Loading...
HomeMy WebLinkAboutARB201900100 Checklist 2020-02-18 r e RESUBMITTAL REVIEW CHECKLIST PROJECT#/NAME: SDP 2019-100, Scottsville Elementary Additions Date 02-18-2020 Previous ARB Comment 02-18-2020 Review X 1. Revise Sheet E3 Exterior Elevations to include the 5 proposed building materials shown on the OK—Margaret said this could be handled as a condition in the materials board submitted with this application. approval letter • Revise the term"Main Brick"to"Matching Red Brick" • Revise the term"Accent Brick"to "Matching Brown Brick". 1. Revise Sheet D 1 Electrical Site Plan to: a. Indicate the lumens value for each _ proposed fixture. • KAD LED 7785 lumens—OK—Full Cutoff • DOCECITY WM K 50 5500 lumens.—OK Full Cutoff—acceptable equal notok. • Note"Or acceptable equal by Lithonina or Hubbell"—not allowed. b. Indicate the mounting height for the wall- mount fixture. OK-done c. Indicate the fixture tilt for each proposed fixture.Fixtures emitting 3,000 or more lumens shall have a zero-degree tilt. OK-done d. Indicate the lighting maintenance factor (LLF).An LLF of 1 is required by ordinance. OK-done 1. Revise Sheet D4 Electrical Site Plan— Photometrics to: a. Show side,front and rear property lines. Add additional footcandle values to demonstrate that lighting values do not exceed 0.5 footcandles at the property lines Previous ARB Comment 02-18-2020 Review as required by ordinance. OK—shown.0 fc at property line. b. Include the standard lighting note:Each outdoor luminaire equipped with a lamp_ that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads.The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle. OK—shown. 2. The two(2)light pole-mount fixture is labeled as LED-A in the Lighting Fixture Schedule(Sheet D 1 Electrical Site Plan)and as LED-B on the Electrical Site Plan.Revise the drawings to correct this discrepancy. OK—corrected 3. Sheet C9 Landscape Notes and Details indicates - one(1)proposed large shade tree and 6 existing large shade trees along the Entrance Corridor road. Revise drawings to show location of these existing and proposed Entrance Corridor trees. Not addressed 4. Add a latest revision date to all revised sheets. Not addressed.Show original drawing date and all revision dates Include a complete set of drawings included in the August 26, 2019 submission. - r _ i 9 Previous ARB Comment 02-18-2020 Review