HomeMy WebLinkAboutWPO202100036 VSMP - SWPPP 2021-06-30 (2)ov ALP COUNTY OF ALBEMARLE
Department of Community Development
o P 401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Tel. (434) 296-5832 • Fax (434) 972-4126
�'IRGLN�'
Stormwater Pollution Prevention Plan (SWPPP)
Project Name: 6889 Free Union Rd
Address: 6889 Free Union Rd
Free Union, VA, 22940
TM 7, Parcel 46
Prepared by:
Shimp Engineering P.C.
Prepared for:
Robert Robertson
SWPPP Preparation Date: 06/14/2021
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload
allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 1. Registration statement
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT #:
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM PLAN/ID #:
CONSTRUCTION ACTIVITIES (VAR10) TECHNICAL CRITERIA: 1113 ❑ IIC ❑
REGISTRATION STATEMENT 2019
Application type. 2 NEW PERMIT ISSUANCE
(CHOOSE ONE) ❑ MODIFICATION WITH ACREAGE INCREASE
❑ MODIFICATION WITHOUT ACREAGE INCREASE
❑ EXISTING PERMIT RE -ISSUANCE
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit).
Operator Name:
Robert Robertson
Contact person:
Robert Robertson
Address:
2910 Old Via Rd
City, State and Zip Code:
Charlottesville, VA, 22901
Phone Number:
434-531-5637
Primary and CC Email:
robrobert50@hotmail.com
B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES
and include a valid email. May we transmit correspondence electronically? YES 2 NO ❑
Section II. Construction Activity Information.
A.
Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site.
B.
Project site location information.
Construction Activity Name:
Driveway for Single Family Home
Address:
6889 Free Union Rd
City and/or County and Zip Code:
Charlottesville, VA, 22940
Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
New driveway off of existing gravel driveway at 6889 Free Union Rd
Latitude and Longitude
(6-digit, decimal degrees format):
38.227967,-78.588126
C.
Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest
one -hundredth of an acre. 2.32 ac
Total land area of development (include entire area to be
disturbed as approved in the Stormwater Management Plan):
2.32 ac
Primary estimated area to be disturbed (include portions with
Erosion and Sediment Control Plan approval only):
2.32 ac
Off -site estimated area to be disturbed (if applicable):
D.
Property Owner Status:
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE 2
E.
Nature of the Construction Activity Description (i.e. commercial,
industrial, residential, agricultural, environmental, utility):
Residential
F.
Municipal Separate Storm Sewer System (MS4) name(s) (if the
site is discharging to a MS4):
Albemarle County
G.
Estimated Project Dates (MM/DD/YYYY).
Start Date:
Completion Date:
H.
Is this construction activity part of a larger common plan of
development or sale?
YES ❑ NO 2
Rev 11/2020 PAGE 1 1 6
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
I. 6" Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page.
HUC
NAME(S) OF RECEIVING WATERBODY
020802040201
Buck Mountain Creek
Section III. Off -site Support Activity Location Information.
List all off -site support activities and excavated material disposal areas being utilized for this project. Include additional
areas on a separate page.
Off -site Activity Name:
none
Address:
City or County:
Off -site Activity Entrance Location (description, street
address and/or latitude/longitude in decimal degrees):
Latitude and Longitude (6-digit, decimal degrees format):
Is this off -site activity an excavated material disposal
area?
YES ❑ NO ❑
If this off -site activity is an excavated material disposal
area, list the contents of the excavated fill material:
No soil shall be transported to or from site
Will a separate VPDES permit cover this off -site activity?
YES ❑ NO ❑
Section IV. Other Information.
A.
A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the
Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been
prepared.
B.
Has an Erosion and Sediment Control Plan been
submitted to the VESC Authority for review?
YES 2 NO ❑
Erosion and Sediment Control Plan Approval Date (for
the estimated area to be disturbed MM/DD/YYYY):
C.
Has land -disturbance commenced?
YES ❑ NO 2
D.
Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications
(AS&S), attached the completed AS&S Entity Form.
AS&S Entity Name (if different from the Operator
identified in Section I):
E.
Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Billing Name:
Contact Name:
Address:
City, State and Zip Code:
Phone Number:
Primary and CC Email:
Rev 11/2020 PAGE 2 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large orsmall construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or(H) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed os follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sale proprietorship: by a general partner or the proprietor, respectively,- or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: N the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including thepossibili of fing and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date Signed:
Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please
send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP
Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authorityplease send to: If the locality is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
const ructionapC@deg.vi rgi n ia.goy
Rev 11/2020 PAGE 3 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
This Registration Statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. This form
covers the following permit actions: new permit issuance, existing permit modification with an increase in acreage, existing permit modifications
that result in a plan modification but do not result in an increase in disturbed acreage, and reissuance of an active permit coverage.
Application type. Select NEW PERMIT ISSUANCE to obtain a new permit coverage. Modifications are for modifying an existing, active permit
coverage. Select MODIFICATION WITH ACREAGE INCREASE when the previously approved acreage(s) increases (permit modifications are not
performed for decreases in acreage unless they result in plan changes — see Modification WITHOUT Acreage Increase). Select MODIFICATION
WITHOUT ACREAGE INCREASE when there is a change to the site design resulting in a change to the approved plans with no increase in acreage(s)
Select EXISTING PERMIT REISSUANCE to extend an expiring permit coverage for the next permit cycle and include the existing permit number.
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over
construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with
a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party
with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project
site that are necessary to ensure compliance with the general permit). If an individual person is listed as the operator, that person (or a legal
representative of) must sign the certification in Section V. An operator may be one of the following:
9VAC25-870-10. Definitions.
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a
large or small construction activity, operator means any person associated with a construction project that meets either of the following two
criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those
plans and specifications or (if) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance
with a stormwater pollution prevention plan for the site or other state permit or V5MP authority permit conditions (i.e., they are authorized to direct
workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context
of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4), operator means the operator of the regulated MS4 system.
"Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities,
and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or
country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates,
charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other
wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of
state waters in contravention of § 62.1-44.5 of the Code of Virginia, the Act and this chapter.
"Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state,
governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity.
B. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all
correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also give the operator the ability to pay by
credit card and to receive Dermit coverage aooroval letters immediately uoon Dermit aooroval.
Section II. Construction Activity Information.
A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances
and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or
topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your VSMP authority if
you have additional questions regarding site map requirements.
B. Construction Activity Name and location. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the
Stormwater Management plans), 911 street address (if available), city/county of the construction activity, and the 6-digit latitude and longitude in
decimal degrees format for the centroid, main construction entrance or start and end points for linear projects (i.e. 37.1234N/-77.1234W).
C. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest
one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the primary development site as approved on the
Stormwater Management Plans and the primary on -site estimated acreage to be disturbed by the construction activity as approved under the
Erosion and Sediment Control Plans. The off -site estimated area to be disturbed is the sum of the disturbed acreages for all off -site support
activities to be covered under this general permit. Do not include the off -site acreage totals in the primary, on -site total and estimated disturbed
acreage totals. Permit fees are calculated based on your disturbed acreage total for all on- and off -site areas being disturbed under this permit
coverage (the sum of all on -site and off -site disturbed acreages).
D. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e.
federal, state or local governments) is PRIVATE.
Rev 11/2020 PAGE 4 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
E. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may
choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation,
Institutional, etc.). Describe the post -construction use of the project (i.e. Commercial — one new office building and associated parking and
utilities; Transportation — Linear roads, sidewalks and utilities; Agricultural-3 Poultry Houses, etc.).
F. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or
completely), provide the name of the MS4(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city,
county, institute or federal facility where the construction activity is located.
G. Estimated project dates. Provide the estimated project start date and completion date in Month/Day/Year or MM/DD/YYYY format (i.e.
07/30/2019).
H. Is this construction activity is part of a larger common plan of development or sale? "Common plan of development or sale" means a contiguous
area where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-50.
Definitions. Le. a subdivision, commercial development, business park, etc.
I. 6th Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 6th order HUCs and receiving waterbody names, for
the primary site and any Off -site areas included under this permit coverage, that could potentially receive stormwater runoff discharging from this
activity. The HUC can be either a 12-digit number (i.e. 0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving
waters on a separate page. You may utilize DEQ!s web -based GIS application, VEGIS, to obtain this information.
• VEGIS application link: DEas VEGIS Mapping Application
• Instructions for utilizing DE(Xs VEGIS application link: CGP-GIS HUC Instructions
Section III. Off -site Support Activity Location Information.
This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards,
material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that (i) the support activity is directly
related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does
it serve multiple unrelated construction activities by different operators; (III) the support activity does not operate beyond the completion of the
construction activity it supports; (iv) the support activity is identified in the Registration Statement at the time of general permit coverage; (v)
appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all
applicable state, federal, and local approvals are obtained for the support activity.
Off -site activity name and location information. Provide a descriptive off -site project name, 911 street address (if available), construction entrance
location (address or decimal degrees coordinates and description), city/county and the 6-digit latitude and longitude in decimal degrees (i.e.
37.1234N, 77.1234W) of all off -site support activities. Indicate whether the off -site support activity will be covered under this general permit or a
separate VPDES permit.
If excavated material (i.e., fill) will be transported off -site for disposal, the name and physical location address, when available, of all off -site
excavated material disposal areas including city or county; 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N, 77.1234W) and the
contents of the excavated material.
List additional off -site areas to be included under this permit coverage on a separate page. Off -site areas not included on this registration will need
to obtain coverage under a separate VPDES permit.
Section IV. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the Registration Statement per 9VAC25-880. See
9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements.
B. If the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section II. C. has been submitted to the VESC Authority
for review and plan approval, choose YES. If you are submitting this application to reissue an existing permit coverage, please provide the date that
the VESC Authority approved the Erosion and Sediment Control Plan for the estimated area to be disturbed.
C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface
that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading,
excavating, or filling of land per §62.1-44.15:24. Definitions.
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form.
If the AS&S Entity is different from the operator identified in Section I. A., list the AS&S Entity Name. The AS&S entity is the entity or agency that
holds the approved annual standards & specification. Please indicate if this project is also requesting a plan waiver.
• AS&S Entity Form link: Annual Standards and Specifications Entity Information Form
Rev 11/2020 PAGE 5 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
E. Billing information. If the person or entity responsible for billing/invoicing is different from the operator, please complete this section. If they
are the same, leave this section blank.
Section V. Certification.
A properly authorized individual associated with the operator identified in Section I. A. of the Registration Statement is responsible for certifying
and signing the Registration Statement. A person must physically sign the certification, a typed signature is unacceptable. State statutes provide
for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be
signed as follows per 9VAC25-880-70 Part III. K. 1.:
a. For a corporation: by a responsible corporate officer. For the purpose of this part a responsible corporate officer means:
(i) A president secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who
performs similar policy -making or decision -making functions for the corporation, or
(H) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with
environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather
complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or
delegated to the manager in accordance with corporate procedures.
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this part
a principal executive officer of a public agency includes:
(i) The chief executive officer of the agency, or
(ii) A senior executive officer having responsibility far the overall operations of a principal geographic unit of the agency.
Section VI. Submittal Instructions.
Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority maybe either DEQ or your locality
depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for
additional submittal instructions. A blank area is provided for the Local VSMP Authority's mailing address.
Who is the VSMP Authority for my orofect? DEQ or the locality?
• DEQ: DEQ is the VSMP Authority and administers permit coverage for land -disturbing activities that are:
➢ within a locality that is not a VSMP Authority;
➢ owned by the State or Federal government; or
➢ utilizing approved Annual Standards and Specifications.
• The Locality: The local government (locality) is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ
as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. A list of Local VSMP Authorities is
available on DEQ's website here: Local VSMP Authority List.
www.deg.virginia.gov/Progra mslwate r/Sto rmwaterM a nageme nt/VSM PPerm its/ConstructionGenera I Perm it. aspx
Email the completed and signed form to:
constructiongp@deg.virginia.gov
Rev 11/2020 PAGE 6 16
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 3. Mature of activity
THIS PLAN IS FOR A DRIVEWAY TO A FUTURE SINGLE-FAMILY HOME. THE DRIVEWAY IS LOCATED OFF OF AN EXISTING GRAVEL
DRIVEWAY THAT CONNECTS TO FREE UNION RD.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 5. Stormwater Management Plan
1. ALL ONSITE RUNOFF SHALL BE ROUTED INTO EXISTING CHANNELS AT RATES THAT COMPLY WITH 9VAC2S-870-66-B(3).
SINCE RUNOFF RATES MEETS THE ENERGY BALANCED EQUATION, NO DOWNSTREAM ANALYSIS IS REQUIRED.
2. ONSITE RUNOFF SHALL BE MANAGED USING UNDERGROUND DETENTION.
3. WATER QUALITY WILL BE ADDRESSED BY A NUTRIENT CREDIT PURCHASE TO SATISFY 9VAC25-870-6S.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
B.
z5ources of ronutants. iocatrons, anu
Pollutant, or Pollutant Location on site Prevention Practices,
Generating Activity Control Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and on-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations
Roads and driveways
and absorbent/oil dry for all paving
machines to limit leaks ands ills
Direct concrete wash water into a leak -
Concrete washout and
Current location and detail shown on
proof container or leak -proof settling basin
cement waste
plan
that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting, and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing compounds.
Water shall be filtered, settled or similarly
Dewatering operations
Dewatering sites shown on plan
treated prior to discharge as shown on
Ian.
Designated areas for material delivery and
Material delivery and storage
Designated area shown on plan
storage. Placed near construction
entrances, away from waterways and
drainage paths
Material use during building process
Building areas
Follow manufacturer's instructions.MSDS's
attached.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
Current designated container areas on
waterway. Containers have lids covered
Solid waste disposal
plan
before periods of rain, or are in a covered
area. Scheduled collection to prevent
overfilling. MATERIALS NOT TO BE
BURIED ONSITE
Convenient and well -maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash Waters
Wash areas shown on plan
control as specified on plan. Minimize
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials
present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site
changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.)
D. Non-stormwater di!
Discharge
Dust Control Treatment
Pollutants or Pollutant
Constituents
chemicals
Location on Site
Designated areas and details shown on
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
E. Persons responsible for pollution prevention practices
To be determined when contractor is selected.
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response procedures as follows. To the extent practical, do
not store oils, chemicals, or other potential contaminants on site. When storage of potential contaminants is
required, provide secondary containment, such as spill berms or spill containment pallets. These should be
located within the drainage areas to a sediment trap or sediment basin. Direct concrete wash water into a settling
basin, dispose of hardened concrete with other construction waste debris to an appropriate waste facility.
Respond to all spills, leaks and discharges as follows. Spills of oil, petroleum products, sanitary wastes, and
substances listed under 40 CFR parts 110, 117, and 302 should be cleaned up as soon as possible while
protecting worker safety. Construct an earthen dike around any spills on dirt to prevent spreading. If a spill
occurs during rainfall, cover it with a tarp or another impermeable cover to prevent contaminating runoff. Do
not bury any spills or wash them with water. Maintain a spill kits in a readily accessible location. A spill kit
shall consist of a lined drum with bags of universal sorbents in the bottom, accessible without tipping the drum,
sorbent socks above the bags, and personal protective equipment on the top. All materials used to remove the
contaminants, including any water used to rinse equipment, and all dirt removed must be treated as
contaminated. Textiles, such as from coveralls, may be sent to a certified laundry facility. Waste must be
disposed of according to the standards of Albemarle County and the Commonwealth of Virginia. Store
hazardous materials and wastes in covered containers.
Report all spills, leaks and discharges as follows: All spills, leaks, and discharges shall be recorded in the
inspection logs. If construction activity results in a discharge of contaminants that may be reasonably expected
to enter surface waters, the operator shall notify the Department of Environmental Quality immediately or
within 24 hours, and shall submit a written report within five days. For significant spills that cannot be
controlled by personnel in the immediate vicinity, notify the local emergency response by dialing 911.
Albemarle County must also be notified, and potentially some of the following agencies: the Fire Department,
the Public Works Department, the Coast Guard, the Highway Patrol, the County Police Department,
Department of Toxic Substances, OSHA, etc. For spills of federal reportable quantities, in conformance with
the requirements in 40 CFR parts 110, 119, and 302, the contractor should notify the National Response Center
at (800) 424-8802.
G. Pollution Prevention Awareness
The engineer, project superintendent, and contractor shall have weekly meetings to review on -site conditions
and advise contractor of potential risks that should be addressed. Contractor will be responsible for following
procedures on a daily basis and applying appropriate waste management and prevention practices to be in
compliance with the conditions of the general permit. Employees shall be informed of the danger to nature and
to human health of various chemical spills.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 7. Discharges to impaired waters, surface waters within an applicable TNIDL
wasteload allocation, and exceptional waters.
Water discharges into an impaired water: Moores Creek. Moores Creek was listed as impaired due to Benthic-
Macroinvertebrate Bioassessments for E-Coli and Fecal Coliforms. Site work shall be in compliance with the
following requirements:
1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
final grade is reached on any portion of the site;
2. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
3. In accordance with Part I B 4 and Part I B 5, inspections shall be conducted as follows:
I. Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at
least once every five business days and no later than 48 hours following a measurable storm
event. In the event that a measurable stone event occurs when there are more than 48 hours
between business days, the inspection shall be conducted on the next business day; and
II. Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to exceptional waters.
Section 8. Qualified personnel
The following personnel are responsible for inspections:
To Be Determined. The Operator or duly authorized representative will serve as the qualified personnel This
may include delegating this responsibility to other contractors as they become involved with the project. The
SWPPP will be updated when contractor is hired.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 9. Signed Certification
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for knowing violations."
Owner/Operator Name: 77Robert Robertson
Company: zk WwhV4 ram
Title: W
Signature: Date: p /
Wa
Issued—10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 10. Delegation of authority.
Delegation of Authority
I, (name), hereby designate the person or specifically described position below to be a
duly authorized representative for the purpose of overseeing compliance with environmental requirements,
including the Construction General Permit, at the 2511 Avinity Dr. construction site. The designee is authorized
to sign any reports, stormwater pollution prevention plans and all other documents required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in
the Construction General Permit (CGP), and that the designee above meets the definition of a "duly
authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 11. General permit copy
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 12. Inspection logs
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County