Loading...
HomeMy WebLinkAboutARB202000093 Correspondence 2020-09-14 HENNINGSEN KESTNER ARCHITECTS September 14, 2020 MEMORANDUM OF COMMENT REVIEW To: Margaret Maliszewski 2300 Hunters Way Hardware Store&Coffee Shop Job: 1924 -2300 Hunters Way Hardware Store&Coffee Shop Transmitted for: Comment Review for ARB Submission Comments from 09/16/19 ARB Review: 1. Provide window glass specs confirming that Visible Light Transmittance (VLT) is not below 40% and Visible Light Reflectance (VLR) is not above 30%. Provide a sample for review. a. Copy of window spec sheet attached to this memo. 2. Revise the dumpster detail to indicate that the brick will match the red brick of the building closest to the EC. a. Dumpster enclosure to match brick on building - Lawrenceville Carter's Grove brick 3. See landscape recommendations. 4. Ensure that vehicles awaiting repair will be fully screened from the EC. a. Landscaping elements and elevation of site fully screen vehicles awaiting repair. 5. Add the standard mechanical equipment note to the architectural drawings. a. Noted on elevations sheets. 6. Add one 2 i" caliper tree along the 4-space parking row located south of the dumpster enclosure. Provide shrubs, 24" high at planting, along this perimeter. a. Landscaping added to EC side of building,per Shimp Engineering. 1108 EAST HIGH STREET, CHARLOTTESVILLE, VA 22902 PHONE: 434.971.7202 I FAX: 434.295.2413 I HENNINGSENKESTNER.COM (Yj? 12{1, HENNINGSEN KESTNER ARCHITECTS 7. Provide landscaping consisting of trees and shrubs along the EC side of the building,between the building and the drive-thru lane. a. Landscaping added to EC side of building,per Shimp Engineering. 8. Provide landscaping consisting of trees and shrubs along the EC side of the drive-thru lane. Coordinate landscaping with utilities. a. Landscaping added to EC side of building, per Shimp Engineering. 9. Revise the utilitarian guard rail to a guard rail that has an appropriate appearance for the EC. a. See attached Response Letter #3 from Shimp Engineering dated July 10, 2020. 10.Show on the plan the locations of all drive-thru related equipment and provide design details for all equipment. a. No other equipment will be installed for the drive-thru. The only element is the drive-thru window, covered by a canopy that is part of the architectural design. 11.Make the extents of the new stormwater management facility easement easily legible on the grading and utility plan. 12.Consider adjusting the drive thru lane and grading to make the lane more level and provide a better base for the building, and to allow a zone to screen the guard rail,and to slightly ease the slope to the EC. a. Grading, entrance lanes, rail screening all properly addressed and changed by Shimp Engineering. 13.Provide a rendered elevation of the west side. a. Provided attached to this memo. 14.Consider maintaining a regular fenestration pattern and explore alternate sign locations. a. Fenestration has been adjusted to a more consistent architectural rhythm. Alternate sign locations will be reviews pending tenant specifics. Emailed to Margaret Maliszewski on September 14, 2020 1108 EAST HIGH STREET, CHARLOTTESVILLE, VA 22902 PHONE: 434.971.7202 I FAX: 434.295.2413 I HENNINGSENKESTNER.COM