Loading...
HomeMy WebLinkAboutARB201900109 Correspondence 2019-09-23 TIMMONS GROUP • Transmittal YOUR VISION ACHIEVED THROUGH OURS. To: Date: September 23, 2019 Margaret Maliszewski - County of Albemarle Dept. of Community Development Job No.: 42231 401 McIntire Road Charlottesville, VA, 22902 Regarding:AutoZone - Charlottesville We are sending you the following items: ® Attached n Under separate cover via ❑ Shop Drawings ❑ Prints ® Plans n Specifications n Copy of Letter n Change Order n Other Copies Date Description 2 August 18, 2019 Building Elevation, Floor Plan, and Roof Plan 2 July 16, 2019 Final Site Plan 1 September 20, 2019 Application, Checklist, and Fee Check 1 September 23, 2019 Written Description of Proposed Work 1 September 23, 2019 Flash Drive containing the above listed components This information is transmitted as checked below: ® For Approval ❑ Approved as submitted ❑ Resubmit_ copies for approval n For your use n Approved as noted n Submit copies for distribution ❑ As requested n Returned for corrections ❑ Return corrected prints • For review/comment n Other ❑ for bids due n Prints returned after loan to us Remarks: RECEIVED Copy to: 14utuf.Akt SEP 2 3 2019 Signed: COMMUNITY A a Fontaine DEVELOPMENT Phone: 434.295.5624 Received by: Name(printed) Signature If enclosures are not as noted,please notify us at once fd 608 Preston Avenue P 434.295.5624 T I M M O N S GROUP Suite 200 F 434.295.8317 YOUR VISION ACHIEVED THROUGH OURS Charlottesville,VA 22903 www.timmons.com September 23, 2019 To County of Albemarle Department of Planning and Community Development Architectural Review Board 401 McIntire Rd Charlottesville, VA 22902 RE AutoZone—Charlottesville Architectural Review Board Final Site Development Plan Submittal Written Description of Proposed Work This project proposes the redevelopment of a 1.42-acre parcel within the,Entrance Corridor Overlay District along State Route 29/Seminole Trail The existing site contains a large paved parking area which used to serve a restaurant,that has since been demolished.The proposed scope includes the construction of an AutoZone store,along with the associated parking, utilities, landscaping and site work. Landscaping and buffering will be provided to meet Albemarle County minimum design standards. Site Constraints The primary constraints of this site are the utilities running along Route 29.Within the 40-foot wide utility easement along the Route 29 frontage of the site,there are large overhead power lines as well as an underground sanitary sewer line.The plantings shown in the proposed layout balance the limited space between these utilities and easements with the ARB Design Guidelines. Entrance Corridor Compatibility The updated plan includes red and beige brick, stucco, and clear glass,to be more consistent with the architecture found in the Entrance Corridor. Changes from the Initial Site Plan are in accordance with ARB and County review comments and are reflected within this submittal. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES