Loading...
HomeMy WebLinkAboutSDP201800070 Review Comments Final Site Plan and Comps. 2019-05-13 ® •**it. 41) ,0 • 608 Preston Avenue P 434.295.5624 T I M M O N S GROUP Suite 200 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS. Charlottesville,VA 22903 www.timmons.com May 13, 2019 Richard Nelson Civil Engineer ACSA 168 Spotnap Rd Charlottesville, VA 22911 RE: Lighthouse— Site Plan Review—Comment Response Letter Dear Mr. Nelson: We have reviewed all of your email comments from December 26, 2018 and made the necessary revisions. Please find our responses to the comments below in bold lettering. 1. A 1.5-inch meter will be required with the proposed fixtures. Connection fees for a 1.5- inch meter are around $69,274.21. Request final connection fee quote when the meter is ready to be installed. Acknowledged. Per emails with Richard 1/2/2019 a credit will be received for the ex.water meter onsite which will recuce the connection fee by the credit amount. 2. Call out an 8x8 tapping sleeve, not an 8x6. Call out has been updated. 3. Looking at the private sewer, you call out 8-inch. Would a 6-inch suffice?Since its private we have no say in the diameter,just something to look into to possibly save some money. Sewer line design has been updated to tie into neighbors sewer outside of preserved slopes. This eliminates the need to disturb preserved slopes and add a new connection to RSWA's main. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624. Sincerely, Jonathan Showalter, PE Project Engineer CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES • sgb e 608 Preston Avenue P 434.295.5624 T I M M O N S GROUP Suite 200 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS. Charlottesville,VA 22903 www.timmons.00m May 13, 2019 Albemarle County Frank Pohl 401 McIntire Rd Charlottesville, VA 22902 RE: Lighthouse Instruments—Final Site Plan Review—SDP201800019- Comment Response Letter Dear Mr. Pohl: We have reviewed all of your comments from January 28, 2019 and made the necessary revisions. Please find our responses to the comments below in bold lettering. 1. It is my understanding the current routing of sanitary/storm is changing. Provide updated plans (11x17) when the routing of sanitary and storm utilities have been finalized. Please submit hard copies of the drawings and do not reference the WPO plans as this application must 'stand-alone'. Updated plans and applications have been submitted accordingly. We have included 9 copies for your review (in addition to 3 for ACSA and 3 for RWSA). If you have any questions or comments, please feel free to give me a call at 434.295.5624. Sincerely, yrinAA-0-.1 Jonathan Showalter, PE Project Engineer CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES RECEIVED MAY 1 3 7019 COMMUNITY DEVELOPMENT • • 608 Preston Avenue P 434.295.5624 T I M M O N S GROUP Suite 200 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS. Charlottesville,VA 22903 www.timmons.com May 13, 2019 Albemarle County Christopher Perez Senior Planner 401 McIntire Rd Charlottesville, VA 22902 RE: Lighthouse Instruments—Final Site Plan Review—SDP2018-70-Comment Response Letter Dear Mr. Perez: We have reviewed all of your comments from January 28, 2019 and made the necessary revisions. Please find our responses to the comments below in bold lettering. 1. [32.5.2(d), 30.7.4(b)(h)] [32.5.2(d), 30.7.4(b)(h)] Source of Topography. The steep slopes depicted on the plan do not match those slopes that are depicted on the County GIS Overlay, which is a zoning district adopted by the Board of Supervisors. Provide the source of the topography utilized on the plan. Prior to approval of the final site plan, the County Engineer must sign off on the topographic information as being more accurate. The source of topography can be found on the cover page under the Site Data. Final: The site plan utilizes new/conceivably more accurate topographic information from a field survey; however, the plan fails to depict the slopes approved by the County's Steep Slopes Overlay District.The plan shall be revised to depict the County's topography and distinguish with hatching the new topography of slopes less than 25%. Hatching shows surveyed topo areas of less than 25%. We have submitted an exhibit sealed and signed by Licensed surveyor Paul Huber to Frank Pohl to show the surveyed steep slopes compared to the county GIS steep slopes layer allowing survey critical slopes to override less accurate GIS steeps slopes layer. The latest copy of Critical Slopes Exhibit has been emailed to Chris Perez on 12/6/2018. 2. [32.5.1(c)] The following improvements are proposed on adjacent parcels and require recorded easements prior to final site approval: a. TMP 77-7 : sanitary sewer pipes and stormwater management pipes CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES b. TMP 77-9A: public water line easements, stormwater management pipes, drainage inlets, drainage easements, sight distance easements, and road improvements, temporary construction easements. c. TMP 77-8B: road improvements, temporary construction easements, public dedication of right-of-way (for areas outside of existing dedicated r/w), sight distance easement, stormwater management pipes, and drainage inlets/easements d. TPP 77-8C: road improvements,temporary construction easements, public dedication of right-of-way (for areas outside of existing dedicated r/w), public water line easements. Prior to final site plan approval, the required offsite easement shall be platted. The DB PG reference information of these actions shall be provided on the final site plan. Acknowledged. Owner is in the process of acquiring easements. Final: Comment not addressed.Also, please ensure all offsite disturbance and improvements are provided easements, as some may have been overlooked by staff above. Acknowledged. Easements have been shown on plans for offsite work and plats will be recorded before work begins. Rev.1: Comment still relevant. Easements have been shown on the plans for work on other owners' properties and will be recorded on the plats once plans are finalized and preliminary approval is received on all items other than plats. 3. [32.5.1(c)] The proposed building and a proposed retaining wall are within an existing VEPCO easement (DB 424 PG 4340). Prior to final site plan approval provide written documentation from the easement holder that the proposed improvements are permitted within the easement. Otherwise, relocate these improvements outside of the easement. Easement will be vacated. Final:The vacation plat shall be submitted, approved, and recorded prior to final site plan approval.The DB PG reference information of these actions shall be provided on the final site plan. Acknowledged. Dominion has been contacted t start process. Rev.1: Comment still relevant. � � Acknowledged � � -1 aecol 4. [32.5.1(c)] A proposed retaining wall is within an existing VEPCO easement (DB 1432 PG 13). Prior to final site plan approval provide written documentation from the easement holder that the proposed improvement is permitted within the easement. Otherwise, relocate these improvements outside of the easement. Approval has been received from VEPCO. See attached letter. Final: Comment addressed. 5. [4.20(b)] Stepbacks. On the plan label the actual height of the building and the number of floors. Without this information staff is unable to determine if stepbacks apply. For each story that begins above 40 feet in height or for each story above the third story whichever is less the minimum stepback shall be 15 feet. The proposed building height and number of floors has been added to the cover page under the Site Data. Final: Comment addressed.Stepbacks are not applicable based on the height. 6. [32.7.2.3(a)] Sidewalks along streets. Provide sidewalk on one side of the existing and proposed public street serving the development. Based on the prescriptive easement for the roadway the sidewalk is only required on one side of the road (the side on the subject property). A sidewalk has been added on the northern side of Avon Court. Final: Comment addressed. 7. [4.12.18(a)] Minimum Design Requirements. Dimension the clearance height for the loading area. The minimum is 14.5' clearance height. A label has been added to the loading dock noting that the minimum clearance height is 14.5'. See Sheet C4.0. Final: Comment addressed. 8. [32.5.2(f)] Existing and Proposed Improvements. Label the max height of all retaining walls. Max height of all retaining walls has been labeled. See sheet C5.1. Final: Comment addressed. 9. [Comment] Provide directional arrows on the travelways throughout the plan. Travel arrows have been added on the plans as a visual aid.All road isles are two directions. See plan sheet C4.0. Final: Comment addressed. 10. [32.7.2.1] Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as required by the standards of the Virginia Department of Transportation. VDOT approval of the proposed entrance(s) to the site shall be required prior to final site plan approval. Acknowledged. Final: Comment still relevant. Acknowledged. Rev.1: Comment addressed. 11. [32.5.2(i)] Streets, easements and travelways. Label Avon Court as either public or private. If public label the State Route Number. Depict and label the end of state maintenance. A label has been added calling out the existing road name of"State Rte. 1101". Final: Comment partially addressed. On the existing conditions page depict and label the end of state maintenance. The approximate location of the existing"End of State Maintenance" sign has been added and labeled. See sheet C2.0. Rev.1: Comment addressed. 12. [32.7.1.2] Resery tion for Future Dedication. Revise the extent of the roadway being dedicated to publi use as required by VDOT. Also, on the plans set apart and label an area of land for the fight-of-way and for temporary construction of the roadway that extends to TMP 77-7. Label this area as "Hereby reserved for future dedication upon demand of the County The extent of the Roadwa being dedicated has been revised a callout for area reserved for future easement has been .dded. See sheet C4.0. Final:The plan incorrectly lab-Is the 21.5' portion of public right-of-way serving the development as the reservatio for future dedication,this sections' label shall be revised to "Hereby dedicated to public use for public right-of-way".This section should also be provided a deed book pave reference numb-r for the recorded plat that dedicates the right-of-way.The dedication plat shall be submitted, .pproved,and recorded prior to final site plan approval. The above label has been added.S• • sheet C4.0. Deed book and page number will be provided when available. Rev.1: Comment partially addressed. P- ding submittal of the right-of-way dedication plat for review/approval. Acknowledged The Section of right-of-way that is 15'wide is correctly labeled as"hereby reserved for future..."; however,the width of this section is inadequate for a future public road.To remedy this,either increase the width of this easement on the subject property to sustain a future public road and 144 temporary grading easement or obtain the additio al right-of-way with from the adjacent property to facilitate this future right-of-way. Width of area to be reserved for future dedication h.s been widened to 21.5'to match current RW to be dedicated. An additional 10'area will be re -rved for a future grading easement. Rev.1: Comment partially addressed. Continue the 21.5' -servation area and the 10'wide grading easement area reservation all the way to the props rty line. The 21.5' reservation area and the 10'wide rading easem nt has been extended to the property line. pe 41 46 I \&.1.)0..-• , feiv‘vii I(AA?? 13. [32.5.2(n)] Existing and proposed improvements. If there is to be a sign for the proposed use, on the final site plan depict and label the sign location. (Depicting the sign on the final site plan is not approval of the sign location or type). Possible site location has been shown on C4.0. Final: Comment addressed. 14. [32.7.9.5, 14-410(H)] Street Trees. Revise street tree calculations and plantings to include the areas for the entrances and the area fronting the building. Staff measures 381 linear feet of frontage. Based on the prescriptive easement for the roadway the street trees are only required on one side of the road (the side on the subject property). Street trees shall be placed in a landscape island between sidewalk and the curb (14- 410(H)). Calculations have been revised. Per coordination with Planning Street trees have been provided behind the sidewalk. Final:The item was discussed prior to final site plan submittal and has been remedied with the proposed location of the street trees. Comment addressed. 15. [32.7.9.8] Tree Canopy. When calculating the required tree canopy do not subtract the SF for the proposed improvements, such as the building. Revise the calculations. Tree canopy calculation have bene revised. Final: Comment addressed. 16. [32.5.2(e), 32.7.9.4(c)] Existing landscape features. On the landscape plan identify whether existing wooded areas are evergreen, deciduous, or a mix thereof. Existing features have been identified. Final: Comment addressed. 17. [32.7.9.4(b)] Existing trees may be preserved in lieu of planting new plant materials in order to satisfy the landscaping and screening requirements of section 32.7.9, subject to the agent's approval. If you intend to use existing trees to satisfy any of the landscape plan requirements, please include the following: a. Areas and other features shown on landscape plan. The landscape plan shall show the trees to be preserved, the limits of clearing, the location and type of protective fencing, grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. Information on limits of disturbance and protective ESC measures can be found on ESC plan. Final: On the site plan depict the limits of clearing and provide the location and type of protective fencing. Protective fencing for trees has been added and labeled on plans. See sheet C3.2, C3.3 and Landscape site plan sheet L1.0 Rev.1: Comment addressed. b. Conservative checklist. The applicant shall sign a conservation checklist approved by the agent to ensure that the specified trees will be protected during construction. Except as otherwise expressly approved by the agent in a particular case, the checklist shall conform to the specifications in the Virginia Erosion and Sediment Control Handbook, pages III-393 through III-413, and as hereafter amended. Conservation Checklist has been added to the Landscaping Plans. Owners signature will be provided before plan approval. Final:The conservation checklist on sheet L2 shall be signed by the owner. Acknowledge. Rev.1: Comment still relevant. Signature has been added. 18. [32.5.2(n)] Outdoor Lighting. Any proposed outdoor lighting must be shown on the site plan. A photometric plan and lighting cut sheets must be provided with the final site plan. Proposed lighting must comply with requirements of Sec. 4.17 of the Zoning Ordinance. Site lighting and photometric plan has been provided. See sheets L3.0 through L3.3. Final: Comment addressed. 19. [4.14, 4.14.1-4.14.5] Performance standards for industrial uses apply to the proposal. On sheet 1 provide by the following note: "Performance standards for industrial uses apply to the proposal as dictated by Section 4.14.1-4.14.5 of County Code and the use shall be subject to those standards". Also, on the sheet 1 provide the following note: "This use is subject to Section 4.18 Noise regulations." Notes have been added under the "General Notes"section on plan sheet C1.0.See note number 34 and 35. Final: Comment addressed . 4.14.5] Certified Engineers Report A Certified Engineers Report shall be completed/complied with prior the approval t e fi aal site I . Acknowledged 0.4r90 Final: Comment a 21. [32.6.2(h)] Signature Panel. Provide the required signature panel. Assure that each member of the site review committee is provided a signature line. New signature panel has been provided. See sheet C0.0. Final: Comment addressed. 22. [Comment] The final site plan shall not be approved until all SRC reviewers have approved the plan. Their comments attached. Acknowledged. Final: Comment still relevant. Acknowledged. Rev.1: Comment still relevant. Acknowledged 23. [Comment] Economic Development Access Project Grant Program. The applicant seeks to build the public road through the state's Economic Development Access Project grant program. The following design elements were discussed: i. Right-of-Way shall be 40-foot wide (with 28-29 feet of road from curb-to- curb)—please work with VDOT for requirements as they may be modified during the design). Applicant is no longer pursuing EDA grant program. Final: Pending VDOT review/approval. No additional VDOT comments were received on this topic. Rev.1:Applicant no longer pursuing EDA grant program. Acknowledged • ii. Curb/Gutter/Sidewalks—Curb and gutter is re fired. The grant may be able to accommodate the cost for sidew son both sides, but if not, sidewalk would be installed on the er side of the road when that lot develops. Applicant is no longer pursui EDA grant program. Curb and gutter and sidewalk has been provi d on the applicant's side of the road. Final: Curbing and gu r was not provided on the southern side of the roadway. Pending VDOT rev' w/approval. No additio I OT comments were received on this topic. Rev.1: It appears VDOT is no longer requiring this improvement, as I have received their approval of the proposal. Acknowledged iii. Fire truck turnarounds—a turnaround sufficient for fire trucks shall be required at the end of the street. The turnaround area provided through the width ofthe right-of-way and the width of the proposed entrances may be equate. Prior to final site plan work with Shawn Maddox at Fire scue and VDOT on the turnaround. A easment has been provided at the western entrance to alow adequate space for a fire truck turnaround. Final: Fire and Rescue has no objections to the proposed turn around, Pending VDOT review/approval. No additional VDOT comments were received on this topic. Rev.1: I have received VDOT and Fire and Rescue approval of the proposal. Acknowledged 24. [4.12.4] Maximum Number of Parking Spaces. The number of parking spaces in a parking area may not exceed the number of spaces required by more than twenty (20) percent. The site is over the 20%threshold by 3 spaces. Please remove the 3 spaces furthest from the building on the curve. Curvilinear parking spaces are allowed per code. Parking calculations have been updated on Cover to reflect Lighthouse's employee and parking needs. Site no longer exceeds number of required spaces by more than 20%. Rev.1: Comment addressed. 25. [Comment] Provide the SDP#on the cover sheet: SDP2018-70. The SDP# has been added on the cover sheet of the Site Plan. Rev.1: Comment addressed. 26. [Comment] Prior to final site plan approval a VSMP and Road plan shall be approved. Acknowledged. Rev.1: Comment still relevant. Acknowledged Engineering Comments (David James): 1. WPO plan approval required prior to FSP approval. Acknowledged. 2. Road plan approval required prior to FSP approval. Acknowledged. 3. Add SDP#to cover sheet (under title). The SDP# has been added to the cover sheet as requested. Addressed. 4. Sheet C1.0 Remove Stormwater Management note & redundant General Construction note. The notes have been removed as requested. See sheet C1.0 Addressed. 5. Sheet C2.0 Show the County's existing GIS steep slope overlay for preserved/managed slopes. The County's existing GIS steep slope overlay is shown. See sheet C2.0 Addressed. 6. Building permit for walls required. Acknowledged. 7. Provide guardrail over any slope steeper than 3:1, wall, or drop-off greater than 4', with start and end sections labeled, at VDOT designations (GR-2, GR-2a, etc.). Guardrail has been added as required above. See sheet C4.0 for locations. Addressed. 8. Provide safety provision(s) for vehicles and pedestrians for walls over 30" high. This is typically a guardrail, wall, or fence [DSM]. Safety provisions have been provided as necessary. See sheet C4.0 Addressed. 9. Show bumper block dimensions in detail. Bumper blocks shall be constructed of a durable material such as concrete treated timbers. Each bumper block shall be a minimum length of six (6) feet, a maximum height of five (5) inches, and shall be securely anchored into the pavement in at least two (2) places. A bumper block detail has been added to the plans. See sheet C1.1 Addressed. 10. Show all proposed easements outside of ROW. All proposed easements outside of the right-of-way are shown. Addressed. 11. Offsite work is needed, please ensure its in an easement to be recorded on an easement plat. CPP. Plat will be provided when available. Fire Rescue (Shawn Maddox): 1. No objections. 2. If the building height is to exceed thirty feet then the unobstructed clear width of the travel way must be increased to 26' along on contiguous side of the structure to allow for aerial apparatus access. See below for code reference. Comment has been resolved per email coordination with Shawn Maddox and his response July 16th 2018. Building floors and roof elevation has been further clarified on cover and sheet C5.0. 3. Hydrant spacing is appropriate. Acknowledged. 4. Thank you for showing the FDC location. Acknowledged. 5. A knox box will be required, a note should be added to the plans to indicate the location must be approved by the fire marshal's office. Callout has been added. See sheet C4.0. 6. The street that serves the FDC, hydrant and what appears to be the rear of the structure shall be marked as a fire lane. A callout has been added. See sheet C4.0. 7. A fire flow test will be required before final acceptance. A flow test has been provided. 8. D105.1 Where required. Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9144 mm), approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. Comment has been resolved per email coordination with Shawn Maddox and his response July 16th 2018. Building floors and roof elevation has been further clarified on cover and sheet C5.0. 9. D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. Comment has been resolved per email coordination with Shawn Maddox and his response July 16th 2018. A 26'wide paved area has been provided for access to the roof along the basement on the north side where the roof height exceeds 30'. 10. D105.3 Proximity to building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet (4572 mm) and a maximum of 30 feet (9144 mm)from the building and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. Comment has been resolved per email coordination with Shawn Maddox and his response July 16th 2018. A 26'wide paved area has been provided for access to the roof along the basement on the north side where the roof height exceeds 30'. 11. D105.4 Obstructions. Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. Other obstructions shall be permitted to be placed with the approval of the fire code official. Acknowledged. Building Official CDD Inspections (Michael Dellinger): 1. Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Acknowledged. Wall design will be provided before approval. 2. An asbestos survey has to be completed and a permit for asbestos removal if encountered must be completed prior to issuance of a building permit for the demolition of the existing building. Have documentation available for asbestos permit, asbestos clearance. Acknowledged. Additional Comment: Refer to note on 2018-10 regarding asbestos permit requirements. Acknowledged. ACSA (Richard Nelson): Addressed on separate comment response letter from October 8, 2018 directly to Richard Nelson. RWSA (Victoria Fort): Sheet C4.0: 1. Include the following RWSA sewer connection notes: "All connections to RWSA manholes shall be watertight and made with a flexible rubber boot. All coring methods, the coring contractor and all materials for construction shall be approved by RWSA in writing prior to construction. RWSA Engineering Staff shall be present for all cores into the manholes. Bypass pumping may be required at the sole discretion of RWSA staff. Grouting of the manhole bench or interior may be required, at the sole discretion of RWSA staff, for a smooth transition of flow. Existing manholes shall be backfilled to original grade to the satisfaction of RWSA. Contact RWSA Engineering a minimum of 3 business days in advance to schedule a core of a manhole." The sewer is no longer connecting to RWSA manhole.See revised design that shows the proposed sewer lateral tying into a private cleanout upstream. General Comments: 1. RWSA needs to see the profiles for the proposed storm drains, since the pipe is shown to cross the existing RWSA sewer main adjacent to MCI-MH-36 (between storm structures 102 and 104). RWSA will require a minimum vertical separation of 18" between the existing sewer main and the proposed storm sewer line. The Storm layout design has been revised.See updated storm layout on sheet C5.0. Profiles on sheet C7.0 have been revised accordingly as well. Thomas Jefferson Health District (Alan Mazurowski): 1. Regarding the existing residence and accessory structures, I can find no septic or well records on file. Sheet C2.0 shows what may be a symbol for a private well, near the SE corner of the mobile home, however there's no reference to that symbol in the legend on Sheet C1.0. If indeed there are any wells, it (they) must be abandoned in accordance with 12VAC5-630-450 of the Private Well Regulations prior to any land disturbance in those locations. Please note well abandonment on this property will require permitting through the Charlottesville/Albemarle Health Department. Acknowledged. Note had been added to the Demo Plan. 2. In the event there is an existing onsite sewage disposal system within the area to be developed, I strongly recommend any septic tanks be located and abandoned. While this activity does not require a VDH permit, our office can provide instruction on proper abandonment procedures. Acknowledged. Contractor has been advised. VDOT (Adam Moore): Land Use 1. Are the two gravel entrances left of centerline permanent or temporary? Please label on plans if the entrance will be terminated at the completion of project. The entrance at station 11+12, should be at 90 degrees to Avon Court and not at a skew. An entrance permit will be needed before construction begins. Per email from Adam 11/27/2018 it has been confirmed that entrances are an ex. condition and they have been labled as existing in plan. 2. Recommend having the future 21.5 ft. dedication and the 15 ft. prescriptive easement recorded to County and shown on plans/plat prior to approval. The sidewalk is not eligible for VDOT maintenance until the right of way is dedicated. A 21.5' area to be preserved for future dedication to public use as public RW has been shown on plans and will be added to plats. An additional 10' reserved area has been added for future grading upon the County's demand. See sheet C4.0 3. The proposed gas line should be placed outside of the pavement: Longitudinal utility installations should be in the outer 3-5' of right of way. • Gas line location has been updated. 4. A storm drainage calculation book was not provided to VDOT for review. Calculations book was emailed to Adam and reviewed per email from Adam 11/27/2018. We have included 9 copies for your review (in addition to 3 for ACSA and 3 for RWSA). If you have any questions or comments, please feel free to give me a call at 434.295.5624. Sincerely, Jonathan Showalter, PE Project Engineer EIVED u l� MAY 1 3 2019 1 COMMUNITY / DEVELOPMENT