RESUBMITTAL REVIEW CHECKLIST
PROJECT#/NAME: SDP 2019-100, Scottsville Elementary Additions
Date 02-18-2020
Previous ARB Comment 02-18-2020 Review
X 1. Revise Sheet E3 Exterior Elevations to include the
5 proposed building materials shown on the OK—Margaret said this could be handled as a condition in the
materials board submitted with this application. approval letter
• Revise the term"Main Brick"to"Matching
Red Brick"
• Revise the term"Accent Brick"to
"Matching Brown Brick".
1. Revise Sheet D 1 Electrical Site Plan to:
a. Indicate the lumens value for each
_ proposed fixture.
• KAD LED 7785 lumens—OK—Full Cutoff
• DOCECITY WM K 50 5500 lumens.—OK Full
Cutoff—acceptable equal notok.
• Note"Or acceptable equal by Lithonina or
Hubbell"—not allowed.
b. Indicate the mounting height for the wall-
mount fixture.
OK-done
c. Indicate the fixture tilt for each proposed
fixture.Fixtures emitting 3,000 or more
lumens shall have a zero-degree tilt.
OK-done
d. Indicate the lighting maintenance factor
(LLF).An LLF of 1 is required by
ordinance.
OK-done
1. Revise Sheet D4 Electrical Site Plan—
Photometrics to:
a. Show side,front and rear property lines.
Add additional footcandle values to
demonstrate that lighting values do not
exceed 0.5 footcandles at the property lines
Previous ARB Comment 02-18-2020 Review
as required by ordinance.
OK—shown.0 fc at property line.
b. Include the standard lighting note:Each
outdoor luminaire equipped with a lamp_
that emits 3,000 or more initial lumens
shall be a full cutoff luminaire and shall be
arranged or shielded to reflect light away
from adjoining residential districts and
away from adjacent roads.The spillover of
lighting from luminaires onto public roads
and property in residential or rural areas
zoning districts shall not exceed one-half
footcandle.
OK—shown.
2. The two(2)light pole-mount fixture is labeled as
LED-A in the Lighting Fixture Schedule(Sheet D 1
Electrical Site Plan)and as LED-B on the
Electrical Site Plan.Revise the drawings to correct
this discrepancy.
OK—corrected
3. Sheet C9 Landscape Notes and Details indicates
- one(1)proposed large shade tree and 6 existing
large shade trees along the Entrance Corridor road.
Revise drawings to show location of these existing
and proposed Entrance Corridor trees.
Not addressed
4. Add a latest revision date to all revised sheets.
Not addressed.Show original drawing date and all revision
dates
Include a complete set of drawings included in the August
26, 2019 submission.
- r
_ i
9
Previous ARB Comment 02-18-2020 Review