HomeMy WebLinkAboutARB201900100 Correspondence 2020-02-21 6/4/2020 Xfinity Connect FW_ARB-2019-100 Scottsville Elementary Addition Updated Drawings,ARB Staff Comments Printout
Brent Nelson<bneison@albemarle.org> 6/4/2020 5'58 PM
FW: ARB-2019-100 Scottsville Elementary Addition Updated Drawings, ARB
Staff Comments
To brentnelson707@comcast.net<brentnelson707@comcast net>
Brent W. Nelson
Senior Planner
Albemarle County
Community Development
434-296-5832 ext. 3438
bnelson@albemarle.org
From.Brent Nelson
Sent:Friday,February 21,2020 11 10 AM
To:Tyler Whitney<twhitn@y@gparch.com>
Subject:RE:ARB-2019-100 Scottsville Elementary Addition Updated Drawings,ARB Staff Comments
Hi Tyler - I have completed my review of your latest resubmission.My comments are below in color following
my original comments of 09-30-2019(in black).
1 Revise Sheet E3 Exterior Elevations to include the 5 proposed building materials shown on the materials board submitted with this application
02-21-2020 Addressed with the latest submission.
2.Revise Sheet DI Electrical Site Plan to:
a Indicate the lumens value for each proposed fixture
b Indicate the mounting height for the wall-mount fixture
c.Indicate the fixture tilt for each proposed fixture Fixtures emitting 3,000 or more lumens shall have a zero-degree tilt.
d Indicate the lighting maintenance factor(LLF).An LLF of 1 is required by ordinance.
02-21-2020 All addressed with the latest submission
Note:Lighting schedule on Sheet D1 contains the wording"or acceptable equal by Lithonia or Hubbell"Revise the drawing by
removing this wording Any change to the lighting will require additional review and an approved site plan amendment
3 Revise Sheet D4 Electrical Site Plan—Photometrics to
a.Show side,front and rear property lines.Add additional footcandle values to demonstrate that lighting values do not exceed 0.5 footcandles
at the property lines as required by ordinance
b.Include the standard lighting note:Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff
luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads The
spillover of lightmg from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half
footcandle
02-21-2020 (a&b)Addressed with the latest submission
4 The two(2)light pole-mount fixture is labeled as LED-A in the Lighting Fixture Schedule(Sheet DI Electrical Site Plan)and as LED-B on the
Electrical Site Plan Revise the drawings to correct this discrepancy
02-21-2020'Addressed with the latest submission
5.Sheet C9 Landscape Notes and Details indicates one(I)proposed large shade tree and 6 existing large shade trees along the Entrance Comdor road.
Revise drawings to show location of these existing and proposed Entrance Comdor trees.
No drawing was provided addressing this comment.
6.Add a latest revision date to all revised sheets
None of the drawings provided were dated No original drawing date and no revision dates.
With your next resubmission,please provide a complete set of all drawing sheets provided in your onginal August 26,2019 ARB
submission.All drawings should contain original drawing dates and all revision dates.
Please contact me should you have any questions.
Brent W. Nelson
Senior Planner
Albemarle County
https://connect.xfinity.com/appsuite/v=7.10.0-29.20200507.032519/print.html?print_1591308817110 1/3
6/4/2020 Xfinity Connect FW ARB-2019-100 Scottsville Elementary Addition Updated Drawings,ARB Staff Comments Pnntout
Community Development
434-296-5832 ext. 3438
bnelson@albemarle.org
From:Tyler Whitney<twhi n y@gparch.com>
Sent:Friday,February 14,2020 4.31 PM
To:Brent Nelson<bnelson@albemarie.org>
Subject:RE.ARB-2019-100 Scottsville Elementary Addition Updated Drawings
CAUTION:This message originated outside the County of Albemarle email system.DO NOT CLICK on links or open attachments unless you are sure
the content is safe
Hi Brent,
Just wanted to check in. Hard copy drawings should have been delivered on 1/30 Are the updated drawings under review? Our civil
engineer just got back site plan review comments and wanted to check the status of the CofA.
Thanks,
Tyler
From Brent Nelson<pnelson@albemarle.org>
Sent:Wednesday,January 29,2020 5.51 PM
To:Tyler Whitney<twhitney@gparch.com>
Cc:Margaret Maliszewski<MMaliszewski@albemarie.org>
Subject:RE ARB-2019-100 Scottsville Elementary Addition Updated Drawings
Hi Tyler - Thank you for your email.As noted in my comment letter of September 30,2019(snap shot below),please provide one set of
the revised drawings along with a memo summanzing the revisions you've made.The drawings and memo can be left with our
receptionist in COMMUNITY DEVELOPMENT.Please include a transmittal indicating the project is ARB 2019-100,Scottsville
Elementary Additions and Improvements and that it goes to me.I will commence my review after receiving this
From Comment Letter(09-30-2019)
Within 15 days of the date of this letter,please reply(email is acceptable)indicating whether you will or will not proceed
with these revisions.If you choose not to proceed with these revisions,staff will be unable to approve your application.If
you choose to proceed with the revisions,please forward me one set of revised drawings together with a memo
summarizing the revisions you've made.Your decision to make the revisions will suspend the 60-day review period
associated with your original submittal.I expel to complete the review of your revised proposal within 2 wccks of your
re-submittal.
Thanks,
Brent W. Nelson
Senior Planner
Albemarle County
Community Development
434-296-5832 ext. 3438
bnelson@albemarle.org
From:Tyler Whitney<twhitney@gparch.com>
Sent:Monday,January 27,2020 5.38 PM
To Brent Nelson<bnelson@albemarle.org>,Margaret Maliszewski<MMaliszewski@albemade.org>,Tim Padalino
<tpadal ino@albemarle.org>
Cc:Walter Harris<wharris@albemarle.org>,Steve Mundt<smundt@gparch.com>
Subject:ARB-2019-100 Scottsville Elementary Addition Updated Drawings
CAUTION:This message originated outside the County of Albemarle email system.DO NOT CLICK on links or open attachments unless you are sure
the content is safe.
Hi Brent,
Here are updated drawings for the county-wide Certificate of Appropriateness for the addition at Scottsville Elementary based upon
your last round of comments. Let me know if you need anything else.
Thanks,
https://connect.x inity.com/appsuite/v=7.10.0-29.20200507.032519/print.html?print_1591308817110 2/3
6/4/2020 Xfinity Connect FW_ARB-2019-100 Scottsville Elementary Addition Updated Drawings Printout
Brent Nelson<bnelson@albemarle.org> 6/4/2020 5.58 PM
FW: ARB-2019-100 Scottsville Elementary Addition Updated Drawings
To brentnelson707@comcast.net<brentnelson707@comcast net>
Brent W.Nelson
Senior Planner
Albemarle County
Community Development
434-296-5832 ext. 3438
bnelson@albemarle.org
From:Brent Nelson
Sent:Friday,February 14,2020 4:54 PM
To:Tyler Whitney<twhitney@gparch.com>
Subject:RE:ARB-2019-100 Scottsville Elementary Addition Updated Drawings
Hi Tyler - Thank you for your email I did receive the hard copies and my review is under way.I am hoping to have it completed Monday
or Tuesday so I can get back to you.
Brent W. Nelson
Senior Planner
Albemarle County
Community Development
434-296-5832 ext. 3438
bnelson@albemarle.org
From:Tyler Whitney<twhitney@gr arch com>
Sent:Friday,February 14,2020 4 31 PM
To:Brent Nelson<bnelsort@albemarle.org>
Subject:RE ARB-2019-100 Scottsville Elementary Addition Updated Drawings
CAUTION:This message originated outside the County of Albemarle email system.DO NOT CLICK on links or open attachments unless you are sure
the content is safe.
Hi Brent,
Just wanted to check in. Hard copy drawings should have been delivered on 1/30 Are the updated drawings under review? Our civil
engineer just got back site plan review comments and wanted to check the status of the CofA.
Thanks,
Tyler
From:Brent Nelson<bnelson@albemarle.org>
Sent:Wednesday,January 29,2020 5 51 PM
To:Tyler Whitney<twhitney-@gparch.com>
Cc:Margaret Maliszewski<MMaliszewski@albemarle.org>
Subject:RE'ARB-2019-100 Scottsville Elementary Addition Updated Drawings
Hi Tyler - Thank you for your email.As noted in my comment letter of September 30,2019(snap shot below),please provide one set of
the revised drawings along with a memo summarizing the revisions you've made The drawings and memo can be left with our
receptionist in COMMUNITY DEVELOPMENT.Please include a transmittal indicating the project is ARB 2019-100,Scottsville
Elementary Additions and Improvements and that it goes to me.I will commence my review after receiving this
From Comment Letter(09-30-2019)
https://connect.xfinity.com/appsuite/v=7.10.0-29.20200507.032519/print.html?print_1591308784199 1/2
6/4/2020 Xfinity Connect FW_ARB-2019-100 Scottsville Elementary Addition Updated Drawings Printout
Within 15 days of the date of this letter,please reply(email is acceptable)indicating whether you will or will not proceed
with these revisions.If you choose not to proceed with these revisions,staff will be unable to approve your application.If
you choose to proceed with the revisions,please forward me one set of revised drawings together with a memo
summarizing the revisions you've made.Your decision to make the revisions will suspend the 60-day review period
associated with your original submittal.I expect to complete the review of your revised proposal within 2 weeps of your
re-submittal.
Thanks,
Brent W. Nelson
Senior Planner
Albemarle County
Community Development
434-296-5832 ext. 3438
bnelson@albemarle.org
From:Tyler Whitney<twhitney@gparch.com>
Sent:Monday,January 27,2020 5 38 PM
To:Brent Nelson<bnelson(elbemarie.org>,Margaret Maliszewski<MMaliszewski@elbemarle.org>;Tim Padalino
gpadalino@albemarle.org>
Cc:Walter Harris<wharrisCaalbemarle.org>,Steve Mundt<smundt@gparch.com>
Subject:ARB-2019-100 Scottsville Elementary Addition Updated Drawings
CAUTION:This message originated outside the County of Albemarle email system.DO NOT CLICK on links or open attachments unless you are sure
the content is safe.
Hi Brent,
Here are updated drawings for the county-wide Certificate of Appropriateness for the addition at Scottsville Elementary based upon
your last round of comments. Let me know if you need anything else
Thanks,
Tyler Whitney,AIA,LEED AP BD+C
Architect
G+P
GMWA AND PACRt+
Dir:434 270.0144 I Email:twhitnex@gparch.com
123 East Main Street,Second Floor I Charlottesville,VA 22902
Calverton I Tysons I Charlottesville
Creative Collaboration I Sustainable Solutions I Engaging Environments
,gn mmancjparker.cont
• image001.png(78 KB)
• image002.png(6 KB)
https://connect.xfinity.com/appsuite/v=7.10.0-29.20200507.032519/print.html?pnnt_1591308784199 2/2