Loading...
HomeMy WebLinkAboutARB201900109 Review Comments 2020-03-24 3/24/20 review of 2/28/2020 revised drawings pThe transom windows changes were made, but corresponding changes were not made in the floor lan and the new transoms are rendered black in the elevations. Is the black infill a mistake?Was the floor plan just overlooked? Please clarify and provide revised drawings accordingly. 4rpfjy c/ ,7 �/ P,LY-.' v .The brick(wirecut 200 Velour and Pebble Beach Velour, both Carolina Ceramic Brick) and stucco colors on the revised elevation differ from the previous submittals(Firehouse Environmental Stoneworks brick; beige brick stucco). Pleas provide the updated brick samples for review. . ._...-t,ti")-) -- es,„e,.,61-1,a., 1.....er-z,t) ,c./4. 6,67,(40,A4,44. de-1.44144c 4'44 - itel)(,V15 62-k Zeic A , , _ ,e,,-,,,ifecA / VIiV CC.... 3.Thank you for submitting sign drawings and updating the red and orange colors. Note that both wall and freestanding signs require separate permits.Signs will not be approved with this ARB application. Though a complete sign review has not yet been done, note that: a.the background of the freestanding sign must be opaque, b.the sign drawings reference the brick color/manufacturer associated with the previous architectural submittal, c.the building and sign brick must be coordinated.