HomeMy WebLinkAboutSDP202100022 Study 2021-06-07SHIMP ENGINEERING, P.C. Design Focused Engineering June 7, 2021 Adam Moore Virginia Department of Transportation 701 Vdot Way Charlottesville, Virginia 22911 RE: SDP2021-00022 Albemarle Business Campus — Block 5 — Final Site Plan Turn Lane Warrant Analysis Dear Mr. Moore, Please find attached a warrant analysis for Albemarle Business Campus — Block 5. The final site plan proposes self -storage and retail uses within a mixed -use development. As a Neighborhood Model District, Albemarle Business Campus (ABC)'s turn lane warrant analysis analyzes a full build -out scenario to ensure appropriate infrastructure is provided at the time of the first phase of development (Block 5 self - storage, retail, and interior private street). Please note that a summary of changes has been included with this submission for clarification. The following items are included with this report: • Transmittal Summary • VDOT 2019 Traffic Data • ITE Trip Generation Summary • Warrant Analysis Exhibits The attached analysis shows that a taper is warranted at the partial access entrance on Route 780 Old Lynchburg Road. If you have any questions, you may contact me at Tustin(a7shintp-eneineerina.com or by phone at 434- 953-6116. Regards, Justin Shimp �Vy TIi Op Shimp Engineering, P.C. M. S1RMP o. 45183 ,III( 912 E High St Charlottesville, VA 22902 1 434 227 5140 1 shimp engineering cam 1. Transmittal Summary (Revisions to May 14, 2021 Submission) After receiving comments from the Virginia Department of Transportation, the right turn analysis was revised to remove adjusted right turns, as the total volume exceeds 300. Additionally, the May 14, 2021 submission included trip generation data from the zoning map amendment of the property (approved ZMA201900003), which had planned for high intensity use of the property of frill build -out construction. This access management exception request is provided as part of the final site plan for Block 5 of the Albemarle Business Campus. As the final site plan for Block 5 nears completion, trip generation included in this request has been updated to reflect established trip generation numbers, as provided for on the final site plan for Block 5 (SDP2021- 00022). 2. VDOT 2019 Traffic Data The following table provides VDOT 2019 traffic data on the 0.47-mile segment of Route 780 from Route 631 to SCL Charlottesville. The speed limit on this portion of Route 780 Old Lynchburg Road is 35-mph. Route 780 Old Lynchburg Road 2-lane road 0.47-mile segment 35-m h AADT 2019 3800 K 0.101 D 0.653 Peak Hour Total 384 Peak Hour Direction A 251 Peak Hour Direction B 133 3. ITE Trip Generation Summary The following trip generation was provided by ITE Trip Generation, 10" Edition. The data for Blocks 1-4 was utilized for the zoning map amendment of the property (approved ZMA201900003), which incorporated very conservative estimates; the provided trip generation seeks to demonstrate high intensity use of the property, which is likely an overrepresentation of actual build -out of Albemarle Business Campus. Trip generation for Block 5 has since been updated for this access management exception request, as this request is provided as part of Block 5's final site plan which now has established land uses for this portion of the property. The trip generation estimates provided for Block 5 are consistent with those included with the Block 5 final site plan (SDP2021-00022). Because this turn lane warrant analysis studies a full build -out scenario, trips generated by Block 1 (multifamily) were incorporated into the advancing volume, as the residential portion of the development is proposed further north of Blocks 2-5, at the intersection of Route 780 and Country Green Road. From the multifamily peak hour trips, it is assumed that 50% of trips would be traveling southbound from the City of Charlottesville, while 50% of trips would be traveling northbound from Route 631, contributing to the advancing volume. Another assumption that was incorporated to the analyzed turns is the presence of two entrances. A partial access entrance is proposed on Route 780 Old Lynchburg Road and a second entrance is proposed off of the existing private street, Wahoo Way. Due to the configuration of these entrances and likely ease of access, it is assumed that 80% of trips generated by Blocks 4 & 5 would utilize the partial access entrance and 25% of trips generated by Blocks 2 & 3 would utilize the partial access entrance. The evening scenario was analyzed, as the higher number of right turns is expected to occur in this timeframe. Updated ITE Trip Generation: Block 5 (SDP2021-00022) ITE Code Independent Variable AM PM In I Out I Total I In I Out Total BLOCKS Mini- Warehouse 151 103,500 SF 6 4 10 8 10 18 Quality Restaurant 931 3,800 SF 2 1 3 20 10 30 Subtotal Block 5 8 28 ITE Trip Generation: Blocks 1-4 (ZMA2019-00003) BLOCK4 Apparel Store 876 4,200 SF 3 1 4 9 8 17 Variety Store 814 6,000 SF 11 8 19 21 20 41 Subtotal Block 4 14 30 Subtotal Blocks 4 & 5 22 58 Right Turns 80% 18 47 BLOCK3 Office Park 750 70,800 SF 91 11 102 5 71 76 BLOCK2 Business Hotel 312 125 Rooms 20 29 49 22 18 40 Subtotal Blocks 2 & 3 111 27 Right Turns 25% 28 7 Total Right Turns into Partial Access Entrance Blocks 2-5 45 54 BLOCK Multifamily Housing Mid -Rise 221 128 Units 12 34 46 34 22 56 Contributing Advancing Volume (50% of Trips from Route 631 onto Route 780 6 17 Turns In Advancing Advancing + Multifamily Morning Right 45 178 185 Evening Right 54 304 321 4. Warrant Analysis Exhibits Given the existing background traffic, the new trips generated by Blocks 2-5, and the contributing advancing volume by Block 1, a taper is warranted into the partial access into Blocks 2-5. F-79 PKV APPRO..�.32L AL. VEMOLES PER HOUR Appropriate Radius required at all Intersections and Entrances (Commercial or Private). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Right Turns For posted speeds at or under 45 mph, PHV right turns > 40. and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula PHV = ADT x K x D K = the percent of AADT occurring in the Peak hour D = the percent of traffic in the peak direction of flow Note An average of 11% for K x D will suffice Wtm right turn facilities are warranted. see Figure 3-1 for design criteria FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Rev 1115