMENTS - SHOW ALL PLATTED EASEMENTS WITH DEED BOOK REFERENCES LABELED. FACILITIES AND DRAINAGE MUST BE WITHIN PLATTED EASEMENTS. PROVIDE COPIES OF RECORDED DOCUMENTS. (INCLUDED) 11. GUARDRAIL, FENCES OR OTHER SAFETY PROVISIONS - DISPLAY THE CONSTRUCTED LOCATION OF ALL SAFETY PROVISIONS; FENCES, GUARDRAIL, INCLUDING THE TYPE, LENGTH AND APPLIED END TREATMENTS, COMPARED TO DESIGN. 12. MATERIAL LAYERS -BIOFILTER MEDIA, STONE LAYERS, SAND LAYERS, KEYWAYS AND CORES MUST BE VERIFIED AS TO MATERIAL TYPES AND DEPTHS. INCLUDE INSPECTION REPORTS, BORING OR TEST PIT REPORTS AND MATERIALS CERTIFICATIONS. BIOFILTER MEDIA MUST BE AN APPROVED STATE MIX. 13. ACCESS ROADS -SHOW LOCATION OF ACCESS ROADS, SURFACE TREATMENT, DRAINAGE, ETC, AS APPLICABLE. 14. COMPACTION REPORTS ARE REQUIRED TO VERIFY FILL COMPACTION IN DAMS. 15. MANUFACTURERS CERTIFICATIONS FOR PROPRIETARY BMP'S CERTIFYING PROPER INSTALLATION AND FUNCTIONING. L71 A TIi . . - _- • v. %via . BIOFILTER LANDSCAPE PLAN PLANT LIST SYMBOL QUANTITY BOTANICAL NAME COMMON NAME SUE COMMENT BIN 2 Betula nigra "Heritage' Heritage River Birch 6' Ht. 25' O.C. SPACING CO 12 Cephalanthus occidentalis Buttonbush 18-24" Ht. 10' O.C. SPACING CS 12 Cornus sericea'Baileyi' Bailey Red Twig Dogwood 18-24" Ht. 8' O.C. SPACING HV 12 Hamamelis virginiana Common Witchhazel 24-36" Ht. 15' O.C. SPACING HM 30 Hibiscus moscheutos Crimson -Eyed Rose -Mallow 1 Gal. Cont. 3' O.C. SPACING RSW 38 Ilex verticillata "Red Sprite" Red Sprite Winterberry 18-24" Ht. T O.C. SPACING JDW 6 Ilex verticillata "Jim Dandy" Jim Dandy Winterberry 18-24" Ht. 5' O.C. SPACING VD 15 Viburnum dentatum Arrowwood Viburnum 24-36" Ht. 10' O.C. SPACING MIX 1 0.5 LBS Ernst Conservation Seeds, Inc. ERNMX-180-2 -- Southeast Rain Garden Mix or Equivalent 20 SCALE: 1 0 20 40 60 GENERAL NOTES & MINIMUM STANDARDS 1. PLANT LIST TOTALS ARE FOR CONVENIENCE ONLY AND SHALL BE VERIFIED PRIOR TO BIDDING. 2. TIMING OF INSTALLATION: LANDSCAPING IN BIO—FILTER SHALL BE THE FINAL STEP IN CONVERSION OR CONSTRUCTION AFTER ALL OF THE UPSLOPE AREAS HAVE BEEN STABILIZED. 3. MIX 1 SHALL BE BROADCAST BY HAND OVER THE ENTIRE SURFACE AREA OF THE BIOFILTER AFTER THE MULCH HAS BEEN PLACED, RAKE SEED MIX INTO MULCH TO ENSURE GOOD CONTACT FOR GERMINATION. THE SEED MIX IS TO BE APPLIED WITHOUT THE SUGGESTED COVER CROP. 4. ALL SHRUBS TO BE PLANTED SHALL MEET THE SPECIFICATION OF THE AMERICAN ASSOCIATION OF NURSERYMEN. PLANTING SHALL BE DONE IN ACCORDANCE WITH EITHER THE STANDARDIZED LANDSCAPE SPECIFICATIONS JOINTLY ADOPTED BY THE VIRGINIA NURSERYMEN'S ASSOCIATION, THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS OR THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, OR THE ROAD AND BRIDGE SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION. 5. CONTRACTOR SHALL ASCERTAIN LOCATION OF ALL UTILITIES PRIOR TO EXCAVATION. PRIOR TO COMMENCING ANY WORK, CONTACT "MISS UTILITY" AT 1-800-552-7001. 6. ALL PLANT MATERIAL TO BE GUARANTEED DURING INSTALLATION AND UNTIL FINAL PROJECT ACCEPTANCE. ANY PLANT MATERIAL WHICH DIES, IS DAMAGED OR DISEASED, OR IS UNHEALTHY AND IN UNSIGHTLY CONDITION, OR OTHER CAUSES DUE TO CONTRACTOR'S NEGLIGENCE SHALL BE REPLACED IMMEDIATELY AT THE CONTRACTOR'S EXPENSE. 7. ALL SITE PLANTINGS OF TREES AND SHRUBS SHALL BE ALLOWED TO REACH, AND BE MAINTAINED AT MATURE HEIGHT. THE TOPPING OF TREES IS PROHIBITED. SHRUBS AND TREES SHALL BE PRUNED MINIMALLY AND ONLY TO SUPPORT THE OVERALL HEALTH OF THE PLANT. J r U 7 m p w ^ �o U ° O Z z U) 0ID �Y� 02 to J 1- 0) taw U Q T Ir J = OU ¢� m o Z =w Q ow wo 0 0 OQ �a 12 v IE z� �¢_ > o W o W En Z O aW N w Q Z J > O vaiw a J >- V > =Zw OaZ o) •,/ Fil w o UQ m= rn U REVISIONS COUNTY COMMENTS Feb 15, 2019 COUNTY COMMENTS April 15, 2019 FOR APPROVAL May 21, 2019 REV. MITIGATION PLANTING AREAS May 21, 2021 CONTOURS 2 FOOT DATE October 22, 2018 SCALE AS SHOWN AyTH Op pr�� 97 Jimmy L. Taggart Lic. No. 2 4 A'Po 05Z 214121 �V910NAL B�Gl r` 0 O O w T z W o LLI Q �:D W W z Q4 C7 Q� J N> zzJ(Y)> _j>Yz J 0 Q WQQO° _ 1221 w O w P4 2 0 C) W �U J oz0 <W 0 a U) O Q W z 06 FILE NUMBER 8053 SHEET 14 OF 14 WRGA\TMPROA8053-01-13 TRAIL\Block 32\ENGINEERINGOWG\8053-01-13 TRAIL- Block 32 - WPO.dwa