HomeMy WebLinkAboutARB202100072 Presentation 2021-06-21TAKE 5 OIL CHANGE
AT 820 PANTOPS CORNER WAY
PRESENTED BY
IN ASSOCIATION WITH
4jDESIGN
DEVELOP
06121 12021
I I COVER
3 1 TABLE OF CONTENTS
5 1 PROJECT DESCRIPTION
6 1 VICINITY MAP
7 1 CONTEXT PHOTOS
8 1 VICINITY AERIAL PHOTOGRAPHS
91 IMMEDIATE ADJACENT CONTEXT
10 1 "TAKE 5" NATIONAL BUILDING BRAND
11 -12 1 PROPOSED REVISIONS
13 1 PROPOSED MATERIAL PALETTE
14 - 19 1 EXTERIOR PERSPECTIVES
PANTOPS OIL CHANGE TABLE OF CONTENTS ARB PRELIMINARY SUBMISSION
ALBEMARLE COUNTY, VA 3 JUNE 21, 2021
PANTOPS OIL CHANGE
ALBEMARLE COUNTY, VA
ARB PRELIMINARY SUBMISSION
0
JUNE 21, 2021
A. INTRODUCTION
Take 5 Oil Change is a rapidly growing national brand in the "quick oil change" service industry.
With over 500 locations across the nation, Take 5 is interested in the Pantops Corner location
because of the high daily traffic counts, the ease of access on and off a major corridor, and the
adjacency to similar automotive -service uses. Understanding the Entrance Corridor Guidelines
will alter the national brand standards for Take 5's buildings, the owner and the national brand
have approached the design with flexibility to ensure compliance with the design standards.
B. COMPATIBILITY WITH FORMS AND FEATURES OF SIGNIFICANT HISTORIC BUILDINGS
The proposed building employs the traditional three-part composition found in traditional and
historic structures within the area: a foundation / base, a middle section / body, and a cap /
cornice. The proposed building features a strong, visually -heavy masonry base, an EIFS body,
and a cornice band marked by brake metal horizontal banding and coping trim. The tower
element features a traditional hipped roof, clad in a traditional standing seam metal roofing.
C. RELATABILITY TO SITE AND SURROUNDING CONTEXT
Automotive dealerships, service stations, and fuel -dispensaries are common along this portion of
the Route 250 Entrance Corridor. The site is smaller than many adjacent parcels, and therefore the
proposed building is also comparitvely smaller, but still within keeping, of the adjacent structures.
The project takes many cues from it's immediate adjacent context, particularly the material
palette and roof forms found at the WaWa's, as well as the material and color palette of the
adjacent O'Reilly's.
D. HUMAN SCALE
Relativelty small in scale, the proposed project continued to relate to a human scale and reduce
height by introducing a horizontal header band at the 12' bay door header height. Approrpriate
amounts of glazing in a legible and orderly rhythm help maintain a project of human scale.
E. COHESIVE WHOLE
A legible, cohesive material palette defines a cohesive whole, as well as a unifying hipped roof
element that elevates the cohesive main flat roof form.
F. LIMITING OF "BLANKNESS"
The three bay doors, as well as customer storefront doors and glazing into the waiting room limit
any large swatches of EIFS and blank areas are proportional solids to the complimentary voids.
Long, flat facades are eliminated by the introduction of the tower element that establishes a
heirarchy, creates a location for signage, and breaks the plane of the front and rear facades by
extending beyond the main building form by 12". A horizontal header band, in combination with
coping trim, contributes to limiting any areas of blankness above the bay doors.
PANTOPS OIL CHANGE
ALBEMARLE COUNTY, VA
G. UNIFYING GROUPS
Given the small scale and size of the building, the effectiveness of unifying groups is limited.
However the repetition of the bay doors, the eifs columns, and the exterior light sconce does
create a repetitive motive that contiruutes to the legibility of the cohesive whole and limits
blanksness along the facades.
H. WINDOW GLAZING
in an effort to improve the transparency into the proposed building, glazing has been included
in the roll up bay doors. storefront windows are included into the manager's office (and the rear
of the building) and also in the waiting area. A storefront door allows access to the waiting area
from the side elevation. the glazing will meet county requirements for visible light transmittance
and reflectivity.
I. ACCESSORY STRUCTURES AND EQUIPMENT
HVAC equipment is minimal, and will be screened from view by the building. The manager's
office and waiting area will be service by a PTAC unit; the associated louvers for the system will
be facing away from the Entrance Corridor, located on the rear of the building. Electrical meters
and panels are located on the south facade, and screened from view by the O' Reillys.
J. LIGHTING
Exterior site lighting will be included in subsequent submissions. Anticipated downlight sconces
have been shown in the proposed renderings and elevations.
K. SIGNS
Exterior signs will be refined and detailed in subsequent submissions. Exterior signs will follow the
Entrance Corridor Design Guidelines for signs.
K. LANDSCAPING
Landscaping plans and selected species will be included in subsequent submissions. Trees in the
proposed renderings have been shown per County Entrance Corridor requirements (streets trees
at 30' O.C., interior drive aisle trees at 20' O.C. etc.)
PROJECT DESCRIPTION
5
ARB PRELIMINARY SUBMISSION
JUNE 21, 2021
r
,. i
1
MOPS OIL CHANGE SITE
r* •j 'M
4 rq - .17
.
01 VAm
PIA
1 2 3 -
WLLI
CL
ISOCL
O APO +
w t .,
1. ENTRANCE LOOKING NE
7. EXISTING VIRGINIA NATIONAL BANK
PANTOPS OIL CHANGE
ALBEMARLE COUNTY, VA
2. SITE
8. EXISTING BMW DEALERSHIP
ENTRANCE CORRIDOR CONTEXT
7
3. ENTRANCE LOOKING NW
9. EXISTING FORD RENTAL CAR SYSTEM
ARB PRELIMINARY SUBMISSION
JUNE 21, 2021
/Ab
.• l_
E wpmss a
�.
Pantops
Shopping Center
i
Ni
sun "limmomm
��•.
44
Af
•. �` � T � � ``��` - .` � {-. ems~ �.��� �-�Tw-. '"�.--``"'w'i''.. =. � `' - •����
y
G'
�y i
PANTOPS OIL CHANGE ADJACENT CONTEXT ARB PRELIMINARY SUBMISSION
ALBEMARLE COUNTY, VA 9 JUNE 21, 2021
PANTOPS OIL CHANGE
ALBEMARLE COUNTY, VA
" TAKE 5" BRANDING IDENTITY
10
ARB PRELIMINARY SUBMISSION
JUNE 21, 2021
lip
Arm,
AL
01, rarer
C,94NCI
A
1
`CI
�
- - �J�Mlm-;m
PREFINISHED STANDING SEAM METAL ROOF
COLOR TO MATCH SHERWIN WILLIAM 7650 "ELLIE GRAY"
BRAKE METAL TRIM, SCUPPERS, DOWNSPOUTS
SHERWIN WILLIAM 9175 "DEEP FOREST BROWN"
EIFS SIDING
SHERWIN WILLIAMS 7646 "FIRST STAR"
GLEN-GERY UTILITY BRICK
"CARBON BLACK"
PANTOPS OIL CHANGE
ALBEMARLE COUNTY, VA ir
STANDING SEAM METAL ROOF
PROPOSED MATERIAL PALETTE
13
PREFINISHED ALUMINUM DOWNLIGHT
COLOR TO MATCH SHERWIN WILLIAM
9175 "DEEP FOREST BROWN"
METAL ROLL UP GARAGE DOORS
WITH GLAZING
DARK BRONZE ALUMINUM STOREFRONT
(TYP.)
ARB PRELIMINARY SUBMISSION
JUNE 21, 2021
%�Q
zt%t�.
11i
`� � ��Ib ..� 1 Vi� a"��,'� a�vt• 1 r"b ,-�. �v� vt�l� yi `{1.i�y r � 1�w,
lka1.
PANTOPS OIL CHANGE*
ALBEMARLE COUNTY, VA
-0
yr�
1
1 e
_ 4
-Slat
\�f1
0
ENTRANCE CORRIDOR PERSPECTIVE
14
ARB PRELIMINARY SUBMISSION
JUNE 21, 2021
i`
' y,
-MINA
-A���
- ♦
y
r
=
•AYs
r
• f .
_ -
Am
j
mum, ; mkj
ww"SIOW-07M7
T
��L�• i ![s1- �l+srJ �_._' �-
\y� '��^ � '.ems.. •'lk
1
La Rif
,h
Lm
'4 'KE