Loading...
HomeMy WebLinkAboutSDP201800070 Review Comments Final Site Plan and Comps. 2018-10-16 Christopher Perez From: Christopher Perez Sent: Wednesday, October 17, 2018 7:40 AM To: 'Jonathan.Showalter@timmons.com' Cc: David James Subject: FW: Lighthouse FSP - comments done Jonathan, Below are Engineering's comments on the final site plan for Lighthouse. From: David James Sent:Tuesday, October 16, 2018 4:02 PM To:Christopher Perez<cperez@albemarle.org> Subject: Lighthouse FSP-comments done Review Comments for SDP2O1800070 Final Site Development Plai Project Name: Lighthouse Instruments -Final Date Completed: Tuesday, October 16, 2018 Department/Division/Agency: Review Status: Reviewer: David James CDD Engineering Requested ChangE 1_ WPO plan approval required prior to FSP approval_ 2. Road plan approval required prior to FSP approval. 3.Add SDP#to cover sheet (under title)_ 4_ Sheet C1.0 - Remove Stormwater Management note & redundant General Construction note. 6_ Sheet C2.0— Show the County's existing GIS steep slope overlay for preserved/managed slopes_ 6_ Provide engineered plans and computations for the retaining wall design for all the walls that are next to parking or travelways. Specify all structural components and dimensions of wall_ The following items will be required [DSfvl]: a_ Atypical detail. (VDOT standard walls are acceptable) b_ Specific details as required for unusual or possibly conflicting areas_ An example is where utilities are expected through walls or footings. c. Certified computations to support the design (for wall over 4' high). All soil and bearing assumptions, as well as reinforcement materials and assumed loadings must be included_ 7. Provide guardrail over any slope steeper than 3:1, wall, or drop-off greater than 4', with start and end sections labeled, s VDOT designations (GR-2, GR-2a, etc.). 8_ Provide safety provision(s)for vehicles and pedestrians for walls over 30r high. This is typically a guardrail, wall, or fenc [DSivl]_ 9_ Show bumper block.dimensions in detail_ Bumper blocks shall be constructed of a durable material such as concrete treated timbers_ Each bumper block shall be a minimum length of six (6)feet, a maximum height of five (5) inches, and sl- securely anchored into the pavement in at least two (2) places. 10_ Show all proposed easements outside of ROW. 11. Provide evidence that neighboring property owner is in agreement with this offsite work in the easement or record an easement plat. This can be a letter of agreement signed by neighboring property owner or record an easement plat. {DSN Sect_ 8C, 3F} Note: Drainage design is being addressed on the road plans 1