Loading...
HomeMy WebLinkAboutARB202000069 Correspondence 2021-01-26 Margaret Maliszewski From: Mark Kestner <mark@henningsenkestner.com> Sent: Tuesday,January 26, 2021 3:01 PM To: Margaret Maliszewski Cc: Caleb Snyder Subject: RE: Sleep Number- material substitution package CAUTION:This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Margaret, Please disregard the earlier document sent on 1/12/21 and replace it with the current. Thanks, Mark Mark A. Kestner, AIA, NCARB, Principal 1108 East High Street-Charlottesville, VA 22902 Tel 434 971 7202- Fax: 434.295.2413 www.henningsenkestner.com H E-1N N-I.N:OS E.N KES TIi B R, AE2C t7"ECTS From: Margaret Maliszewski<MMaliszewski@albemarle.org> Sent:Tuesday,January 26,2021 2:31 PM To: Mark Kestner<mark@henningsenkestner.com> Cc:Caleb Snyder<caleb@henningsenkestner.com> Subject: RE:Sleep Number-material substitution package Mark and Caleb, Do you want the 4-page document emailed to me on 1/12/21 to be combined with the set of drawings emailed on the 25th?Or does the more recent set replace the earlier one? Thanks. Margaret Margaret Maliszewski Planning Manager, Department of Community Development Albemarle County 1 From: Mark Kestner<mark@henningsenkestner.com> Sent: Monday,January 25, 2021 11:56 AM To: Margaret Maliszewski<MMaliszewski@albemarle.org> Cc:Christian Henningsen<chris@henningsenkestner.com>;Caleb Snyder<caleb@henningsenkestner.com> Subject:Sleep Number-material substitution package CAUTION:This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. i Hi Margaret, Thank you for the feedback at the last meeting. Please find the link below to our revised package attached for discussion. At this point we are proposing the dark blue stucco (which we dofeel is compatible and acceptable to be used in this area) in lieu of the metal panel. We have introduced dark bronze metal on all horizontal linear surfaces including all canopies. This was an alternate material suggested at the meeting and we agree with it. Other than these two items,the building remains unchanged from the approved scheme. Please let me know if you have questions or need anything else at this time. https://www.dropbox.com/s/1vtxgmacf57s8he/1924-arb-amendment-210122.pdf?d1=0 Thanks, Mark Mark A. Kestner, AIA, NCARB, Principal 1108 East High Street-Charlottesville, VA 22902 Tel 434.971.7202-Fax: 434.295.2413 www.henningsenkestner.com .E 31>i 3t I$G.S E N K.'ES TN ER: :A4c1-1ITeCT.S 2