HomeMy WebLinkAboutSDP201800087 Review Comments 2019-03-14 (2) . ROUDABUSH, GALE &ASSOCIATES, INC. A
21
A PROFESSIONAL CORPORATION S p
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING
LAND PLANNING ENGINEERING DEPARTMENT SURVEY DEPARTMENT
172 SOUTH PANTOPS DRIVE.STE.A 914 MONTICELLO ROAD
JIM L.TAGGART.P.E. CHARLOTTESVILLE.VA 2291 I CTIARLOTTESVILLE,VA 22902 WILLIAM J.LEDDE rTER.L.S.
DON FRANCO.P.E. PI IONE(434)979-8121 PHONE(434)977-0205 BRIAN D.JAMISON,L.S.
DAVID M.ROBINSON,RE. FAX(434)979-1681 FAX(434)296-5220 KRISTOPIIER C.WINTERS,L.S.
AMMY M.GEORGE,PLA INFO@ROUDABUSH.COM
March 14th,2019
Mr.John Anderson
Department of Community Development
401 McIntire Road, Room 227
Charlottesville,VA 22902-4596
RE: Site Plan review—Response Letter
Project title: Timberwood Square
Project file number:SDP201800087
Dear Mr.Anderson,
We received your comments dated January 14,2019 on the above-referenced project file number. Please find
attached eight copies of the revised Plans. The plans have been revised to address the comments in
accordance with the following:
1. Provide detail for tot lot permanent fencing shown on sheet 5. Ensure fence design/material/heightdo not
obscure sight distance on Lois Lane.
RESPONSE: See sheet 11 for detail.
2. Revise plan title to include SDP201800087.
RESPONSE: The plan title has been shown on the cover sheet.
3. Provide dumpster pad section detail.
RESPONSE: Dumpster pad detail shown on sheet 18.
4. Relocate pin oak(sheet 9)between drainage structure 11 and E7,to eliminate conflict.
RESPONSE: The pin oak on sheet 9 has been moved to eliminate conflict.
\14 1
5. Engineering defers to VDOT on Left Turn Restriping Plan and MOT Plan(sheet20).
RESPONSE: VDOT comments have been satisfied with this submittal.
6. Sheets 5 and 7: Show and label Arbor Lake waters'edge.
RESPONSE: Arbor Lake waters' edge has been shown with this submittal.
7. As discussed 1/10/19,please provide copy of letter of agreement between Timberwood Square and
Forest Lakes HOA stipulating/permitting Timberwood Square's use of Arbor Lake for SWM purposes.
RESPONSE: A copy of the letter of agreement will be provided prior to FSP approval.
We trust the above adequately addresses your comments. Please let me know if you have any questions or require
additional information.
Best Regards,
Dustin Greene, EIT
Y !% '
M1; /r