Loading...
HomeMy WebLinkAboutWPO201800077 Review Comments Mitigation Plan 2021-07-09�r County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT VSMP Permit Plan Review Project title: Old Trail Block 32 Project file number: WPO201800077 Amendment 2 Plan preparer: Ammy George [ageorge@roudabush.com] Owner or rep.: Dave Brockman [Dave@oldtrailvillage.com] Plan received date: 03 June 2021 Date of comments: 09 July 2021 Reviewer: Emily Cox 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296 -583 2 WWW.ALBEMARLE.ORG County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied/approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Mitigation Plan 1. Please only provide the cover sheet and any sheets with revisions. 2. [Sheet 11] There is a note that says a portion of the required area is addressed in areas 1 and 5 of the master plan. Isn't the ENTIRE required mitigation for block 32 covered in areas 1 and 5 of the master plan? Please clarify. 3. Please add a note similar to this ...... Proposed mitigation areas have been removed from this plan because they are addressed in the master plan WPO20190007. Please refer to WPO20190007 for required mitigation plantings" 4. Please add a note/narrative explaining why the original planting areas were not used and were not ideal locations for mitigation. Also, explain why the proposed areas in the master plan were a better location. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the Engineering Review Comments Page 2 of 2 approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, ajoint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org[govern ment/community-development/apply-for/engineering-applications