HomeMy WebLinkAboutSUB202000113 Review Comments Final Plat 2020-10-01Patricia Saternye
From: John Anderson
Sent: Thursday, October 1, 2020 4:30 PM
To: Patricia Saternye
Subject: Planning Application Review for SUB202000113 JPA TOWER INVESTORS, LLC -
EASEMENT . [ Engineering review comments ]
The Review for the following application has been completed:
Application Number = SUB202000113
Reviewer = John Anderson
Review Status = Requested Changes
Completed Date = 10/01/2020
This email was sent from County View Production.
Patty, thanks for your patience.
CV comments:
[ Note: There is no request for linework revision or further change to the BLA/easement plat, per se; items 8. /9. persist, but
are in process, with no further action required from Applicant at this time. ]
`1. Provide inset detail for D10. (Rev. 2) Addressed.
2. Revise table caption (or create new table) to reference courses along public drainage easement downstream of SWM
facility (dry retention basin): DI, D4, D5, D6, D7, D13, D14. [ ref. image sent with review comments ]. (Rev. 2) Addressed.
3. Revise public drainage easement widths per ACDSM easement width diagram, p. 15 (20' is minimum public drainage
easement width); link to ACDSM: https://www.albemarle.org/Home/ShowDocument?id=270. (Rev. 2) Addressed.
4. Revise table caption (or create new table) to reference courses along SWM facility easement (dedicated to public use;
proposed dry retention basin): D29 — D36. (Rev. 2) Addressed.
5. Provide retaining wall easement with recorded agreement (Albemarle not party to Agreement) since proposed new
boundary appears to locate portions of existing retaining wall on two commonly held parcels that may be separately owned at
some point in the future. Comment traces to building inspections requirements; county building inspections is aware wall is
existing. (Rev. 2) Addressed. Ref. email, September 17, 2020 3:29 PM, S. Blaine, Esq., Woods Rogers, PLC, to Brian Ray,
Paty Satemye, Michael Dellinger, et at [ Party Wall Agreement attached to email; okay to record with BLA /Easement plat. 1
6. Engineering recommends ownership data for adjacent properties. 14-302(A)15 may provide sufficient basis to request
data (Name, deed bk.-pg.) be displayed on the BLA for T.M. 60-25 and CSX Transportation, Inc. Engineering defers to
Planning. (Rev. 2) Withdrawn.
7. Revise plat title to reference easements as well as boundary line adjustment since plat establishes private /public
drainage easement, SWM facility easement, and public utility easements. (Rev. 2) Addressed.
8. SWM facility easement requires deed. Engineering will format deed once SWM facility Maintenance Agreement is
recorded (ref. also WPO202000030 review comments, 7/17/20, review item 3). (Rev. 2) Persists; no action required of
Applicant at this time. CDD staff in process of recording SWM Facility BMP Maintenance Agreement. Once recorded,
Engineering review staff will use Maintenance Agreement parcel and ownership information to format the SWM deed of
dedication, which may be recorded with the BLA and Easement plat (St 202000113).
9. Public drainage easement require., ..ced of aL nation of easement. Engineering will format deed once Maintenance
Agreement is, (Rev. 2) Persists, but in process. CDD staff in process of recording Maintenance Agreement (internal
email, September 30, 2020 10:13 AM). No further action at this time, on Applicant's part.'
Please share with Gwen Lacy, Brian Ray, Scoff Collins or others, as appropriate.
Engineering has not distributed comments to Applicant, surveyor, developer, etc.
Thanks again
best,
I Anderson 434.296-5832-0069