Loading...
HomeMy WebLinkAboutWPO201500057 Plan - VSMP 2017-01-13GENERAL NOTES OWNERS: MOSS ACQUISITIONS AVINITY ESTATES LLC 321 E MAIN ST 455 SECOND STREET SE, 5TH FLOOR CHARLOTTESVILLE, VA 22902 CHARLOTTESVILLE, VA 22902 AVON PROPERTIES, LLC P.O. BOX 1467 CHARLOTTESWLLE, VA 22902 DEVELOPER: RIVERBEND DEVELOPMENT, INC. 455 SECOND STREET SE, SUITE 400 CHARLOTTESVILLE, VA 22902 ENGINEER: COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE, VA 22902 TAX MAP NO.: 09100-00-00-016CO 09100-00-00-016EO ZONE. • PRD ZONE: PRD DB 4319 PG 247 DB 4571 PG 88 09100-00-00-016AO 09100-00-00-01400 ZONE. PRD ZONE: PRD DB 4571 PG 88 DB 3472 PG 015 TOTAL PROJECT AREA: A WNI TY ES TA TES 09100-00-00-016CO — 2.472 AC. 09100-00-00-016EO — 4.982 AC. 09100-00-00-016A0 4.432 AC. 11.886 AC. TOTAL ZONING: PRD — PLANNED RESIDENTIAL DEVELOPMENT — ZMA 2013-016 TOPOGRAPHY SURVEY & TOPOGRAPHY PROVIDED BY ROUDABUSH GALE & ASSOCIATES, DATED AUGUST, 2013. TOPO FIELD VERIFIED ON DECEMBER 2014. DATUM: NAD 83 FLOODPLAIN: THERE IS NO FLOODPLAIN LOCATED ON THIS SITE. FEMA MAP ID 51003CO407D & 51003C0426D DATED FEBRUARY 4, 2005. STORMWATER MGMT STORMWATER FOR AVINITY ESTATES WILL BE HANDLED BY A PROPOSED STORMWATER MANAGEMENT FACILITY JUST UPLAND OF THE EXISTING SWM POND. ADDITIONAL AVINITY ESTATES STORMWATER WILL BE TREATED BY A SECOND SWM FACILITY AT THE SOUTH OF THE SITE, AND (2) UPLAND DRY SWALES. SWM SHALL MEET ALL STATE REGULATIONS REQUIRED WITH THE DEVELOPMENT. FIRE & RESCUE. AS REQUIRED, ALL FIRE FLOWS MTHIN THE DEVELOPMENT SHALL BE A MINIMUM OF 1000 GPM AT 20 PSI. ADDITIONALLY, FIRE HYDRANTS SHALL BE PROVIDED ALONG THE STREETS FOR FIRE FIRE PREVENTION AT A MAXIMUM SPACING OF 500 FT PER IRA VEL WA Y. PROPOSED USES: SINGLE—FAMILY ATTACHED UNITS & TOWNHOUSE UNITS SINGLE FAMILY ATTACHED UNITS. • 49 TOTAL UNITS (AVINITY ESTATES) TOWNHOUSE UNI IS. 30 TOTAL UNI IS (A VINI TY ES TA TES) SITE AMENITIES: CLUBHOUSE/PAVILION AREA (960 SF MIN) TOT LOT (2,000 SF MIN) DOG PARK (2,325 SF MIN) PASSIVE RECREATION AREA (6,000 SF MIN) ACTIVE RECREATION GRASS COURTYARD (11,500 SF MIN) NOTE. • TOT LOT TO CONTAIN AT MINIMUM (4) SWINGS, (2) CLIMBERS, (1) SLIDE, (1) WHIRL, AND (2) BENCHES. RIGHT — OF— WAY.• 2.40 ACRES OPEN SPACE.• 2.31 AC OPEN SPACE (AVINITY 12.312 PLATTED) ACE AVINITY ESTATES 2.99 AC OPEN SP ( ) 5.30 / 21.13 AC TOTAL AVINITY I & ESTATES = 25.1% LOTS: 6.21 ACRES SETBACKS. • FRONT — 10' MIN (WITH VARIATION SUBMITTED TO THE COUNTY) SIDE — 5' MIN REAR — 10' MIN INTERIOR, 20' MIN WHERE LOTS ARE ADJACENT TO THE PROJECT BOUNDARY CLUBHOUSE/PAVILION — 8' MIN FRONT, 5' MIN SIDE, 10 MIN REAR SETBACKS SHALL INCLUDE A 4' FRONT AND REAR ENCROACHMENT OF ALL SETBACKS WITH PORCHES, EAVES, AND OTHER ARCHITECTURAL ELEMENTS OF THE HOMES SETBACKS SHALL ALSO ALLOW UP TO A 1' SIDE YARD ENCROACHMENT FOR ARCHITECTURAL ELEMENTS AND OVERHANDS, PROVIDED THAT THE ENCROACHMENTS ARE FIRE RATED PER BUILDING DEPARTMENT REQUIREMENTS WHEN BUILDING SEPARATION IS REDUCED FROM 10: SETBACKS WERE APPROVED WITH THE BUILDING MODIFICATION WAIVER REQUEST WITH ZMA 2013-016. BUILDING HEIGHT- 35' MAXIMUM HEIGHT PARKING: EACH PROPOSED LOT SHALL PROVIDE OFF—STREET PARKING FOR TWO VEHICLES IN A MINIMUM 18' DEEP DRIVEWAY AND A GARAGE. ADDITIONALLY, ROADWAYS SHALL ACCOMMODATE OVERFLOW PARKING ON —STREET WITH PARKING ON ONE SIDE ONLY. PHASING: THE PROJECT MAY BE COMPLETED WITH A MAXIMUM OF 4 PHASES AS SHOWN ON THIS ROAD PLAN STREETS: CURB & GUTTER PRIVATE STREETS THE ACCESS ROADWAY SHALL BE MAINTAINED BY THE HOA. UTILITIES, • SITE SHALL BE SERVED BY PUBLIC WATER AND SEWER CONSTRUCTION TRAFFIC: ALL CONSTRUCTION TRAFFIC FOR THE DEVELOPMENT OF AVINITY ESTATES SHALL ENTER THE SITE FROM THE EXISTING DRIVEWAY AT ROUTE 20. DENSITY 9. 43 A = 11.58 UNITS AC A TY 107 UNITS 2 C 1/lNl I / / 6 = 6.65 UNITS AC 79 UNITSi/ 1.88 AC AVINITY ESTATES: / LANDSCAPING: ALL PROPOSED ROADWAYS SHALL HAVE STREET TREES IN ACCORDANCE WITH COUNTY REQUIREMENTS. ALL TREES SHALL BE OUTSIDE OF THE ROW ALBEMARLE C Q WITHIN A 5' WIDE LANDSCAPING AND MAINTENANCE EASEMENT AND ALL STREET TREES SHALL BE MAINTAINED BY THE HOA. TRAFFIC GENERATION: TRIP GENERATION BASED ON ITE TRIP GENERATION MANUAL ( 8TH EDITION) S CODE 210 49 SINGLE FAMILY UNITS ( ) 23 469 VPD (234.5 ENTER 234.5 EXIT) AM PEAK. • 37 VPH 9 ENTER 28 EXIT) PM PEAK: 49 VPH (31 ENTER/18 EXIT) 30 TOWNHUME UNITS (CODE 230) 174 VPD (87 ENTER/87 EXIT) AM PEAK: 13 VPH (2 ENTER/11 EXI T) PM PEAK: 16 VPH (10 ENTER/6 EXIT) TRASH: ALL UNITS SHALL HAVE AN INDIVIDUAL TRASH CONTAINER AND THE HOA SHALL PROVIDE TRASH COLLECTION SERVICES. RESERVOIR WA TERSHED: MOORE'S CREEK WATERSHED AGRICULTURAL —FORESTAL: NONE PLACES OF BURIAL: NONE RETAINING WALL: ALL WALLS AS SHOWN ON THIS PLAN SHEET AND THE GRADING PLAN SHEET SHALL NOT EXCEED 6' IN HEIGHT. AVINITY STATES SCOTTSVILLE DISTRICT ALBEMARLE COUNTY, VIRGINIA 'K r I (` ti i 1 . . ... . ..... ... . . . . . . ) ............... f I I ? C 1 r, f^ o •c, ;r eor ( •: :::::. I 1 .. 7� l- � .;.f .. .."`,^6151 1 -'--.,,, •-�: -- Aar �'� i \.• 7 -- � i / n {. as ear / /�: v,,:.. �i♦f�4i1} .�">";"-r^+-»:,,'/ r ' a:.;.$ a j / ffa 'f -- — _ •^-^-. / ./ F for � E .: t of .'^-•-•� eY I t / ,,,., ::j -.. /+ // a, � eor [or / � , � '•. £ � : r.{. : t [ �¢S :1 ✓ � / / ). ai a easr wr .� , [ ,�� '? � if r ,- r ; I f:. i'N � f /• '^ •. �>i,:i I � sa , rx� r 6 � : I t :. 1 \ \ \ ;t- '^•-.. �_ /r / j ""' „'d" _a,,,aa:�a..• I ' I r h ff,, / :f}(� / 4QTd I I + 1 � s .S� •:�, a t � i s tit +7. I l � / \ I- � ,/ { i / M. tArb j i.' L 7 ; ` I [ x / '• fore .. [ I [ i , 1 f, :j ✓ x) I Sd7d 1 I r. I r r:IM •-._—_.__ - � 3>134f I,{. �" �.I � F :LQT.4$ { ,.I',. [. 5 ! �,J [[ j !�� 1 � t tAzy3 :• ' I I � r / r � t/'/ � �Q;� J 1'��: I1 �, 7 1 � [ \SOT\ ti��rZ. I •f� i i I t: A�Lq�� �\ i ,°f %i : E vrt� 11 • � i 5 � , I q �,v \\ �I l ��: • I T r � f,, / 4 •„ i e , { , t %•/r $ �E;a { j I `` L I I s/Aiea s ,;, / / .- /,/ % t r v 1, , rtk ( I i I { vE • � JJ ; ^Q >r x ad/ r 6. is .4s L gr. s + s y f \. ! gg st r r 2 F �.• E t1.• r a '.. ,. I r — r. i >rrf . 1l/ l E/t A. ed s. r / !I ,. 1, 7 I <, i t i >N f. h ! 1110", /( ; _ 4 / 1' I ''•iiv� .k , ♦ I > a r t .E .W •7 i 4, w\ i .fie r7 \f, sr' k ! `D ? P. f ,.fis • 1 I F /• %55 ;y i/ e s' I .r 7i)F I ,I 'fI : Ir ` ! .........1 / ell -- — — — — — — —---------------------------------------------------------------------------------------- - ------------------------------ :.. 1 / r F i 1 ! r I { r r r SHEET LAYOUT SCALE: 1" = 100' NO TES. 1) THIS PROPERTY DOES NOT LIE WITHIN AN AGRICULTURAL AND/OR FORESTAL DISTRICT, 2) THIS PROJECT IS NOT LOCATED WITHIN FLOODPLAIN LIMITS, BASED ON FEMA MAP NUMBER 5100JC0407D & 51003CO426D ADOPTED FEBRUARY 4, 2005. 3) EACH LOT AS SHOWN HEREON CONTAINS A BUILDING SITE WHICH MEETS THE REQUIREMENTS OF SECTION 4.2.2(b)l (18-520) 4) ALL PROPOSED EASEMENTS SHALL BE DEDICATED TO PUBLIC USE. 5) STREET TREES SHALL BE PROVIDED ALONG ALL THE PUBLIC STREETS 50' O.C. IN ACCORDANCE WITH VDOT AND ALBEMARLE COUNTY STANDARDS. 5�. TO alyNr)ND MILL CREEK LAKE REYNOVIA �O MILL CREEK GIB• SOUTH Q 0 Q STA?E 64 INTgR PIEOMONr VIRGINIA COMMUNITY COLLEGE 1__I MONTICELLO HIGH SCHOOL ELEMENTARY / SCHOOL VICINITY MAP SCALE: 1" = 3000' WPO PLAN SHEET LIST Sheet Number Sheet Title 1 COVER SHEET 2 EXISTING CONDITIONS 3 GRADING PLAN 4 PRE -DEVELOPMENT STORMWATER MANAGEMENT PLAN 5 POST -DEVELOPMENT STORMWATER MANAGEMENT PLAN 6 STORMWATER MANAGEMENT DETAILS & CALCULATIONS 7 STORMWATER MANAGEMENT DETAILS & CALCULATIONS 8 EROSION & SEDIMENT CONTROL NARRATIVE & DETAILS 9, EROSION & SEDIMENT CONTROL PLAN PHASE I 10 EROSION & SEDIMENT CONTROL PLAN PHASE II 11 EROSION & SEDIMENT CONTROL CALCULATIONS TOTAL 11 PAUEb AP P RO V ED b the f,e " Albemarle m arl e Coun ty tv Com mil ' nit Date Develo pment Department I 13 I File wPc� tic, i�or r — I Avinity II RnnaP of Residential Uses Block Townhome (min -max) Single Family Attached/Detached (min -max) Proposed Number of Units Avinity 1 6-8 - 7 A 0-20 0-9 8 B 0-30 0-15 15 C 0-30 0-15 14 D 0-34 12-32 27 TOTAL 0-122 12-71 71 01 SCOTT4 R. COLLINS�?4 > No. 35791 11� ssIONAL z z z O E 4 a o O w m z z � V) O O H p —I U U Z ~ LL W ® a_ a j � � H o 0 w w M/ ce ce Ln Ln 'D LU t1 Q O n L 1 N DN-1 n O V 0 1) Within Avinity I, a 24 unit condo building is proposed to be eliminated and in its place, a maximum of (8) townhouse o rn units are proposed. 2) The overall density (number of units) for Avinity I shall decrease from 0 Ce LU 124 units to 106-108 units with the approval of this a V) L ; JOB No. 092033 rezoning. The original proposed condominium building shall be replaced with (6) - (8) townhouse units. SCALE 3) The proposed minimum number of units within Avinity II a shall be 60 units with a maximum number of 102 units. The AS NOTED o density shall range between 5 DU/AC and 10 DU/AC. Q SHEET NO. � a 10 EXISTING SANYTARY SE LOT NE IN ABANDO H 0 4 L P CE 48 LOT WATERLINE EXI&T(NG I "I", ABANDONE IN P7C LOT EXI&TING SANITARY , '' �''/ _ _— .._ _ _ S", 'SC�OT' . ...... COLLIN EXISTING SWM POND "'53 T SEWER 54 C-) No. 35791 LO%LOT FOR AVINITY 1 EXISTING W -----_&TERCINE r6 EXISTING vv- _MANAGED 'cuss STE -SLOP TO BE fALL '�P 9 66 A) TMP t �) i IMPACTED JASPER L. & MALL(E-P-.-HA YNE,3 D.B. 859 P. 143 ...... D.B. 619 P, 368 PLAT m.. wv T' LOT r Y. :• Idlu I ji �'fNl I I ... ..... .... z ui w w 0 t- u IL u r u mw L EXISTING BUILDING w m M :D E DEMOL 0 0 jjj LJ Z ISHED 16D 0 -j U U D. HOLDINGS Lbc . ..... V) kv VILLE, R w w V) W KAPPA SIG-fRA UNITY (Ty Sc TMP 170 D.B. 3257 P.-'-702 D.9'550,t'.P. > > tr w w p 434. > 4t-- ce os: as 41 ................ . . TMP 91-�-i bT PL,'QTTSWLLE A2 IqLDINGS4t1c 79 IT LO /CIO KAPPA D. FRA IERNIff D.B. 3257 P. 702 OT I LOT LOT "'T D. 1080 P. 173 PDK 83 OT LOT - G W//AT -1 LINE�/ /&1S/TIN-G' SANITARY/ 8", S WEIR t-z n w -4 �- I ••=,. ,. ,,H:, .\ � Z&--- , ,t t %`/ '•` , Lam% , �-- —f _ + „ s/ / ) / / / / / OZ C) Ln (0 C) JAMES'R 471. ITMP 90-35H mpss 15 P. 54,- , �4�L 1 16 P. 17 4p D.B. W.B. iq 6 B, P1 I - z / 417, /\-/ �14FR/7OPE TY B&UNDA/RY ' I f t \y 1 / / / \ ���`' / r� / '/// �/ / 7 Lu 0 i 'j:' 71- N T / / GOT I <<J {/ cy) , / %�� X EXISTING PA 90-30L) X NIF HYPRIAULTICMP 190 COWANMNC, 7' 7MP 91-16E 0 7P. 200 NIF AWNITY ESTATES, LLC % / d- O.H. &2 D.B. 571 P. 88 Lr� Rt Nq KA�PA SIG A EXIS�-jl 4 / / / / / N 0 CIVIEATQUART IRS BLDG. 9:AISTING 811 SANITARY AMT _�/0 \ SEWE LINE - /' ` / 1 4 + �, \ 3 G WAT E I '� �RLINE �, / / ' �- / Q It - / / , I 1 ! I i l l ��! , , /, / LLi U) \> 6"0 z It TMP 191-1&A1+ ! r l ` / / / ��o>;� ! J �/ _1 z �c NIF SCOTTSVILLEIRYA t HOLDINGS > 0 u.u. 97 p. gj \ \ TMP 90-J5B / L' 3 r 0 1 / / / % // / / / /, t / ,� U) D - 8J9 P 321 NIF S�QT " CHt H�IDE JRCW OF GOD, aw-� i - / \' i ' .� / f l, UJ X, T'L0 I , '11, 1( / I -- / J / % / t f % / z it I T X To 488 X Q1 EXISTING OUILDINGS TO BE DEMOLISHEDff'iP). ry vt 484.' PRIOR TO HE DEMOLTION OF �HE MAIN' HOUSE AND ITS ASSOYIATED STRUCTURES, 19, w w THE DEVELOPER SHALL DOCUMENT THE N LINCLUDE uj DOCUMENTATION SHALL ,z STRUCTYRES WITH LABELED PHOTOGRAPHS. 1/ `` 1 , i (( ; / / // / / 0 -j PHOTOGRAPHS SHOVYING ALL SIDES 0 CH F,E�AZ .......... .............. ... . . ......... .... . .............. 7,-"-( . ....... ................... 'HE If . ... .... STRUCTURE, CONTEXT OF THE SITE, A SKETCH '57'�V c FLOG PLAN AND, A SKETCH PLAN 01� THE SITE S61 OE 435.00 OH TAGC MERCIALENTRANCE OHE FYI —LO- 73�6'1 uj IDENT NG THE CKT ONS SHOWN / ui HE XH KAP SIGMIA PROPERTY AS PROVIDED. -r"('S DOCUMENTATION SHALL OHE 485 1 E PROPERTY BOUNDA BE SUBMITTED rO'ALBEMAF�LE COUNTY HE "/ i)v R :D CPMMUNITY DEVE-LOPMENT PRIOR TOT � E�ISTI�G OYERHEAD j / POWE�LINE JTO E EQUEST FOR A DEMOLITION PERMIT FOR ANY I #0 REROUTED I F THE STRUCTURES. k 0 Ile. a) Lij Ir -v� LLj 0 EXISTIkG\BUILDING 110 00-0 TO BE DETLISED m U) C14 LID �� E��CD �XJSTI GOV E I, LID c E \-T ldam: 0 POW RL 'Hic CAL c) 0 25 0 5 100 200 LLJ ry z: 0-001 It 0 V 91�T16A NIF W %IN FEE;'�' ITY E A ` I / / i /,� l\ i r / 4/ U / li: 7� I / I f 1 ich 5 ft. I < A LLC D.B. 4571 P. CD 80 0 u ul NOTES: 1. THIS IPROJECT IS NOT LOCATED WITHIN FLOODPLAIN LIMITS, BASED ON FEMA MAP t-u Lu .. .......... 0 . ...... . ....... . ........... .. 7 0 2 6112 4� W 807. 6 NUMBER 51003CO407D & 51003CO426D ADOPTED FEBRUARY 4, 2005. 0, �c[077� -::. 2. TOPOGRAPHY & BOUNDARY INFORMATION PROVIDED BY ROUDABUSH GALE & JOB NO. 25' ROW ASSOCIATES. THE TOPOGRAPHY HAS BEEN FIELD VERIFIED ' / I I a�p 490. RIFIED IN JUNE, 2014. 7- 092033 -N 0/-9 SCALE EX. ROW Lo 3. MANAGED STEEP SLOPES EXIST AS SHOWN ON THE PROPERTY. 25' ROW D.B.317-552 x SY cmp 4. NO WPO STREAM BUFFER ON THE SUBJECT PROPERTY. If 501 7E%SLOPES/TO �E-1/' .4f 5. THIS PROPERTY IS NOT LOCATED WITHIN A DAM INUNDATION ZONE. `EXI�TING MANAGED x PHONE — — — ---------- I Ek S 91 168 SHEET NO. fiNQGR�VEL D�IVEWAY46B, ND PED ACCESS TO PARCELS 90-35F 91TED (TY BERRY,D \1 D. 4\ 2 O�P-�� AN 91-�6A 3 1 '2, III AS Lor 4 �vj LOT/ LOT CH E�TEND 10' WII�E TyR4�A114m Xl�)-ANG GRADE HI TIE GRADE WI HIN EX. ROW/ OLLINSZ' T A(T 2% FROM OTT R. C J l_­1 z U4 LOT z� T-) No. 35791 9�>. r — F�OPOSEDAAVED PORTION EMERGE�CY ACCESS ROAI),/ If Y-IONAL (P) VAR. WIDTH/PRIVATE STORMWATER MANAGEMEN _T, ACCESS ANI�MAINTENANCE EASEMENT If EPLACE EXI TING 48?�_CULVEeT WITO 28 LF 48" RCP'CVLV RT, < T1wp q :16A2 PROPOSED GRAVEL PORTION SUY I f,�) VILLL PD. HOLDINGS UC, Ro CIO 'KAI, y TERNI T -7- EMERGENCY ACCESS ROAD IDA 32,57 P. 702 T D. H. 1080 A 173 P�� 7- L/ '0 PROROSED PAYED POiq 0' 140AI N EMERGEVCY/ACCES, 7- LOT NQ MANAGED EXIST U) Ln LOT 71 -z- — 8T EP SLOPE -a- z z t U-i uj 0 0 7; J F U) ui U) L u co 0 0 NOTE: THE EXISTING MANAGED CRITICAL 0 U U E��TEND DE z z " SL0PEq,IN THIS AREA THAT ARE LANE 10, WI Ty_R� U) PROPOSED TO_BF DISTURBED SHALL BE z FROM fXI,SyNG GRADE- 0 Lu Lij -GRADED IN ACCOkIDANCE WITH THE ADE IN WITHIN EX. RO TLY AP _SIL RECbN _PROVEDSTEfff) -OPES > VAR. vy L; n o rORM-YVATER MA tr �NAGEMENT__. ORDINANCE. I OE�SANR MAINTENANCE E EASEMENT A Lu L�XIS\T\1N­G MAN\Alq'�Eb ce St _ULVER . . . . . . .... f EPLAC�EX16/TING 48Fb -DPES\ IN Izu ..... ..... .... WITO 28 LF 48" RCF\CULV L 9\ If h LOT I LOT' �OT Etuyr'-111 f PROROSEE 0K. 10 2rS ROAD \s f EMERGEVC CC�E$ T_ 141 kD Lu r_1 F- ZD� Lr) Ln %.D w EXISTING'�AN 3M*� If 1�" FN ­_ C5. (D ­1 1- STEE /(P) V1,8(k. WIDTH ORI AT� 3TQK~j1 Em lVLAN/Akamylyly _y� 1�o v1 �,sS 4NND MAINTENANCE­�4SEMFNT T*J T_ VAR. WIDT PRIVATF_ STORMWATE7R MANAG T/'- L9 (p) EMEN OESSIAND MMNTT��NoEjz_ASEM EINT cy) x\ x Q c� ESE= q1t cy) c\j �pv cy) J c\1 & Lu < I N 7p Li 1Z U) r- --- ----- - w X uj z t7y 1 (2 Z (P) VAR. WIDTH STORMWATER M ,ANAGEMENT ui ACCE ,�S'�ND MAINTEN�NCE EASEM N. . . . . ...... "J, .......... 06 w Ul '7`111 E­$ j*1-..` M11 Eli o U) m I'm 1. 1 44/ w ui OTES: r CONTRACTOR SHALL VERIFY ALL TIE-IN ROAD CONNECTIONS FOR AVINITY ESTATES ROADS TO ANY ROAD 0 EXISTING OR UNDER CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE ENGINEER OF ANY 77� 77 Z A !x i AA .4 7 RE 2. CONTRACTOR SHALL VERIFY CURB ELEVATIONS ADJACENT TO THE SANITARY SEWER MANHOLES TO ENSURE DE ENGINEER SURVEY WORKSHEETS OF ALL ROADWAYS, PARKING LOTS, ALLEYS, THAT MANHOLE TOPS ARE CONSISTENT WITH THE ADJACENT PROPOSED CURB ELEVATIONS. 3- ONTRACTOR SHALL PROVI 3 UTILITIES MANHOLE TOPS AND DRAINAGE STRUCTURES PRIOR TO INSTALLATION OF CURBING, DRAINAGE, OR \< _5 I PROVAL PRIOR TO CONSTRUCTION. COLLINS ENGINEERING F .1-go *gg'� M TO COLLINS ENGINEERING FOR REVIEW AND AP < r"', �q SHALL VERIFY ALL SURVEY SHEETS TO ENSURE POSITIVE DRAINAGE AND PROPER ELEVATIONS FOR ER 0 CONSTRUCTION. g 4. ALL PROPOSED SANITARY AND WATERLINE EASEMENTS SHALL BE DEDICATED TO ACSA FOR PUBLIC USE. C) a u ONE.M �Rv 5k2�,g- ALL CROSS DRAINS AND UNDERDRAINS SHALL BE INSTALLED PER VDOT STANDARDS. c\j b 40 '2C Lu LLJ Lu .............. ... ......... ­7 P. JOB NO. .. . . ... ...... t32 B /117 GR�PHW SC/ALE 7�1 < 092033 OZ 32E 200( 50 0 /100 EBRI !A �0 SCALE If I 1 50' f I �V!AR TH SHEET NO. PRIVATE �TORMWATER M/ANAGEMENT I PHONE IN F�ET PED �j �s ND MAINTENA�CE EASEMENT (PROVIDES 3 IMES ROM PROPERTY TO PEBBLE 014. PUBLIC ROW) 1 i�ch = �O ft\. _,__.___/ ----~_ /,�/ - -,-'----., __\ 1. m '. . — — ___ ,­­ .-, , - I ___ '1\ / I, _-, - .7, _ _11 __P ­1 , _. , 'I- J'-_,_�f - , . , —.-.-- -- --,-- j /_ \ \ �.�; A. _ -% -----. �, �__ .., __� - , ___ ­_", ��11 " ,--v ___ _ ---.-.. ­­­­­ _­*._, -- _­', -- , ­17, —, - ,� _� ­ - - , "",- _... 1___/ ,I 14 <_�� ,:_­_:_-_-_:-�,_7. " �, ---,,, , , 1�\ I v /j _ :�'=_)_ i____' — —,- I ­ ­ - �_ __________­_ ---- -------/----------------------.,-- --- _]� f1__ - - __ , " - I - I _, ly, _11, � , --,.,., L�__ ­­­ - _�.,_­­,__­­ I j \/ " �_ \ - "I _'_ -.---- 7_4L., .__-_ —, ." 1-1 11 -, � *I, ( — — ­­�__- E___ -- - Z �j *,gs'; ­ -_ __,_ ----- ___'� ._______4__�----- :- _­ ... ­­ .1— -_ \--,I- -_ _-­ , , -------r I----- " , ,-, �_�-__A__ _- r, - , , A,�, --- - _,_=T____­_ , _- f I \ " \,-.-- , - - , -,::, 1 ,4 1 ,_� - - / \ ____ ,v_ 10 ,, \ / \ ') 1 1, - ___ / ,_ , , _____N:_ -.-- ,---,. -,-- __—, \I--- _­ I----- --- I—. -,.,- - ___ I. - - -:�'/' . ..I. I q � -1 - �/­' ') A-_ ­­�_ / ",_ N -, ...___A - — , --- I \ — - ­ �t ,,, 00000 -y -� --/,\ zz A,_ -1" - __�".�:_ I \� --- �_ _­___ _,______/ --,-.--, .1 ____ .--- -- -� '.. . It- i , ._: _1 / ,><_ 2-5 F,- f �� 1. _ t 1. -_ / - ­_ ­­­­ ---- I , -, - I I . z U __", , \ _ _,_ .,� - _,�,_­__ I ___..., ,� ___ I ___, ) __ ___ .... ___ __ , __ _____-3 * 1\ 11 I I I \ / - I,---- � I 1 � // - ,\ � \ ___7 11 ­­_ - I _­x, ,\ -,/ --�`-:� / - , I/ /_�_,\ __ ­� T - _ 'I- --.----- 't._ ___ 1--__ ____ __ ­__ -,-,-, ­___­ F, ,-", " - k ____ __�� / \ , " - ­ __________ - '\ /\� \ ` /,_._A__", ­"�----,,_' /--..--- , ') __��____/ - -1 ___ 11, .... - _ ---�� L \1 \ \\- - ", , � -V -,-,-- I \ _,__ T __ -I- 11 __,___1. , , ­­_ � __ -.,-. `,' ­1 . I ­ _. �___ - ----- \L - ��,. it P I I ,I I \x _,__­_­ ---- 1, / \ __ --,-"- - , " , i - X__ \ x/ \ ,--. , -_ I \ 1, 11 I I I I - I _,,', . , - -:::- -f- _\ ___;�_ ,�---`- � 'A / I ,-. 11\1 - _ � ------- - ----- -_ ___-___I I k f m :,_-5: - -:, .-.A: ------ ,- � ,,,) ) __ , � � -A cf 1--_., -i-, _____v 44 I, Ir ' I � 11 I� I �:V,.., -'.." __-N I I ­- ­ I _­ � V-11 A___----v 'I �_______ -----------, ... i ,/ .� ,_ - , _/� _____ � � � / I / ) ".//� - p , , 1_;� I, , , 1- _q` __ - -- - _"", \ �I ....... /, I __ .— - ­ I)IIIIIIIIIIIIIiII am 97 1 ,_,', I � I �0 � \ , ,,"_., 7111 � �_ � I ,116, , I" / .--,. I =_____�­_ \ -1-1____, � I � � -, )-- . - I .1/ I __ \ __-, � \ mom low I I 'I , 1//* I� )5�� ) / //' v _J= ------- � IV ,.i J___________________ \,�. - I � ow goo wo 00 k \ I i I lt� � 11 \ I I w / I L , - :::--------._,__,_-. - I A, `1 - � � It I / _;Aem _40pmt-IIIIIiIIIIIIiiiIiI� I wo r/m 11111111iiIiiIIIIII =a an Mai goo \ ) I � I . 1\ __ _J ---.-- \s � / :�---� - . \ -.---- /rw 1) I 1) I I ,,I ­­­ 1_­ \If 'N , " __.)._/ u� \ \ - / / ) / I _I , / 'If � ,�, ,, I A __ �, - I I ,<L �V j 11 - i " *% I / /_" , �1) �� ,-, -- ____ ---- ----- 11 � 14,__1 \ \' I� L-------- ) / � " . I I-,' - / ­- /, - -IJ -.-- -_ ­­­ - ,/ -m 1, M - I . 1__// / \, I z r I... ,_ e, � / t " / / z //I'- I '.1 - /, � ;, �-__,_� (_ t-4,#, y ___,_11 - -7 .1 .. ...... e .11 - y--7L! j ,k�INIT :� 9 I N . / - -, N 1- .I____ — , I I _ — -- V ,--,---- ____ f .. I ) - � I t v .111" —_ -11, 11' I \ � 1-11 � I �'j 1 / I I / - k- . ___ _ - I—— ..--\ \1 \ __­ - ij - __ 4 , .1'. ::::, .J r / � W__ ) �', '/ / . /_ . __- I-"-- ­_ � F- I I ""', � I 11'.' .- _.­­ //// `61 Do. ..�, . .1 I sm", � ­m- V I . / .. _­­ -A. _­ I \ \ ,/ / - ­- -1 - ­­ _ I I / \ " %,-,---/ I "--- I I I/ '� ."T 1�___ -,,/ /, __ � I, - k�m \'�Ii\ \ ) i � --- �, - __ _ ,,_ I hlll� 1­ \ /I I - , / , / / I/ I � ,�' "_ , , i --- - r . -1 \,\ \"-. ___, I / , ­" Z_ __�__ " \/ I / -,.! .------ .-,.--A- ­­­ __... .,.--,-.. I- , 111"11 ­ ___-4_-._.., - / I-,- -- g Li � / �, \C,V\' \Q ___ ­­ ­___ I------ /_', % I If " __-_j � � I I // / �� " , . 1 , ­_ �_,,-���, �, I I �__� - ) � I I I - _-A __ - �­ �`..-?�M�? I- ,_ ` - � --"--. __._ ---..-,- _­_ ,- -- - - I / %, I �, _,,- I -1. ___ � ­ �____ 11 � ,:�_..;_7- . _�, '.. 1­ Z.-_ - - --.-..- - ­ ---� ��_7::___ � -- .� \ ) / , � I � '__ ___11 4_-___ --"-". �,, i -,-- ­.. - --- - ­_­__� 1_1� I- __-, t ­'_,__1/­­__­_____-__ 11 I / --,, I i)) \ \.--. , ___� I I I I-"' I`__1 _-, __ � ... 0 z - I-, --- 1 .4 2t� I - -.---. ----.-. _.- - ­___- �_--- -1 __ \ 1,�, ,-,-,-,.----- - 11 _____ ) -1--\ I �� - ) m 11 " , --------- _­'. I .1.1�'111 \ �, ­1 ­_ __�. --.,- - '- _-_­­­_._ __, I-,' __ ___,_.11. I ` __7% I \1 �� � I—, IF 1"', , 1� 11 - - I \,, I ­1 I,- --- _ ". , \.: '��, 11, - �_ - __ _ 1_� _-, \ 14 , \ I I .p ,/ � ,.\ \ ____ _ ----"---.---- -­ ____ _____ __ am 4�\ ,�..i'�, � Ili, , .. \ \\ \ , _� -"--------- ­ .-------.- - <�. � .. .. . .... ...... ­­.....'.�..j --.I'- ��__, , -� I, 11 — - � . . ..,.. I t - '\_ ,_� / __ -...--- ___ --",-----.-,,- -, __... __ ______ ___ - I __ . ...... _A­_______7­­__­_ Z­_ ______1­171 0 1 ,. 11 , \_, " I .1 - _ \ .-'I-- �, 11 ­­ ­1 -1 I I - I . , \ L, �.� \ I, I " -,..- - 1. ­_ , _ ...... ___ , __ ___ -..---.,. I ----.-.-- .------- -..-- 11� __ __ , , , _.,(�;� -,A ��l I ` 0 It Il I �. IIIIIIIIIIIIIIIIIII ­­ _­_­_1____11..____ I - -I-----------. _.-____ ��.\ \ \ � i/, ----\--- ---,- \ __ /`_____,, r,__1 / I 1, - ­,� __ , � 7' "� \ __ I __ � \�.".: X,,�- X,--. " ,­ "' -, 0s, \ I 0 . 041I , \ .I-----.- -,- 1__­_,�_ � --.--.-- \ � \ � \ , \ , � � \ / / - _._____ ___­-, _________­1� '----..----' , -�, \-� " I 1. __ / I , I .1 I k- \, \ A;� \ I 1, � ". � 1.11, � I _\� 7 S WiMkACI� X/ . , 11 - " , ,,-, T- ------ \ _N . \ , � � \� � T \ "., �\ , I , , 1\ 1, 03100044-1MI I--.-,--- ­­ �� ---,_.L----_­- ----,- -- ­__ _____ I I I I \ \ � "'I, V2' OR qRADING __ _____ � W"'.., \ , ... * ' _­­ _. ­­­ _�­- - - \ 11 -1 __. _,_ ___.__� ---- 'd \ �' � � � _). , � \. __ - , - -_ \ I \___ L I /W - . -1 ___­ , \,- ___1' I e� \ - . - / , \,� _/. 140, , \I 15o 6. THIS I f--'- __ �1�1 \ 1 ,_�� \ I , I ... _ _-.1,­_ ITY 11 � 1 A,�, 111111111 1* I I slv� I I \ \ " 11 � 1\ I � . I II �J\ __ )It I \ � M�DE � TH,5DP\ #2 0� - � � < - \ I I- I / ') I I I 'I \ - I , � \� .�I i ( �_.__ - I -I- ---------- - \/ a/ : " __ .__ I- 1�, z I ,gQ, DAV - *) \ \ I \, � � \,� I � I i \ � I\I--..- .--.-.-,-- 7 '; - - __ -,- 4 \ \' __ .. - _ _\ z I � 11 �11 I �It I '� __ -A � I . z I Z - I — I \ \�., W,� [ i �/ I --.---- . � k ,x . 1 _J __ -- I / __1 , I / ju it"l, \ \ _ _�­_­ ­­11- ­ E - .. , , * I, /�v / 1! I - \ -, __ '..-.7 __� , , , _` .,-- �t /, , - - _­ __ T �� � ,� __ __­ 11; I I I \ � . /� 0 1 1 _­___ _ -7 TOTAL Tc= o.i5 hrs.. - - -f 550 .-- ...... ­­ 1;1; . ­ - I— __ _� / I/ ./, I - - I �� �i� 1, I \ \\ \ "I \\1 I �\ IV \ /-i -- __ ­­­., "_ ,/ PLAN,T�0-f�ECEIVETRW�,TMENTONSITE / .. / /_;"��._ ____ �� �', � I \ \ I \ \ \ \\��,____ ­-, ---,--- Z----- __ --.,- __ ___� . " � . - I ­1 _ .-,. 0 a _ :_�w I I �, . . // / / 1, / I/ / (( � I ) '\ \ N - , ---,----. ,_­__,____.1­ ...... __.,.-_,,_­__ ­_1_F.__ -.-.- ___ ___,_____­­ _­­­_.__..1__ - - - ,.� / ; 1�' - I— - — ,�4u _ _- - ­ - " / / \ / i� I It ') " I \ __ - ----. I ------ � '-, � , / .- - ! -- , ,- - . , -, �,E* _- ,..-,.- ... ... ... ­ / --- _____ - 11 / , I , I 1% \ \ v 1 ,j j ,--,- ­­_ __ - —..,- — I z - I 11 1, / I 1' / . \ I t __ __11 .. .-.-- __ , -, ( _1 11 ", , .,- I / �, - ___________,__ _ I ____ ­_ __ -, __ t I -1 . _/ "I �,� " , / 11 ,_�,_ I 1 ,,/ \\ -.-- ____________11 ___ 4 ___ ­_ . I - , '--... / j � � I . I � \ -11 - __ ___ "'N �' ---'-- __­__­__. ____ - __J_-_-____7-- --- �, - //____1 \ \ - ...._­.- ­_ --"_--_, ___.__-_._ " _'�_,��_ __ _ .... ___ -, _­ ___ L­ _ ­� 5�, , I I ­ / \ \ \ "� / -__� __- \ ` . ---� | \ � \ � \ \ / \ ` ' ! \ \ \ _'____-11 \ \ `` 1-1 | | \ \ \� �___ _ / | � ` // / \ \ � ~ - ' " \ `\ ` \ / \ ~' ', . \ ` \ � \ ` // '' \ \- _` � \ \ \ -�. ` i \ ` ` ~'' ---` -^ | ` \ Z:z /,' '__- � `` ` .` ' `�_~__-- ~�- \ \ ``_ . /\ . --`~ | - \ ` \ `` ` - / / \ � \ ' \ \ 11 '.-~~_~ \ \ \ ' ~_ / \ \ ```~-~~--~'``~-~~ / -_ � ` \ _`- _49a- / / \ \ -_______-_ ~�' - \ ` `\ /' \ � `- \ - / '--LO(��| ��U--- / / ` > ~~_ `.. `` ` ,/ -.- � \ ``. \ ` --- /'' �VV UTD�S - 1./ / \ ' -~-- -- -- �~ `--- `' �� ` '/ �--- --- ~` ```- ' `\ \ \ ~-� w/ �*c/ �` ,~/� _ __ �� _ __ / , /'/'_ -'�~~- .~-~_� �-~� - ' `` // /. ''-_- _-_` �-_ `` ~ .` ```` � \ \ ``� �/ '/ '' `~� - � _ ' ``� ' / / / '- _~~_ __--- '`` �_` -_ ' / -- _ -�� �` .` � \ , ` . ' / / ~` /11 /'~� ~_�- ~~��`\� � \ \ /-� / / -- --. _=~ \` ` ^~ -1 \ \ `~` _^_ / �� ~ / - \` �- ' / / ' l '~~ ---- ' ``� \ ` ' / / --- ---` '_~- ``�' `� -\ ` ` ``` �~ -`` `` ~~~� -_` -~~ ``� �� ~a / -\` `\ � - / / / ' K | / /~-- `\ \ / / / / /' /-~ --�' ```~ `\\ \ ``~ `` ��-` -`-- ��` �` ---' �--- ```~ ' / `\ � ` ' / / ` ` / \ ) \ / ' ,' // _'__ ____ `.�� , ` - ^�^ �`. .__` �-- --- --- -�` �~- _.� ` ``� �` ___ ��`, ` � \ `�. � / // } \ / ` \ �/ ,/ / / '�~ �, ` .~ `��`.`_~ ^` ` ```_ '--' --- --- --- -_-- -`.` --- --` ``` `^ / / \ � ��T7�T���T/. -�� � T. - \ \ \ \ ( / / / / ` `.,. ^ ``_- �.```~ ``��� ``,_ `` '� ---- --- --- ---- ~`-----``-` �--`- --'- `` `^`~ ~�- ---` `�` --- --. `�� ` `__� // / I--,- ___ \ ' ~^'� `�' `` --- --- ^ - `�`�` -- --- - --- --- -_�~- ~� ` --\ ` --`- -`` / // � __ `�'��� ~_ __ -� � _ � _ �_ _ ' ' \ / / '� __ �� \ ^ .� -� -_ __ __ _� \ �� �� � �� _~ ��� __ __ _ _~ -1-1 � �� \ / / �/__ �� -� -� ` � �- -� ` ` ` \ � �- __ __ �� '� __ __ __ -�� __ �_��� / / '� .`` ~` __- ` \ \ ` ` `` ~~. -_ _,' `` `% / / /' ---� --- --- �__ - `.~^`` `�^ ` ---' ---- --- \ \ \ \ ` � ` ,-'' __-- --- --- --- --' �--- --� --- �--- -..-- , ^ - � .~� _./ /' / �`-. 11 11 11 1 ` -� '---O'IL ' / / / /~ -- --- --- --- ` ^ �` � `` -- --- -�` ` `\ � \ \ \ \ .~-' ~ ''' --- --- -- --- ---- -`~ - ``-` `` -- `) ' ED uum V^ � �a =) �� m 0 O �� ��~ uu � � m (9 o� � � in a �� � °��° V) UJI uj 110114 | � |oc|ce| � .0 ' 4K� ^` U� � I l _.._ _ i �._•_ l _ . ___ I'll i General construction notes for stormwater Mana ement laps ._ -_.__ _. �'- �\ I 1 - ' -= -. - _�= �_-�` __- � � - ___ sr- / _._. ~. _. _, g P ' "- _ \ ` //" - .i \ I _ ~ J �;'." - � --' - 0- In _- r� � r j -- a \ _\ / _ _- a s and constructed fill to e within /o of maximum ~ _ _._ _.._ s. All d m b d densit _ _ - -- `� -> \ ..� / / / _ ~ \ :: ' ... _ ~ :_-:_ --- � _.�- a e � � '-Nw�s,, 95 rY Y _ ., , - _ - _ ,, - =~ - - - / - x � and 2/0 of optimum moisture content. All fill material to be approved by a , 1 -~ --� _._ __X _ �_=-= _ _ N r _. _ X` _•.- i ---_ <_�-'- - ....._ _ E - r 9peotechnical engineer.hnl Iengineer is present during _ -- =- - - A eotec ca to be ese t du -�. - ... ____.._ - � �- --� - M- _ w- - __:.� - _ - Y \ \ _ E _ar r s R so- _ _ _ \ __- '-� ._ - •-„_.. -.._ -_! \/ \ �_,�• �'..',1;_.��" 'a�-.�----s'S'_�_�"� N�t/ON�� �-p, �\ -..�; �Yq;'�'�c�c, ",�s�-;;t'a ...`� �t �` ( ,( �> / A; construction of dams n� _ - \ r - _ - _ .r -----.._ (- -_... ._._.._� _ \� , > Q 1 x _ _...__... ` - --_.......... �, - ._._-.._._ _ �,, _-._...� t `\ �~ "' .. r-a""'.%y.-^-a'"""` � - � __ ,.. � • Rom- � -� •� ! ,�,"v�'`'�.-_, :�,: �` _ � - t :� / - -� l _*::�'­-, _ �` _� \ _..�----� 2. Pipe and riser Joints are to be watertight within stormwater -- _ •.-,- , % .� .� _ - - - - _ f _ - - _.-- r t ,f / ` g 'mentfacilities. - ____ �_ _ r -- r. _ -� (� pry _ /i/ -1. mana e _ s t r '- ' 1 For temporary ora sediment traps s or basins which are to be converted to _ ~'-__ �;'� \ _ -' -- =' .� / '�� I- - r __, �� - --' - �� , F..,t - 3 __ _, _: p ' J p �,./ \�.._ �--' \--_.._.__..._ _,___ -.._.- _, "�- --\ ..,.1 `7� -- 5....._=ie'_} f _.'..� i `t g `{: i ,�:. -.l 00000 / - - `\.__ __ -I .--- permanent stormwater management facilities; conversion is not to take -. -,� '\_ ;�. _.i :-- ----,---I �---.____.-_-_______ r--_,_, - . _-._____.��:.:� �_- , ��,.� �`- ; t___� -- �- . - _ _ .__ ... _ _.__ ....__ _..._ . �` `- . ! % �'� � � ; ��'- � -- __,____ -_.._ -DJ, lace until the site is stabilized and \ J I_. _ -- r __.__. _ __._ ;�-- . \ T ri K.. I, I\ `' ..�, T i ___- - permission has been obtained from the Count erosion control ins ector. ({-..--.- --_ _•__. _ • -_ - I J y p \ `\.,--- 7_ --h t - - '-i - J'\ I L t v i I r! : rt l -,. L �N."k , _ __ __ _ 1. _ € \ P--- . \ \ - , , � --- , __ \- \ / J//� \ \ \ - , , / � -,--" - - ­ _` \, -- - -. _ -/ \ X i I I t I - , \ - ,t 4 •. 1 _ J gf I I l- r w_ -,- 1_ _ _ - -"... - - - - - - \ �__ -- --- - ~- ::� �r - ' '! I I I fir_.- ,ram _ r i _-T - _.-..._. ____..._.___._ .__...._._ _- t _. _ t -- - -- - - � 1 l � I t r 1�1/ � � 1 '�1' � �I■11 � I � J4 I / ;�//,.,.. � -- � � �3 � ^�.�- �r Y •� r �._. - 1_._ __ --- --` 1 - � i I / - �-r - - ~ '�� ____________.11 �_ \ s - - tI \ %ir; \ _k \ --- 1 1110007� I^11 � i . V \ MW MW am Mors low `, _'J - � /\ I / 1`I I \ 1 r f% 1.;M \ r .1 V � v , j - __ ;�� 7 / ) /� � 1K k t I �.._. I __.__ _ I Qf l�, / u7 /�sr t „ rsR� �y h. \ \ t /'_,_ Zt% ED �' �- l ) , I � ,I� I' --I t{ ! - ` - `� I I._._ ._.- ~ I - / �sI I' r� �.�� / r 4 v�v" ,1Y i \\ _ -! / \ � - - 44 .- / / \\ _ / / Z A / 1\/ - _ �'k I./1-1 I\ ** � /I / I I ( / _ ' -7 , __ El -S { I --- --- 'i j / 1 p } ��. : J% , � _ t \ .\ l / -/ / / _.. -- 1 - l- I -•-"'-- I I / ' I � � / ;:E ipe rn. "'� L'3 ;r ,...�•-•- +.. y g _ ,4, , 1 '/ t / .�" / / i `,, \..,•.__� --` "t-�F F/''� ! r--/ % \ •' -1 I ��r i �: . I ,:! I t 1 ., i. r- /S.� iS�. t^'., IF 1 I I } �„ J� / - / _ - - _, � / i r q �1 ,, AVII�IT f� �> 1 Il I - _ '/ l -/ -�•_ = _�. �- �- :-f r / �/ �` 'ISUBAREADRAINSTOAPPROVED I / a't ,,' k9 ' _ ' _ -� I -- - AVt -ND _ _ '` ' ` _ _ _ _-- ___ , �= --_=+ �_ k I NITY I, PHASE I WET PO .. i / i r i �� -� �� I . \ t; 7 I I t`Y -_ r _ _.1 .� --,------ �__.__ -•-- •" _. -•--" 1 , .; `'_. _.�-WP_O-#zol3oo04 ` i _ 1.="��� I�{:r2+f /, V,.; I� 7',1 , I - r I I _ - - J� `- _ . , __- __ \ //` / i I` � - , I r_. /� � +, -� r * l , �/}� , '" �:: '' I � 1,1 ` (I SUBAREA DRAINS TO APPROVED - %. ' 1 - _--.-s 1 / I l I ��• / � ;, l - - 111 , _ __ 11. ? �r`s 1 _ / - =` j'lil II AVINITY I, PHASE I WET POND - I _,._ 1 _ -. - - ""- / '`� _ ' \ / f ` - _-_ -_-_-__-... � s _ t: _ s $ �II-I1 (WPO #2os30004 j -' `_ , \ , "` _... - it �f t x r ; -` _` I I 4 __ _ �� _ �`' f/ -- I I 1 '� ' \ / / _-_ _ it I / al a r. I Il I / j / % � ``� 4 \ I / / : ; ._'- ._.r -- ... L. ��' \� I\ ..._..._ , ; � / J \ I `I I � I i i \ 1/1 i , ♦{� II \ 1-- ~__ - I I I 1 � / \,- � % ' I � Y3r '�Y1e% fi Yi ! Al � ` t 4 II \ \ II / / II t ` (� j � �' -^'\•, ! I :,, ,,_...:e ' _ -/ ,\ _ _!.. �'--...,.,,,,,_ _._-- - i r' �r , I c 'sf � 1 v � , t I�� 1144� 1 1 I / / '`•~'-J .___ / r...l"; �:.�-� �-=� I _..__ f `i \ / -,... � ,lr�{7, .� ''y?-.1 .a ,s4� <1 1.. I�•` � �� `� 't , I ` \\ i 1��I�ir_\ (\� 1 I v11-1 '/'" f../' / - 1 I ( ,i I _.w...._ - _ _ __-1111 + .}i; 4\ \� l \ I j . � v. - 'e l%') ` ~\\\ `ti\�. ..._,.__. _.__ i 1 _ t ,._ - _. 1 / \%_1 I \ I / / i I ! 1 f , ..`.. I --- ---_-. I _ �I. / rJ _,\ , t _ \, - _: _._ ._ -- - 1 ,�` - - - r " ! _.__. fl l ti.._.. 1 S i 1 .,. HIC �Z�''._ _ - -' �1I.,,I%* - r_ i II\_..-_ - 0 - 0 50 100 200 - A00" ~- _ a. .. oft I � }1. ` - L I 77� \ 1 DRY S \I \ _-- - ,.._--.,- _ - -- \ t - `- I / i ' _ (LEVCLL2 D SIGN) (L E 2 DESIGN)• - �° ,{ \ `_ ,. et rD __._-, R ` a C: D a Ab r- --_­11- _._._ 7 `'- : \ - r r \ CUL I�RT �E EATH �AGILr - , , - I t I , , __ __ ` _. ._,, 100 \ _ __ __ ' tC - - \ _ NSF/ Pia �F -- - - - -- - / inch it-- Z__ -1-_ E RES`` CE lS FLl E - .-\ , -. ...__�_. ._..__ V ~\ i ll--'- ! S hs �"' :1? �. `'`.� \. l '\ ( ( t 'l `� \ t f I J' �� :,.:.� `vt r _. --_..� \ h-w ...... A- .... . ..... . _ c_ I \\ / \ I „ I \ - - -- _ r - - -_' %<;/.� ` _,. � r 1 � €I�t� , `... M1 1 � �APPROVACPENDING W .�} #203300044 I ,TS; � __ _.._._ _ _ \ i _._.-- �_-__._._ - 4 .::. r 0 \ ! :`..r :.,; :r..,:.. i<.:+:;'�:,: ......,nu. Jr`•.M. :lwl: , .1M1 ._ A�.Ir...., i ..!€!.. ». 711`• ,.,_..,�_�_E J � + _ \1 , \ �_.. 1 ,::, r»,,...,,.. a ,..:,.. ��,•. .. „ .,..<�: ,, I!... QESI N TOHANDLEEHEAMPROV DY - . \ 1 I � :,`, .",;' ;..: R 31 , i>. \ll1 , r1! J,,:,c::<<': , t t I _._ _ _ _. --' _-- '1 �...-,. ;' : S .fin', .. r•1.>.5:>s::r I ---••--^ - -_ - - .... \ \ _�./ , I ',. -� ",: .<,.` \I AV11VltY1 EVELOPMENT. •-_... --- -.-_.---_ - - -- p , - . : h 1 \ J _ -- _.__._--- •. TOTAL o.0 Ihrs. , � �, . / s \ \\ <. / ) f / /\ ,_,_.__ ---- .�,_ ---.,_ \ � � zoo OFOLFw LE - c-o rs. : r �,:. ... :� a<, ��'::�:;:, I--- IJ 91 / I , .. . . r --__._._ _ \ 225 OF CONC. FLOW w/AE EV g (c o.o s.) S 4 , \ I i I ! / -\ _� _ I __ \ --- _ I I _ - . r ` . rk _ �� F CHANNEL FLOW 8fts Tc o o h s. �: , L • ✓ �, i 11:tom'' 1 r I' ti` ! t'4' 5'I I I o � 1 ! -� '3 I \ `\ x 1• ti is 1 z 1` ? t \ 5'x 1 \ _ „ f :Y F ` m I l \ } I >. 4 i\ u7l *► a 1 AV NITY II .,f .. , ^`� f r „I ! 4 � \ i A � �.r !t i.` / t I \I i I .c,. x l-l�� \, t 1 I I I 1, J' t 1 I J t Bioretention Basin APost-Development Impervious Areas / \ r I / t \, ts. I \ : I \ �. - _ Roads &Sidewalks 50,120 sf I' - �=,.- k `� \ F \ __ \ `i / _.. -----\ r, I 1` I Ii Attached � � ./ t ched Homes Garages, Porches 55 535 sf � . t-.-<=µ-•. .: ,.- Y J l I ;Sr >5 E I �: 1 / ,x, � 'i 1 t I \. { 1 , \ I Y,�:[ it i `'\ I I i 1 : •-� ` l 1 S :,::. I ,:,,, is Kn Homes Private Sidewalks & Driveways 11750 sf \ ,. „ - »»„r,`.r,.:.r, I I \ a I � I j - I I `\ / i \ Clubhouse I \ & its Amenities 3 417 sf _ -� « I \ 1 *, 1 I { _ I , _ I it 1 I _ I 1 1 - -I t! i D .. r Swale #2 Watershed r t shed within Subarea A I a j I `>, ; i a p rzS': Me : oY. \ ✓ <, 1 ::':. P Op�S�D U DE GROUND TEI�TION & \ I ;.. o;.\a,,:l .:, ;.. :�• t �' "r. �, x a �lI •:y�: .r JIr", a.`Attached Homes 7 785 sf \ _- _ :kk w..., xe.5 a+__ - ..., tl BIORETI N ELL (LEVEL s ESIGN) TO Total = 128,607 sf \ - _ -�' _.., _ , -, ,l x k ,, �.. -. - M l \ N A\ _ / I _,_ / a \► �I / 1 ,R PL • E PR�VIOUSL�YAPPROVE\D PHASE II SW __ __ _ __"•._-_J .._..._.._ , r>. ".�'\ , ,, r ...r .:,:< .;� r' 201 000 THIS e e tion Basin B Post Develo meat Im ervious Areas I. -, -.:5, C ITY Nb R WPO #�' \ - - ITY F Y '-•--_ --'- ':_ � �, ;.., < ;<: �'r?ROPb � ED AQILITY,IS D SIG D 'OR AVIN II I 4 \ , Roads &Sidewalks 44 957 sf / __- _.._ _ ..� - Ft' yR-- S. ,..;:. t,;_; -.,.: <sr ems, :.: I: ,.c:i%:;55»I i5i; .'z' f i ,\ s. , ,\,\' ;y /~~- % I } 1 \� ----- , -' u ,,, ,,,,; % ,: CUR I N Attached Homes Garages, Porches 50 704 sf \ -' �' /' `" r \\ �` ! M 'ETfNG E REG L T O g_._. _.___. -- -. _ __ _ i----- I Homes Private Sidewalks & Driveways 8,010 sf -----. __.. __- ,_.•-- / 3 1 " ` F ' / �, ! 1 '1 \ \ ,, Dry Swale #1 Watershed (within Subarea B) - - "-. ' _ _ -__- -_. .. �. DA 1 I �- = 15 h - /r. -,_ _:_ - -`'!; illl \ \ -_ T AL`T o. rs. _.._. _ - . __ -._ ,(4 5- 7-9'; �. - -T'DA Ar- t ( {I Attached Homes 1,289 sf / _.. _ j,r.. _. _.,__ 8 ac. CN= ' ; .�5� - _ - //f /� ! 1 I \ \ -•- - ---' 6o OF CHANNEL FLLO,Vt @ 8fts Tc-o.o' hrs. \11 �\ _.__ _ .- _ TC ) 9 ! 3 7 _ \ \ \ _,-. Total = 104,960 sf __._. _-� -_- _-. - - .___ = r ( _ _._._ __ 0 2�,✓h 's _. _ ^ ` _ _ , 1�1 _.-- _- \ t I - - _.._. - = 1 _ % �, r -._.. ,/ Tc=o.15 hrs f - Project Av(Inity Estates - Kappa Sigma Entrance Culvert Plan Sheet No. Diesigner KKW Street 1 of 'I ' Culvert #1 Rev. Date Date 07106/16 STATION: HYDROLOGIM DATA: AHW Cont€'ols 10Q. yr: Flood plain elev. Outflow from SWM Pond 'B' Addliionat Overland Flow to Culvert (I A6 ac.; Cw--0;34; Tc=12.5 min.) Design AHVV depth elev. Q2 = 1.11 cfs Q2 = 1.84 cfs 12 3.7 Siructures elev. freq, TWelev. 010 = 6:35 cfs Q10 = 2.38 cfs 110 4.8 = 025 = 12.92 cfs Q25 = 2.68 cis 125 5A = Shoulder . elev. 48 8.06 = -----L CL elev. 487.65� - --_- - -- _ D U A - -�_---- . ADT Skew 0 Cover Q 2 = 2,95 CFS Detours Available Length Q _T1 = 8,,73 US Overtopping Stage ,� - -' _11' Q � - C�'S. Flood Plain MarYagement 1. El, 485.14 1 u So- QA3t� Inv. El, 484.87 Q CFS Criteria and Significant Impact prig. Gr. Elev. L= �� Orig. Gr.. lev. Q - CFS HEADWATER COMPUTATIONS CANT. OUTLET CULVERT TYPE:$€ SIZE Q Q)B HK . VELOCITY` End INLET CONT, OUTLET CONTROL Et.W Treat. HIN/D HvV ' Ke de I (dc+D)/2 ho H LSo I HW C.M. Smooth - Existing 18" RCP Culvert (2 yr) 2.95 2.95 0,62 0.9 0.5 0,60 1.05 1.05 0.4 0.3 1.2 1.2 3.75 N/A Existing 18''. RCP Culvert(10 yr) 8.73 8.73 1.25 1.9 0.5 1.20 1.35 1.35 0A 0.3 1,5 1.9 3.90 N/A . Exisiing`18" RCP Culvert (25 yr) 14 7Q. 14.7 1.8 2.7 0. 1.40 1.45 1.45 0.4 0.3 1:6 2.7 3.90 N/A _ \ I I S ', _ _ I I � I � 1 x r - . /�/ - _ / , . - _,. _ / , JD �r _ .r Y sr r _ -- I 11 ' \ t ..... ~" �'`\, \` _ / r` /, _ 1� '1 ,I - 't u- \ - \," ._ ..l I jj I J ! \ ~'� i _- .i , ------- � t .- .1- , \ ___ -, ,--J.-. J,!..::�,1x:i�,.­.,::: . ,PVg-,,.,-::-x.��:::,,:s­ �,,.:,.,,�:. - _ __.- ____ ­­1 ­ i ( " \ I ` \\ _ l - \ , --- 1 w _ . _ _ l `I \ ' Z. ----.� _ - Total- --, _ \ - t f � t i __�`=�. f'ROPOSEI? BIORETENTION J \ _J - l - 1 I \ \11 -- __ -...- .-._ ._. _ ) - ,- _. �04 =�= \ �`\CELL'B' LEVEL If' IGN{ , / �3/ �, -_ _...._- r T D J,. ..Ll- - ; __.- . _ - - _ /- cP -P _ `' -_ \S . -ETEN _ OEL `;� - / \\ __ - _ _.. f - _- /.. _. _ .._ _ _ .. _. __ ti-._._ �� -- == _� _ - ,. _-_ ' ^ _ -K� \ f i .,mot-. _ _� \ ` - �� I / j \ _._. _. _ -- - -= - - - _ _, : " I \ _.__. ` '-- ­-,�,,:�', I '. I ?11 i. - - .Z:: - - __ , __ ,_ \ I 1 �_____ , - r - _- YY _ \ _ �. _�_ �_­ ,-,-. � � y `< ``,, �.- - .i r J _. _ � ) \ " - ~•• _ _._ < 4, __/ �_�' / '- \ _-.-.... - _ __ _.._ _... , _... \ -- _ ... - r 11. , _ - `\ __.. _-_ _..__ _.....- '~� R- / J - _ _ _ _ _ . `� ��i _.. - __._. �. -- - _% \ \ r _ _ _ . - \ _ ; \\ 1 Ll Wafarchad Rummary [:::::Pre- Development Post -Development 5.18 ac. 4.94 ac. 3.48 ac. 4.85 ac. 1.13 ac. - 9.79 ac. 9.79 ac. Outflow Summary: (1-Year Storm Event) Pre -Development Post -Development DA W 3.04 cfs 1.25 cfs DA ' B' 2.21 cfs 1.11 cfs I DA C 0.72 cfs - - 2.36 cfs Total- 5.97 cfs Outflow Summary: (2-Year Storm Event) Pre -Development Post -Development DA W 3.74 cfs 2.62 cfs DA W 2.71 cfs 1.52 cfs DA 'C' 0.88 cfs - Total= 7.34 cfs 4.14 cfs Outflow Summary: (10-Year Storm Event) Pre -Development Post -Development DA W 10.69 cfs 14.89 cfs DA ' B' 8.06 cfs 6.35 cfs DA 'C' 2.62 cfs - Total= 21.36 cfs 21.24 cfs P''' TH o �( 4 �� SCOTT R. COLLINSI4 No. 35791 ,�` �o� (a 7,tz (i t��� ��`NNAL �_' Z Z 2 o � � ¢ a O O w � ED }U•. }U W LIJ ED Z Z Z z U) O O F=- J U U Z Z IQ r w I 'L 1--i H W z a a Q9 F-I LL 0 1.r) Ln CO to .-1 Q I O n N O lfl rACN z Q_ 0 a 3: H Q F- w z Z Q J a. z w w CD Q Z Q 00-0 H Q 'S O H z w U_ O J 11J W (A O a. w w . = U1 JOB NO. 092033 SCALE 1It = 100' SHEET NO. 5 26 Z aa, N W mW 73Z o- Q Z W O C co Z a _J I_-5 o � C O v a, Z, >? C C O U L O Q)�-r O �_ O " C �; 3 W In a� L a Q- X N U N a Q) O -C N- L = 0 0 0- - 3 o a, C C T -`L a a E m a C Co a _+, U 5 � ._� Y to �J C o U z ° .0 -a n '_ Z v J 6 J C 5 -o - -.2 -0 o J7 >, C L o Q) U s a O L L _ D Q• to = � o U 15 o V .'..' Q)-.t E Y., N -a✓ � v C Y .1_: �° O J7 U, O U)_0n a U v •C + I. U > U)0 h. -a a C -C a 3 In ° C:(n 0 O a D ° t? N T I- o SWM FACILITY #A UNDERGROUND DETENTION (ONLY) ROUTING Basin Input Data Routing Method: storage -indication Inflow Hydrographs o Contour Areas Hydrograph o 3 Inflow Hydrographs Elevation(ft) Area(sf) Computed Vol.(cy) Routing Summary of Peaks: 1- Yr. Storm- SCS Method Hydrograph o inflow (cfs) 1o.681 at 11.94 (hrs) SCS 2 Storage Pipes discharge (cfs) 1.25o at 12.32 (hrs) name: 1- Yr. Storm- SCS Method Storage pipe o water level (ft) 504.254 at 12.34 (hrs) Area (acres) 4.940 name: Underground Detention storage (cy) 470.6o8 CN 83.000 diameter (in) 12o.000 Type 2 length (ft) 140.000 Hydrograph 1 rainfall, P (in) 3.500 invert (ft) 498•290 Routing Summary of Peaks: 2- Yr. Storm- SCS Method time of conc. (hrs) 0.1500 angle 0.287 inflow (cfs) 11.654 at 11.94 (hrs) time increment (hrs) o.o2oo volume (cy) 407.243 discharge (cfs) 2.622 at 12.18 (hrs) time limit (hrs) 30.000 water level (ft) 504.529 at 12.18 (hrs) fudge factor 1.00 Storage pipe 1 storage (cy) 498.718 routed true name: Underground Detention peak flow (cfs) 1o.691 diameter (in) 120.000 Hydrograph 2 peak time (hrs) 11.930 length (ft) 140.000 Routing Summary of Peaks: lo- Yr. Storm- SCS Metthod volume (cy) 1233.423 invert (ft) 498•290 inflow (cfs) 21.388 at 11.94 (hrs) angle 0.287 discharge (cfs) 14.890 at 12.o6 (hrs) Hydrograph 1 volume (cy) 407.243 water level (ft) 5o6.398 at 12.o6 (hrs) SCS storage (cy) 677.604 name: 2- Yr. Storm- SCS Method Start_Elevation(ft) 498.29 VOL(cy) 0.00 Area (acres) 4.940 CN 4 Outlet Structures Outlet structure 2 Type82000 Outlet structure o Culvert rainfall, P (in) 3.700 Orifice name: Barrel time of conc. (hrs) 0.1500 name: Low -Flow Orifice multiple 1 time increment (hrs) 0.0200 area (so o.1o8 discharge out of riser time limit (hrs) 30.000 diameter or depth (in) 4.450 D (in) 24.000 fudge factor 1.00 width for rect. (in) 0.000 h (in) o.000 routed true coefficient o.600 Length (ft) 84.000 peak flow (cfs) 12.665 invert (ft) 498.2go Slope 0.005 peak time (hrs) "1.930 multiple 1 Manning's n 0.013 volume (cy) 1345`848 discharge into riser Inlet coeff. Ke 0.500 Equation constant set 3 Hydrograph 2 Outlet structure 1 Invert (ft) 498.290 SCS Orifice name: ao- Yr. Storm- SCS Method name: Mid -Flow Orifice Outlet structure 3 Area (acres) 4.940 area (so 0,349 Orifice CN 83.000 diameter or depth (in) 8.000 name: Emergency Spillway Simulation Type 2 width for rect. (in) 0.000 area (sf) 7.386 rainfall, P (in) 5.600 coefficient o.600 diameter or depth (in) 36.800 time of conc. (hrs) 0.1500 invert (ft) 504.290 width for rect. (in) 0.000 time increment (hrs) 0.0200 multiple 6 coefficient o.600 time limit (hrs) 30.000 discharge into riser invert (ft) 5o6.790 fudge factor 1.00 multiple 1 routed true discharge into riser peak flow (cfs) 21.408 peak time (hrs) 11.930 volume (cy) 2469.903 BASIN A NOTES: i, STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS, 2. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. 3. AS SHOWN ON THE PLANS, A 30' WIDE BIORETENTION BASIN SPILLWAY SHALL BE CONSTRUCTED WITH A CREST ELEVATION OF 497', CREATING A MAXIMUM BIORETENTION BASIN PONDING DEPTH OF 12". THE BIORETENTION BASIN WEIR WILL THEN OUTFALL TO THE DOWNSTREAM DETENTION CELL FOR QUANTITY CONTROL. 4. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TO ALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION SHORING ASSOCIATED WITH THE BIORETENTION BASIN EXCAVATION. 3" 6" SCHEDULE 40 P' SPACING WITH CLE THE BIOFILTER I SHALL BE SLOPE DAYLIGHT INTO TH CONSTRUCTION NOTES: SUMP LOCATED 1. ALL FILL EMBANKMENT MATERIAL UNLESS OTHERWISE SPECIFIED BY A UNDERGROUND DETENTION SYSTEM NOTES: MANUFACTURER'S MORE STRINGENT REQUIREMENTS, SHALL CONSIST 1. SWM FACILITY's ORIFICE COEFF.=0.610 & WEIR COEFF.=3.3 PREDOMINANTLY OF SOIL AND BE PLACED IN SUCCESSIVE UNIFORM LAYERS 2• DETENTION SYSTEM PIPING SHALL BIE PRE -MANUFACTURED AND DELIVERED TO THE NOT MORE THAN 8 INCHES IN THICKNESS BEFORE COMPACTION OVER THE SITE TO PREVENT CORROSION AND ILEAK WEAKNESSES. ENTIRE AREA IN ACCORDANCE WITH VDOT 2008 ROAD AND BRIDGE 3. PLEASE CONTACT COLLINS ENGINEERING (434.293.3719) & CONTECH (804.310.4829) SPECIFICATIONS. REGARDING ANY QUESTIONS CONCERNING THE UNDERGROUND DETENTION SYSTEM. 4 TRASHRACKS SHALL BE INSTALLED ON ALL ❑RIFICES IN ACCORDANCE w/ THE TRASH RACKP TO BE INSTA LED ON ALL ORIFI ES PE VSMH TECHNICAL B LLETIf V7 I 515 ORIFI E_COE FICIE -T = 0.666 ____-__---------------� _......__ _. -_�.- _ _ -- - ----._-.. _. 515 I i t I i510 � EXI ....... --_- TING GRADE 505 � I ( 505 PROPOSED r1J36' CL� IifR P--".._._._ j RISER RIM ELEV 495.25 WN/HAN ON TRA H RACK P C NOUTES E f�R(OPOS D 10' WIQE TOP 0 DAM 500 D�TAIL FORELEV. = 4 7.25' 500 p- _ _l..._- INFORMATION.! ( P.) I 0 WIDE GRASS LIMED I101`L �MIERGE CY SPILLWAY CREST _ - ELL SU FAC- ELEV. 494.25 cam+ 49 5 - ---- ' - -- -'Max - "'�'----- _ _ 495 6' OF STATE APPROVEDSOIL I MEDIA. SIDE _ ._. CL. I I RCP EXCAVATION NEED NOTBE--- _..--- --- -... - ( --'BARR C_-.- ... ' � '-_ : - -== -24" VERTICAL. _ _ _ : ... _ _ _ - INV IN: 4�7.0; 490 =- _ = - - I OUT, 86.63 490 ANIMUM PEA GRAVEL LAYER . _ . - r. RISER 12" MINIMUM GRAVEL SUMP - _ _ - : - _ - .... .. .. - FOOTING :RFORATED PVC UNDERDRAINS, io' MAXIMUM 12" ANOUTS, SHALL BE INSTALLED THROUGHOUT ELE .=487.Ot,' i 485 4 THE LOWER STONE LAYER. UNDERDRAINS ) TO DRAIN TO THE RISER STRUCTURE OR TO -- -' -- - (M( •DEPTH) - E DETENTION CELL & SHALL HAVE A 12" STONE EX. 0" SANIT�RY j BELOW THE INVERT OF THE UNDERDRAINS. S WER PIPE j 482 PROPOSED R PRAP EN RGY W W o Ln L0 DISSIPATER N OUTF LL J J W W p VDOT STD EC-1 CL. Al 0LL. _6 � r- RIPRAP W/ d UNDERLA EOFAB MENT L IC 8' W W1=6'; W2 =10'; D=1 4' 2. VDOT STD. I3-1 REQUIRED ON ALL STRUCTURES. 3. THE MINIMUM REQUIREMENTS SET FORTH IN VDOT STD. PB-1 SHALL BE DETAIL SHOWN ON THIS SHEET, 10+00 10+50 MET FOR PIPE BEDDING AND BACKFILL. THE MINIMUM HEIGHT OF COVER 5, UNDERGROUND DETENTI❑N SYSTEM PIPING SHALL BE 0120' CONTECH DUR❑MAXX. FOR PIPES SHALL BE MET AND BE IN ACCORDANCE WITH VDOT STD. PC-1. 6, UNDERGROUND DETENTION SYSTEM PIPING SHALL BE INSTALLED w/ ADEQUATE 11 +00 11 +50 12+0012+25 4. ALL FILL SHALL BE PLACED AT 95% COMPACTION AND TESTED BY A STONE & STRUCTURAL BACKFILL 1N ACCORDANCE w/ THE MANUFACTURER'S SCALE: HNICAL ENGINEER TO ENSURE COMPACTION IS REACHED AND SPECIFICATIONS. V:1 -5 � 'A' MAINTA" MAINTAINED. 7, ANY RETAINING WALLS CONSTRUCTED IN THE VICINITY OF THE UNDERGROUND BIORETENTION BASIN 5. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL TEST -DIG AT THE DETENTI❑N SYSTEM SHALL HAVE GE❑GRIDS PLACED ABOVE THE UNDERGROUND H:1 "=50' EXISTING INLETS & OUTFALLS TO CONFIRM THE INVERTS AND TO ENSURE DETENTI❑N SYSTEM, OR ❑UTSIDE OF THE LIMITS OF PIPE C❑NSTRUCTI❑N. THE PROPOSED GRADES CAN BE ACHIEVED. CONTRACTOR SHALL ALSO 83 THE CONTRACTOR MAY ELECT TO INSTALL A DIFFERENT PIPE MATERIAL FROM VERIFY EXISTING ELEVATIONS OF CURB, GUTTER, PAVEMENT AND BUILDINGS. WHAT IS PROPOSED, HOWEVER THE CONTRACTOR SHALL ONLY INSTALL VDOT CONTRACTOR SHALL NOTIFY COLLINS ENGINEERING OF ANY DISCREPANCIES APPROVED MATERIALS FROM THE LIST PR❑VIDED IN VDOT STANDARD & BIORETENTION BASiN'A' (LEVEL 1) DESIGN & REQUIREMENTS: 1N THE HORIZONTAL OR VERTICAL ALIGNMENT PRIOR TO ORDERING AND SPECIFICATIONS 107.20, 107.21 ANiD 107.22 'WHERE APPLICABLE, THE CONTRACTOR SHALL ENSURE MINIMUM STONE BACKFILL IS INSTALLED MEETING Treatment Volume (Per VRRM Calculations) 11,070 cf CONSTRUCTION. 6. ALL PROPOSED SLOPES STEEPER THAN 3:1 SHALL HAVE A LOW MINIMUM LOCAL & STATE REQUIREMENTS FOR ALL PIPE INSTALLATI❑NS, SEE Minimum Treatment Volume Required 11,070 cf MAINTENANCE GROUND COVER FOR STABILIZATION PURPOSES. THESE VDOT STD. PB-1 & PC-1 FOR MINIMUM PIPE BEDDING AND HEIGHT REQUIREMENTS. CONTRACTOR SHALL NOTIFY COLLINS ENGINEERING PRI❑R TO Minimum Surface Area Required (Tv/Storage Depth) 3,811 sf <- 6' Mix at 25% porosity; 3" pea gravel at 2% porosity, AREAS SHALL NOT BE PLANTED WITH A GRASS COVER FOR STABILIZATION & SHALL BE A GROUND COVER CHOSEN FROM TABLE 3.37C OF THE VESCH ANY SUBSTITUTION FOR CONFIRMATI❑N, AFTER HAVING RECEIVED IN WRITING Surface Area Provided 1,820 sf 12" stone at 40% porosity £ 12" of ponding at 100% UNLESS OTHERWISE DIRECTED BY THE INSPECTOR. AN APPROVAL FROM THE MANUFACTURER A,LL❑WING THE SUBSTITUTION FOR 7. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY ITS INTENDED USE. porosity WITH OSHA STANDARDS FOR CONSTRUCTION INDUSTRY (29 CFR PART STORMWATER MANAGEMENT FACILITY GRADING 1926). Area of Filter 8. PRIOR TO PLACING THE UNDERGROUND DETENTION SYSTEM BEDDING, THE FOUNDATION SHALL BE CONSTRUCTED TO A UNIFORM AND STABLE GRADE. Elevation Cell Contours Volume IN THE EVENT THAT UNSUITABLE FOUNDATION MATERIALS ARE (ft) (sf) (cf) ENCOUNTERED DURING EXCAVATION, THEY SHALL BE REMOVED AND BROUGHT BACK TO THE GRADE WITH A FILL MATERIAL APPROVED BY THE 494.25 1,820 0 PIPE MANUFACTURER MEETING MINIMUM VDOT REQUIREMENTS. ONCE THE 495.25 2,631 2,213 FOUNDATION PREPARATION IS COMPLETE, 6" OF A WELL -GRADED GRANULAR MATERIAL SHALL BE PLACED AS THE BEDDING. 497.25 4,611 9,363 VARIES PER PLAN *A minimum surface area of 3,811 sf is required for this drainage area. A total of 1,820 sf WATERTIGHT, THREADED PVC CAP 8" SOLID PVC CLEANOUT PIPE 12" ..... ....... filter floor surface area has been provided. Water quality credits shall be purchased for the remaining 1,991 sf surface area shortage, equivalent to 1.68 Ibs/year of phosphorus. ENGINEERED MODERATELY 3 r PERMEABLE SOIL MIXTURE 1.25' Y ' MKVlz NO. 78 OR N0.8 PEA GRAVEL NO. 57 STONE COMPACTED DRY SWALE s" SCHEDULE 40, PERFORATED PVC UNDERDRAIN, .F 1SECTIO SPACED PER PLAN, SLOPE TO DRAIN - UNDERDRAINS NOTE: NTS SHALL BE WRAPPED IN FILTER FABRIC TO PREVENT 1. PROPOSED DRY SWALE SHALL BE CONSTRUCTED ONLY AFTER THE CLOGGING - CLEANOUT CONNECTIONS SHALL BE CONTRIBUTING UPSTREAM WATERSHED HAS BEEN STABILIZED. INSTALLED WITH A WYE CONNECTION 2. THE CONTRACTOR SHALL SUBMIT A MATERIAL SPEC SHEET FOR REVIEW AND APPROVAL FOR THE ENGINEERED MODERATELY PERMEABLE SOIL MIX (STATE APPROVED MIX). 3. DRY SWALES SHALL BE LANDSCAPED WITH TURF PER THE DETAIL ABOVE. 530 I ? 1i I i I 1 1 530 525 8" GTE IN AT V. 52 i I I BOTTOM OF I SWALE - - ELEV. 20.0 I 4 6" t SCH. 40 PERF. PVC UNDERDRAI--------- N SPACED 201 O.0 CONNECTING CLEANOUTS - - INV IN. 516.25 INV OUT.515.98 =54; S=0.50% W (SEE PLAN VIEW) W W N C9 C.9 'n W LJ_. 6 10+00 SCALE: V:1 "=5' H:1 "=50' ! i TP=52 .10 NV OWT: 515.)7 525 Dry Swale #2 Watershed (within Subarea 'A') f I i I Attached Homes 7,785 sf 1 I Managed Turf 17,480 sf i - --._..,.__..... - .................... _----- --_--_-_____----------...------- Total - 25,265 sf i t I f 1 EMERGENCY OVERFLOW SPILLWAY AT 5o6.79' ELEV,=5o8.zg ELEV-504.29 6- (d8" Ln ORIFICES o6 i0 ELEV.=498.29 INSTALL TRASH RACKS REINFORCED 12 GA. ON ALL ORIFICES (TYP.) STEEL PLATE INSTALL ONE (1) 04.45" LOW -FLOW ORIFICE AT LOW POINT OF SYSTEM, ELEV-498.29' 03.20" WEIR PLATE DETAIL SCALE:1"=5' I1 I iI i I i iI I 520 DRY TREATMENT SWALE #2 DESIGN & REQUIREMENTS: UI EME NTS: 1 t -- -- - T --- I - Treatment Volume (Per VRRM Calculations) 91 0 cf 3 1 I `i f t i I Minimum Treatment Volume Required 1,001 cf I I Minimum Surface Area Required(Tv/StorageDepth 465 cf 3I Mix at 25/ porosity;pea ravel at 2/porosity, Y I i Surface Area Provided 11 II 0 0 cf t 100 0 746 12 stone at 40/ porosity & 12 of ondin a / p Y P g i 515 Minimum 'Approximate' roximate1 Surface Area 3/-10/ of CDA porosity iI Surface Area Provided Relative to CDA 3. p /o 12 DS PIP i E I INVIIN. 1 5 5.98 ' I INV OUTS 'S.40 1 t 1downspout 51 2 NOTE: Gutters shall outfall onto a concrete wn t ou splash p p upland of to the dry Swale. block where runoff shall then flow into the grass channel pretreatment g L=96.50; S=0.60% o 01 O CV N N LnMANAGEMENT` I STORMWATER FACILITY GRADING Dry Swale 10+50 11+00 11+5011+75 Elevation Contours Volume (ft) (sf) (cf) 520 746 0 SWALE## 2 521 1,172 951 522 1,662 2,361 Y TM Aces _',\fd/AAft R1sec Barrels. Design Your Own Detention System !wIIV#P DETENTION SYSTEMS Header. r / r Fordlesign assistance, drawings, and pricing Send completed WOfksheetto: ctr F ors ttac. dyodsCcontech-cphccsrn \\� � :\ \ gsrritl .. : v Project Name: 1 City J County: tNtBStI'fyQ( s��\�\\ t.._ r FJWshedF Grade State:«.{:. r : 1i` 6 \ \�aaa \\ \\ y?vs`I F"ava[r�enC• &teu3tfritl Designed �• BI Com pa y: n Telephone: '♦� 4uc �33z�\ i.. 4 .. j { '�i > t \ \ 1 Enter Information in t:tfi h ,....� ,�»„y,.a.. ..,. .,.,. . :aa..... �:...t, .I glue Cells - :.`if ^-n*...""sY,'°'t ..-.-�^^^•-'^-�'' ,...-.-. �;,. ' k?ac(ttrlr to Grede �ree �tA� � Y,f� � ✓S 1 'vh.31 R, k { •yS'% 1,, '7.J, 'G �. £,7 1 �1 �� ,.�..�-. �•, �,y p ,, _._� ... x 3��f:j �Y... • '•1•a<��{,>�_.. �4f `4C:MMI.C>�. ,: ... 71d�J2M F.�h2>. ., \r 'v` Q\\\ \'`A.���\��a.\4\��\\.\ Storage Volume Required (cf): ). Limiting Width (ft); Invert Depth Below Asphalt (ft): Solid or Perforated Pipe- f, Spam Shape Or Diameter (in): 78.54 it` Pipe Area Number Of Headers: vYt""max Spacing between Barrels (f#): Stone Width Around Perimeter of System (ft): 0 `r4\ f art r# z rr r EMIS Depth A: Porous Stone Above Pipe (in): Y Depth G: Porous Stone Below Pipe (in): W Stone PorosityQ to 40% . \�\3 y . xh\ �' .�a... .hl:f�• \\ \\Q�\\�\,..\\�.�.. ,v\\ \77... Pipe Storage: 11,153 of a :tin. nr:..�v ..\.,te. r..... �.:.\S..,,,•\\. > .�.��.7777777 r Pardus Stone Storage: 0 of ,,f \\ . ` , \ . \ � r Total Storage Provided:11,163 100.7ffl C) Sidra a ( F`'it�a' 2� \ v\ t.\ c ^3'" Number of Barrels: 2 barrels �} �a....>i�..,..5, Length rBarrel: 'Jo per ASS` ��f• •tom\v,, `:"v'�. .,..\ . »_,:. > �. .� ,,. der. Length Per Header: a��..:. Reetan ular Foot tint x L 23. ft x 71. It .. ':) ��JI...:...:., a � „ I� v;v ::,.. s:::.?':'.:Cv:)�, ..✓.............a,., a„ ....\ , o a t:.. a..... ... :.: ....::....'.,:to. ...... ,..a \ \ . z : ii(':. :� :'\ . �\ ,.\ �. . `\\. \ ` \� u , t� ,\vv .`.a;E \. ..a`\o.e.,. ..f •"'.,,.::,,.+f:�,::ev .rk\♦ ...\.f:. ,. 4\ \�.v\. �a\ .\.. .� Ct .. .. ,:}, ,.rs,..,,.. .\..\\,....,.:nt,.;t.::..c..if.:ii,...t`:::. v�\.�., �:..:a>..:.:... "' ..:................ Total C:MP Footage: 142 )t a Approximate Total Pieces: pcs Approximate Cou Coupling Bands: 6 bands .\:�\ >`.:'\:A�: fir ♦...: t � Approximate Truckloads. 4 trucks •\"� t i \\"v\\'vim\\�\\.\\. \\'�•.:.:< _.v.. \.. t>:,vw, a`\'v:` �\vE y \a a, ;\:} �. : \ .:`: «..?..:`;''3,:,�. �`\\\ \. \ \.\:♦,. eon \'. .`\\a ,:\. � Q�v \: a tt:at ,< \,: 8 Total Excavation: 47 c EX v y 1 , Porous Stone Eiackflll For Storage: 0 c stone ti�`v? ,:..�\���,\\. ..,..` ,4.y ;., �:' ,\ ,g`.' \: \ \�. ��\ \' ` ,:'�` ,: �e. :e\5 �. r<a 1 Excluding Stone: 434 c flii Backf"II to Grade clad Sto E .\ v.\:`.•<\\. a ,:•4:;: ,::\fir<`t>' .�\\`sY. \\ a �. vS♦f, ..,;:..• \....:.\off ,i;\Ev u **Construction ry hoa be final de a \,: v ,:„ `?2'R•: :f h <:f�..:.).v� :, ..:a.,\a\.. uanttresareapproximate and verified upon 'n ,y„:.•.i„2�. a�♦ ..a....„z,�i`\,, � ,_a.,:�:> .a,:a.�:°°��<" , 0 2007 CONTECH Stampoater Solutions f ,TH 6�,� SCOTT R. COLLINS'Z F--I No. 35791 11L_ � i0�2lt�l-� •�,�• kO"`.`YIONAL E�G� z z z O O O V V w t- w m z z z O O f=- zO Q U U IzIn LL.I w V H CL a � � M LU 0 w w rl Ln Ln q ',O H,--I 1-1 ,-r T' <[ O r, Ln N 110 T-i n CD z -0Fy oW o' W :3z oCD ° z W o z O J � J 0 U i C: o ° O Ui C C a M! .00 S. . •l s V i L L _w;�( ' �' "`l (L00 T-€LEV96 1�- - -- PROPOSED GABII ..I BA \-T WEIR \ /�` 63 '� •' / W 'T V. \ _= /45NOTCH � 49� / �___-=ter`- ,\ 53 / I PROPQSED,RIPRA NERG`i DISSIPATER / 'PRE- ,REAT-Mf T- tea.\'_3;.•4 } t F/ siy t "01� 0 EB _ R T A - � P E- RE TMENT I / PROPOSED 1o' WIDE TOP 49� Gw r "-7 ---- OF DAM ELEV­ 498.00' PROPOSED 45' L - -- - __. _GRASS LINED - `' EMERGENCYSPtLLWAY CREST ELEV.=497.75' - ti ._. - -- ' "�... f ; =.._ -PROPOSED 30" CL. III RCP RISER 3-' / `R'IM ELEV.-= i&g 6, vl/�RFLOW 4-06" ORIFI E :,. INVERT/TE6EV.=492. �--- ',.. - -- --.. w/ LOW FLOW &y �01ZI I6E INVERT EXISTING PUBLIC ROAD TO -SERVE �•_ AT E1_EV 486.o0 �. _Pk( AS ACCESS TO SWM FACILIY-'- _._ _._ PQW 15" CL. III _ RCR9 RREL z. --4 J v INN=486.00 _ `-- ' IINVQUT=485.60 --- LEVEL 2'BIORETENTION - RECEIVING CUILVERTCONNECTING 'B' BASIN DESIGN !` -`"` - =" TO.SUBAREA A RUNOFF �- _ SCALE 1" = 30' ' - _1 ~ - _ _ CUIL'VE-RTTN�/ W`485 4- SWM FACILITY #B LEVEL II BIORETENTION BASINi(1.25Tv) BIORETENTION CELL (ONLY) ROUTING Routing Method: storage -indication Basin Input Data Inflow Hydrographs Hydrograph o 4 Contour Areas Hydrograph 1 1-yr 24-hr Peak SCS TR-S5 Storm Event Elevation(ft) Area(sf) Computed Vol.(cy) SCS inflow (cfs) 8.136 at 11.98 (hrs) 496.00 4320.00 0.0 name: 2-yr 24-hr Peak SCS TR-55 Storm Event discharge (cfs) 7.688 at 12.00 (hrs) 497.00 4823.00 169.2 Area (acres) 4.850 water level (ft) 497.229 at 12.00 (hrs) 498.00 5325.00 357.1 CN 79.000 storage (cy) 192.497 499.00 5827.00 563.5 Type z rainfall, P (in) 3.700 Hydrograph 1 Start_Elevation(ft) 496.00 Vol.(cy) 0).000 time of conc. (hrs) 0.2100 2-yr 24-hr Peak SCS TR-55 Storm Event Inflow Hydrographs time increment (hrs) o.ozoo inflow (cfs) 8.951 at 11.98 (hrs)time limit (hrs) 30.000 discharge (cfs) 8.631 at 12.00 (hrs) fudge factor 1.00 water level (ft) 497.14o at 12.00 (hrs) 5 Inflow Hydrographs routed true storage (cy) 194.374 Hydrographo peak flow (cfs) 8.957 SCS p (hrs) Hydrograph 2 name: i-yr 24-hr Peak SCS TR-S5 Storm Event volume 2122 347 (Y) 347 io-yr 24-hr Peak SCS TR-55 Storm Event Area (acres) 4.850 inflow (cfs) 17.273 at 21.98 (hrs) CN 79.000 Hydrograph z discharge (cfs) 16.819 at 11.98 (hrs) 2 SCS water level (ft) 497.218 at 11.98 (hrs) rainfall P Hype ( ) 3.5 0o navie: io-yr z4-hr Peak SCS TR-55 Storm Event storage c) zo8. 9 (Y 599 time of conc. (hrs) 0.zloo Area acres 8 0 (acres) 4. 5 time increment (hrs) o.o2oo CN 79.000 Hydrograph 3 time limit (hrs) 30.000 Type z 25-yr 24-hr Peak SCS TR-55 Storm Event fudge factor 1.0o rainfall, P (in) 5.600 inflow (cfs) 23.817 at 11.98 (hrs) routed true time of conc. (hrs) 0.2100 discharge (cfs) 23.449 at 11.98 (hrs) peak flow (cfs) 8.142 time increment (hrs) 0.0200 water level (ft) 497.272 at 11.98 (hrs) peak time (hrs) 22.982 time limit (hrs) 30.000 storage (cy) 218.485 volume (cy) 1020.145 fudge factor 2.00 routed true Hydrograph 4 peak flow (cfs) 17.285 too-yr 24-hr Peak SCS TR-55 Storm Event peak time (hrs) 11.982 inflow (cfs) 33.975 at 11.98 (hrs) volume (cy) 2165.824 discharge (cfs) 33.663 at 11.98 (hrs) water level (ft) 497.346 at 11.98 (hrs) Hydrograph 3 storage (cy) 232.123 SCS h LEVEL 2 DRY SWALE #1 Dry Swale #1 Watershed (within Subarea W) Attached Homes Managed Turf Total = 1,289 sf 3,549 sf 4,838 sf name. z5-yr 24- r Peak SCS TR-55 Storm Event Area (acres) 4.850 CN 79.000 Type 2 rainfall P in .000 time of conc. (hrs) 0.2100 time increment (hrs) o.ozoo time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 23.835 peak time (hrs) 11.982 volume (cy) 2986.459 Hydrograph 4 SCS name: too-yr 24-hr Peak SCS TR-55 Storm Event Area (acres) 4.850 CN 79.000 Type 2 rainfall, P (in) 9.100 time of conc. (hrs) 0.2100 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 34.000 peak time (hrs) 11.982 volume (cy) 4s6o.15o DRY TREATMENT #1 SWALE DEIGN & REQUIREMENTS: Treatment Volume (Per VRRM C Iculations) 175 cf Minimum Treatment Volume Required 193 cf Minimum Surface Area Required �(Tv/Storage Depth) 89 sf <- 3' Mix at 25% porosity; 3" pea gravel at 2% porosity, Surface Area Provided ( 188 sf 12" stone at 40% porosity & 12" of ponding at 100% Minimum 'Approximate' Surface rea 3%-10%of CDA porosity Surface Area Provided Relative t CDA 4.3 % NOTE: Gutters shall outfall onto � concrete downspout splash block, where it shall flow to the dry swale via the rear yard's grassy lawn upland of the facility STORMWATER MANAGEMENT FACILITY GRADING Dry Swale Elevation Contours Volume (ft) (sf) (cf) 560 188 0 561 471 319 562 810 952 & HIGH r- J ON BASKET WEIR ELEV! 497 -(MAXzz" f70Nd!' G) ) POP D / 1 I DETENTION CELL �\ \ \ v J 1 I ' - I 11 BIORETENTION BASIN B LEVEL II DESIGN & REQUIREMENTS: Treatment Volume Per V Calculations) 00 RRM10 5 cf Minimum Tr atment Volume Required 12 506 cf Minimum Forebay Volume Required (15% of Tv) 1,876 cf Forebay Volume Provided 1,935 cf Minimum Surface Area Required (Tv/Storage Depth) 4,305 sf Surface Arez Provided 4,320 sf STORMWATER MANAGEMENT FACILITY GRADING Area of Elevation orebay Cell Volume (ft) ontours (sf) (cf) 496 222 0 497 484 345 498 793 977 499 1 1 1,133 1 1,935 Elevation (ft) Area of Detention Cell Contours (sf) Volume (cf) 486 488 0 488 894 1,362 490 1,418 3,654 492 2,062 7,114 494 2,828 11,983 495 3,258 15,024 496 3,719 18,510 497 4,139 22,437 498 4,710 26,858 499 1 1 5,314 1 31,867 <- 6' Mix at 25% porosity; 3" pea gravel at 2% porosity, 12" stone at 40% porosity & 12" of ponding at 100% porosity Area of 'Filter Elevation Cell Conitours Volume (ft) (sf)) (cf) 496 4,321.0 0 497 4,823 4,569 498 5,3215 9,641 499 1 5,82!7 1 15,215 SWM FACILITY #B LEVEL II BIORETENTION BASIN(1.25Tv) DETENTION( CELL ROUTING Basin Input Data Inflow Hydrographs Routing Method: storage -indication 10 Contour Areas 5 Inflow Hydrrographs Hydrograph o Elevation(ft) Area(sf) Computed Vol.(cy) Hydrograph o ROUTED OUTFLOW 3.-yr 24-hr Peak SCS TR-S5 Storm Event 486.00 488.00 0.0 Curve inflow (cfs) 7.688 at 12.00 (hrs) 488.00 894.00 50.4 ROUTED OUTFLOW 1-yr 24-hr Peak SCS TR-55 Storm Event discharge (cfs) 1.107 at 12.28 (hrs) 490.00 1418.00 135.3 time incr (minlhlrs) 0.02 water level (ft) 492.433 at 22.32 (hrs) 492.00 2o62.00 263.5 time limit (minlhlrs) 30.00 storage (cy) 297.8o6 494.00 2828.00 443.8 file: ) YEAR-o.toz hr intervals.txt 495.00 3258•oo 556.4 volume (cyl) 500.93 Hydrograph i 496.00 3719.00 685.6 routed) true ROUTED OUTFLOW z-yr 24-hr Peak SCS TR-55 Storm Event 497.00 4139•00 832.0 time in houirs true inflow (cfs) 8.631 at 12.00 (hrs) 498.00 4710.00 994.8 discharge (cfs) 1.515 at 12.26 (hrs) 499 00 5314 00 1180 3 Hydrograph 1 water level (ft) 492.834 at 22.26 (hrs) Start _Elevation(ft) 486.00 Vol.(cy) 0.0000 Curve storage (cy) 331.789 ROUTED OUTFLOW 2-yr 24-hr Peak SCS TR-55 Storm Event 5 Outlet Structures Outlet structure z time incr (minlhrs) 0.02 Hydrograph 2 Outlet structure o Weir time limit (minlhrs) 30.00 ROUTED OUTFLOW io-yr 24-hr Peak SCS TR-55 Storm Event Orifice name: Riser file: z YEAR-o.oz hr intervals.txt inflow (cfs) 16.8ig at 11.98 (hrs) name: Orifice diameter (in) 30.000 volume (cy) 572.95 discharge (cfs) 6.35o at 12.18 (hrs) area (sf) o.1io side angle 0.000 routed true water level (ft) 495.442 at 22.28 (hrs) diameter or depth (in) 4.500 coefficient 3.300 time in houirs true storage (cy) 612.387 width for rect. (in) 0.000 invert (ft) 496.67o multiple 1 Hydrogriaph z Hydrograph 3 coefficient 0.500 invert (ft) 486.000 discharge into riser Curvre ROUTED OUTFLOW 25-yr 24-hr Peak SCS TR-55 Storm Event multiple 1 transition at (ft) 0.76o ROUTED OUTFLOW 10 r z Ihr Peak SCS TR Storm Event Y 4 55 inflow cfs) z . at 21. 8 (hrs ( 3 449 9 ) discharge into riser orifice coef. 0.50o .500 time incr (minlhrs) 0.02 discharge (cfs) 1z.o17 at 1z.14 (hrs) orifice area (sf) time limit (minlhrs) 30.00 water level (ft) 496.968 at 22.14 (hrs) Outlet structure 1 file:lo YEAR-a.oz hr intervals.txt storage (cy) 8z6.158 Orifice Outlet structure 3 volume (cy) 2339.02 routed true Hydrograph 4 name: Mid -flow Orifice area (sf) o.196 Culvert name: Barrel time in hours true too-yr 24-hr Peak SCS TR-55 Storm Event diameter or depth (in) 6.000 multiple 1 Hydrogrlaph 3 inflow (cfs) 33.975 at 11.98 (hrs) discharge (cfs) 28.923 at 22.04 (hrs) width for rect. (in) 0.000 discharge out of riser Curve water level (ft) 497.920 at 1z.04 (hrs) coefficient o.5 D (in) 15.000 h (in) o.000 ROUTED OUTFLOW 25-yr 24-Ihr Peak SCS TR-55 Storm Event storage (cy) 980•935 invert (ft) 492.670 multiple Length (ft) 80.000 02 time incr (minlhrs) o.oz 4 discharge into riser Slope 0.005 time limit (minlhrs) BASIN B NOTES: B INSTALLED N ALL ORIFICE OPENINGS. 1. STATE APPROVED TRASH RACKS SHALL E S O O IC GS INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS 2. A CONCRETE FOUNDATION SHALL BE INS O S SET FORTH IN THE VESCH SPEC. #3.14. IN I L Y SHALL BE CONSTRUCTED WITH A CREST ELEVATION P DE BIORETENTION BASIN SP L WA SHA S ION OF 497', 3. AS SHOWN ON THE LAMS, A 30'WIDE CREATING A MAXIMUM BIORETENTION BASIN PONDING DEPTH OF 12". THE BIORETENTION BASIN WEIR WILL THEN OUTFALL TO THE DOWNSTREAM DETENTION CELL FOR QUANTITY CONTROL. 4. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TO ALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION SHORING ASSOCIATED WITH THE BIORETENTION BASIN EXCAVATION. TRASH RACKS TO BE INST LLED ON ALL ORI ICES PT VSMH TECHNICAL BULLET�N #7 1 510 ORIFICE COEFFICIENT = Of I 510 EIR AT ROCK WEIR AT ROCK PROPOSED 03 " CL. III CP ELEV. 99.0' ELEV. 498.0' RISER RIM ELE .=496.67 _..._...--•_ ---WITH 5'----'....__ _._._____..----WITH 5'------- -._.._. ---.......___ ___...._- .__._ .__._. _-- wIFfA SON�T SH RACK----"-- NOTCI� AT NOTC AT C I NO 0 4-06" �VIID FLUY - ORIFIC S 40 5O5 AT ELFV. 492.61 5O5 ' LOW FLOW ORIFICE AT-_ -------- -------i------------- ---- - ---- -- --- -- ----- ---- -1-04.5' ELE- 486.00 (r/BMP DEBRIS PROPOSED CAGE C OUT, SEE -- ET) IL F 100-YR = 49 WSE .920 PROPOSED O DAM ECV. IO' WIDE = 499' TOP 31 ( ADDITION L I INFORMATION (TYP.) 500 j\/-- I 10-YR WSE ( 45' IDE GRASS RGENCY LINE SPILLW Y CREST 5OO - - I_- _ _ - _ _ = 49 '- .442 _ ___EM ELE 497.7 OSED PR PBIORETNTION PRE-TJRI CELLSURFACE RIPRAP I ELEV. 4 6.0 2 1' = 49 WS E . 4 -__ CANNEL------.... I_-.-.--_.---_. __ __.__-- --•----___ __._ _.._ ___ ,_..._-----__....____-- �---___--- .. __-•---- ROPOS D i _ . _ _ ._. - - -_ 495 FOREB Y -_ - - - ENT - ----- -------- I-- --- -- --- 9 9' MAX -------- -- 495 PR -TREAT _ 6' OF STATEAPPROVED SOIL MEDIA. SIDE SLOPE - EXCAVATION NEED NOT BE - "- _ _"- VERTICAL. - - - 77 3 MINIMUM PEA GRAVEL LAYER - - - - ------ ------ -------- _-___ -______ 12" MINIMUM GRAVEL SUMP -- i 12' P Q_4 SED_L�VEL ELEV= 88.75' 1 0 29' (FU HERS-_ URE 8" 15_ S SAN B M - __..__2.._ ._.-_...__.._.,.__ ._.__._...._.__(MIN;.D BIORETENTION) BAST _. .PTH).. .__..___.....__.._ _�____.______...._..._.__ �VER T BE PROVIDED Ar ME OF INST LLATIOd 6" SCHEDULE 40 PERFORATED PVC UNDERDRAINS, 1o' MAXIMUM 485 SPACING WITH CLEANOUTS, SHALL BE INSTALLED THROUGHOUT THE BIOFILTER IN THE LOWER STONE LAYER. UNDERDRAINS -- RISER - ------ - -- SHALL BE SLOPED TO DRAIN TO THE RISER STRUCTURE OR TO FOOTING I VDOT STD. EW 1 I 482 DAYLIGHT INTO THE DETENTION CELL & SHALL HAVE A iz" STONE I 015" CL. III RCP SUMP LOCATED BELOW THE INVERT OF THE UNDERDRAINS. BARREL > > N O INV IN: 486.0; INV OUT. 485.6 'n 00 N PROPOSED RIPRAP ENE GY DIS (PATER O OUTFALL VDOT ST . EC-1 CL. Al W W NN 0 N p p cD t9 C0 u7 LO LO dam- L=80'; S=0.50% In 00 Itd 0) 4-• RIPRAP W/GEOFABRIC L=28; W1=7% W2 NDER 11; D=14' MENT W LL SCALE: V:1 "=5' H:1 "=50' 10+00 10+50 11 +00 11 +50 12+00 12+50 13+0U1.5+15 BIORETENTION BASIN'B' Manning's n 0.013 file: 25 YEAR-o.oz hr IntervalsAxt MAINTENANCE Inlet coeff. Ke o.500 volume (cy)) 1982.64 1. BIORETENTION AND DRY SWALES SHALL BE MAINTAINED IN ACCORDANCE WITH COMMONWEALTH OF Equation constant set q 3 routed true time in houirs true VIRGINIA REQUIREMENTS. Invert (ft) 486.000 2. MAINTENANCE SHALL OCCUR ANNUALLY EACH SPRING. Outlet structure 4 Hydrograph 4 3. EACH MAINTENANCE INSPECTION SHALL INCLUDE: Weir SCS 3.1. VISUAL INSPECTION - ASSURE 75% TO 90% COVER HAS BEEN ACHIEVED IN THE BED (MULCH AND name: Emergency Spillway too-yr 24-hr Peak SCS TR-S5 Storm Event VEGETATION), MEASURE DEPTH OF REMAINING MULCH length (ft) 45.000 Area (acres) 4.85o CN 3.2. CHECK FOR SEDIMENT BUILDUP OR TRASH AND REMOVE IT side angle 63.43o 79.000 Type 2 3.3. INSPECT BIORETENTION SIDE SLOPES FOR EROSION AND REPAIR coefficient 343 invert coefficient.000 rainfall, P (in) 9.100 3.4. CHECK INFLOW POINTS FOR CLOGGING, REMOVE ANY SEDIMENT 49 multiple 1 time of conc. (hrs) 0.2200 3.5. LOOK FOR BARE SOIL IN CONTRIBUTING DRAINAGE AREA, AND STABILIZE IMMEDIATELY discharge through dam time increment (Mrs) o.ozoo 3.6. CHECK FOR CLOGGED OR SLOW -DRAINING SOIL MEDIA, A CRUST FORMED ON THE TOP LAYER, time limit (hrs) 30.000 INAPPROPRIATE SOIL MEDIA, OR CAUSES OF INSUFFICIENT FILTERING TIME AND RESTORIE PROPER fudge factor routed trueue FILTRATION CHARACTERISTICS peakflow(cfis) 34.000 3.7. SPOT RESEEDING - IMMEDIATE STABILIZATION OF BARE OR ERODING AREAS WITH GRASS COVER peak time (hrs) 11.982 3.8. REPLACE ANY DEAD OR SALT KILLED PLANTS volume (cy)) 426o.15o 8" GRATE INLET-\ A 6 E t E STR 48 TP=563.60 T ELEV. 61.00 j INV IN: 55 .10(STR I INV OUT: 5 565 I i 50605( ' CLEA OUT-, IOTTOM OF - ---- -- --_ - - ;WALE :LEV. 560.9, 0 I 560, 6" SCH. 40 PERF. i I i PVC UNDERDRAINS SPACED 20' O.0 INV IN. 556.64 i 555 INV OUT.556.44 i ADS RIPE IN. i i L=40; S=0.50% 8" I('lIV 556.44 552 I INV OUT; 556.10 ( i 552 27.60; S=1.23% J J Ln In (D W W O (0 W LA_ L5 10+00 10+50 11 +0011 +25 SCALE: V:1"=5' S H:1 "=50' WALE #s. 50) 'R 46) )XATERTfQHT CAP �N-T.1=FiMli`�lAL 1=�1a �, OF PiP�. `y x 4� P V O. S01710N :CAP ON GRADE' 4" P _V:C.. [ )JN!?ERFORATED / ST,Af`d0PIPE / ®.: •' f aw 1*!.,4f r+�•O��rafiNi!` r�,�,+• .r r44r 1f .�rAit•-ir••iiili'fr�rrkl•r�9�i•,•♦i*b�;++rl •- ►oistr?�• •:;r'r.•';;?• I+❖d.�:+� •i �t+:+:� •:+:+'�.rr'� :$era ::« •::'+ , Nt i,►►%F:*'r-��,.�4±�•arr�•' ;f f1rit�r♦s•�f',r.itt>'•si rY1-.tf'r+t r.+;✓ir#•T1i.*riii•r1tt•*T�»ir•o i*•'v•r.�iff•YMbt-• sr��rb+jso.stf •si� .�»i►r.Ofiiri+►N►•A•�sbr'riy RiRpti►rtyrtiiM.r.•isr�4t�fs•ttr •�»t�w«•,sri�sifx�wys7btp��'rI♦•r••1�••sist1i�•tf•iy»irr+r«yy9�i+44•Yys• +•ar•si a/•twsf .' •t•r•,ir! /"irat•�ra*Oi•#t.t'�a• Ii1D'�••Y+«R`••�r e•*'a.r�'1�sf• «.b'sw.�•e#rI t----iPr- er-----i-----0-----ri% '►��+�'s� � � •t'.t I I I +r}�,�n�+� rft ♦» r o•R,r It•�ti♦b•'t«t r o r r r frh�ir rs•iti ir+i 1•.i #�'�i*rf•rt�.'e�ra yi'ar"'t"�*;r. it��.�� r».r.r I ■ I r'�: r*. irr.. • i � � NI • �t�1*�r sir«r<:4+.�.ssta� �r+rt• orr»�i •Y i'�ai. b1• r rs r s�r'�.*s*�iy���rt ����Y. dui+'' �.»e�s"tj.taros"• is♦a»a war..✓p 4),.�,l�fieti�:.• ,ii.tiyf t«1s�,•s tr r+tifi 1,9r F» i•rri„} i++•C► lirr t sdrri •♦ o� a�"ri s aa• airs rstit�. �1 s � 'M i � » '~ ♦s"t"+ts�'a` 'k9isf•i•IiYi•s» A• ••,r3 rs� . ♦+�•i irris . s ,•+ ♦ •+r,► ►»fir#si of+�•ssrssa+ir•s•s I.*:ar�'�t'�o �s�•�ss•.��i�r�s•�ria,*.irw.'�"a �4f'Sr `.fir ��%�i`rr•ao+°«�:'•r'ro.�''�1ri�`OrSr:"*••di•�s .''.'?. •'1�:''"i -,!•fy�isyti�yyl#�t�ti.�•*3.r�r Xr,>�f�iyry+�}•:is�rr,,+; Sr_rYt•s-.�rft1E61�rift ss*••r�•f► Ps•.vsrw''�iibiri ara>< +�Tiyss rrrr � r•a rt +�. i t•l a+a t'i�r •a j�ad,3+r�+�,ol i.s�iti•ai+i•a "� '✓i�'1'�i•is•.p-i �,bi��t ski• �i fi r•T • • 7ti a:s•1 r+ d i s. r• ♦ r s' ♦�s r •F +off• +sY t •� �+%• ��' t «♦ it r� 4 r.' i r•�•4•a�� •ii�at �•a"s�6i a r4:r ta�•i<� 1 a•i•w1il�i � r i �► a 1�,��rr`- F� � • � 1► ��Ie"�'1>ws. iL tom. i . � .. � i• � 8 ■ lir Figure 9-B.1. 4" P V.G. Cleanout Detail H 0 f SCOT'T R. COLLINSt2� No. 35791 � �4Q�- IONAL E�Ot z z O 3r :7 a a( O 0 U U Uj)w m z z 0 D (= XI O O Q ZZ a U U > ~ W w ® 1�1 � LU H 1�1 � Ce 1-4 M Lf, t0 `D W ,a Q o i Ii N n o L. 06 O _l � J ,0 U y LEGEND ROADS EXISTING CULVERT CUL VERT Q DROP INLET & STRUCTURE NO. CURB CURB & GUTTER PROPOSED PAVEMENT EC-3A DITCH 6• DEPTH OF EC-3A DITCH EC-2 DITCH g" DEPTH OF EC-2 DITCH EARTH DITCH DRIVEWAY CULVERT + BENCH MARK - e _ - ® CLEARING LIMITS S VDOT STANDARD STOP SIGN - - - - zoo- - - - EXISTING CONTOUR 20o PROPOSED CONTOUR 240.55 PROPOSED SPOT ELEVA77ON ./-- TBC DENOTES TOP/BACK OF CURB T/B DEN07ES TOP OF BOX EROSION CONTROL VIRGINIA TROL HANDBOOK SPECIFICATION NUMBER DD >P, TEMPORARY DIVERSION DIKE 3.09 OST oo 000 TEMPORARY SEDIMENT TRAP 3.13 SB ® SEDIMENT BASIN 3.14 lP-- INLET PROTECTION 3.07 SFX x x SIL T FENCE 3.05 CE CONSTRUCTION ENTRANCE J. 02 PS PS PERMANENT SEEDING 3.32 ClP CULVERT INLET PROTEC7ON 3.08 DC DC DUST CONTROL 3.39 SA SAFETY FENCE 3.01 TEMPORARY RIGHT-OF-WAY 3.11 DIVERSION TABLE:3639--A ADHESIVES USED FOR DUST CONTROL Water. Application Mution 'Cype Of Rate. Adhesive { wive: Water) CallonsfAcre Ao.iOrlie Asphalt Emulsion 7:1 Coarse Spray 1,200 1 atex E i mull ou 12.5:1 Pin 2 5 Pine Spray 3 Resin in Water 4:1 Fine Spray 300 Acrylic'Eaiulsi0n (Pion Traffic) 7.1 Coarse Spray 450 Acrylic Emulsion (Traffic) 3.5:1 Coarse Spray 350 Source: Va. DSW.C'. SiOO L $1d K (.1 OR MTiAL US PER AM KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP 20 LBS. SEASONAL NURSE CROP 150 LBS FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STD 3.35. PS PERMANENT SEEDING SCHEDULE GENERAL NOTES I. THE OWNER/CLIENT OF THIS PROPERTY IS.• MOSS ACQUISITIONS 321 E MAIN STREET CHARLOTTESWLLE, VA 2290)2 A VINI TY ESTATES LLC 455 SECOND STREET SE, 5MH FLOOR CHARLOTTESWLLE, VA 2290)2 2. THE DEVELOPER OF THIS PROPERTY IS: RIVERBEND DEVELOPMENT, IINC. 321 E MAIN ST, SUITE 201 CHARLOTTESVILLE, VA 229072 ATTN. ALAN TAYLOR J. THESE PLANS HAVE BEEN PREPARED BY- COLLINS ENGINEERING, INC 200 GARRETT STREET, SU17FE K CHARLOTTESVILLE, VA 2290)2 TELEPHONE: (434) 293-37119 FACSIMILE: (434) 293-2813 4. SOURCE OF TOPO & SURVEY SURVEY PROVIDED BY ROUDABUSH, GALE, AND ASSOCIATES, DATED AUGUIST 2013. TOPO FIELD VERIFIED DECEMBER 2014. 5. ZONING., PRD-PLANNED RE,'SIDEN77AL DEVELOPMENT ZMA 2013-016 6. TAX MAP AND PARCEL NUhYBER: 91-16C, 91-16E, 91-16A, 91-14 Z USGS DATUM: NAD 83 8. LOCATION/ADDRESS OF PROJECT EAST OF AVINITY I DEVELOPMENT 9. TOTAL ACREAGE OF SITE. • 1.:3.453 ACRES 10. SITE PHASING. • MAXIMUM FOUR PHASES 11. PUBLIC UTILITIES' CONNECT TO EXISTING PUBLIC SEWER AND WATER * COLLINS ENGINEERING SHALL NOT HAVE AUTHORITY OVER CONTRACTOR'S WORK, SAFETY PRECAUTIONS, SCHIEDULES, OR COMPLIANCE WITH LAWS AND REGULATIONS WE SHALL NOT ASSUME RESPONSIBILITY FOR ANY CONSMUC77ON STARTED PRIOR TO PLAN APPROVAL. EROSION & SEDIMENT CONTROL MEASURES: STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND) SEDIMENT CONTROL HANDBOOK. STRUCTURAL PRACTICES USED IN THIS SECTION CONSIST OF THE FOLLOWING.' 3,01 SAFETY FENCE.- A PR07EC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY 7HE PUBLIC. APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE CONSIDERED UNSAFE BY VIRTUE OF POTEN77AL ACCESS BY THE PUBLIC. 3.02 CONSTRUCTION EN7RANCE-: A STABILIZED PAVED CONS7RUC770M1 ENTRANCE W1771 A WASH RACK LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. CONS7RUC7I0N ENTRANCES SHALL IBE INSTALLED AS SHOWN ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS. 3.05 SILT FENCE.- A TEMPORARY SEDIMENT BARRIER (CONSISTING OF A SYN7HE71C FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED, TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROIM_ DISTURBED AREAS DURING CONS7RUC770N OPERATIONS IN ORDER TO PREVENT SEDIMENT FROA1 LEAVING THE SITE, AND TO DECREASE THE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL CHANNEL FLOWS THE SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH). 3.07 STORM DRAIN INLET PROTECTION: A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILIZA7ON OF THE DISTURBED AREA. INLET PR07EC77ON APPLIES WHERE STORM DRAIN INLETS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT STABILIZATON OF THE CORRESPONDING DIS77JRBED DRAINAGE AREA. 3.09 TEMPORARY DIVERSION DIKE A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM UNPROTECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET. TO DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING FACILITY SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER RUNOFF MUST BE TEMPORARILY DIVERTED TO PROTECT DISTURBEDRETAIN SEDIMENT ON T DU NS U RON. THESE ST U .v OF 18 SITE RING CO TR C R Cr RES GENERALLY HAVE A LIFE EXPECTANCY MONTHS OR LESS WHICH CAN BE PROLONGED WITH PROPER MAINTENANCE. 3.13 TEMPORARY SEDIMENT TRAP: A TEMPORARY PONDING AREA FORMED BY CONSTRUC77NG AN EARTHEN EMBANKMENT WITH A STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG ENOUGH TO ALLOW THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. USE BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBUTING DRAINAGE AREA IS LESS THAN 3 ACRES, WHERE THE SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 MONTHS, AND IT MAY BE CONSTRUCTED EITHER INDEPENDENTLY OR IN CONJUNCTION WITH A TEMPORARY DIVERSION DIKE. J. 14 TEMPORARY SEDIMENT BASIN: A TEMPORARY BARRIER OR DAM W77H A CON7ROLLED STORMWATER RELEASE STRUC77JRE FORMED BY CONSTRUC77NG AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. "WET" AND as DETAIL SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN TO A l "DRY" LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. APPLIES BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBUTNG DRAINAGE AREA IS EQUAL TO OR GREA7ER THAN THREE ACRES 77-IIERE MUST BE SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR THE CONSTRUCT710N OF A TEMPORARY IMPOUNDMENT. 3.18 OUTLET PRO7EC77ON: STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPA77NG DEVICES PLACED AT 77.1E OUTLETS OF PIPES OR PAIVED CHANNEL SECTIONS. TO PREVENT SCOUR AT STORMWATER OUTLETS TO PROTECT THE OUTLET STRUCTURE, ZE E POTEN77AL RMW ER EAND TO MINIMIZE 7H FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED STORMWATER FLOWS APPLICABLE TO THE OUTLETS OF ALL PIPES AND ENGINEERED ,CHANNEL SECTIONS 3.19 RIPRAP: A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE WITH FILTER FABRIC OR GRANULAR UNDERLINING. TO PR07ECT THE SOIL FROM THE EROSIVE FORCES OF CONCENTRATED RUNOFF, SLOW THE VELOCITY OF CONCENTRATED RUNOFF WHILE ENHANCING THE POTENTIAL FOR INIFILTRATION, AND TO STABILIZE SLOPES WITH SEEPAGE PROBLEMS, AND/OR NON -COHESIVE` SOILS USE WHEREVER SOIL AND WATER INTERFACE AND THE SOIL CONDITIONS, WATER TURBULENCE AND VELOCITY, EXPECTED VEGETA77VE COVER, ETC., ARE SUCH THAT THE SOIL MAY ERODE UNDER THE DESIGN FLOW CONDITIONS. 3.31 TEMPORARY SEEDING: THE ESTABLISHMENT OF A TEMPORARY VEGETA77VE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION AND SEDIMENTA7ON BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF-517E AREAS, AND TO PROVIDE PR07EC77ON TO BARE SOILS EXPOSED DURING CONSTRUCTION LUN77L PERMANENT VEGETATION OR OTHER EROSION CONTROL MEASURES CAN BE ESTABLISHED. 3.32 PERMANENT STABILIZATION: THE ESTABLISHMENT OF PERENNIAL VEGETA77VE COVER ON DISTURBED AREAS BY PLAN77NG SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER 771AT IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. TO IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF CONSMUC77ON ACTIVITIES, ALL AREAS WILL RECEIVE A PERMANENT VEGETA77VE COVER. 3.39 DUST CONTROL: REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION AND CONSTRUCTION AC77WTIES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE 7HE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE. DUST CONTROL MEASURES SHALL ;BE EMPLOYED TO PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE WITH THE VESCH. EROSION CONTROL NOTES ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STTRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND ;SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULA TIONS ES-2: THE PLAN APPROVING AUTHORITY MUST BE N077FIED OINE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOIR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND OINE WEEK PRIOR TO THE FINAL INSPECTION. ES-J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES-5.-PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN' AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITI-ED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL .SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNEER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT' EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROWING AUTHORITY. ES-7.'ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZA7ION IS ACHIEEVED. ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED WATER FILTERING DEVICE. ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN IIHE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. EROSION CONTROL NOTES 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPIECRON. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSP7RUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS 07HER 774AN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIM17ED TO, OFF -SITE BOORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO 77-IE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROWING AUTHORITY. 6. TFIE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CON7ROL MEASURES NECESSARY TO PREVENT EROSION .AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. Z ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL 77MES DURING LAND DISTURBING ACTIVITIES AND DURING SIVE DEVELOPMENT UN77L FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO) AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFEC77VENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIA TEL Y. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL 0 0 S SHALL BE INERT MATERIALS ONLY FREE F ROOTS, STUMPS, Wi000 RUBBISH N OTI-I R A e. E ONLY, a , DEBRIS 12. BORROW OR WASTE- AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7.• OOAM TO 9: OOPM. 15. BORROW, FILL OR WASTE AC77VITY SHALL BE CONDUCTED IN A .SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL ERO-3ION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT C Q a UNIT BUILDING OR OTHER PORTION OF THE PROPERTY. 1 Z TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO ]FEBRUARY TO CONSIST A 50150 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNA77VES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, . AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4 6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 957. KENTUCKY 31 OR TALL FESCUE AND C BLUEGRASS. GRASS OR KENTUCKY STRAW MULCH IS TO BE APPLIED D 5q PERENNIAL RYE AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE.- ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIA TEL Y. SILT TRAPS ARE TO BE CLEANED WHEN 509" OF ZHE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIA TEL Y. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PR07EC77ON ORDINANCE SECONN 17-204G.) 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-2078) SOIL DESCRIPTION 71 B - RABUN CLAY LOAM-27. TO 77. SLOPES SOIL IS WELL DRAINED, WITH MORE THAN 80 INCHES TO THE WATER TABLE. MADE FROM RESIDUUM WEATHERED FROM GREENSTONE, THIS SOIL HAS CONmEX DOWN AND ACROSS -SLOPE SHAPE. NO FREQUENCY OF PONDING OR FLOODING, MODERATE WATER CAPACITY, AND MODERA TEL Y HIGH' TO HIGH KSA T. RABUN CLAY-77. TO 15q SLOPES, SOIL IS WELL DRAINED, MODERATELY 72C3 -HIGH TO HIGH KSAT, MORE THAN 80 INCHES TO THE WATER TABLE, NO FREQUENCY OF PONDING OR FLOODING, MODERATE WATER CAPACITY, MADE FROM RESIDUUM WEATHERED FROM GREENSTONE. RABUN CLAY-157. TO 257. SLOPES, SOIL IS WELL DRAINED, MODERA TEL Y 72D3 -HIGH TO HIGH KSAT, MORE THAN 80 INCHES TO THE WATER TABLE, NO FREQUENCY OF PONDING OR FLOODING, MODERATE WATER CAPACITY, MADE FROM RESIDUUM WEATHERED FROM GREENSTONE. NO SCALE 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. 3. ATTACH THE FILTER FABRIC TO (STD. & SPEC. 3.32 OF VIRGINIA EROSION & TRENCH UPSLOPE ALONG THE LINE THE WIRE FENCE AND EXTEND SEDIMENT CONTROL HANDBOOK, 3RD ED.) OF POSTS IT INTO THE TRENCH. I vfipA�� oft •i a; FAMC ENEMCMM CONFACM SOILmain" = 1 .�TEMPORARY SIL T FENCE sF (WITH WIRE SUPPORT) . E NO SCALE 4. BACKFILL AND COMPACT THE EXCA VA TED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. EROSION CONTROL NOTES &NARRATIVE DESCRIPTION OF EROSION &SEDIMENT PURPOSE: CONTROL MEASURES: THE PURPOSE OF THIS LAND -DISTURBING ACTIVITY IS TO CREATE A 57 LOT SUBDIVISION. THE TOTAL ACREAGE TO BE DISTURBED WITH THIS PLAN IS 12.20 ACRES EROSION AND SEDIMENT CONTROL MEASURES. EXIS77ING SITE CONDITIONS.' IT IS AN77CIPATED THAT A CONSTRUCTION ENTRANCE, TEMPORARY DIVERSION THE EXISTING SITE IS A SOMEWHAT WOODED HILLY PARCEL. THERE ARE TWO EXISTING HOUSES THE SITE IS GENERALLY WELL DRAINED WITH SOME CRITICAL SLOPES EROSION AND SEDIMENT CONTROL MEASURES HAVE DIKES, RIGHT OF WAY DIVERSION, SEDIMENT TRAPS AND BASINS, OUTLET BEEN DESIGNED TO CONFORM TO THE EXISTING SITE SLOPE AND PROTECT THE ADJACENT PROPERTIES. PROTECTION, INLET PROTECTION, AND SILT FENCE WILL BE INSTALLED TO ADJACENT AREAS. CONTROL SURFACE DRAINAGE. TEMPORARY SEEDING WILL BE USED IMMEDIATELY THE SITTE IS POSITIONED BETWEEN 'SCOTTSVILLE ROAD AND AVON STREET EXTENDED. AVINITY 1 IS WEST OF FOLLOWING ALL LAND DISTURBANCE ACTIVITIES. TEMPORARY STOCKPILE AREAS THE SIME. KAPPA SIGMA FRATERNITY HEADQUARTERS BORDERS THE SITE ON THE EAST. RESIDENTIAL LAND IS WILL BE MAINTAINED FROM TOPSOIL THAT WILL BE STRIPPED FROM AREAS TO BE NORTH AND SOUTH OF THE SITE. , GRADED AND STORED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE OFFSI ZE LAND DISTURBANCE.' THE S111E WILL TIE INTO THE EXISTING ROADS OF AVINITY 1. THERE IS ALSO MINIMAL OFFSITE GRADING ALONG ON SITE AND SHALL BE STABILIZED WITH A TEMPORARY VEGETA77VE COVER. THE SOUTH BORDER INTO THE PEBBLE DRIVE ROW. PERMANENT SEEDING WILL BE PERFORMED FOR ALL AREAS WHICH WILL NO CRITIC: L AREAS.' LONGER BE EXCAVATED AND WHERE CONSTRUCTION ACTIVITIES HAVE CEASED. CRITICAL SLOPES ON -SITE WILL BE PROTECTED. CARE WILL BE TAKEN TO PREVENT THE EROSION AND PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL DENUDED AREAS SEDIMENTATION OF THE EXISTING GRADE AND TO PROTECT NEIGHBORING PROPERTIES WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELECTION OF SEED SOILS:' MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. TEMPORARY SEEDING SEE SOILS BOUNDARIES ON THE EROSION AND SEDIMENT CONTROL PLAN PHASE 1 SHEET, AND DESCRIPTIONS WILL BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT ON THIIS SHEET. FOR MORE THAN SEVEN DAYS THESE AREAS SHALL BE SEEDED WITH FAST SEQUENCE OF CONS77?UC77ON: GERMINATING VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. 1. NOTIFY ALBEMARLE COUNTY TO SCHEDULE A PRE -CONSTRUCTION MEETING AS REQUIRED. 2 NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE SELECTION OF SEED MIXTURE WILL DEPEND ON THE 77ME OF YEAR APPLIED. APPROVAL FROM THE INSPECTOR ON THE PROJECT. J. INSTALL THE PAVED CONSTRUCTION ENTRANCE WITH WASH RACK AS SHOWN ON THE PLANS. 3.01 SAFETY FENCE - SAFETY FENCE WILL BE INSTALLED AROUND ALL CONSTRUCTION ENTRANCE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PROPOSED SEDIMENT BASINS AND SEDIMENT TRAPS. PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) 3.02 CONSTRUCTION ENTRANCE - ONE CONSTRUC7ON ENTRANCE SHALL BE TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD INSTALLED AT WES7HALL DRIVE. THIS WILL BE THE ONLY POINT OF INGRESS SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPOR77NG TO A SEDIMENT CONTROL AND EGRESS TO THE SITE. CARE WILL BE TAKEN TO PROTECT ADJACENT DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT /S REMOVED /N THIS ROADWAYS FROM TRANSFER OF SEDIMENT. MANNER. INSTALL THE WASH RACK UPHILL FROM PROPOSED SEDIMENT TRAP #1. ACSA WILL DETERMINE 3.05 SILT FENCE- SILT FENCE WILL BE PLACED ON THE DOWNSTREAM SIDE OF THIE APPROPRIATE METHOD OF SUPPLYING THE WASH RACK. PARKING AND CONSTRUCTION ENTRANCE DISTURBANCE WHERE NOTED ON THE PLANS. AREAS SHALL BE CLEARED OF ALL VEGETATION, ROOTS, OR 07HER OBJECTIONABLE MATERIALS BEFORE 3.07 STORM DRAIN INLET PROTECTION- IP WILL BE INSTALLED ON EACH CONSTRUCTION ROAD STABILIZATION IS INSTALLED. 4. INSTALL THE INITIAL CONSTRUC7ON MEASURES AS SHOWN ON THE PHASE I EROSION CONTROL PLAN PROPOSED INLET AS SHOWN ON THE PLANS. SHEETS THIS INCLUDES 2 SEDIMENT BASINS, SILT FENCE, ROW DIVERSIONS DIVERSION DIKES, WALLS, AND 3.09 TEMPORARY DIVERSION DIKE- DIVERSION DIKES WILL BE USED AROUND THE DRAINAGE PIPES SHALL ALSO BE INSTALLED AT THIS TIME. STABILIZATION MEASURES SHALL BE APPLIED PERIMETER OF SITE DISTURBANCE WHERE SHOWN ON THE PLANS TO DIRECT TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. RUNOFF TO ON -SITE SEDIMENT CONTROL FACILITIES. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND 3.13 TEMPORARY SEDIMENT TRAP- TEMPORARY SEDIMENT TRAPS WILL BE DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES INSTALLED WHERE SHOWN ON THE PLANS. PLACE. 5. INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE PHASE I EROSION CONTROL PLAN. 3.14 TEMPORARY SEDIMENT BASIN- TEMPORARY SEDIMENT BASINS WILL BE 6. ONCE ALL THE EROSION CONTROL ITEMS HAVE BEEN INSTALLED AS SHOWN ON THE PHASE 1 EROSION INSTALLED WHERE SHOWN ON THE PLANS CONTROL PLAN AND THE INSPECTOR HAS APPROVED THE EROSION CONTROL MEASURES, THE CONTRACTOR 3.18 OUTLET PROTECTION- TO BE PROVIDED AT THE OU7FALL OF DRAINAGE CAN BEGIN GRADING OPERATIONS. PIPES WHERE SHOWN ON PLANS 7. ROUGH GRADE THE S17E TO THE CONTOURS SHOWN ON THE EROSION CONTROL PLAN. 3.19 RIPRAP- RIPRAP SHALL BE INSTALLED AS OUTLET PROTECTION WHERE 8. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN SHOWN ON THE PLANS. DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SMALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL 3.31 TEMPORARY SEEDING- TEMPORARY SEEDING SHALL BE APPLIED WHERE REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS PERMANENT STABILIZATION SHALL BE SHOWN ON THE PLANS. APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 3.32 PERMANENT SEEDING- PERMANENTLY SEEDING SHALL BE APPLIED WHERE 9. INSTALL THE CONSTRUCTION MEASURES AS SHOWN ON THE PHASE ll EROSION CONTROL PLAN SHEETS. SHOWN ON THE PLANS. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND 3.39 DUST CONTROL- DUST CONTROL SHALL BE APPLIED THROUGHOUT THE SITE DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES WHERE SHOWN ON THE PLANS PLACE. THE CLUBHOUSE, BYPASS STORM, AND UNDERGROUND DETENTION WILL NOT BE INSTALLED UNTIL AFTER UPLAND AREAS ARE SUFFICIENTLY STABILIZED AND SEDIMENT BASIN 1 FOOTPRINT CAN BE REDUCED. 10. INSTALL THE UTILITIES, CURB AND GUTTER, AND ROADS. INLET PROTEC7ON SHALL BE INSPECTED AFTER STORMWA TER MANAGEMENT EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES STORMWATER RUNOFF QUANTITY WILL BETREATED ON -SITE THROUGH THREE NE MUST ONa THE STONE M ITS FUNCTION, CiLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS DRY TREATMENT SWALES AND TWO BIORETENT70N BASINS WITH DOWNSTREAM BE PULLED AWAY AND CLEANED AND/OR REPLACED. INSTALL ANY REMAINING EROSION CONTROL ITEMS DETENTION. SEE STORMWATER MANAGEMENT PLAN SHEETS AS SHOWN ON THE PHASE ll EROSION CONTROL PLAN. 11. UPON INSPECTOR APPROVAL,. SEDIMENT BASIN 1 MAY BE REDUCED IN FOOTPRINT TO ALLOW THE CLUBHOUSE, UNDERGROUND DETEN7ON SYSTEM, AND BYPASS STORM SEWER TO BE INSTALLED. 12, ONCE PHASE II OF CONSTRUCTION IS COMPLETE, THE SITE IS STABILIZED AND THE INSPECTOR HAS GIVEN APPROVAL, THE CONTRACTOR CAN REMOVE THE EROSION CONTROL MEASURES. NO ITEM SHALL BE REMOVED UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PERMISSION. 13. MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE W17H THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. MAINTENANCE, 14. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS IN GENERAL, DURING CONSTRUCTION THE RLD OR CONTRACTOR ON -SITE WILL CHECK OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED ALL EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY SIGNIFICANT RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. NEEDED. SPECIFIC ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS.' a. SEDIMENT BASINS AND/OR TRAPS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK. b.ALL INLET PROTECTION AND GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP THAT WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE GRAVEL WILL BE REMOVED AND CLEANED, OR IT WILL BE REPLACED. c. ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR D. ENT SHALL DEIFRIORA77ON THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT OF FA Q BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO 77-IE TOP OF THE BARRIER. d. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FER77LIZED AND RESEEDED AS NEEDED. IN CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD WILL BE DETERMINED THE TIME THE OR CONTRACTOR ON SITE. THE CONTRACTOR WI DETERMN AT CONTRACT IS AWARDED. IN ADDIT70N THE OWNER MAY BE CONTACTED, MR. ALAN TAYLOR. UPON COMPLETION OF THE PROJECT, THE OWNER WILL BE RESPONSIBLE FOR SITE MAINTENANCE. CUR INLET ---� v CONCRETE BLOCK WIRE SCREE�_TFN� GRAVEL* FILTER OR 15 COARSE AGGREGATE. OBLOCK & GRAVEL CURB INLET Q IP SEDIMENT FILTER 3'Q�-8 NO SCALE rLa ALBEMARLE COUNTY NSTRUC 10N ENTRANCE TO sv$EDrMrA&A Ecrs flow 70' MIN. r SM-ZA ASPHALT 70P COURSE 2x-- v /STING PAVEMENT DIVERSION D�CHI SIDE ELEVATION AGGREGATE BASE 70' MIN. EX. CURB OR ASPHALT PAVED wAsnRAa< EDGE OF PAV'T t 3 12, MIN. EXISTING PAVEMENT H P05� ORFus4E DIVERSION0(T MINIMUM WIDTH AT TPPIto NGBr OEME DESIGN WATE ELEVATION IS .0' PLAN VIEW MUST EXTEND MILL WIDTH OF INGRESS AND E RESS OPERATION SET 1 1/2- WATER HYDRANT PATH FROST - 12' MIN. PROOF HYDRANT 3' A80VE GRADE AND 4' OFF EDGE OF PAVEMENT. 2% _ SECTION A -A NOTE: A MINIMUIA WATER TRAP OF 1" IS REQUIRED WITH A INIMUM WASH HOSE: OIA. OF 1.5" PAVED TEMP CONS/' &M I�AGI SrALE N.T.S. TABLE 3.31•11 ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS' Rate Eaanting Dates species Ibs. re Sept. 1- Feb. 15 50150 Mix of Annual Ryegrass (Lolium multi-florum) & 50 - 100 Cereal (Winter) 1Zye (Secale cereale) Feb. 16 - Apr. 30 Annual Ryegrass 60 - 100 (ulium m lu ti-florum) May 1 - Aug 31 German Millet 50 (Sc L tSctaria italic to ca) Source: Va. DSWC SCOTT R. COLLINS-Z;` No. 35791 jONAL ����� z w z O 2 E n- V V �: r w vu) w m z z Ce z O O Q n� ce ~ w w ® H H f1 t k�l /ate. !J LL w w w rvo ry., ,-1 w Q O n v N ,-1 Ul Z C'O C'M N CY) N' 0 a) N Q W J W H 0 ry Q U I W V / W �wN t1. i- W r�// ry 0 0 N � w O rz vJ W 0 `W z I 0 010-0 F_ z 0 U H z W 0 �W VJ z 0 U) 0/ L.L. W W w 2 JOB NO. 092033 SCALE 1"=50' SHEET NO. 8 o � z o� 0w �W �z Qz �w 0 z C J O U C U 0 L � o v Q� C o N LEGEND LEGEND LIMITS OF LAND DISTURBANCE SILT FENCE PER VESCH 3.05 BOUNDARYLINE \ 'N V X SILT FENCE DIVERSION DIKE PER VESCH 3.09 OLLINS'Z DIRECTION OF FLOW SEDIMENT TRAP PER VESCH 3.16 U No. 35791 11h, 653.75 PROPOSED CONTOUR CONSTRUCTION ENTRANCE PER VESCH 3.02 flu DRAINAGE DIVIDE 'Al CULVERT INLET PROTECTION OUTLET PROTEC71ON PER VESCH 3.18 CULVERT INLET PROTECTION PER VESCH \ _-~-3.08 - IN/| ' \ \ DRAINAGE WAY | \ \ 1992 3.01 PROPOSED SAFETY FENCE r-ANSTALL SIGNS "WARNING: SAF QUICK SAND, KEEP OU, MERGENCY SPILLWAY ' /)c \pROPO3ED 24' CL. || RCP BARREL ' ` ' ' LU 'PRQFIL ' ' ' LLJ ` -- `iz ` '- - 01 ' ' ` » tovo | v| | | K uu U ,+ | -~ | -+ T SEDIMENT BASIN SB-1 SCALE. 1 J>i40' _ _..PROPOSED SAFETY FEINCE J NSTALL SIGNS "WARMING: ..,QUICK SAND, KEEP OUT" • �-X � `• � PROPOSED 50' EARTHEN-'_ MERGENCY SPILLWAY >..... .... ono \a PROPOSED 24" CL. RCP BARREL .� ' t \ INV IN=487.0(0\\ I / \ ]N_V OUT=486..63 \ ROPOSED 36" CL. III RCP RISER IM=495.25 1 \` W/HANSON ANTI -VORTEX TRASH RACK ..,\ SEDIMENT BASIN SB-2 SCALE. 1 "=40 -$ PROPOSED 15 CL. III RCP BAR =60';S=0.5% INV IN=486.00 INIVI OUT=485.60�,< }� �� �! �� i� PROPOSED 45' EARTHEN 2 f ,1g / i / >%i MERGENCY SPILLWAY J '/ :ELEV.=497.75 21 /Z. I �/ I PROPOSED SAFETY FENCE SAF NSTALL SIGNS "WARNING: /QUICK SAND, KEEP OUT„ U Sediment Basin ##1 Design M1H.I'YIfSPILLyyAY 2' 1MTHOUT CREST OF EMERGENCY SPILLWAY drainage area (acres) 7.22 DESIGN HIGH WATER basin volumes: (using 2' contour intervals) (25-M STORM ELE,41 elevation (ft) contour area (sf) volume (cy) O.W 486.00 629.0 0 WIN, 110, 487.00 968.0 29.3 ::_ RISER CREST 488.00 1365.0 72.3 " CRYSTORAGE --, 0£HATERi�lG °CAGE 490,00 2330.0 207.6 ' WET' STORAGE .: �''• 1l ' fir:::;:: 492.00 3482.0 421.4 494.00 4778.0 726.1 496.00 6240.0 1133,0 EDiMF q CLEANOUT Palm ' wEr STORAGE REDUCED TO 34 C.Y./ ACRE) 497.25 7254.0 1445.0 wet storage: wet storage required (cy) (67*DA) 483.7 design high water (ft) 496.25 dewatering orifice elevation (ft) 492.41 top of dam (ft) 497.25 wet storage provided at this elevation (cy) 484.0 top width of dam (ft) 10.0 available volume before cleanout (cy) (min. 34*DA) 245.6 bottom of basin (ft) 486.00 cleanout elevation (ft) 490.35 approx bottorm dimensions: 14.5'x67.7' distance from cleanout to orifice (ft) (> V) 2.06 upstream face slope: 2:1 downstream face slope: 3:1 dry storage: dry storage required (cy) (67*DA) 483.7 baffles: NO principle spillway crest (ft) 495.25 length of flow„ L (ft) 120 dry storage provided at this elevation (cy) 484.0 effective Wdtth, We (ft) 29 diameter of dewatering orifice (in) 5.0 L / We (bafflles not required if > 2) 4.14 diameter of flexible tubing (in) (orifice+2") 7.0 collars: YES runoff: depth of water at spillway crest (ft) 9.20 C (use 0.45 for bare earth) 0.45 slope of upstream face (Z:1) 2:1 to (min) 13.2 slope of barrel (Sb) 0,500/G 1 2yr 3.7 Q 2yr 12,0 length of barrel in saturated zone (Ls) 66.34 1 25yr 5.4 Q 25yr 19.3 number collars required 2 dimension of collars 4,8'x4.8' principle spillway - available head (ft) 1.00 emergency sipillway: YES diameter riser (in) 36 required capacity (Q25-Qp) (cfs) 0.0 spillway capacity, Qp (cfs) 30.00 bottom width (ft) 50 diameter trash rack (in) 54 slope of exist channel (ft/ft) 33% barrel length (ft) 73 minimum length of exit channel (ft) 16 head on barrel through embankment (ft) 9.62 crest of spillway (ft) 496.25 diameter of barrel in 24 Sediment Basin #2 Design drainage, area (acres) basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) 492.00 4165.0 494.00 6137.0 4.96.00 8487.0 497.00 9875.0 498.00 11412.0 49900 12803.0 we_ storage: wet storage required (cy) (67*DA) dewatering orifice elevation (ft) wet storage provided at this elevation (cy) available volume before cleanout (cy) (min. 34*DA) cleanout elevation (ft) distance from cleanout to orifice (ft) (> T) d storage: dry storage required (cy) (67*DA) principle spillway crest (ft) dry storage provided at this elevation (cy) diameter of dewatering orifice (in) diameter of flexible tubing (in) (orifice+2") runoff: C (use 0:45 for bare earth) to (min) 12yr 3,8 Q 2yr 125yr 6.6 Q 25yr principle spillway: available head (ft) diameter riser (in) spillway capacity, Qp (cfs) diameter trash rack (in) barrel length (ft) head on barrel through embankment (ft) diameter of barrel (in) 5.16 DESIGN HIGH WATER (Z-YR. STORM ELEV.) volume (cy) 0 379.2 • GRY - STORAGE 918.5 1258.2 ` A'ET ' STORAGE 1652.1 2100.2 EOttJEtR c�EaWauT P�olrfr �' WEI " STgtL10E REDUCE° TO 34 C.Y,/- FCRE)r MIM.t'WISPILLWAY CREST OF EMERGEMGY x' WITHour SPILLWAY --------- ----- RISER CREST DEWATM4 345.7 design high water (ft) 498.00 494.00 top of dam (ft) 499.00 379.2 top width: of dam (ft) 10.0 175.4 bottom of basin (ft) 492.00 492.93 approx. bottom dimensions: 4VX123' 1.07 upstream face slope: 2:1 downstream face slope: 3.1 345.7 baffles: NO 495.70 length Of flow, L (ft) 151 458,4 effective width, We (ft) 56.21 4.0 L / We ((baffles not required if > 2) 2.69 6.0 collars: YES depth of water at spillway crest (ft) 3.70 0.45 slope of iupstream face (Z:1) 3:1 12.6 slope of (barrel (Sb) 0.50% 8,7 length of barrel in saturated zone (Ls) 22.65 14.0 number collars required 2 dimension of collars 3.TxC3.V 1.00 emergency spillway YES 30 required capacity (Q25-0p) (cfs) 0.0 24 bottom width (ft) 45 42 slope of exist channel (fYft) 33% 80 minimum length of exit channel (ft), 17.8 12.15 crest of spillway (ft) 497.75 15 SCALE V:1"=5 H:1 "=5 TRASH RACK TO B INSTALLED O ALL ORIFI ES PER VSMH TECH ICAL. B LLETI #7 515 ORIFICE COEFFICIE T = 0.6 Y I 515 510 I 510 I � 505 PROPOSED 036" L. III RC': RISER F IM505 NTI-V w1H N RTEX TR, SH RAC 1 N FEZ 5" DEW TERING gRIFICE /7" TUB( G=492.4 CLEAN UT=490.35 ROPOS D IIY WIDE TOP O DAM 500 LEV. = 4 7.26 500 ` `Y WIDE GRASS LI ED MERGE CY SPIL-4_WAY CR ST LEV.=49 - . 57 I_-- - 495 --------- - ^ate€;. - »� CLAY ,- THi€ CORED DAM K EXISTIhIG-GROUND-WI-Tkl YED INTO 495 IL - PRO PRE-TR OSED ATMEN ( SC C RIFTED KEY FOR HESION b4ND 6" TOPSOIL " L. OIL M M RCP N. RI . _ - --------- c CHANNEL TRAP yi,'y INV IN: 4P7.0; a' K� INV OUT. 86.63 490 490 :::...:...:... ) =73'; s=q.5o°io - -BID rOM OF BASIN El 485 4s�oo 485 RISER-F WIDE, CONC. OTING-( EM�EDMEN IN. 18� EEP� " (RISER - _ _ --- -- I- --- - - ^� J HALL EX END 6" I TO FOO ING MIN.) EX. 0" SAN IT, RY 482 ` S WEIR PIPE 482 PROPOSED RI PRAP ENERGY > > W W It 0 DISSIPATE R OUTRA LL W W VDOT STD EC-1 CL. Al 0) o 0) RIPRAP W/ EOFAB IC 'n rtLO�t UNDERLA MENT L 8' W1=6; W =10; D=1 4' 10+00 10+50 11+00 11+50 12+00 12+25 SEDIMENT BASIN 1 TRASH RACKS T BE INSTrLLED ON ALL ORIFICES P R VSMH T CHNICAI BULLET #7 i 510 ORIFICE�COEFFII4IENT = 0. [ ` - -- 510 i i I 505 I 1 PROPOSED 0. ELEV/.=495.70 0" CL. III /HANS RCP RIS N CONC R RIM ETE 505 _________-___ i I - ANTI VORTEX 4" D WATERI TRASH RACK G ORIFI E W/6' T BING =4 4.00 ! I i I CLEF NOUT=4 2.87 _-- --_ _ _ _- ___ -� ----- ----- - -------E•---- i ----- ..__- - I PF ----�--- Zf OPOSED -DAM-EL�.V-= 10' WIDE 499' TOP - 500 `31 I I 45' IDE GRASS } LINER 500 _ _ _ - _ ! I - _L _ EM RGENC SPILLW Y CREST PR POSED !- I PRE-T EATMEINT l j I I i I CLAY CORED RED DAM KEYED INTO R PRAP j EX STING -ROUND ITH 1' ----- - - -I ---i -- -- -� _THE I SCAR' ED KEY OR SOIL C ANNEL-- --- ----- 495 E f i `<<'<<_<;' ` COHESIION AND " TOPSO L MIN. 495 01 490 I BOTTQM OF I I : F 5j 4 5/ z " n,Y .. ,.. I 490 _-_------- --BA-SIN- -i- `' ------- -- -- i i 485 RISER FOOTIN (MIN. 18' DEEP, 1 1 485 72" DE CON�C. EMBEDMENT - (RISE R SHALL XTEND " INTO FOOTING MIN.)- VDOT STD. 482 015" CL. III RCP ! EW-1 482 I I BARREL > > W W � N to � INV INV IN:. 485. OUT. 485.6 � 00 PROPOSED RIPRAP ENERGY DISSIPATER J � CV n cV L=80 ; S=0.50% N OUTFALL VDOT ST . EC-1 C Al W W 0 0 0) rn 0) RIPRAP W/GEOFABRIC NDER MENT W ( LID L=28; W1=7; W2 11'; D=1. ' 10+00 10+50 11+00 11+50 12+00 SCALE: v:1"=5' SEDIMENT BASIN 2 H:1"=50' 12+50 13+00 13+25 �TH0F� SCOTT R. COLLINS'Z No. 35791 111�- '.oho 1p tu' ��4 ,�,',�• z z O E a~ Q O O V V w W w m z z Z O O f=- Z J U U Z o W W ® H C1 O (n z a o 0 �N w w r/ Q� ce In Lr, l0 "0 w ,-I ,--I ,•-I QO n Lr) N CD