Loading...
HomeMy WebLinkAboutWPO202000032 Correspondence 2021-06-08David James From: Daniel Hyer <dhyer@line-grade.com> Sent: Tuesday, June 8, 2021 4.44 PM To: David James Cc: Ryan Cheney Subject: Cost of Underground system at Sheetz Follow Up Flag: FollowUp Flag Status: Flagged CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. David: See below from the GC for Sheetz. Underground detention is 122k Thanks! DANIEL HYER, PE 434.262.0169 dhyer@line-grade.com Line and Grade Adaptive. Responsive. Resilient. line-erade.com (Sent from Mobile Device) Begin forwarded message: From: David Thornton <dthornton@ccg-builds.com> Date: June 8, 2021 at 4:25:51 PM EDT To: Daniel Hyer <dhyer@line-grade.com> Cc: Andrew baldwin <andrew@corecville.com>, Ryan Cheney <rcheney@line-grade.com> Subject: RE: as builts Daniel, The underground system installed in place was $122,000. From: Daniel Hyer <dhyer@line-grade.com> Sent: Tuesday, June 08, 20219:23 AM To: David Thornton <dthornton@ccg-builds.com> Cc: Andrew baldwin <andrew@corecville.com>; Ryan Cheney <rcheney@line-grade.com> Subject: Re: as builts USE CAUTION: This email was sent from outside of our server Hey David, As Andrew mentioned, the County is trying to wrap up the bond paperwork for Sheetz and all we need is a line item cost for the underground detention system. Do you have a method to break that number out from the overall SWM costs? If so, that would help get this administrative task wrapped up. Thank you. DANIEL HYER, PE 434.962.2430 OverCoiline-arade.com Line and Grade Adaptive. Responsive. Resilient. line-arade.00m On Mon, Jun 7, 2021 at 3:49 PM Andrew baldwin <andrew@corecville.com> wrote: Hey man, sorry I didnt get back to you last week. As builts have been ordered a bit ago, but roudabush is considerably backed up. They said they would get to asap. I also spoke to Sheila and she said if it shows it was not built to spec they would deal with it. As a side note, I am wrapping up posting bonds on Sheetz and need to know (if you can) what you were carrying in the costs for the underground detention. Let me know when you can. Best Andrew <i m age001.j pg>