Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARB201800115 Plan - Approved 2018-08-31
Boar's Head Resort Revisions to Existing Monument Signs Design Intent Drawings August 8, 2018 RUVO RODGERMOt1A(ADESIGN LLC 761:8 Pwh*ir• Court Charlotte. NC 2827G T 704.376.OeO3 E •odse, moiiskadesigncom ft,05 kpY O t -k I Number Color Color Match Material P1 Dark Blue Match PMS 282 Matthews Paint P2 White MP 32071 White Wonder Matthews Paint P3 White 3M Scotchcal Vinyl P4 Dark Grey Match PMS 425c Matthews Paint 1.1 CHpRLOTTESV,Lte BOAR'S HEAD RESORT Ns -v -&— Number s -v-& I STANDARDS Color Palette yoz- 00 tkf,��1� CLIENT/PROJECT: PROJECT NO. Boar's Head Resort KI -344 Master Sign Plan DATE: I REVISIONS: SCALE: 7/27/18 As Shown © Rodger Motiska Design, LLC NARLOTTESVII .BO- AR I S .11EAD RESORT CNPRLOTTESV/L(f t�3 U A ' , � R E S O RT 1.2 1 STANDARDS Logo CLIENT/PROJECT PROJECT NO. Boar's Head Resort KI -344 Master Sign Plan DATE: I REVISIONS: I SCALE: 712711 v M Shown © Rodger Motiska Design, LLC f Clean metal mounting elements; prime with rust-inhibu v- -- — and paint with MA Mount sign panels to existing sign; paint edges of existing sign with MAP paint Mount sign panels to existing sign; paint edges of existing sign with MAP paint Elevation C.0,p I.OTTES Vqt< BOAR'S HEAD RESORT vf-� 2.7 Design Intent 2 sided sign Sign Type M2 Primary Entry Sign Existing Sign Hwy. 250 & Golf Course Dr. •(gyp ���`�� CLIENT/PROJECT: PROJECT NO. Boar's Head Resort KI -344 Master Sign Plan )ATE: REVISIONS: SCALE: 7/27/18 As Shown D Rodger Motiska Design, LLC 1 1/2" HDU board; paint finish; M ' =ONTVI€W �. •^' LOALE:1' 1' G' �r i; �r 2 9x'16" ave 1 1/4" — --- -- Ice of �— iSrl Die -cut vinyl lettering and graphic CNp,R LOTTES VILLe BOAR'S HEAD RESORT 2.9 Design Intent 2 sided sign Sign Type M2 Primary Entry Sign Construction Details Sign: HDU sign board, 181b density; finish all sides with equal number of coats to prevent warping. FINISHES: All sign elements are painted with be Matthews MAP polyurethane semi -gloss paint. 2 panels required 90° �0 Installation: Mounts to existing sign panels. To be engineered by fabricator. CLIENT/PROJECT PROJECT NO. Boar's Head Resort KI -344 Master Sign Plan DATE. REVISiONS: SCALE: 7/27/18 As Shown © Rodger Motiska Design, LLC Artwork for Toga to be supplied by designer Center artwork on oval 8 GN Ap LOTTES V,L.. BOAR'S HEAD RESORT 2.8 1 Design Intent Sign Type M2 Primary Entry Sign/Secondary Panels Graphics Details All graphics are centered on sign faces. FRONTVIEW SCALE: V = P - 0" CLIENT/PROJECT: PROJECT NO. Boar's Head Resort KI -344 Master Sign Plan DATE. ' RE'vW""IONS: SCALE: 7/27/18 As Shown © Rodger Motiska Design, LLC 2" 76,: GN pR L�771;41':tF F,' BOAR'S HEAD RESORT Vt_ . 2.101 Design Intent Sign Type M2 Primary Entry Sign/Secondary Panels Construction Details SIGN: Sign fabricated from Alucobond PE; fabricator to engineer attachment to existing sign. Graphics die -cut vinyl. FINISHES: All sign elements are painted with be Matthews MAP polyurethane semi -gloss paint. Sir C;.<. rn Ri'ediunn, I D I -^ E?rspacinr Graphics Details All graphics are centered on sign faces. oond _. .r�site panel, paint finish 8 Installation: Mounts to existing sign panels. To be engineered by fabricator CLIENT/PROJECT: PROJECT NO. Boar's Head Resort KI -344 Master Sign Plan DATE: REV'iSIONS. SCALE: 7/27/18 1 1 As Shown © Rodger Motiska Design, LLC