Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP202000061 Study 2021-06-11
SEWER DATA SHEET Date 5/19/2021 (1) Project Name Airport Road Sheetz (2) Project Location 3510 Seminole Trail, Charlottesville, VA 22911 (3) Consultant Line and Grade Civil Engineering (4) Wastewater Treatment Facility Moores Creek WWTP (5) Design Population 42 Restaurant seats @ 180gpd (16 hrs)=7560gpd (6) Industrial Waste None (7) Pipe Material SDR-26 PVC (8) Pipe Diameter (Inches) DIP Length (Feet) PVC Length (Feet) 6" 120 10" 12" 15" 18.1 21" 24" (9) Total Pipe Length (Feet) (10) Manholes: (A) Standard (B) Drop (11) (A) Siphons & Pump Stations (B) Force Main (Size -Length) 2 N/A N/A N/A 120 Authority Provide: Drainage Basin RWSA Interceptor Sub Drainage Basin ACSA Trunk Sewer or Collector Main IT (Number) (Number) (Number) (Inches -Feet) WATER DATA SHEET Date 5/19/2021 (1) Project Name Airport Road Sheetz (2) Project Location 3510 Seminole Trail, Charlottesville, VA 22911 (3) Consultant Line and Grade Civil Engineering (4) Primary Water Plant North Rivanna WTP (5) Design Population 42 Restaurant seats @ 180gpd (16 hrs)=7560gpd (6) Hydraulic Capacity From Fire Flow Analysis (Q20) = 3,171 GPM (7) Pipe Material SDR-26 PVC (8) Pipe Diameter (Inches) Length (Feet) 4" 9 6" 8" 101, J m, (9) Total Pipe Length (10) Fire Hydrant Assemblies (11) Blow -off Assemblies (12) Air Relief Valves (13) Gate Valves (Inches) A" C� 8" 101, 12" 94 103 1 0 0 Quantity (Number) 2 2 (14) Minimum pressure at critical water meter Authority Provide: Booster Station Water Storage Tank Pressure Zone A-1 101 (Feet) (Number) (Number) (Number) (20 psi required)