Loading...
HomeMy WebLinkAboutSDP201800070 Correspondence Final Site Plan and Comps. 2019-02-19 Christopher Perez From: Frank Pohl Sent: Tuesday, February 19, 2019 7:09 PM To: Jonathan Showalter Cc: David James; Christopher Perez;James Veale;John Hulburt;James Veale Subject: RE: 2018-070 Lighthouse Instruments - Final Site Plan Johnathan, I am going to go ahead and cancel tomorrow's meeting. In the effort to keep this moving forward, please refer to page 15 of the County Design Standards Manual. http://www.albemarle.org/upload/images/forms center/departments/community development/forms/design standa rds manual/Albemarle County Design Standards Manual 2015-04-25 draft.pdf The manual includes a sketch and calculation for a typical utility easement. If you are seeking something wider, justification is required. Note that minimizing impacts to the preserved slopes is required. I will say I have never seen an easement this wide for utilities this shallow. Having a work area the width of a two-lane road (25-ft) on each side of the trench is not typical. If you'd like to discuss, please let me know. I think we can go over this with a phone call. Thanks, Frank Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville,VA 22902 434-296-5832 (ext. 7914) From:Jonathan Showalter<Jonathan.Showalter@timmons.com> Sent:Tuesday, February 19, 2019 9:28 AM To: Frank Pohl<fpohl@albemarle.org> Cc: David James<djames2@albemarle.org>; Christopher Perez<cperez@albemarle.org>;James Veale <jveale@lighthouseinstruments.com>; Brad Nichols<brad@martinhorn.com>;Tyler Gifford <tyler@martinhorn.com>; Duane Oot<ootduane@gmail.com>;John Hulburt<jhulburt@lighthouseinstruments.com>;James Veale <jveale@lighthouseinstruments.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Frank, Talking with the owner we are watching the weather and see there is a chance of snow and ice tomorrow. Is there a backup time we can set up for Thursday in the event tomorrow is not possible? Thank you, Jonathan From:Jonathan Showalter Sent: Monday, February 18, 2019 6:04 PM To: 'Frank Pohl'<fpohl@albemarle.org> 1 Cc: David James<djames2@albemi rg>; Christopher Perez<cperez@albem,.... .Jrg>;James Veale <Iveale@lighthouseinstruments.com>; Brad Nichols<brad@martinhorn.com>;Tyler Gifford<tvler@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Frank, Thank you for your email and for being willing to meet. Wednesday at 3:30 works well for us. We will come down to community development. Look forward to talking to you then, Jonathan From: Frank Pohl<fpohl@albemarle.org> Sent:Thursday, February 14, 2019 8:39 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Cc: David James<diames2@albemarle.org>; Christopher Perez<cperez@albemarle.org>;James Veale <Iveale@lighthouseinstruments.com>; Brad Nichols<brad@martinhorn.com>;Tyler Gifford <tyler@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Jonathan, I think it would be better if we discussed this in person. Please let me know when you and the owner are available to meet. We usually meet on Thursdays, but knowing how important this issue is,we can meet as soon as you can. Here are some times that I have available: - Today at 3:30 or 4. - Tomorrow any time after 10:30. - Tuesday 2/19 at 4. - Wednesday 2/20 after 3. Thanks, Frank Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville,VA 22902 434-296-5832 (ext. 7914) From:Jonathan Showalter<Jonathan.Showalter@timmons.com> Sent:Wednesday, February 13, 2019 4:16 PM To: Frank Pohl<fpohl@albemarle.org> Cc: David James<djames2@albemarle.org>; Christopher Perez<cperez@albemarle.org>;James Veale <Iveale@lighthouseinstruments.com>; Brad Nichols<brad@martinhorn.com>;Tyler Gifford <tyler@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan David and Chris, Please see the two attached details that demonstrate that the proposed private sewer lateral can be installed parallel to the either the ex. channel or proposed stormwater pipe without requiring additional disturbance beyond that which would be required for the public storm conveyance system. For the sewer we plan to install it per the attached ACSA detail which will keep the depth of excavation for the sewer to be much less than what was shown in the previous designs for the sewer line. 2 • Lighthouse is still determining which of the two routings for the storm and sewer the will proceed with based off conversations with the neighboring land owners. We have been coordinating with Martin Horn the contractor and based on the steep nature of the slope they believe to maintain or replace the ex. channel or to install the proposed storm pipe they will need 25' of room on either side of the trenching or channel to allow for equipment access,circulation, slope benching and stockpile of material. This is reflected in the updated limits of disturbance on each PDF. The first section on each page shows the disturbance that would be necessary to install the storm pipe or channel system. The second shows how the sewer trenching disturbance fits within the total corridor of disturbance for the storm pipe or channel. We feel these on these exhibits demonstrate that either routing option will not require additional disturbance outside of the by-right disturbance for either the proposed storm pipe or the ex. corridor of disturbance required to replace or maintain the ex. concrete channel. Please let us know if you concur and if per the emails below you can confirm we will not need a special use permit for the installation of the sewer lateral for this project. Or please let us know if you have any comments or questions. Thank you, Jonathan From: Frank Pohl<fpohl@albemarle.org> Sent:Tuesday,January 29, 2019 8:10 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Cc: David James<djames2@albemarle.org>; Christopher Perez<cperez@albemarle.org> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Jonathan, David will be reviewing this from here on out, please submit everything to his attention if it is VSMP related. If site plan related, it should be directed to Chris, with David copied. Thanks, Frank Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville,VA 22902 434-296-5832 (ext. 7914) From:Jonathan Showalter<Jonathan.Showalter@timmons.com> Sent: Monday,January 28, 2019 5:45 PM To: Frank Pohl <fpohl@albemarle.org>; Christopher Perez<cperez@albemarle.org> Cc: David James<diames2@albemarle.org>; Tyler Gifford <tyler@martinhorn.com>; Brad Nichols <brad@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Frank, 3 • Sorry I missed this before sending r it email. Thank you very much for your lination and determination on this item. We will keep this in mind as update the storm/sewer design and provide a detail for your further review as soon as we are able for the public storm easement and the sewer lateral disturbance. Thank you, Jonathan From: Frank Pohl<fpohl@albemarle.org> Sent: Monday,January 28, 2019 4:52 PM To: Christopher Perez<cperez@albemarle.org>;Jonathan Showalter<Jonathan.Showalter@timmons.com> Cc: David James<djames2@albemarle.org>;Tyler Gifford <tyler@martinhorn.com>; Brad Nichols <brad@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Jonathan, I spoke with Chris with the following determination.The private sewer lateral can be located within the 'public' storm easement with a minimum 5-ft of separation between the two. However,you will need to provide a cross section on the plans to show land disturbance is not required beyond the limits of the easement. Note that the adjacent land owner will need to be a party to the public drainage deed of easement and plat.There will also need to be a deed of easement and plat for the private sewer lateral, but the County will not be a part of that deed/plat. Thanks, Frank Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville,VA 22902 434-296-5832 (ext. 7914) From: Christopher Perez Sent: Monday,January 28, 2019 11:15 AM To: Frank Pohl <fpohl@albemarle.org>;Jonathan Showalter<Jonathan.Showalter@timmons.com> Cc: David James<djames2@albemarle.org>;Tyler Gifford <tyler@martinhorn.com>; Brad Nichols <brad@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Jonathan, Attached are the County review comments for the proposal. Christopher Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road l Charlottesville,VA 22902 434.296.5832 ext.3443 From: Frank Pohl<fpohl@albemarle.org> Sent: Monday,January 28, 2019 8:17 AM 4 • To: Christopher Perez<cperez@albi le.org>;Jonathan Showalter<Jonathan.: 'alter@timmons.com> Cc: David James<djames2@albemarle.org>;Tyler Gifford <tyler@martinhorn.com>; Brad Nichols <brad@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Jonathan, Chris and I spoke and have the following determination. 1. Storm piping: since this includes runoff from the public right-of-way, it qualifies as a public facility and can be routed through the critical slopes.The preserved slopes should be preserved to the maximum extent practicable [30.7.4.b.1.c(iii)], so it is expected that the existing outfall on the adjacent property will be utilized if possible. 2. Sanitary lateral:the lateral is private unless the ACSA accepts it. ACSA does not maintain private laterals and utilities that are not maintained by the ACSA/RWSA(or some other public entity)are considered private and do not meet the definition of a "necessary public facility." As we discussed in our meeting last week,the lateral can be installed under the critical slopes by boring and encasing it in a sleeve.The sleeve will allow for replacement of the lateral in the future as needed without disturbing the critical slopes. Boring the lateral under the critical slopes shouldn't disturb the critical slopes and therefore does not require a special use permit(by-right). It was also determined that using the neighbor's sanitary outfall is also allowed without the requirement for a special use permit since it is serving an existing use and the disturbance was previously approved. If you have any questions or comments, don't hesitate to let us know. Thanks, Frank Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville,VA 22902 434-296-5832 (ext. 7914) From: Christopher Perez Sent: Monday,January 28, 2019 7:33 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Cc: David James<djames2@albemarle.org>; Frank Pohl <fpohl@albemarle.org>;Tyler Gifford<tyler@martinhorn.com>; Brad Nichols<brad@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Jonathan, I'm back in the office after being out Thursday and Friday of last week. I'll get with Frank today about your question. Additionally, I hope to have the site plan review comments to you by COB today. Christopher Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext.3443 5 From:Jonathan Showalter<Jonath,....,,..owalter@timmons.com> Sent: Friday,January 25, 2019 10:16 AM To:Christopher Perez<cperez@albemarle.org> Cc: David James<diames@albemarle.org>; Frank Pohl<fpohl@albemarle.org>; Tyler Gifford <tyler@martinhorn.com>; Brad Nichols<brad@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Chris, Just left you a message to follow up on the question below. Please let us know you response as soon as you are able. Also as far as the review of the plans resubmitted December 10th, I see we have received David's comments on the Road and VSMP Plan and also ACSA's comments. When do you expect the remaining VDOT and Site plan approval letters or comments to be ready? Thank you, Jonathan From:Jonathan Showalter Sent:Thursday,January 17, 2019 5:22 PM To: 'Christopher Perez' <cperez@albemarle.org> Cc: David James<diames@albemarle.org>; Frank Pohl<fpohl@albemarle.org>; 'Tyler Gifford' <tyler@martinhorn.com>; Brad Nichols<brad@martinhorn.com> Subject: RE: 2018-070 Lighthouse Instruments- Final Site Plan Chris, Due to some difficulties in getting an easement from parcel 77-7 to the north,we are exploring the options to get an easement from parcel 77-9A to the east. Meeting with David and Frank to discuss the stormwater outfall the sewer connection to the downhill RSWA sewer main also came up. The attached exhibit shows one possible routing for that connection. However, all of this is very approximate pending survey and further design. The main question is whether the proposed sewer lateral from the site through the preserved slopes is considered a by right use or whether it requires a special use permit. Up to this point from the comments and the initial conversations we were under the impression this is a by right use not requiring a special use permit. It seems it should be by right either under the section necessary public facilities, necessary to allow the use of the lot as to not cause unnecessary hardship or maybe under the distribution facility section. The site is separated from the sewer main by the preserved slopes so to not allow the sewer lateral to connect through the preserved slopes by right would leave the owner of the parcel no option to develop the parcel other than to get a special use permit. Please let us know if you can give us a determination on this situation or if you have any questions. Thank you, Jonathan Jonathan Showalter, PE Project Engineer TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 I Charlottesville, VA 22903 Office: 434.327.1681 I Fax: 434.295.8317 6 Jonathan.showalter(r7timmons.com • Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Christopher Perez<cperez@albemarle.org> Sent:Wednesday, November 07, 2018 8:01 AM To:Jonathan Showalter<Jonathan.Showalter@timmons.com> Cc: David James<djames@albemarle.org> Subject: FW: 2018-070 Lighthouse Instruments- Final Site Plan Jonathan, Below are RWSA review comments for Lighthouse. thanks From:Victoria Fort<vfort@rivanna.org> Sent:Tuesday, November 06, 2018 8:11 PM To:Christopher Perez<cperez@albemarle.org> Cc: Richard Nelson <rnelson@serviceauthority.org> Subject: 2018-070 Lighthouse Instruments- Final Site Plan Chris, RWSA has reviewed the final site plan for Lighthouse Instruments as prepared by Timmons Group and dated 7/10/2018, with most recent revision dated 9/13/2018 and has the following comments: Sheet C4.0: 1. Include the following RWSA sewer connection notes: "All connections to RWSA manholes shall be watertight and made with a flexible rubber boot. All coring methods, the coring contractor and all materials for construction shall be approved by RWSA in writing prior to construction. RWSA Engineering Staff shall be present for all cores into the manholes. Bypass pumping may be required at the sole discretion of RWSA staff. Grouting of the manhole bench or interior may be required,at the sole discretion of RWSA staff,for a smooth transition of flow. Existing manholes shall be backfilled to original grade to the satisfaction of RWSA. Contact RWSA Engineering a minimum of 3 business days in advance to schedule a core of a manhole." 2. Show RWSA 30' sanitary sewer easement on this sheet (D.B. 369 P. 248). 3. RWSA needs to see the profiles for the proposed storm drains, since the pipe is shown to cross the existing RWSA sewer main adjacent to MCI-MH-36 (between storm structures 102 and 104). RWSA will require a minimum vertical separation of 18" between the existing sewer main and the proposed storm sewer line. Please let me know if you have any questions. Thank you, Victoria Victoria Fort, P.E. Senior Civil Engineer Rivanna Water and Sewer Authority 695 Moores Creek Lane Charlottesville,VA 22902 (0):(434)977-2970 ext.205 (F):(434)295-1146 7