Loading...
HomeMy WebLinkAboutWPO201300032 Correspondence 2021-06-18®ROUD"US11, GALE &c ASSOC. A PROFESSIONAL CORPORATION Serving Virginia Since 1956 June 18th, 2021 Community Development Department 401 McIntire Rd Charlottesville, VA 22902 RE: WP0201300032 — Cascadia Blocks 4-7, Final ESC and SWM Plan Amendment#2 Dear John, We have received your comments dated 5/6/2021 and have provided the following responses: Now is an appropriate time to provide geotechnical inspection reports for construction of the permanent wet pond embankment. Engineering seeks to confirm embankment construction (compaction, suitable material, cutoff trench, impervious core, etc.). Please submit relevant permanent geotechnical reports for the existing 13.3' high embankment with next submittal of the WPO Amendment application. (Rev. 1) Not addressed. Applicant: `This is an Amendment submittal. We are not asking for final as -built review or trying to get off of any bonds. I believe this is a little early for inspection reports at this time and not required for amendment approval.' As follow-up: This Amendment plan proposes modification to existing conditions that already deviate from design; request for As -built information for a SWM facility that does not obtain design parameters before applying or approving additional modification is reasonable. For example, equipment mobilized to modify the emergency spillway could at the same time effect adjustments that As -built information may identify are needed. Please respond to initial comment for embankment construction /other information. RESPONSE: The contractor is currently building the sediment forebay and will provided embankment inspection reports for the sediment forebay and the wet pond embankment concurrently. This submittal is intended to address all remaining comments except for this one which will be handled as the construction is completed and the inspections are done. Since construction is underway it is imperative that we receive technical approval minus this last comment. 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com 434.977.0205 Cascadla Pond tt2 VSMP Amendment 6/18/2021 4. Emergency spillway outfall: d. Revise emergency downslope riprap spillway design to accommodate a threefold increase in weir width, from 16' to 48'. Ref. images, below: (Rev. 1) Partially addressed. Applicant: 'The emergency downslope riprap spillway design has been revised to include the 40' increase in the emergency spillway. A permanent diversion will be used at the new end of the emergency spillway to create a non -erodible channel down to the original 16' spillway near the outside toe of the dam.' As follow-up: Please add section arrows, notes, or labels to plan view to clearly indicate placement and purpose of modified permanent diversion dike. Proposed grade must redirect flow in the spillway; provide spot elevations or 0.5' proposed contours to emergency spillway so that grade redirects flow in the spillway. Design may rely on a modified permanent diversion dike to redirect flow, but without grade change, proposed modified diversion dike may experience inertial force not yet analyzed, or force it cannot withstand. RESPONSE: Proposed grade has been shown to redirect flow in the spillway with spot shots. The proposed design decreases the velocity flowing over the emergency spillway into the downhill channel to the toe of slope. See the comparison calculations for the original approved flow through the emergency spillway and the updated flow through the emergency spillway and you will see that the velocity has actually decreased. I would be more concerned if this were a vegetative spillway but am not concerned about a reduction of velocity making that turn in a rip rap spillway. h. Provide and label existing and revised proposed grades in vicinity of emergency spillway, to property line (PL) and beyond. Ref. approved plan image, below: (Rev. 1) Partially addressed. As follow-up: Please see follow-up at item 5.d., above. RESPONSE: Proposed grade has been shown to redirect flow in the spillway with spot shots. The proposed design decreases the velocity flowing over the emergency spillway into the downhill channel to the toe of slope. Provide design rationale as riprap outfall narrows by Y to 2/3 the 48' width at weir. Consider velocity, momentum, and scour potential as riprap narrows, 48' to 16' (or other dimension). (Rev. 1) Partially addressed. As follow-up: Please see follow-up at item 5.d., above. RESPONSE: Proposed grade has been shown to redirect flow in the spillway with spot shots. The proposed design decreases the velocity flowing over the emergency spillway into the downhill channel to the toe of slope. 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 2 of 3 Cascadia Pond #2 VSMP Amendment 6/18/2021 Email comment 5/27/2021 Comment request for barrier around perimeter of the retention basin is withdrawn. From a water quality perspective, since As -built volume of the pond appears less than design volume, please confirm there is no effect on storm water quality. Specifically, please consider Table. 3.06-1 (p. 7, Attached .PDF), and whether decreased WQ volume shifts retention basin type from higher target phosphorus removal efficiency to a lower phosphorus removal efficiency. I missed this, but joint review picked it up. If type changes, please provide remedy —nutrient purchase, for example. Thanks for your help and patience. -take care, best, J. Anderson RESPONSE: Email sent back on 5/28/21 to John Anderson "The new water surface elevation was chosen to maximize the storage for the 1.5yr, 2yr, 10yr and 300yr storm events. The updated SWM-2 Stage Storage 4*WQV and aquatic bench still provide the required 65% removal rate for the drainage area. See page 4 of the H&H Calculation packet." No response from Engineering on this and it is assumed that this comment has been satisfied. There has been no change to the calculation packet at this time so there is resubmittal of the H&H calculation packet. We trust the above adequately addresses your comments. Please let me know if you have any questions or require additional information. Best Regards, Dustin Greene, PE 999 Second Street SE. Charlottesville. VA 22902. www.Roudabush.com Page 3 of 3