HomeMy WebLinkAboutARB201900109 Application 2019-09-24 „,.,� Community Develo mentDe artment
�'I'�i "� Albemarle Count, f p p
P,i n..,-, 401 P.7c Road Char3ottesville,VA22902-4595
4.' ti .'�'- Vc ,434)29B-5832 Fax (434)972-4128
`l .....,. !Planning Application
PARCEL/ OWNER INFORMATION
TMPI 061W0-01-0A-00300 Owner(s): UNIVERSITY OF VIRGINIA FOUNDATION
Application# ARB201900109
PROPERTY INFORMATION
Legal Description 1 WESTFIELD 1 B 1 FORPIERASIAN BUFFET A
Magisterial Dist. Rio v Land Use Prima Commercial v'
CurrentAFD Not in A/F District 's, Current Zoning Primary Cl Commercial ”
t' a
APPLICATION INFORMATION
Street Address Entered By
Application Type Architectural Review Board v Buck smith
9124/2019
Project AUTOZONE- FINAL
Received Date 09/23/19 Received Date Final Submittal Date 09/23/19 Total Fees 1075
Closing File Date Submittal Date Final Total Paid 1075
Revision Number
Comments
,
!, I
Legal Ad
'i
' I
SUB APPLICATION(s)
Type Sub.Applicatio ; Comment •
Final'Site Development Plan ' , 09/23/19
APPLICANT/CONTACT INFORMATION
ContactType . ' Name Address - CityState Zip Phone . PhoneCell
ors-.,VAp li_e:t. 'UPIIVERSIT,Y OF VIRGINIA FOUNDATION " 'P 0'BOX 400218 •CHARLOTTESUTLL '22904- "
Primary Coasts:t _CRAIG KOTARSKI-TIMMONS GROUP '608 PRESTON AVE,SUTIE 200 'CHARLOTTESVILL '22902 '-' 4343271688 '!!
4
Signature of Contractor or Authorized Agent Date
Architectural Review Board Application A.„
Part A:Applicant, Contact and Parcel Information
Project Name: AutoZone
Tax map and parcel(s): 061 W0-01-0A-00300 Physical Street Address: Corner of Rte 29 and Westfit+
Contact Person: Craig Kotarski
Business Name: Timmons Group
Address 608 Preston Ave, Suite 200 City Charlottesville State VA Zip 22902
Daytime Phone(434) 327-1688 Fax#( ) - E-mail craig.kotarski@timmons.com
Owner of Record: University of Virginia Foundation
Address PO Box 400218 City Charlottesville State VA Zip 22904
Daytime Phone(434) 982-4848 Fax#( )_ _E-mail
Part B: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan/Advisory Review(for a Special Use Permit or a No Fee
Rezoning)
Preliminary/Initial Review of a Site Development Plan No Fee
X Final Review of a Site Development Plan $1075.00
Amendment to an approved Certificate of Appropriateness $242.00
Building Permit Review $634.00
County-wide Certificate of Appropriateness
Structures 750'or more from the EC,no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB-approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50%or less of the altered elevation No Fee
NOTE: For SIGNS,use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE.ONLY BP# ' " ARBittkif000 r
�/ ,J
I Fee Amount S Jo/5—l a Y/<t Date Paid 5 ,By whhc ,GD ZDr/(Receipt#/1.2�Zheck#/Preig>Bya '
- County of Albemarle Dept of Community Development,401 McIntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126
102015 Page I of 2
OVER—,
Part C: Description of Proposal
Describe your proposal.Attach a separate sheet if necessary.
This project proposes the construction of an AutoZone building, along with associated parking,
utilities, landscaping, and site work.
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain(8)folded copies of all plans and documents being submitted.
Only(1)set of building matenal samples is required. All submittal items,including building material
samples,become the property of Albemarle County. Applicants are encouraged to maintain duplicate
copies of all submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate, true,and correct to the best of my knowledge, and that the attached
plans contain all information required by the appropriate checklist.
09-20-19
Signature of owner, weer' res ative Date
or contract purchaser
Dana L. Riggins, Sr Design Drafter 901/495-7398
Printed name,Title Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation,partnership or association,or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the 'applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency.Attach the owner's written consent.
11/2010 Page 2 of 2
OVER—*
Gp�
l r Architectural Review Board
Vr
•�r ; " Final Review of a Site Development Plan
Submittal Requirements Checklist
Part A: Applicant,Contact and Parcel Information
Project Name; AutoZone
Tax map and parcel(s): 061 W0-01-0A-00300 Physical street address: N/A
Contact Person: Kevin Murphy
Business Name: AutoZone, Inc.
Address 123 South Front St City Memphis State TN Zip 38103
Daytime Phone(9tE) 495-7625 Fax#( ) E-mail kevin.murphy@autozq
Part B: Submittal Requirements
Important:Submittal packages must contain 8 collated copies of all information unless otherwise indicated.
A. Written description of the proposal
® Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate
specifically how each ARB comment from the preliminary review has been addressed. If there are no
changes proposed,then explain why.
® Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of 1"=20;clearly legible and folded):
• Location(s)of proposed building(s)on the site.
® Location of proposed parking, traveiways, walkways and other improvements.
® Mechanical equipment, trash containers, loading and service areas, other similar features and
improvements, and associated screening.
® Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient
off-site topography to describe prominent and pertinent off-site features and physical characteristics,
but in no case less than 50-feet outside of the site.
21 Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
® Storrnwater management plan.
® Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed
materials,with material and color samples.
® Sheet number,total number of sheets,date of the drawing,date and description of the latest revision,and
contact information for the firm preparing the drawings in the title block on all drawings. For revised
drawings,clearly identify revisions made.
OVER-.
C. Landscape plan showing the following(drawn to the scale of 1"=20'or larger,clearly legible and folded):
® Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
® Existing landscaping to be removed. Include the location,size,and species.
® Landscape key including all landscape symbols and a description of what they represent.
® Location of existing and proposed tree lines and tree save areas.
® Location of existing natural features.
® Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
® Location and height of above-ground utilities and associated easements, and location of below-
ground utilities and associated easements.
® Stormwater facilities.
❑ Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
® Include tree protection fencing and limits of work on the landscape, grading and EBBS plans.
D. Lighting plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded):
® Location of all proposed building and site lighting.
® Lighting schedule identifying all proposed light fixtures, poles and brackets.
® Manufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type,
intensity, style, shielding, color,finish,and installation height.
® Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
Section 4.17 of the Zoning Ordinance.
® Coordination of lighting with landscaping and other site elements.
E. Appearance of the building(s) (architectural elevations,color perspective sketches,site sections):
® Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the
scale of 1/8"=1'-0". Include a building materials schedule and key on the elevation drawings.
Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the
overall building design.
❑ Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed
development from the Entrance Corridor Site sections shall indicate the finish floor elevation(s)and
roof height(s)relative to the natural elevations along the Entrance Corridor.
® One set of all building materials/colors.
❑ A floor plan adequate to show exterior walls, windows and doors.
F. Additional material
❑ Provide labeled, color, 8'/" x 11' photographs of the site as seen from both directions on the
Entrance Corridor.
❑ Color perspective images (for example: sketches, renderings, photosimulations, etc.) that show the
proposed development as seen from the Entrance Corridor are often useful for gaining a clear
understanding of the proposal. The ARB may require such images in certain cases when other
submitted documents do not answer all questions of building form, building details, materials, context,
topography, and/or visibility.
❑ Any additional material that is necessary to address comments made by the ARB at the preliminary
review with a memo itemizing how each of the preliminary comments have been addressed.
❑ The applicant is welcome to submit any additional material that will make the final site development
review more productive. Drawings or other submittal items that clarify topography, visibility, utilities,
landscaping,or other unique or unusual conditions are welcome.
2
OVER-•
v ,
Part C: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a final site development plan review by the ARB. Additional submittal materials may be required,
depending on the proposal.
• Only complete application packages will be scheduled for ARB review The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, 1 hereby state that the
information provided in this application, and all accompanying information,is accurate, true and correct to
the best of my knowledge, and that the attached plans contain all information required by this checklist.
09-20-19
Signature of person`completingi c ist Date
Dana L. Riggins, Sr. Design Drafter 901/495-7398
Printed Name/Title Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville,VA 22902-4596
(434)296-5832 Tel www.albemarle.orq revised 10/24/2014
3
OVER-6
r
County of Albemarle 1 9 24
Department of Community Development
PH:(434)296-5832 Date I
RECEIVED.FROM: Ais6 2U/v., r ✓
AMOUNT O c 6f,5�!-.1 5,, '✓t r-- Ali " $ (o 9-'-
307 308 % ill11 7- 510 check
For: cash
12ii)c9 /l- 012{'01 cred. and
B