Loading...
HomeMy WebLinkAboutARB202000090 Application 2020-11-02 Application and Checklist for Sign Permit -41e Part C:Submittal Items Required Part A:Applicant and Parcel Information Note:Submittal packages must contain 4 collated copies of all information unless otherwise indicated. Additional submittal Project Name• Aldi at Albemarle Square Adare.a: 100 Albemarle Square materials may be required if review by the Architectural Review Board is necessary. Applicants will be notified if additional materials or ARB review are required. Tax map and parcd(s): 06100-00-00-12300 zoning. PDSC Contact(Who should we call w/questions?)Name KEVIN SCHAFER Business Name DESIGN DEVELOP LLC SECTION 1:FREESTANDING,SUBDIVISION OR DIRECTORY SIGNS Address 418 E.MAIN STREET City CHARLOTTESVILLE state VA Zip 22902 Daytime Phone(434)665-4144 Fax#( ) E-mail KSCHAFER@DESIGNDEVELOPLLC COM A. Submittal Requirements ❑ Site plan or latest approved plat showing,to scale,the proposed location of the sign(s)with dimensions. Contractor Name: Business Name ❑ Distance from the sign to the property lines and/or edge of the VDOT nght-of-way Address City State Zip ❑ A footing/foundation diagram showing how the base or pole will be anchored in the ground Daytime Phone( ) Fax#( ) E-malt ❑ If the sign will be located in an easement,a letter of approval from the easement holder will be required ❑ A to-scale color illustration of the proposed sign showing Business Owner Name:JUSTIN SPRUILL Business Name ALDI ❑ Dimensions of the sign,including overall height from the ground,cabinet size,length,width and depth,base size,etc (Be sure to also include these dimensions on the diagrams provided in the Sign Permit Application packet) Address 6801 ALDI WAY City PETERSBURG State VA Zip 23803 ❑ Proposed lettering and/or graphics in their proposed location Daytime Phone(804)362-0828 Fax#( ) E-mad JUSTIN.SPRUILLOALDLUS ❑ Entrance Corridor Requirements If the sign is to be constructed in an Entrance Condor,consult the Entrance Condor Sign Guidelines at www alhemarle.org/arb for design requirements Provide a color illustration of the front and side elevations of the sign showing Part B:Determining application requirements and fees o If internally illuminated,indicate which areas of the sign are opaque and which are illuminated.Internally 1. Sign Permit—Please indicate which sign type you are applying for: illuminated cabinet signs must have opaque backgrounds (Opaque matenals don't allow light to pass through ❑ Freestanding or Monument Sign $91 64 When lit only from behind,the color of an opaque matenal cannot be detected nor can objects be seen through it) o Identification of proposed materials and colors Include standard color id numbers(Pantone,Benjamin Moore, ❑ If a footing is required,an additional fee is required $32 64 Acrylic,etc)for all materials,text,graphics,base,faces,trim caps,returns,etc ❑X Wall Sign(Including property,awn mg,fuel pump canopy signs) $91 64 o If colors other than Pantone equivalents are identified,provide accurate physical samples of all colors proposed, ❑ Sign Refacing $59.00 preferably in the matenal proposed.(Paint chips that accurately reflect the proposed colors are acceptable) 2. Electrical Permit—Will the sign be illuminated? o Provide a site plan showing proposed landscaping around the sign,including botanical names and planting sizes. o Additional submittal materials may be required if review by the Architectural Review Board is necessary (The © Yes (Illuminated signs require an electrical permit and an electrical schematic) S48.96 applicant will be notified if this requirement applies) ❑ No $ 0 00 3. ARB Review—Will the permanent sign(s)be constructed in an Entrance Corridor? (Go to www albemarle org/arb for more information) B. Inspection Requirements for Freestanding,Subdivision or Directory Signs ❑ Yes (This sign will be constructed in an Entrance Corridor and it does not meet the criteria of an S 129 00 approved Comprehensive Sign Plan See ARB requirements next pages) ❑ Applicant must mark the location of the property lines and the location of the sign with stakes in preparation for a preliminary zoning inspection.(All four corners of the sign must be marked with stakes that are easily visible to all El Yes (This sign will be constructed in an Entrance Corridor and it does meet the criteria ofa Waive Fee Comprehensive Sign Plan(CSP) Write the name of the CS?here: ALBEMARLE SQUARE Inspectors) See ARB requirements next pages For more info on CSPs,go to the link at virse alhemnrle org/arb ❑ A preliminary zoning inspection must be completed to venfy the location of the sign before the permit can be 0 No (This sign will not be constructed in an Entrance Corridor) $0 00 issued O Freestanding signs are required to have footing inspections (scheduled by applicant) FEE TOTAL(Please add all the amounts checked in sections 1—3) $ 0 Freestanding signs are required to have electrical inspections if illuminated (scheduled by applicant) FOR OFFICE USE ONLY BP# ARB# ❑ Freestanding signs are required to have final building and zoning inspections (scheduled by applicant) Fee Amount$ Date Paid By who? Receipt# Check it By County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126 SECTION 2:WALL SIGNS SECTION 4:WORK VALUATION A. Submittal Requirements A. Work Valuation S ® A drawing,to scale,showing dimensions of the sign(length,height,depth). ElElevation drawing(s)or modified photograph of the entire building,to scale and in color,showing Part D: Applicant Agreement ® The sign location on the building,sign height above grade,and the length of building frontage.(Be.sore to also Applicant must read and sign laclude these dimensions on the diagramt provided in Appendix B.) • Each application package must contain 4 folded copies of all plans and documents being submitted. Only 1 set of ® Sign lettering and/or graphics in their proposed location material/color samples is required. All submittal items become the property of Albemarle County Applicants are encouraged to maintain duplicate copies in their own files l Entrance Corridor Requirements: If the sign is to be constructed m an Entrance Comdor,consult the Entrance • The application package is not complete without this checklist,completed,signed,and included with the required Comdor Sign Guidelines at www.alhemarle,orgtait for design requirements Provide a color illustration of the front submittal materials indicated on the checklist. and side elevations of the sign showing. o Indication of sign type(channel letters,cabinet panel,etc) I he by certify that the information provided on this application and accompanying information is accurate,true and car et to the best of my knowledge and belief and contains all information required by these checklists o Indicate on the drawings the proposed materials and colors Include standard color identification numbers (Pantone,Benjamin Moore,Acrylic,etc)for all matenals,text,graphics,faces,trim caps,etc For channel letter .�. 1 1/02/2020 signs,indicate on the drawing that the raceway color shall match the color of the wall to which the raceway is attached. Sign ure of person completing checklist Date o If colors other than Pantone equivalents are identified,provide accurate physical samples of all colors proposed in the sign,preferably in the material proposed.(Paint chips that accurately reflect the proposed colors are KEVIN SCHAFER,R.A. 434-665-4144 acceptable) o If externally illuminated,indicate the location of proposed light fixtures and provide manufacturer's cut sheets Printed Name/Title Daytime phone number of Signatory descnbmg illumination type,intensity,style,shielding,color,and height.All lighting must meet ordinance requirements as outlined in Section 4 17 County of Albemarle Department of Community Development o For internally illuminated signs,indicate which areas of the sign are opaque and which are illuminated (Opaque 401 McIntire Road North Wing,Charlottesville,VA 22902-4596 matenals don't allow light to pass through When ht only from behind,the color of an opaque material cannot be (434)296-5832 Tel,(434)9724126 Fax detected nor can objects be seen through it.Internally illuminated cabinets must have opaque backgrounds 1 www.albemarle.org B. Inspection Requirements for Wall or Projecting Signs x❑ Wall and projecting signs are required to have electrical inspections if illuminated.(Scheduled by applicant) Pti Wall and protecting signs are required to have final building and zoning inspections (Scheduled by applicant SECTION 3:ILLUMINATION REQUIREMENTS A. If the proposed sign is to be illuminated,the applicant must provide the following: ® Electrical permit ® Electrical schematic ® The location of proposed light fixtures identified on a plan and/or elevation El Manufacturer cut sheets describing illumination type,intensity,style,shielding,color,and height.All lighting must meet ordinance requirements as outlined in Section 4 17 of the Zoning Ordinance COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information, please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski, Principal Planner DATE: 11/02/2020 PROJECT NAME: Aldi at Albemarle Square Submittal Type Requiring Revisions ( ) indicates County Project Number # Copies Submittal Code Erosion & Sediment Control Plan (E&S) Mitigation Plan (MP) Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/public comparison (PRR) Private Road Request— Development Area (PRR-DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP-CP) Reduced Concept Plan (R-CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D-GWMP) Final Groundwater Management Plan (F-GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB-2020-90 1 (digital) Other: Please explain (For staff use only) Submittal # Distribute To: Submittal # Distribute To: Code Copies Code Copies ARB 1 Margaret Maliszewski 418 EAST MAIN STREET, CHARLOTTESVILLE, VA 22902 www.designdevelapllc.org • 434.804.8365