Loading...
HomeMy WebLinkAboutSDP201900015 Review Comments Final Site Plan and Comps. 2021-06-15Short Review Comments Report for: SDP201900015 BROOKHILL - BLOCK 813 - FINAL SubApplication Type: IFinal Site Development Plan Date Completed: 05/16/2019 Reviewer: Alexander Morrison Division: ACSA Review Status: Administrative Approval Reviews Comments: Date Completed: 09/24/2019 Reviewer: Alexander Morrison Division: ACSA Review Status: Approved Reviews Comments: See letter dated 9-24-2019 uploaded to Laserfiche for ACSA approval. Date Completed 04/25/2019 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated 4-25-2019 uploaded to Laserfiche for Planning comments. Date Completed: 04/18/2019 Reviewer: Emily Cox Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: 04/09/2019 Reviewer: Heather McMahon Division: CDD ARB Review Status: See Recommendations Reviews Comments: A Certificate of Approrpriateness if required prior to Final Site Plan approval. The applicant must submit an ARB application and associated fee for Final Site Plan review. As a courtesy, I have provided the comments provided of the Initial Site Plan Review below: This item was placed on the CONSENT AGENDA of the 8-20-18 ARB meeting. Motion to Approve Consent Agenda: Motion: Mr. Binsted moved to approve the consent agenda and forward the recommendations outlined in the staff reports for the Initial Site Plans to the Agent for the Site Review Committee, as ARB-2018-102: Brookhill Block 8B — Initial Site Development Plan (TM/Parcel )0001800) Proposal: To develop Block 8B with 55 lots for multi -family attached dwellings (110 units grouped into 11 buildings) and associated improvements on a 7.18-acre, L-shaped site. Location: East side of Seminole Trail (Rt. 29 N) and north side of Palo Grounds Road (Rt. 643). Forest Lakes Community is to the north and Montgomery Ridge is to the east. Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) recommended conditions of initial plan approval: None. Note that a Certificate of Appropriateness is required prior to final site plan approval. Page: 1 of 7 County of Albemarle Printed On: June 15, 2021 Regarding recommendations on the plan as it relates to the guidelines: None. Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Regarding conditions to be satisfied prior to issuance of a grading permit: None. Regarding the final site plan submittal: Architecture and landscaping will be reviewed with a future submittal. A Certificate of oropriateness is required prior to final site plan approval. Provide site sections of Block 8B from the EC to determine visibility of the proposed buildings t site structures. Submit material and color samples, dimensioned elevations of the fagades, and floor plans of attached multi -family buildings on lots 1-15 and 38-55 for review. Provide the standard window glass note on the architectural elevations submitted for review: idow glass in the Entrance Corridors should meet the following criteria: Visible light transmittance T) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide a roof plan and architectural elevations that show the placement and proposed ghts of mechanical units, if roof -mounted mechanical equipment is proposed. Show how all bility of mechanical equipment from the EC will be eliminated. If above -ground utilities are proposed, provide these and their easements on revised site 7. Include the mechanical equipment note on the revised site plans and architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. B. Provide in the site plan sufficient details to show that all proposed light fixtures meet the requirements of the lighting ordinance. 9. Provide a landscape plan for review at a scale of 1" = 30'. Include utilities and their easements on the plan, as well as a plant schedule. 10. Provide street trees on the east and south sides of Road ENVesley Circle. 11. Provide shade trees on the eastern edge of the site around the four parking spaces. 12. Provide the standard plant health note on all landscape plans submitted for review: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 04/05/2019 Michael Dellinger Division: CDD Inspections See Recommendations noted on previous reviews. Other than this, no objection. J the following note to the general notes page: taining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 t in height require an stamped engineered design also. J the following note to the general notes page: L water lines, sewer lines, and fire lines from the main to the structure MUST have a visual pection performed by the buildng department. to to developer: e to required distances from lot lines and structures as required by the NFPA, undergound pane tanks may be prohibited. Plan accordingly. 03/21 /2019 Shawn Maddox Division: Fire Rescue Requested Changes Thank you for addressing previous comments. Based on the building heights shown on the first page of the submitted plans the travel ways on one side of each building must be 26' of clear, unobstructed travel way. If the building heights will not exceed 30' then this comment no longer pertains. 04/17/2019 Page: 2 of 7 County of Albemarle Printed On: June 15, 2021 Reviewer: Richard Nelson Division: ACSA Review Status: Requested Changes Reviews Comments: I do not have the SDP number for the final site plan but I wanted to let you know that it is currently under construction plan review by the ACSA. Date Completed: 04/19/2019 Reviewer: Adam Moore Division: VDOT Review Status: Requested Changes Reviews Comments: Date Completed: 04/01 /2019 Reviewer: Andrew Slack Division: CDD E911 Review Status: No Objection Reviews Comments: No Objection. Date Completed: Reviewer: Victoria Fort Division: RWSA Review Status: Pending Reviews Comments: Date Completed: 09/05/2019 Reviewer: Cameron Lanaille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated 9-5-2019 uploaded to Laserfiche for Planning Division 2nd submittal wmments. Date Completed: 08/21/2019 Reviewer: Emily Cox Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: 07/29/2019 Reviewer: Heather McMahon Division: CDD ARB Review Status: See Recommendations Reviews Comments: A Certificate of Appropriateness if required prior to Final Site Plan approval. The applicant must submit an ARB application and associated fee for Final Site Plan review. As a courtesy, I have provided the comments provided of the Initial Site Plan Review below: This item was placed on the CONSENT AGENDA of the 8-20-18 ARB meeting. Motion to Approve Consent Agenda: Motion: Mr. Binsted moved to approve the consent agenda and forward the recommendations outlined in the staff reports for the Initial Site Plans to the Agent for the Site Review Committee, as ARB-2018-102: Brookhill Block 8B — Initial Site Development Plan (TM/Parcel iosal: To develop Block 8B with 55 lots for multi -family attached dwellings (110 units grouped 11 buildings) and associated improvements on a 7.18-acre, L-shaped site. in: East side of Seminole Trail (Rt. 29 N) and north side of Polo Grounds Road (Rt. 643). Lakes Community is to the north and Montgomery Ridge is to the east. 10 Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) Page: 3 of 7 County of Albemarle Printed On: June 15, 2021 recommended conditions of initial plan approval: None. Note that a Certificate of Appropriateness is required prior to final site plan approval. Regarding recommendations on the plan as it relates to the guidelines: None. Regarding conditions to be satisfied prior to issuance of a grading permit: None. Regarding the final site plan submittal: Architecture and landscaping will be reviewed with a future submittal. A Certificate of oropriateness is required prior to final site plan approval. Provide site sections of Block 8B from the EC to determine visibility of the proposed buildings t site structures. Submit material and color samples, dimensioned elevations of the fagades, and floor plans of attached multi -family buildings on lots 1-15 and 38-55 for review. Provide the standard window glass note on the architectural elevations submitted for review: idow glass in the Entrance Corridors should meet the following criteria: Visible light transmittance T) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide a roof plan and architectural elevations that show the placement and proposed ghts of mechanical units, if roof -mounted mechanical equipment is proposed. Show how all bility of mechanical equipment from the EC will be eliminated. If above -ground utilities are proposed, provide these and their easements on revised site 7. Include the mechanical equipment note on the revised site plans and architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. B. Provide in the site plan sufficient details to show that all proposed light fixtures meet the requirements of the lighting ordinance. 9. Provide a landscape plan for review at a scale of 1" = 30'. Include utilities and their easements on the plan, as well as a plant schedule. 10. Provide street trees on the east and south sides of Road E/Wesley Circle. 11. Provide shade trees on the eastern edge of the site around the four parking spaces. 12. Provide the standard plant health note on all landscape plans submitted for review: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. Date Completed: -------------------------------------- 07/31/2019 Reviewer: Michael Dellinger Division: CDD Inspections Review Status: No Objection Reviews Comments: Date Completed: 08/13/2019 Reviewer: Shawn Maddox Division: Fire Rescue Review Status: Requested Changes Reviews Comments: There appear to be fire lines extending to the structures. If the buildings are going to be sprinklered then FDC's must be shown on the site plan and must have a hydrant within 100' of each FDC. If sprinklered the buildings must also have a Knox Box - add a note that indicates the requirement and that the location can be coordinated with the fire marshal's office. Date Completed: 08/14/2019 Reviewer: Richard Nelson Division: ACSA Review Status: See Recommendations Reviews Comments: SDP201900015 Brookhill Block 8B Final Site Plan is currently under review. Thanks, Richard Nelson Page: 4 of 7 County of Albemarle Printed On: June 15, 2021 Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: 08/16/2019 Adam Moore Division: VDOT Requested Changes 01 /29/2020 Cameron Lanaille Division: CDD Planning Requested Changes See comment letter dated 01-29-2020 uploaded to Laserfiche for Planning Division third review 01 /22/2020 Emily Cox Division: CDD Engineering Requested Changes 01/21/2020 Shawn Maddox Division: Fire Rescue No Objection Willis Bedsaul Division: VDOT Pending Richard Nelson Division: ACSA Pending 01/16/2020 Margaret Maliszewski Division: CDD ARB See Recommendations tificate of Appropriateness if required prior to Final Site Plan approval. ARB202000012 has submitted and is under review. As a courtesy, ARB comments made during Initial Site Plan Review are provided below for reference: This item was placed on the CONSENTAGENDAof the 8-20-18ARB meeting. Motion to Approve Consent Agenda: Motion: Mr. Binsted moved to approve the consent agenda and forward the recommendations outlined in the staff reports for the Initial Site Plans to the Agent for the Site Review Committee, as ARB-2018-102: Brookhill Block 8B — Initial Site Development Plan (TM/Parcel Proposal: To develop Block 8B with 55 lots for multi -family attached dwellings (110 units grouped into 11 buildings) and associated improvements on a 7.18-acre, L-shaped site. Location: East side of Seminole Trail (Rt. 29 N) and north side of Polo Grounds Road (Rt. 643). Forest Lakes Community is to the north and Montgomery Ridge is to the east. Page: 5 of 7 Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) County of Albemarle Printed On: June 15, 2021 recommended conditions of initial plan approval: None. Note that a Certificate of Appropriateness is required prior to final site plan approval. Regarding recommendations on the plan as it relates to the guidelines: None. Regarding conditions to be satisfied prior to issuance of a grading permit: None. Regarding the final site plan submittal: Architecture and landscaping will be reviewed with a future submittal. A Certificate of Dropriateness is required prior to final site plan approval. Provide site sections of Block 8B from the EC to determine visibility of the proposed buildings t site structures. Submit material and color samples, dimensioned elevations of the fagades, and floor plans of attached multi -family buildings on lots 1-15 and 38-55 for review. Provide the standard window glass note on the architectural elevations submitted for review: idow glass in the Entrance Corridors should meet the following criteria: Visible light transmittance T) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Provide a roof plan and architectural elevations that show the placement and proposed ghts of mechanical units, if roof -mounted mechanical equipment is proposed. Show how all bility of mechanical equipment from the EC will be eliminated. If above -ground utilities are proposed, provide these and their easements on revised site 7. Include the mechanical equipment note on the revised site plans and architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. B. Provide in the site plan sufficient details to show that all proposed light fixtures meet the requirements of the lighting ordinance. 9. Provide a landscape plan for review at a scale of 1" = 30'. Include utilities and their easements on the plan, as well as a plant schedule. 10. Provide street trees on the east and south sides of Road E/Wesley Circle. 11. Provide shade trees on the eastern edge of the site around the four parking spaces. 12. Provide the standard plant health note on all landscape plans submitted for review: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. Date Completed: 04/14/2021 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: I See comment letter dated 04/14/2021 uploaded to Laselfiche for Planning Division 4th review Date Completed: 04/09/2021 Reviewer: Emily Cox Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: Reviewer: 04/13/2021 Margaret Maliszewski Division: CDD ARB Review Status: Requested Changes Reviews Comments: I Provide revised architectural elevations for Buildings 1 and 3 showing the updated siding colors. Date Completed: Reviewer: Review Status: Reviews Comments: ..... _....._............................................... _. Date Completed: Reviewer: Page: 6 of 7 Richard Nelson Pending 03/30/2021 Adam Moore Division: ACSA Division: VDOT County of Albemarle Printed On: June 15, 2021 Review Status: Requested Changes Reviews Comments: I See comment letter dated 04/14/2021 uploaded to Laserfiche for VDOT 4th review comments. Date Completed: 04/15/2021 Reviewer: Margaret Maliszewski Division: CDD ARB Review Status: Approved Reviews Comments: Date Completed: 06/10/2021 Reviewer: Cameron Langille Division: CDD Planning Review Status: See Recommendations Reviews Comments: I See comment letter dated 06/10/2021 uploaded to Laserfiche. Date Completed: 05/18/2021 Reviewer: Emily Cox Division: CDD Engineering Review Status: No Objection Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: 05/17/2021 Richard Nelson Division: ACSA Administrative Approval recommend this site plan for approval. Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 Date Completed: 05/19/2021 Reviewer: Adam Moore Division: VDOT Review Status: No Objection Reviews Comments: I See comment letter dated 5/19/2021 uploaded to Laserfiche for VDOT no objection. Date Completed: 06/15/2021 Reviewer: Cameron Langille Division: CDD Planning Review Status: Approved Reviews Comments: Page: 7 of 7 County of Albemarle Printed On: June 15, 2021