Loading...
HomeMy WebLinkAboutSP202000006 Checklist - Project Closeout (Administrative) 2020-08-19 SPECIAL USE/ZONING MAP AMENDMENT FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA for QC and status label. CDA will forward to the Imaging Center for digital closeout. SP ' MA#20 062600 6 PROJECT TITLE ( OC FULL NAME OF LEAD REVIEWER f r1 l�iahellafa-`F NAL ACTION DATE: e�/l ji��Z6 Hardcopy—File Folder Closeout: All documents listed should be placed in project folder in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imagmg Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Where applicable,please provide the digital location(path/name) of the document in the space provided. Application v ❑ Scan laved location ❑ Notification records/Abutting Owner correspondent v ❑ Scan Saved location ❑ Project Review-Correspondence to/from Applicant(including emails)/Review Comments ❑ Scan Oil-Saved location C-j/ n Engineering Folder-Information/documentation from Engin ermg Group ❑ Scan ❑ Saved location /ff xr Approved Plan/Code of Devement ❑ Scan Saved location C n PC and/or BOS Presentation Display Documents (Include Plan if not part of Staff Report) ❑ Scan •aved location C V ❑ White Envelope(Staff Report,PC Minutes,Executive Summary,Action Letter,Presentation documents) OR-Minutes/Presentation available by contacting Pb 1 epording Secretary El Scan 'rSaved location l&// ❑ At the planner's discretion, copies of unapproved plans may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan n Saved location N/A- n Other Items (Please explain) ❑ Scan ❑ Saved location ❑ Other Items(Please explain) ❑ Scan ❑ Saved location NOTES: SP/ZMA project folders will be accepted by the Imaging Center when the following items ire complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label(same font&label color as project label)placed under the project label to reflect current project status and date; 3) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Director of Planning for corrective action. Issued 2/16/2010,Revised 3/29/2010,Revised 11/12/2012