Loading...
HomeMy WebLinkAboutSDP202100019 Correspondence 2021-06-08 (2)f 608 Preston Avenue P 434.295.5624 Suite 200 IF434.295.1800 T I M M O N S GROUP Charlottesville, VA 22903 www.timmons.com June 8, 2021 Megan Nedostup Albemarle County Community Dev. 401 McIntire Rd Charlottesville, VA 22902 RE: Southwood Village Phase 1— Major Amendment 1 Plan Review — SDP2021-19 — Comment Response Letter Dear Ms. Nedostup: We have reviewed all of your comments dated May 3, 2021 and made the necessary revisions. Please find our responses to the comments below in bold lettering. 1. Revise the site plan number to reflect the new application number on the cover sheet. The site plan number has been revised to be SDP202100019. 2. [32.5.2(a)] Indicate on the cover sheet in the narrative which new units have been added so that it is easier to distinguish the changes proposed with this plan. Please note that lots are not approved with a site plan and a separate subdivision plat will need to be approved. The narrative on sheet C0.00 has been revised to include which lots have been subdivided and which lots have new units, water service, and sanitary laterals added to it. 3. [32.5.2(a)] Many of the charts have not been updated to include the additional units including: parking, trip generation, housing mixture plan, etc. All information related to the changes needs to be updated. QC the plans to make sure relevant information has been updated. Additionally, the housing mixture plan table should have a total at the bottom. The parking table, trip generation table, and housing mixture table have been updated to reflect the current plan. 4. [32.5.2(a)] Notes also need to be updated if impacted by this amendment. For example, note #2 on the cover sheet states that all the units are to be affordable, however, the narrative states that market rate units were added. Revise and QC all notes and sheets. Notes have been revised to reflect the amendment. Note #2 on the cover sheet has been removed. ENGINEERING I DESIGN I TECHNOLOGY 5. [32.5.2(a)] Include the ZMA number on the plans with the zoning district note (ZMA2018-003). The ZMA number has been added to the zoning district note. 6. [32.5.2(b); Code of Development page 13] Provide the proposed height of the building/units. Proposed building heights have been added to sheet C0.01. 7. [32.5.2(b)] Recommend moving the tracking information for both the units/density (Table 4) and the open space/amenities (Table 7) to sheet 2 so that all the tracking information is on one sheet. In addition, on the density chart it appears that a lot was lost from the previous approval in Block 6, please make sure the number of lots/units is accurate. Table 4 and Table 7 have their own sheets (sheet C4.05 and C4.06, respectively) due to previous county comments on SDP202000048. The Density Regulations by Block Summary table (Table 4) has been updated accordingly on sheet C4.05. B. [32.5.2(b)] In addition to the above, it appears that the required amount of greenspace is not being provided as shown in Table 7. The table lists 2 acres provided, but 10 acres required. Please clarify. Table 7 has been revised accordingly. The requirements are for all of Southwood Phase 1. This plan is only for a portion of Phase 1. Therefore, some of the proposed areas are less than the required areas. Due to previous county comments, the green space provided is only green space that will not be developed in future phases. 9. [32.5.2(b)] Show the maximum setback on the layout plans. According to Table 5 on sheet C0.01, there are no maximum setbacks. 10. [32.5.7.9] It is highly recommended that the landscape plans only show required landscaping and that a separate bid sheet be developed that has all the landscaping for the contractor that is not approved by the County. Otherwise, what gets approved, ends up being required and inspected by the Code Compliance Officers, so any future change to any landscaping that is on the approved plans will require a letter of revision or other type of amendment to the plans. Acknowledged. CDD Engineering — Matthew Wentland — 05-03-2021: 1. The WPO amendment will need to be approved prior to site plan amendment approval. Acknowledged. 2. A road plan amendment will be required and will need to be approved prior to site plan amendment approval. Acknowledged. 3. The match lines between sheets do not appear to match. Match lines have been revised to match between sheets. 4. Provide fence and or railing around the proposed pond, as it is located close to backyards and adjacent to the proposed trail. A fence has been added around the proposed pond. 5. Per the Code of Development, residential lots are to be located outside of stream buffers, preserved slopes, and floodplains. Several lots on Wardell Crest will need to be revised. Lots along Wardell Crest have been revised to be located outside of stream buffers, preserved slopes, and floodplains. Fire Rescue —Howard Lagomarsino — 05-03-2021: 1. On page 21, The west turn radius (closest to Cardinal Hill Lane) into the parking lot servicing Condo #1 needs to be 25 ft. to accommodate emergency apparatus turn radius capability. The radius of the emergency access road and parking lot intersection has been revised to be 25' per e-mail conversation on May 18, 2021. 2. Please provide ISO calculated fire flow for a representative sample of building types and add as a note on plan, preferably on same page as hydrant fire flow rates. ISO calculated fire flow has been sent to Howard Lagomarsino on May 19, 2021 and a note has been added to sheet C9.1. CDD E911— Elise Kiewra — 04-10-2021: 1. Per site plan dated 03/18/2021— page 25, 26 says Cardinal Lane instead of Cardinal Hill Lane, please udpate. Sheets C8.02, C8.03, and C8.04 have been revised to say Cardinal Hill Lane. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to email me at clint.shifflett@timmons.com . Sincerely, Clint Shifflett, PE Project Manager