Loading...
HomeMy WebLinkAboutSDP201800017 Review Comments Letter of Revision 1 2019-04-17 1\GYIGvv .7Vr`LV IOVVV II iviajur .rnenurnent Jo Project(dame: KESWICK HALL CENTF ENERGY PLANT DEMO & RENOVATION Date Completed: Wednesday, April 17. 2019 Department!Division:Agenc_.: Review Status: Reviewer: hn Anderson v I CDD Engineering Requested Changes "] 1. Please revise index Strikethrough sheets not included with LOR(ESC sheets for example) 2. Note 1 Engineering does not review or consider design parameters proposed mechanical systems or equipment. or possible error of design relating to Central Energy Plant (CEP; plan section site layout notes or details shown on sheets PS- 4, PS-5 3. Note 2 Provided design revisions shown on C4 5 and C4 6 (related primarily to location or ratings of electrical pull boxes) meet Virginia Uniform Statewide Building Code (USBC) Engineering has no objection C4 5 and C4 6 do not alter utility corridor relative to approved WP0201800023 (Keswick Hall Central Energy Plant and Demo) and has no effect on compliance review or approval of land use types areas of disturbance ESC measures, SV/r i calculations. etc approved with WP0201800020 Keswick Hall Additions and Site Improvements.' Page: 11 Count:of Albemarle Printed On: 104/18/2019