Loading...
HomeMy WebLinkAboutSDP202000029 Review Comments Major Amendment, Final Site Plan 2021-05-20 y \ r Short- eview Comments Report for: SDP202000029 — Woolen Mills Industrial Park - Major SubApplication Type:. Major Amendment Date Completed: 05/01/2020 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: Requested changes. See letter dated 05-01-2020 uploaded to Laserfiche for Planning Division first review comments. Date Completed: 05/14/2020 —_� Reviewer: .David James Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: 04/09/2020 Reviewer: Michael Dellinger Division: CDD Inspections Review Status: Requested Changes Reviews Comments: Revised work need to be better identified with clouding, etc. so it can be determined what the proposed amendments are. Date Completed: 04/03/2020 Reviewer: Brian Becker Division: CDD E911 Review Status: No Objection Reviews Comments: No objections. yDate Completed: 04/28/2020 Reviewer: Shawn Maddox Division: Fire Rescue Review Status: Requested Changes Reviews Comments: 1. Please.provide ISO needed fire flow for each of the buildings to be constructed. 2. Please provide currently available fire flow. 3. The travel way on the address side of each structure shall be marked no parking fire lane.The areas being used as turn arounds for emergency vehicles should_also be marked as fire lane. Date Completed: 04/01/2020 Reviewer: Richard Nelson Division: ACSA Review Status: Requested Changes Reviews Comments: Cameron; Comments have been returned to Tim for this Site Plan. Thanks, Richard Nelson Date Completed: 04/30/2020 Reviewer: Adam Moore Division: VDOT Review Status: .No Objection Reviews Comments: See letter dated 4-30-2020 for VDOT no objection. Date Completed: 04/30/2020 Page: 1 of 5 County of Albemarle Printed On: June 08,2021 Reviewer: ' Victoria Fort Division: RWSA Review Status: See Recommendations Reviews Comments: We have looked at the revised WPO plans and our concerns about grading within the easement were addressed. That being addressed, RWSA has reviewed the Major Site Plan Amendment for the Woolen Mills Light Industrial Park(SDP202000029)as prepared by Meridian Planning Group, LLC and dated March 16th 2020 and consents to the proposed construction.All changes to the proposed work from that shown in the drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its easements, including but not limited to its rights to access, construction, operation, maintenance, and repair of its facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore. Please let me know if you have any questions. Thank you, Victoria Fort Date Completed: 05/04/2020 Reviewer: Josh Kirtley Division: Health Department Review Status: No Objection Reviews Comments: See comment letter dated 05-04-2020 uploaded to Laserfiche for VDH no objection. Date Completed: Reviewer: Division: Historic Preservation Review Status: Pending Reviews Comments: Date Completed: 09/11/2020 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated 9/11/2020 uploaded to Laserfiche for Planning Division 2nd review comments. Date Completed: 09/17/2020 Reviewer: David James Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: 09/22/2020 Reviewer: Michael Dellinger Division: CDD Inspections Review Status: Requested Changes Reviews Comments: Add the following note to the general notes page: Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. Walls require inspections as outlined in the USBC. Add the following note to the general notes page: Accessible parking spaces, access isles, and accessible route shall be installed in accordance with ICC ANSI A117.1-09 and the 2015 Virginia Construction Code. Add the following note to the general notes page: Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain or horizontal branch serving such.fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next Page: 2 of 5 County of Albemarle Printed On: June 08,2021 upstream nianhol, the public sewer shall not discharge throi backwater valve. Add the following to the general notes page: All roof drains shall discharge in a manner not to.cause a public nuisance and not over sidewalks. Date Completed: 08/18/2020 Reviewer: Shawn Maddox Division: Fire Rescue Review Status: Requested Changes Reviews Comments: 1.A Knox box will be required on each building.A.note indicating this requirement will suffice. 2. Since the ISO fire flow cannot be provided by the applicant at this time a note should be added that each building must have an ISO needed fire flow equal to or less than the fire flow currently available on site. No building permit should be issued until ISO NFF is confirmed. 3.ACSA fire flow test results are pending and to be submitted prior to final approval. Date Completed: 09/24/2020 Reviewer: Richard Nelson Division: ACSA Review Status: Requested Changes Reviews Comments: Comments have been returned to the applicant August 24. This plan in under review. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap.Road Charlottesville,Virginia 22911 (434)977-4511 Date Completed: 08/27/2020 Reviewer: Adam Moore Division: VDOT Review Status: No Objection Reviews Comments: Date Completed: Reviewer: Victoria Fort Division: RWSA Review Status: Pending Reviews Comments: Date Completed: 09/03/2020 Reviewer: Margaret Maliszewski Division: Historic Preservation Review.Status: See Recommendations Reviews Comments: Virginia Department of Historic Resources(VDHR)records indicate that archaeological resources have been discovered on the southern portion of this property and there.is potential that the site could contain significant additional archaeological deposits, and potentially human remains: It is recommended that an archaeological survey be completed prior to any ground disturbance south of Moore's Creek.Lane to protect any buried resources and the information they contain relative to our local history. Note that this is a County recommendation, not a requirement. If this project requires any federal permits, however, VDHR review will be required. If survey will not be undertaken prior to disturbance, great care should be taken during grading and construction.Work should stop and VDHR should be contacted immediately if deposits are uncovered. If additional.information is desired on the archaeological potential of the.site.and its implications,we would be happy to provide contact information and help coordinate a site visit With VDHR. Date Completed: 10/08/2020 Reviewer: Michael Dellinger Division: CDD Inspections Review Status: No Objection Page: 3 of 5 County of Albemarle Printed On: June 08,2021 Reviews Comments: Date Completed: 11/13/2020 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated 11/13/2020 uploaded to Laserfiche for Planning Division 3rd review comments. Date Completed: 11/09/2020 Reviewer: David.James Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: Reviewer: Richard Nelson Division: ACSA Review Status: Pending Reviews Comments: Date Completed: 10/22/2020 Reviewer: Victoria Fort Division: RWSA Review Status: Requested Changes Reviews Comments: RWSA has reviewed the Woolen Mills light industrial final site plan dated October 7th 2020 and has the following comments. Sheet C-205: 1. RWSA has a 30" clay pipe that sits very close to the headwall of the SWM-1. Please include language:to protect the pipe upon excavation for the headwall. Let me know if you have any questions. Thanks,. Dyon Vega Civil Engineer Date Completed:. 11/16/2020 Reviewer: Shawn Maddox Division:. Fire Rescue Review Status: No Objection Reviews Comments: Thank you.for addressing the previous comments. Fire Rescue has.no objections. Date Completed: 11/02/2020 Reviewer:. Unassigned Division: VDOT Review Status: Requested Changes Reviews Comments: Date Completed: 02/02/2021 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated 02/02/2021 uploaded to Laserfiche for Planning Division 3th review(3rd revision)comments. Date Completed: 01/29/2021 Reviewer: David James Division: CDD Engineering Review Status: Requested Changes Page: 4 of 5 County of Albemarle Printed On: June 08,2021 Reviews Comments: Date Completed: 01/26/2021 Reviewer: Richard Nelson Division: ACSA Review Status: See Recommendations Reviews Comments: The applicant should submit 3 copies to ACSA for administrative approval. Last I heard, comments have been addressed, but need to a set in our Office to approve. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (434)977-4511 Date Completed: 02/24/2.021 Reviewer:. Victoria Fort Division: RWSA Review.Status: No Objection Reviews Comments: RWSA has no further comments on this plan. Dyon Vega Civil Engineer Rivanna Water&Sewer Authority (434)977-2970, Ext. 170 695 Moores Creek Lane Charlottesville, VA 22902 Date Completed: 05/03/2021 Reviewer: Unassigned. Division: VDOT Review Status: Administrative Approval Reviews Comments: See VDOT administrative approval letter dated 5/3/2021 uploaded to Laserfiche. Date Completed: 05/20/2021 Reviewer: Cameron Langille Division: CDD Planning Review Status: Approved: Reviews Comments: Page: 5 of .5 County of Albemarle Printed On: June 08,2021