Loading...
HomeMy WebLinkAboutSDP202000040 Checklist - Project Closeout (Administrative) 2020-04-20 • • SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and status label. CDA will forward to the Imaging Center for digital closeout. SDP SUB# 20 ZC —Gl PROJECT TITLE S/e /`I//j, ,'7T I c{ ( FULL NAME OF LEAD REVIEWERl YIe(/( d1)10-SFINAL ACTION DATE:6�ZA CountyView— ❑Application,Page 2 Data Entered ❑ Staff Report,Ground Water Assessment, or other documents placed in"Does&Pics" Hardcopy—File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item.on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name) of the document in the space provided. ❑ Engineering Folder Information/documentation n ❑ Scan n Saved location /rT tg Application(signature copy) l /� ❑ Scan Saved location (� FPublic Notification records/Abutting Owner corres o ence ( ❑ Scan 0-Saved location ❑ Applicant Correspondence(to/from,memos/email) ❑ Scan R.-Saved location ❑ Complete set of printed Review Comments / El Scan Saved location U F. ❑ Approved plan/plat(signed, or stamped"Approve " ith Pl ner/Engineer name) El Scan Saved location 0 2 2—2 ❑ Action Letter(Administrative Approval)El /Scan Saved location Ca 06 -ZZ` 7,-) ❑ White Envelope-PC/BOS Meeting Package- Staff Re fort(include plan/plat presented,PC/BOS Action Letter) ❑ Scan ❑ Saved location 4"f ❑ Ground Water Assessments ❑ Scan ❑ Saved location ,////'A` ❑ Other(Please explain—i.e. Studies) ❑ Scan ❑ Saved location 4/1 f}— ❑ Other(Please explain—i.e. Studies) ^! I ❑ Scan El Saved location ! " ❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note l rifying why it was included. ❑ Scan ❑ Saved location /" Additional Information on this project: • Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary • Board of Supervisor Minutes—may be obtained online or by contacting the Clerk of BOS • Construction Documents—will be added to this folder after completion of project. Prior to completion, documents may be obtained by contacting the County Engineer. NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label(same font&label color as project label)placed under the project label to reflect current project status and date; 3) Documents are Acco-fastened(except plats/plans),and in chronological'order(latest documents on top); 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Chief of Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012 7