HomeMy WebLinkAboutARB201900145 Correspondence 2020-03-05 (2) A.
Margaret Maliszewski
From: Evan Philips <evan@designdevelopllc.com>
Sent: Thursday, March 5, 2020 10:41 AM
To: Margaret Maliszewski;Ashley Davies; Bob Pineo;Jess Achenbach
Subject: Presidio ARB Review I Response to Staff Inquiry
CAUTION:This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hey Margaret,
Thank you for your perseverance in ensuring our complete submission is included,we appreciate all of your work!
Ashley asked me to tackle your questions as to the most recent documents you have on-hand. Please find your
questions below with corresponding answers. I've also included a link to all document PDFs that should be included in
our ARB submission, these documents are the same ones you have and represent the most recent version of each
document respectively. Please let me know if you have any further questions or concerns.
ALL DOCUMENTS LINK (This link has PDF copies of all documents listed below)
Submitted Documents
•
• (Margaret)11
• x 17 spiral bound Riverbend 29-page color document (Nov. 25, 2019) and revised sheet 8 of 29
received 12/4/2019
•
0
o (DD) This is correct and
o should be included in the submission.
0
•
• (Margaret)
• Design Develop 2-page memo (undated)with questions to answers asked on December 23, 2019*
• 0
o (DD) This is correct and
o should be included in the submission.
0
•
• (Margaret)
• Window specs*
• 0
o (DD) This is correct and
o should be included in the submission.
0
•
• (Margaret)
• Sixteen 11 x 17 color elevations undated*
• 0
o (DD) This is correct and
o should be included in the submission.
0
• (Margaret)
• Collins L1 lighting plan dated 11/15/19*
• 0
o (DD) This is correct and
o should be included in the submission.
0
• (Margaret)
• Fugleberg Koch photometrics and cut sheets E1.03 and E1.04 dated 11/15/19
• 0
o (DD) This is correct and
o should be included in the submission.
0
• (Margaret)
• Jessica Primm plans L1.1, L2.1 and L3.1 Amenity Grading Plans dated 12/2/2019
• o
o (DD) This is correct and
o should be included in the submission.
• (Margaret)
• Collins Engineering Martha Jefferson Hospital Apartments ARB Plan, sheets 1-13 dated 11/15/19
• 0
o (DD) This is correct and
o should be included in the submission.
0
• (Margaret)
• Fugleberg Koch architectural plans and elevations dated 11/15/19
0
o (DD) This is correct and
o should be included in the submission.
0
Addition Documents
2
•
• (DD)
• Collins Engineering Landscaping Plans: Dated 2019-11-15
• 0
(DD)
0 This was not mentioned above but should be included in the submission.
0
Thank you,
Evan
3
DESIGN
DEVELOP
Hello Margaret,
Below are responses to your previous inquiries regarding the Presidio apartments ARB
submission.
1. Four buildings are illustrated in "View 4" sheet 17 and 29. From left to right, are these
Buildings #5, 3, 1, and 2?
• Response: in "View 4" sheet 17 of 29, from left to right, are buildings #5, 3,
2, and 4. See images below.
2
5
_ 4
EXTENTS OF ...
..Tf 74, . ..tea:. ,
ALB EE MAnE C^.UNIY alkOSED
ALBEAAARLE COUNTY VA
DESIGN DEVELOP
418 East Main Street I Charlottesville,VA 22902 1434-806-8365
www.designdevelopllc.com
Page 1 of 2
....,,, DESIGN
DEVELOP
2. Is the Building Visible in View 3, Building #5?
• Response: In "View 3," you can see building 3, building 5 is slightly visible.
See image below.
rine1 t,,,, -. - .-'91111a1,%, 4.,
- e�ye!7 T �,
1 4 i':
- `iE EXTENTS OF VISIBILITY `<
z Ai
, i.w. y
' _ 1%4j\ 1`,' , ." ,,,, ' ' -- *
_ii`JI`.P� jl. tn. J.
a ;• ` _ M
40.
�Irr
PRESIDIO APARTMENTS VIEW 3-PROPOSED ARB SUBMISSIO
ALBEMARLE COUNTY,VA -- _. .-v 15 OF 29 NOVEMBER 25,201
3. Can you provide color end elevations for Building Types 1 and 2?
• Response: Yes, please find the renderings here (LINK
Note: We have chosen to change the window spec listed in our ARB package. We will now be
specifying Ply-Gem windows in place of the previously listed Pella Spec. Generally speaking, all
single windows will remain casement, while operable ganged windows will change in operation
from casement to sliding.
Thank you,
Design Develop LLC
DESIGN DEVELOP
418 East Main Street i Charlottesville,VA 22902 1434-806-8365
www.designdeveloplIc.com
Page 2 of 2