Loading...
HomeMy WebLinkAboutSUB202100124 Other 2021-07-01 (2)SHIMP ENGINEERING, P.C. Design focused Engineering July 1, 2021 Adam Moore Virginia Department of Transportation 701 Vdot Way Charlottesville, Virginia 22911 RE: SUB2021-000XX Proffit Road Townhomes South — Road Plan Turn Lane Warrant Analysis Dear Mr. Moore, Please find attached a warrant analysis for Proffit Road Townhomes South. The final site plan proposes the development of 40 townhome units on Proffit Road, between Pritchett Lane and U.S. Route 29. The following items are included with this report: • VDOT 2019 Traffic Data • ITE Trip Generation Summary • Warrant Analysis Exhibits Please note that this analysis includes new trips generated by Proffit Road Townhomes North (SDP2020- 28). The attached analysis shows that a right nor left turn lane is warranted with this development. If you have any questions, you may contact me at justin(alshimp-engineerine.com or by phone at 434- 953-6116. Regards, Justin Shimp Shimp Engineering, P.C. m U JUFN9 M. SFIIMP j . 4518'PZ ��SSIONAL ENG� 912 E High Sr Charlottesville, VA 229021434 227 5140 1 shimp-engineering com 1. VDOT 2019 Traffic Data The following table provides VDOT 2019 traffic data on the 0.54-mile segment from Pritchett Lane to U.S. Route 29. The speed limit on this portion of Proffit Road is 35-mph. For further accuracy, estimated trips generated by the maximum 80-unit townhome development immediately north of the property, Proffit Road Townhomes North (SDP2020-28) has been added to the 2019 AADT and accounted for in this warrant analysis. Proffit Road 2-lane highway 0.54-mile segment 35-m h AADT 2019 8000 ITE Trip Generation Daily Total SDP2020-28 564 AADT Total 8564 K 0.11 D 0.543 Peak Hour Total 942 Peak Hour Direction A 512 Peak Hour Direction B 430 2. ITE Trip Generation Summary ITE Code Independent Variable AM PM Daily Total In I Out Total In Out Total Low -Rise 220 40 Units 5 15 20 16 10 26 262 Multifamily With 40 units proposed, there could be up to 5 trips occurring in the morning peak hour and 16 trips occurring in the evening peak hour. Based on the directional factor given by the VDOT 2019 AADT, right and left turns are likely evenly split in the eastern and western direction. Based on the data above, potential turning movements are highest in the evening, with 8 right tuns and 8 left turns into the property. The evening scenario was analyzed, when the highest number of turns would occur. Turns In Advancing Opposing % of Left Turns Morning Right 3 433 - - Morning Left 3 514 433 0.5% Evening Right 8 520 - - Evening Left 8 439 520 2% 3. Warrant Analysis Exhibits Given the existing background traffic, including Proffit Road Townhomes North, and the new trips generated by Proffit Road Townhomes South, right and left turn lanes are not warranted with this development. WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAY 800 = 700 o_ w 600 500 0 0 400 Z 0O 300 fl d 200 0 0 � 100 .wwuwwualt■v■wtowlow■wu■ - ■Iw■w■ ammummanowsmam . . .... ... ii ■■ Cw■■■■■■■■■■■LAtolulololo■Itu ■■■■■■■■■■■■■w\■■■■■■■■■■■■ iiiiiiiiiiiiipEeiiiiiiiiiii m:ai �:m:::::::: ::::::::::::::::i':::::::::::::::::::::::�®::::' ■■■■■■■■w■■■w■■kvuuuuuw■ ■uuuuew■■. �ilo lowlowlo■ulolo■■■■■■■■■■■', iiiiiiiiiiiii■iiinv■ au luau toau■ ■ ■■�■■�■�M ■ww■■,, �Eii=i'. 1111 9Ba... :i:iii.ii�i■■i iiB9E9pE91Be: SEINES IN■M:::■w■:: I::::�LT■■:::::::■ '11 sivivi soon BOB; INIi! ORION i0iiiE iiu1ii�i� iiiiMENE l, i•i••::••:ic:::E:itSEEN ■:■..e wwwww■■o•touwwwwww■w cw Yw wv OW iuuV VA ADVANCING VOLUME (VPH) FIGURE 3-4 WARRANT FOR LEFT TURN STORAGE LANES ON TWO LANE HIGHWAY PHV APPROACH TOTAL VEHILIEa PER I R FIGURE 948 WARRANTS FOR RIGHT TURN TREATMENT (24ANE HIGHWAY) Appropriate Radius required at all Inteseotiure and EnVances (Cornmercial or Prviale). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adlus[ment for Right Turns For posted speeds at or under 45 mph, PHV right turns > 40, and PHV total < 300, Adjusted right turns = PHV Right Turns . 20 K PHV is not known use formula_ PIN = ADT x K x D K = the percent of AADT oocvmng in the peak hour D = the percent of traffic in the peak direction of lbw Not- An average of 11 % for K x D Will suffice. When rW tun f=Mm are mffwded, aee Fbure 3.1 for design Told : Rev. 1115