Loading...
HomeMy WebLinkAboutSDP201800087 Review Comments 2019-03-14 (2) . ROUDABUSH, GALE &ASSOCIATES, INC. A 21 A PROFESSIONAL CORPORATION S p LAND SURVEYING Serving Virginia Since 1956 ENGINEERING LAND PLANNING ENGINEERING DEPARTMENT SURVEY DEPARTMENT 172 SOUTH PANTOPS DRIVE.STE.A 914 MONTICELLO ROAD JIM L.TAGGART.P.E. CHARLOTTESVILLE.VA 2291 I CTIARLOTTESVILLE,VA 22902 WILLIAM J.LEDDE rTER.L.S. DON FRANCO.P.E. PI IONE(434)979-8121 PHONE(434)977-0205 BRIAN D.JAMISON,L.S. DAVID M.ROBINSON,RE. FAX(434)979-1681 FAX(434)296-5220 KRISTOPIIER C.WINTERS,L.S. AMMY M.GEORGE,PLA INFO@ROUDABUSH.COM March 14th,2019 Mr.John Anderson Department of Community Development 401 McIntire Road, Room 227 Charlottesville,VA 22902-4596 RE: Site Plan review—Response Letter Project title: Timberwood Square Project file number:SDP201800087 Dear Mr.Anderson, We received your comments dated January 14,2019 on the above-referenced project file number. Please find attached eight copies of the revised Plans. The plans have been revised to address the comments in accordance with the following: 1. Provide detail for tot lot permanent fencing shown on sheet 5. Ensure fence design/material/heightdo not obscure sight distance on Lois Lane. RESPONSE: See sheet 11 for detail. 2. Revise plan title to include SDP201800087. RESPONSE: The plan title has been shown on the cover sheet. 3. Provide dumpster pad section detail. RESPONSE: Dumpster pad detail shown on sheet 18. 4. Relocate pin oak(sheet 9)between drainage structure 11 and E7,to eliminate conflict. RESPONSE: The pin oak on sheet 9 has been moved to eliminate conflict. \14 1 5. Engineering defers to VDOT on Left Turn Restriping Plan and MOT Plan(sheet20). RESPONSE: VDOT comments have been satisfied with this submittal. 6. Sheets 5 and 7: Show and label Arbor Lake waters'edge. RESPONSE: Arbor Lake waters' edge has been shown with this submittal. 7. As discussed 1/10/19,please provide copy of letter of agreement between Timberwood Square and Forest Lakes HOA stipulating/permitting Timberwood Square's use of Arbor Lake for SWM purposes. RESPONSE: A copy of the letter of agreement will be provided prior to FSP approval. We trust the above adequately addresses your comments. Please let me know if you have any questions or require additional information. Best Regards, Dustin Greene, EIT Y !% ' M1; /r