Loading...
HomeMy WebLinkAboutSDP202000077 Correspondence 2021-06-09 (2)I® COLLINS ENGINEERING May 18, 2021 Bill Fritz Planning Division 401 McIntire Road Charlottesville, VA 22902 RE: White Gables Major Site Plan Amendment SDP202000077) 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Thank you for your comments dated January 28, 2021 on the above referenced project. Below are our responses to the remaining comments on the road plans. CDD (Bill Fritz) 1. Conservation checklist has been signed. Please see sheet 6. Engineering (Emily Cox) 1. This comment is acknowledged. 2. Comment addressed. 3. Signed and sealed engineering plans for the retaining wall are included with this submission 4. This comment is acknowledged. The plat containing these easements are under review. 5. Comment addressed. 6. Curb detail is provided on sheet 4 as well as callouts. 7. This comment is addressed. 8. Comment addressed. 9. Comment addressed. 10. Comment addressed. 11. Grass pavers have been removed as shown on sheet 4. The extra width of roadway is proposed as new pavement instead of grass pavers. Fire Rescue (Shawn Maddox) 1. ISO calculations were corrected for automatic sprinkler reduction. Please see updated calculations attached. The needed fire flow for each building is below the Q20 test. Please see attached fire flow certification letter with this submission. CDD ARB (Margaret Maliszewski) 1. This details will be added to the ARB submission 2. The standard mechanical note has been added on sheet 4, below the north arrow. 3. This view will be included in the next ARB submission. ACSA (Richard Nelson) 1. Updated Fixture Counts are included as an attachment with this submission. A 2" meter is shown on Sheet 4. 2. Should you have any questions, please feel free to contact Scott Collins at Scott@collins-engineering.com. Sincerely, Scott Collins, PE