Loading...
HomeMy WebLinkAboutWPO202100033 VSMP - SWPPP 2021-07-07 ; ,,t ;,,.,,., COUNTY OF ALBEMARLE ;`-Ji �'lllll ' Department of Community Development =� -�' ` 401 McIntire Road, North Wing � _ 1 � Charlottesville, Virginia 22902-4596 "�`i�'' .,��,,��� TeL (434)296-5832 � Fax(434) 972-4126 i.�.� � Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Project Name_ Address 7369 Dyers Mill Lane Scottsville,VA 24590 Prepared by: Name_ Blackwell En�ineerin� Prepared for: Name_ Broc Troxell SWPPP Preparation Date: 7/2/21 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued— 10/2014 Stormwater Pollution Prevention Plan (S WPPP)Albemarle County C�NT'�'NZ'.S: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. ll. General permit copy 12. Inspection logs Issued— 10/2014 Stormwater Pollution Prevention Plan (S WPPP)Albemarle County Section 1. Registration statement (NI� .U� d _ ;��. _. ���`IT1����T�>: CO7 < . t '.,; I11 O 1�_!,tiil.lii�ll iTt:I�C1CI1T) Rev I 1/2020 PAGE 3 � 6 VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY pERMIT#: GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM pLAN/ID #: CONSTRUCTION ACTNITIES (VAR10) TECHNICAL CRITERIA: IIB ❑ IIC ❑ REGISTRATION STATEMENT 2019 Application type. � NEW PERMIT ISSUANCE (CHOOSE ONE) ❑ MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUTACREAGE INCREASE ❑ EXISTING PERMIT RE-ISSUANCE Section I. Operator/Permittee Information. A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit). Operator Name: Rittonhouse Excavating Contact person: ravis Rittonhouse Address: 631 Suncrest Dr. City, State and Zip Code: Scottsville�VA�24590 Phone Number: 434-981-2124 Primary and CC Email: B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card,you must choose YES and include a valid email. May we transmit correspondence electronically? YES ❑ NO 0 Section II. Construction Activity Information. A. Include a site map showing the location of the existing or proposed land-disturbing activities,the limits of land disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site. B. Project site location information. Construction Activity Name: roxell Poultry House Address: 7369 Dyers Mill Lane City and/or County and Zip Code: cottsville 24590 Construction Activity Entrance Location N37.836743, W78.546513 (description, street address and/or latitude/longitude in decimal degrees): Latitude and Longitude N37.832115° '�78.553514'° ' (6-digit, decimal degrees format): C. Acreage totals for all land-disturbing activities to be included under this permit coverage. Report to the nearest one-hundredth of an acre. Total land area of development (include entire area to be 399.71 disturbed as approved in the Stormwater Management Plan): Primary estimated area to be disturbed (include portions with 7.90 Erosion and Sediment Control Plan approval only): Off-site estimated area to be disturbed (if applicable): /A D. Property Owner Status: FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE ❑X E. Nature of the Construction Activity Description (i.e. commercial, industrial, residential,agricultural, environmental, utility): gricultural - Poultry Houses F. Municipal Separate Storm Sewer System (MS4) name(s) (if the N/A site is discharging to a MS4): G. Estimated Project Dates (MM/DD/YYYY). Start Date: 8/1/2021 Completion Date: 8/1/2022 H. Is this construction activity part of a larger common plan of YES ❑ NO ❑X development or sale? Rev 11/2020 PAGE 1 � 6 CONSTRUCTION GENERAL PERMIT(VAR10) REGISTRATION STATEMENT 2019 I. 6`h Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Indude additional areas on a separate page. HUC NAME(5) OF RECEIVING WATERBODY 20802031103 Middle James- Buffalo Section III. Off-site Support Activity Location Information. List all off-site support activities and excavated material disposal areas being utilized for this project. Include additional areas on a separate page. Off-site Activity Name: /A Address: City or County: Off-site Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Latitude and Longitude (6-digit, decimal degrees format): Is this off-site activity an excavated material disposal YES ❑ NO ❑ area? If this off-site activity is an excavated material disposal area, list the contents of the excavated fill material: Will a separate VPDES permit cover this off-site activity? YES ❑ NO ❑ Section IV. Other Information. A.A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities rior to submitting the Registration Statement. By signing the Registration Statement,the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been YES � NO ❑ submitted to the VESC Authority for review? Erosion and Sediment Control Plan Approval Date (for the estimated area to be disturbed MM/DD/YYYY): C. Has land-disturbance commenced? YES ❑ NO 0 D. Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications (AS&S), attached the completed AS&S Entity Form. AS&5 Entity Name (if different from the Operator /A identified in Section I): E. eilling information (leave blank if same as the Operator identified in Section I. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Billing Name: Contact Name: Broc Troxell Address: 7369 Dyers Mill Lane City,State and Zip Code: Scottsville, VA 24590 Phone Number: 570-4120364 Primary and CC Email: roxellfarms@gmail.com Rev 11/2020 PAGE 2 � 6 CONSTRUCTION GENERAL PERMIT(VAR10)REGISTRATION STATEMENT 2019 Section V.Certifitdtion. A person representing the operator as identified in Section I.A.and meeting the requirementsof 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that operator is defined in 9VAC25-870-10 as follows: "Opera[or"means[he owner or operator of any facili[y or activity subject to the Act and this chapter.In the con[ext af stormwa[er associa[ed with a large orsmall mnstruction ac[ivity, operatar means any person associa[ed with a construction project that meets eitherof[he follawing two cri[eria:(i)fhe person hos direct opera[lonal control over tanstruttion p/ans and spetifications,induding � the obility[o make modifica[ions to those p/ans and specifications or(iiJ the person has day-[o-day operational control of those acfivities at o projed[hot are neressary[o ensure compliance wi[h a stormwa[er pollution prevention plan foi the si[e or otherstate pe�mit or VSMP authority permit conditions(i.e., [hey are authorized to direc[workeis at a si[e to carry out activities required by the stormwoter pollution prevention p/an or comply with other permit condi[ionsJ. In [he context of stormwater discharges from MunicipalSeparate Srorm SewerSystems(Nl54sJ,opera[oi meons[he operataraf the regu/ated fv154 system. 9VAC25-SSO-70. Part III. K.Signatory Requirements. Regis[rotion Statemen[.A/l Registrotion Stotements sha/l be signed as follows: o. Fo�a mrpora[ian:by a responsib/e corporote offirec For the purpose of[his chapter, a responsib/e rorpoiate officer means:(iJ o president secre[ary, treasurer,or vite-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for[he corporation;or(ii)the manager of one ormore manufacturing,production,oroperating facilities,provided the manageris authorized to make management decisions that govern the operotion of[he regu/a[ed facility inc/uding having[he explicit or implicit duty of making major capital inves[ment recommenda[ions, and initiating and directing other comprehensive measures to assure/ong-term complionce with environmenta/lows and regu/ations;the manager can ensure that the necessary systems are established or ac[ions taken to gather comp/ete and accurate information for state permi[application requirements;and where authority to sign documents has been assigned or delegoted to the manager in accordance with corpora[e procedures; b. For a partnership orso/e proprietorship:by a genera/partner or the proprietor,respectively;or c. For a municipaliry,sta[e,federal, or other public agency:by either a principa/executive officer or ranking e/ected official. � For pu�poses af this chapter,a principo/executive officer of a public agency includes:(iJ the chief executive officer of the agency or(iiJ a seniar executive office�having responsibility far the overa/l aperotions of a principal geographic unit of the � agency. I Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this ' document and all attachments were prepared in accordance with a system designed to assure that qualified personnel J properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage p, � the system or those persons directly responsible for gathering the information,the information submitted is to the best � of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." �— Printed Name: ro � V' 7.�� � � Signature �signed m��k�: � � { Date Signed: 7—� "- o� l �i r — Section VI.Submittal Instruttions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please I � send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ.A list of local VSMP � � Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authoritv please send to: If the localitv is the VSMP Authoritv please send to: Department of Environmental Quality The Local VSMP Authorit insert address below Office of Stormwater Management Suite 1400 PO Box 1105 Albemarle County,VA 401 Mclntire Road Charlottesville, � Richmond VA 23218 VA 22902 434-243-7929 constructionspCa�deq vir�inia �ov Rev 11/2020 _ PAGE 3 � 6 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part 11, section C-) (Yrovidc a copy of thc DEQ covcra�c Icttcr�ehen obtaincd) Rev I 1/2020 PAGE 4 � 6 Section 3. Nature of activity (�L, ' . , .. .,�I�i��_�� tl�,�Ic.[IA _ aj l IJ C(111>T U�[��)Cl 'JCIIA�1CIl>. 1,'.��l��ll' i�f � ;ilCl' . � .il�(IU� �, J ti�l'�� l!�.' , .., ,�Uu�nrc Inclu�l� �tm� pha>in�� l Erosion sediment control measure to be installed first. Grading of building pad to proceed once measures are in place and stabilized with seed/mulch. Road to be graveled, and open areas to be seeded once grading allows. Construction of buildings to commence. Esc measures to be removed and seeded once county administrator allows. Rev 1 I/2020 PAGE 5 � 6 Section 4. Erosion and Sediment Control Plan. (��i l `- ll,i :i ��uL��..�. : �S�� COi�t i`7 TIl2 11:�tii iU�li ,.Il�; ,��C���11Cilt L OI1tI01 P�dll. �O 1]OT Cetel"eC1Ce OLlly.� Rev I 1/2020 PAGE 6 � 6 MINIMUM STANDARDS '°� 10' MIN � �� ���� � � Date: 3�21�21 1. Permanent or temporory soil stabilization shall be applied to denuded areas within seven days after final . ,<�C� rade is reached on an ortion of the site. Tem ora soil stabilization shall be a lied within seven da s to �� SANDBAGS 9 Y P P ry PP Y O � � O OR STAPLES denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent A J ` A stabilization shall be a lied to areas that are to be left dormant for more than one ear. � �� SCOIe: AS NOTED �� � �� O O 10 MIL PLASTIC SANDBAGS LINING i� 2. During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with 3do do � '. OR STAPLES ^ sediment trapping measures. The applicant is responsible for the temporary protection and permanent � ��� ��� 6' MAX 1:1 SIDE ti/� Designed by: NHK stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the PIPE OUTLET TO FLAT 10' MIN O SLOPE (TYP) � / � 3" project site. AREA WITH NO - EXCAVATE 4" X 4" TRENCH DEFINED CHANNEL UPSLOPE OF STAKELINE. � 3' MIN. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. �, �',. - - _ - ATTACH FENCE MATERIAL O O ' . GROOVING IS CUTTING FURROWS Drawn by: BWK Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, PLAN VIEW � -°-�� 'y � - - AND EXTEND INTO AND � ALONG THE CONTOUR OF A mature enough to survive and will inhibit erosion. � •< �xt , = ALONG BOTTOM OF TRENCH. SLOPE. IRREGULARITIES IN THE -�,G�, - - BACKFILL AND COMPACT O O O O SOIL SURFACE CATCH RAINWATER Checked b NHK 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap - '. �__- . EXCAVATED SOIL SECTION A-A AND PROVIDE SOME COVERAGE y� sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional �a� d �.rt , - A OF LINE, FERTILIZER, AND SEED. before upslope land disturbance takes place. '�^ °- �,�� 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions �% ~ � ' NOTES: PLAN immediately after installation. s ; ::_ ��---- FLOW 1. ACTUAL LOCATION DETERMINED IN FIELD GROOVING SLOPES � "" s , � 7 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area SECTION A-A 'r ; �- �n �,r ". ��1_. _ LIQUID AND/OR SOLID REACHES 757 OF THE STRUCTURES CAPACITY. NTS to be served by the trap or basin. �I � ��� � 3. CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARLY MARKED WITH SIGN � a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and / WASHOUT STRUCTURE ,.o• ,.5� � � the trap shall only control drainage areas less than three acres. FILTER CLOTH KEY IN 6"-9" � � b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal RECOMMENDED FOR TT r�. NTS .. � m � to three acres sholl be controlled by o sediment basin. The minimum storage copocity of a sediment basin ENTIRE PERIMETER SlLl F�NC� � �Ya� J� � � shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the a.� � o u structural inte rit of the basin durin a 25- ear storm of 24-hour duration. Runoff coefficients used in � n0 9 Y 9 Y PIPE OUTLET CONDITIONS (SHEET FLOW PROTECTION� ��� �` runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. NTS NTS h q�l`�. 2 5' � x � ap ¢ c FLOW� �_.:., V ry LL o0 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that _ � � Y N ,n c are found to be erodin g excessivel y within one year of permanent stabilization shall be provided with additionalv . "' EXCAVATED SOIL a � c '�^ m slope stabilizing measures until the problem is corrected. COMPACTED SOIL ��. � � � ��m 3 24" WIDE x 12" HIGH 24° WIDE x 12" DEEP ' ,�,�.�. �,� _- � `�\" > _ � N u permanenttrchaanelnflume�olrnslopeodra�Wstructu�e, fill slopes unless contained within an adequate temporary or PROPOSED DRIVE SF� 3 R��NjP�� F��W � � � � '� � > a m EXCAVATE FOR on�- SECTION ���E 5�� /��%��%���% � � TRAPPING FILTER LASS I � � � � � w� 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be P�o��ded. L E G E N D ��� �'�` ��'�� - - - - � _ � � 'm FABRIC RIPRAP NTS VDOT #3. #357, #5, #56 OR #57 COARSE '- f0 � v - 10. All storm sewer inlets that are made operable during construction shall be protected so that EXISTING BUILDING �� � � T>tr�.-�-�' --z - ; AGGREGATE TO REPLACE SILT FENCE IN = w �� c �@ sediment-laden water cannot enter the conve ance s stem without first bein filtered or otherwise treated to � � � � � � � r � remove sediment. Y Y 9 PROPOSED BUILDING � "HORSESHOE" WHEN HIGH VELOCIN OF W �n x a w PROPOSED ROAD/EOP t � TYPICAL DITCH SECTION FLOW IS EXPECTED 11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet EXISTING ROAD . T._���:. '` - ��` -,TT, ,TT, � ., � NTS DIVERSION CULVERT INLET PROTECTION STONE protection and any required temporary or permanent channel lining shall be installed in both the conveyance � " � -. � -.-. � channel and receiving channel. APPROXIMATE PROPERiY LWE � � � NTS COMBINATION 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, 0 GRAVEL AREA BASE AGGREGATE, COMPACT SUB-GRADE TO NTS control sediment transport and stabilize the work area to the greatest extent possible during construction. 0 CONCREfE AREA 6" OF #57 STONE 95% PROCTOR DENSITY Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be Q Q REVISION SYMBOLS NOTE: used for these structures if armored by nonerodible cover materials. DRY POND SEDIMENT BASIN EARTHEN DAM NOTES• EXISTING CONTOURS SEDIMENT BASIN TO REMAIN IN PLACE UNTIL SITE IS COMPLETED AND STABILIZED. � 1230 TOP OF DAM = 498.0 1 TO COMPLY WITH VSMH. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month AFTER APPROVAL FROM COUNTY E&SC ADMINISTRATOR, SEDIMENT BASIN TO BE ) PROPOSED CONTOURS DESIGN HIGH WATER = 496.0 2 CUT OFF TRENCH FOR ENTIRE LENGTH OF DAM period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 1290 � CONVERTED INTO DRY POND. DEWATERING ELBOW TO BE REMOVED BUT 6" ORIFICE EMERGENCY SPILLWAY CREST = 495.7 � PROPOSED/EX DITCH OR SWALE TO REMAIN. PRINCIPAL SPILLWAY CREST = 494.7 AT CENTERLINE TO BE EXCAVATED 4' WIDE AND 2' 14. All applicable federal, state and local requirements pertaining to working in or crossing live watercourses DEEP INTO IMPERVIOUS MATERIAL. SIDE SLOPES shall be met. + 28.5 PV PROPOSED SPOT ELEVATION OWNER WILL BE RESPONSIBLE FOR LONG TERM MAINTENANCE REQUIREMENTS OF DEWATERING ORIFICE INVERT = 493.4 TO BE 1:1, AND COMPACTED. THE BASIN. TRASH AND SEDIMENT BUILDUP WILL NEED TO BE REMOVED. VEGETATION CLEANOUT ELEVATION (SB) = 492.7 3 DAM COMPACTION TO BE 957 OF MAXIMUM �� �- � DRAINAGE FLOW � Z� �l 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is WILL NEED TO BE TRIMMED PERIODICALLY. BOTTOM (DRY POND/SB) = 490.0 DRY DENSIN. 4.� � '�.}? completed. cRs CONSTRUCTION ROAD STABIL2ATION (3.03) (1) ANTI SEEP COLLARS 4.5x4.5' p� � �'i� SILT FENSE (3.05) - p N 'Z 16. Underground utility lines shall be installed in accordance with the following standards in addition to other SF �� MAINTAIN AT LEAST 18" OF o '� applicable criteria: iP STORM DRAIN INLET PROTECTION (3.07) EDGE OF COVER OVER CULVERT F �� a a. No more than 500 linear feet of trench may be opened at one time. � PAVEMENT 40.5"x21.125" -' � � ;z b. Excavated material shall be placed on the uphill side of trenches. �iP CULVERT INLET PROTECTION (3.08) � ANTI-VORTEX TRASH RACK � °� O c. Effluent from dewatering operotions shall be filtered or passed through an opproved sediment trapping O CULVERT 3:1 SIDE SLOPES OR f� c% DD TEMPORARY DIVERSION DIKE (3.09) DEWATERING ORIFICE = 6° (SEE DETAIL SHEET 4) 3 c� device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site NATURAL SLOPE WHERE .� � q, property. SB TEMPORARY SEDIMENT BASIN (3.14) ._ _ FLEXIBLE TUBING = 8° APPLICABLE �y� F -� 04 d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote x � 1 SEAL WITH RUBBER GASKET Iv Q Q� stabilization. aP OUTLEf PROTECTION (3.18) r�"-� rj I COMPACT SOIL TO 957 �`� Z e. Restabilization shall be accomplished in accordance with this chapter. :, ; sR SURFACE ROUGHENING (3.29) , �_ _; �TOE OF RY STORAGE-494.7 f. Applicable safety requirements shall be complied with. GRAVEL �'�� � �' FILL To TOPSOILING (3.30) ; ,r- Y: . > � �.,. - 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to ).�_.. v 12 ORIFICE TO BE TOP OF BERM-498.0' rs TEMPORARY SEEDING (3.31) ��,��,� ` DRILLED AND SEDIMENT J' 4.5'X4.5' ANTI SEEP COLLAR minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is � a WEf STORAGE-493.4 � PLACEMENT: 3� Revision Dates transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of O ��� ���� � TO BE CLEANED OUT �^ 30"0 �� Ps PERMANENT SEEDING (3.32) k r � �� *DISTANCE IS 6� , 25' FROM RISER 100 YR WSEL=496.0' each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment � WHEN CONVERTING TO J� HDPE 150 HDPE � > �` = c�. MIN. IF FLOW IS �p (SEE DETAIL SHEET 4 �O 7�6�21 PER CO control disposol areo. Street washing sholl be allowed only ofter sediment is removed in this monner. This Mu MULCHING (3.35) % , ��, .� a� DRY POND (INV AT 490) A RISER CULVERT � F CREST ELEV=495J' TOWARD t� SLOPE MIN-- provision shall apply to individual development lots as well as to larger land-disturbing activities. '�`� c �� �' <" OeM EMBANKMENT SOIL STABILIZATION BLANKETS AND MATTING (3.36) �--�-�"''� 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site �c DUST CONTROL(3.39) o stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP J INV IN = 490 authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures � 4'x4'x15" CONCRETE ANCHOR INV OUT = 489 20 shall be permanently stabilized to prevent further erosion and sedimentation. '� � � DISTURBED AREA COMPACTED SOIL GRAVEL CULVERT INLET 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, NUMBERS IN PARENTHESES REFER TO VESCH MEASURES TEMPORARY SEDIMENT BASIN erosion and damage due to increoses in volume, velocity and peak flow rate of stormwater runoff for the PROTECTION EMERGENCY SPILLWAY stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream EXTRA MEASURES TO BE ADDED AS NEEDED AS DETENTION POND restoration and relocation projects that incorporate natural channel design concepts are not man-made DEfERMINED BY THE COUNTY INSPECTOR XA-CIP NTS N.T.S. NTS chonnels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate R9R � natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system rc A9s dso=0.5' shall be performed. L J� P LA N W 6,25'� � b. Adequocy of oll channels and pipes shall be verified in the following manner. � � � � � �` � ' � -� � - �- ' _ - - _ � (1) The applicant shall demonstrate that the total droinage area to the point of analysis within the channel is R'9m � �� \ � � / � � � � �. 'rBs - - - - - � � - �Ca=9� _ _ - � � _ _ _ _ _ _ - � � \\ �� 100 times greater than the contributing drainage area of the project in question; or S � � �� � � � �`• / � � �P THICKNESS=.14'-' �-- � � � � � \ \ � � � (2) (a) Natural channels shall be analyzed by the use of a two year storm to verify that stormwater will not �� \ � � \\ „ � - � __� 6 � � � ¢gR O _ _ _ � � _ � �. overtop channel banks nor cause erosion of channel bed or banks, � . s � \� \ �'�,���' � - �S� S _ i � _ _ _ _ _ - � , � (b) All previously constructed man-mode channels shall be analyzed by the use of a 10-year storm to verify �� ,� � � \, � + � - � - - _ _ SF , � � that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that � - -� M MU. � (stormwater will not cause erosion of channel bed or banks; and - ��- oso¢ \\\ \ � \ �\ � - . � / DC _ _ 4gp I - ' TS ` \ / \ S \\ , � _ c) Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that � \ ��T� -I _ . - - - _ . - .. ' � �, W stormwater will be contained within the pipe or system. S � .� � � � � Z � c. If existing natural receiving channels or previously constructed man-made channels or pipes are not � _. . � (n adequate, the applicant shall: � � � � � � 4g2 \ � ..qg¢. ` W Q Q � (1) Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year s � � � � � _ � � = J � storm will not cause erosion to the channel, the bed, or the banks; �� � �� � � . \ � \ � ,���� � � . � - ' �� � I i � � J N 2 Im rove the i e or i e s stem to a condition where the 10- ear storm is contained within the � �'� �� �� ' �4=5' '. q94� _ _ ._ ._ � a� -... i QP ' J Q � ) P PP PP Y Y �� - �. � - - � � � � W J appurtenances: � THICKNESS=14,, THICKNESS=14'> � p� �' X - > (3) Develop a site design that will not cause the pre-development peak runoff rate from o two-year storm 3io ' � � � ,; � O � to increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff y�� R � J � .. rate from a 10-year storm to increase when runoff outfalls into a man-made channel; or �"�_ '`�6' ^ � H N W (4) Provide a combination of channel improvement, stormwater detention or other measures which is '- � � , � 0 � J satisfactory to the VESCP authority to prevent downstream erosion. s� ,��� (� . 49B , � � U W J d. The applicant shall provide evidence of permission to make the improvements. � �� � � � � e. All hydrologic analyses shall be based on the existing watershed characteristics and the uRimate �/ �� �� / , �C J �' � (n development condition of the subject project. C & SR ...�% 5�� � i L w m � � f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the , VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance , � ' �\�� - � � , X � O requirements of the facility and the person responsible for performing the maintenonce. !. � �� 5p2 `s�o �� �� ' � � � N g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be ' � � - � U � placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility � , ''\\ � to the receivin g channel. S T O C K P I L E L O C A T I O N ' /\\ � 4 \ � U TO�� B , N h. All on-site channels must be verified to be adequate. � 1 , � - - - -_ _ - - � -- � � 5� �-�- -� �� � �� -- -- -�� _ - - - " � � � � � � DC w i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be � ` �` � `� � --� � � S PS R � diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. / � CRS � c � � � ��� - � � � � � �O � � -. j. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or � I � - - � � - � - � - � � --�_ \ � � ' - _. industrial development shall not be considered to be separate development projects. Instead, the development, - - - - - y ��� �. � � \ ,.., - � � � , � - - - - - - . . . - -lR - - -. � �� as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the , . � -- � - - - �. � � � - - - - �-- - - � � - � --- - - � T'HRNAROUND PAD TO BE USED AS ultimate development condition shall be used in all engineering calculations. � � A STA�ING & PARKING AREA ONCE k. All measures used to protect properties and waterways shall be employed in a manner which minimizes , . - - � � � impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. I I �I _ - _ � PkELIMINARY GRADING IS COMPLETE I. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow � 8 \ -� rate capacity and velocity requirements for natural or mon-made channels shall satisfy the flow rate capacity � 1 i� '� r 5� _ � � � and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the � �I � - I -� - - - . water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the 1 ' \ � ` _ �I .. ` expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate IL . � - resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or equal to the peak � '' - '�- - �, ��� .. flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the � forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in � ' , ,__ 50 / \ a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be ��-.� � - _ _ _ _ � g / - ._ exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined � � �" ' -� .. . ,.;�_,��. - - - ' � - ��� - � r--.�.,� _ � - - , . in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act. � � � - � __ . . __ � � � Drawing No. - - - ��� Mu - - - - m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § ;� '� ., _. ._ - - - - � -- � _ _ _ - - - - _-_ � - - � _ 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity � � ' -�--- --- - � - - - � - - - - - - - - - __. _. _.. _ _ _. ._. _ - - - -- . . . � � -' - -. - � - - _ � requirements in the Stormwater Management Act (§ 62.1-44.1524 et seq. of the Code of Virginia) and ��� „ �- � - - - -� - ---- - -- -- - �� � CRS � � � F � � CRS _,� s attendant regulations, unless such land-disturbing activities (i) are in accordance with provisions for time � - -� - � � � . �` limits on applicability of approved design criteria in 9VAC25-870-47 or grandfathering in 9VAC25-870-48 of � GRS � � �- _ _ � � �� � � /�� � . the Virginia Stormwater Management Program (VSMP) Regulation, in which case the flow rate capacity and � S � � � � � � / � �\ , STOCKPILE LOCATION ��\ �-_. � velocity requirements of § 62.1-44.15:52 A of the Act shall apply, or (ii) are exempt pursuant to § � g. � _ - _ � _ _ � � � � - - � . � ' � T�.�\\ �-� � � 62.1-44.15:34 C 7 of the Act. � � � � � � � � � � � - �, /� \�� �- n. Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia �k � � � � � / 504 S\AGING & PARKING AREA � SF � Of 4 Sheets Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this y � � � � � - - � � � SF GRAPHIC SCALE subdivision 19. -� / i / � � � � / /� �� � _ _ _ 502 - - � � �� , , , - � ��, �- �' 0 50' 100' � � � � .. - - - - � � \ , 572 _ _ � i/ ,� � � � � � i � � - _ 500 - � � � �\ � i " - - / �� � � � ' � � - - � � - � � � , � � �� ,I ~ � � � sca�e i"=5o' Job No. 2888 - i ,_ .� i . 4s8 �- � . . . 510 Section 5. Stormwater Management Plan (Pi. . _i��ti � _ �.. ,. . _�.' � ���f�c � i � �,._ '����1��,'�,. ri �'. ,:7: .i .�lit ',�I i ll., �i:. �. ��. ....: nn �� , Rev I 1/2020 PAGE 7 � 6 EROSION & SEDIMENT CONTROL NOTES VICINITY MAP ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES � O ppp ppp � �� ppp ppp O SCALE: 1"=1000' Date: 3/21/21 WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION � �� JJ 0 � � � � � � � � � �� JJ � � 0 � � � AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 9VAC25-840-40 EROSION AND SEDIMENT CONTROL � �� „ REGULATIONS. O O � \O Scale: 1 "=50' ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL �� �NSPE�T�oN. PROJECT FILE # : WP02021 00033 ' oes�g�ed by: NHK s� ES-3: SEDIMENT BASINS, TRAPS, AND ANY OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A � � � � FIRST STEP AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCES TAKE PLACE. PERIMETER DIKES AND ��pp`SL� ��.�. SEDIMENT BARRIERS SHALL BE CONSTRUCTED AS A SECOND STEP IN ANY LAND DISTURBING ACTNITY. F �c° ' � ` �. 20� �,o �. :.. , Drawn by: BWK ES-4: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS E N T R A N C E ` �. / IMMEDIATELY AFTER WSTALLATION. ��� ES-5: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN INCLUDING THE NARRATIVE SHALL BE � v Checked by: NHK MAINTAINED ON THE SITE AT ALL TIMES. ` SC 49� ES-6: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS \,p�S` � APPROXIMATE LOCATION OF �«,i (INCLUDING, BUT NOT LIMITED T0, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A • a! SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORIN. TRANSITION FROM PUBLIC r�j�F /� I 8z4 I . ROAD TO PRIVATE DRIVE 'P� � - � . ES-7: THE CONTRACTOR IS RESPONSIBLE FOR THE WSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES DYERS MILL LN. \ `S'S -� i �`� � NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. �--- -�- \ O , 'r � � �,,, RT.713 � \ � �� - ^ ES-8: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND F'`� j � DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. � \, � �9� � � . � � Ox � . � � m ES-9: DURWG DEWATERWG OPERATIONS, WATER WILL BE PUMPED WTO AN APPROVED FILTERING DEVICE. f'�y \ � , ,� � _. � ! I �L ES-10: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF EXISTING DRIVEWAY � �� �`\ �X . ��J � � `_ ^\, ��� . � p x � PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION '' � �1 �� . - �\ .. •.�:,� , .�� ��� op ¢ c CONTROL DEVICES SHALL BE MADE IMMEDIATELY. a EXISTING SERVICE ENTRANCE ` s - � . �- � �J ry LL � � TO SITE \ `rp J Y ^� �n C ES-11: PERMANENT OR TEMPORARY SOIL STABILIZATIONS SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS .�'` '� 'f'i a v 'c � v AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN \ c'S' � � v� �m O1 3 SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE A FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED FOR / � j'-- �� / \ \ �9� = v j m u LONGER THAN 14 DAYS). PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR I 7 • � �. •i � `n a m MORE THAN ONE YEAR. � / \ x � � � � � (3j 1 � a SITE DESIGN: NOTE: � _ " � �m ES-12: A PERMANENT VEGEfATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY / \ ` FOR THE PURPOSES OF PLAN REVIEW AND APPROVAL, NATHAN � o v _ STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, \ BLACKWELL ENGINEERING H. KNOPP, P.E. IS THE CERTIFIED RESPONSIBLE LAND •� "' 'c c '@ IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. f \ � LEGEND ATTN' NATHAN BLACKWELL DISTURBER (CRLD). CONTRACTOR SHALL PROVIDE � _ � �o r E REPLACEMENT CERTIFICATE AT TIME OF CONSTRUCTION TO THE W �n x a w ES-13: DURING CONSTRUCTION OF THE PROJECT SOIL STOCK PILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT 566 EAST MARKET STREET COUNTY E&SC ADMINISTRATOR. TRAPPING MEASURES. �. \ EXISTING BUILDING HARRISONBURG, VA 22801 � °� PROPOSED BUILDING 540-432-9555 ES-14: CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE � PROPOSED ROAD/EOP FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OR PERMANENT STABILIZATION SHALL BE PROVIDED WITH I � NOTE: ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. � � � - - � EXISTING ROAD DEVELOPER: CONTRACTOR TO PROVIDE A CERTIFIED ES-15: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT � � \ APPROXIMATE PROPERTY LINE BROC TROXELL RESPONSIBLE LAND DISTURBER UPON PERMIT SEDIMENT WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO � 0 GRAVEL AREA 7369 DYERS MILL LANE REQUEST FROM COUNTY E&SC ADMINISTRATOR. REMOVE SEDIMENT. / � 1 SCOTTSVILLE, VA 24590 \ � 0 CONCRETE AREA 570-4120364 ES-16: BEFORE NEWLY CONSTRUCTED STORM WATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONS, / � Q Q REVISION SYMBOLS CRLD FOR THIS PROJECT IS: ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN / BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. � � �,���� 1P30 EXISTING CONTOURS PROPERTY INFO: ES-17: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE � � f � ��2gp� - PROPOSED CONTOURS TM #129-5 NAME: Q, ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE � � � PROPOSED/EX DITCH OR SWALE 7369 DYERS MILL LANE �1��� a' �(3 DURING CONSTRUCTION NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND � GRAPHIC SCALE SCOTTSVILLE, 24590 CERT. p�� � ��'i COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS + 28.5 PV PROPOSED SPOT ELEVATION MAN. DISTRICT- SAMUAL MILLER � - � 300' 0 300' 600' 4 ES-18: WHEN A LNE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN NJICE IN A SIX-MONTH � DRAINAGE FLOW AREA = 399.71 ACRES S o � �W PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. � ��' " �- DISTURBED AREA ZONED: Rural Areas F. � �� ¢ SCALE: 1"=300' PROPOSED USE: AGRICULTURAL ROUGH, UNADJUSTED CUT/FILL d -� � z ES-19: THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE - POULTRY HOUSES ESTIMATES � z� `' IS COMPLETE. FEMA FLOOD ZONE: X 3 � � DISTURBED AREA = 7.90 AC CUT- 22,000 YD3 �'� � 04k' ES-20: TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FILL- 21,600 YD3 LJi� Q Q�y. FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. NET- 400 YD3 CUT OJ z ES-21: UNDERGROUND UTILIiY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: R� ��o A. NO MORE THAN 500 LWEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. � ; � �� --- - -- � B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. ��-��' � � � �. s, � � � �i / i � � � � � i � �� � � '�=�� i ' ' - / _ � � � � C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING � � � �s � � � i i � ,i � � � _ � � � � �\ � � NOTE: Revision Dates � � - - � ��� THE ENTIRE STORMWATER PLAN WILL BE RE-EVALUATED DEVICE OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OF � \ -�� \ � � � i � � �`a� � � � i \ � � �B � i - i � � � . AND NEW CONTROL AND TREATMENT MEASURES OFF-SITE PROPERiY. �� � 8 � � � � � i � � � i � � � - - - - � � \ 7/6/21 PER CO � � � � �, � � � � � � � � � � - � IMPLEMENTED AS NEEDED FOR ANY CHANGE TO OPEN D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND � � � � .. Ry � , � � � � � i _ � � � \ \ PROMOTE STABILIZATION. � � � � � � � � � � i � � � � � SPACE/ MANAGED TURF/ IMPERVIOUS COVER. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. � � �\ � � sr9� �� \ �� � /� /� � � � ' F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. , \ ` ` � \ � � �\ �\ �\ � \/ / / � i / � � � " � � � �"� �� _ �� ` � ;- \ � OWNER RECOGNITION: ES-22: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE � � � '9A � � \ � i � � � � i SEDIMENT BASIN TO BE CONVERTED TO DRY POND AT \ � THE END OF CONSTRUCTION. SEE DETAIL ON SHEET 3. \ � MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT �- � � � � �� � \ � � � � � � ` � NAM E: IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF � � � '9s . � � � \ \/ � � \ � - � � '� \ � ---------------------- EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROAD BY SHOVELING OR SWEEPING AND TRANSPORTED TO A � � � � \� \ � � � � � \ _ - � � � � � , SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS - � � ���� R'98 \ \� \ � \ / � � � ¢B6' � - - - - � - ' \� DATE: MANNER. � .. � \ � � \ \ . .� . ---------------------- ES-23: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL S�� � � \��r�� \� \ �� � � �-'���'�� � � � �488 � - - � ' `�� = � � �� �j� � _ - ��'-'� ` SITE STABIL2ATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY So � �� • 4gp -' � � � --� - !� � � �� THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE � � i �, � ��. � - � �.0� � 49�- DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND soR �� �� � � � ° - \ 49Q � a 494 � g 0' BERM / � �� `�\ -� SEDIMENTATION. �. � � . �� '� � _ _ � \ � . ' � � - 498 - _ ' \ � ES-24: ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT 3'06. � � � R+ \, '� ... � _ - -� _. qgg -_ � �� \ � RAINFALL. THEY WILL BE INSPECTED FOR UNDERMINING. DETERIORATION, EROSION, AND EXCESS DEPOSITED MATERIAL. ALL � \ � �,� � ' � �- �_' � qg2 � �" -� � - _ � DEFICIENCIES WILL BE CORRECTED IMMEDIATELY. EXCESS MATERIAL WILL BE SPREAD ON THE SITE IN A MANNER WHICH � � 'R� �� -° \�� . , - - ��- - -- 494 - - � , � � _ WILL NOT LEAD TO FURTHER EROSION POTENTIAL �s'oB �. �� � _ `98 R +P� 95.7 � - - �_; ` - - � � INV+ � � � I 1 ����-���. � � � - - �, � �. �s � s -0 a as2 � � �� � � ' . -� '�. . . '. , 4 ' INV; 49 � _ gq , � \ �F � � �� ��8.0 R f � � - � .. i " , _ 496 - � � S. t�;: ..�.. �. _ , ��� 8 . � � - � . - - - . S�� , 9 � V� �R�� �Q �� � � W 0 9 Pli. R 01. 6 �,oV..��'9 g9' �p �. � Z � N SEEDING & MULCHING TABLE s�2 "�� " �� � ��.> P ,5" HDPE INLET OR EQUN. 4g8 PROPOSED � � o0o P� ,o I I Q o J � F = � V � TOP=500.3 103 LF OF 15° 63 X 7O4 178' LF OF 15" 15' HDPE INLET OR EQUIV. +PV ��'� ,� , � J J N ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH TEMPORARY OR PERMANENT � 15'� INVERT=495.6 HDPE PIPE � 1.4% 5�0 POULTRY HOUSE HDPE PIPE � 1.1% ��� �Q � � w J SEEDWG WITHIN 7 DAYS FOLLOWING FINISH GRADING. SEEDWG SHALL BE DONE ACCORDWG TO � �� TOP=500.3 ��. � _ Q p� � 15" INVERT=495.5 ��� �' X STANDARD & SPECIFICATION 3.31 TEMPORARY OR 3.32 PERMANENT SEEDING, OF THE VIRGINIA I . PV . FFE=�JO2� 15" INVERT=496.0 �P � � � � � EROSION AND SEDIMENT CONTROL HANDBOOK AND DCR TECHNICAL BULLETM #4. APPLICATION �'I� � �Z N , 'Soo 15° INVERT=495.9 � � 07 � , � J Q. RATES FOR MULCH, FERTILIZER, LIMESTONE AND SEEDWG MIXTURE SHALL BE AS INDICATED BELOW. O�' V�' , 501 ��.6 1 � _ , 501 � _ _ . 1 , ,,Pv , 9 00 7 Pv 5 , Z O ~ � J 9 P � � +PV 2 � U W J TEMPORARY PERMANENT '� 9s.o Pv+ � - G + � 5p4 P�+ p�+ p�+ � � � � SPECIES LBS/ACRE SPECIES LBS/ACRE � 23.0' + 0 � . . 0 � , � J � � N ANNUAL RYEGR4SS & CEREAL RYE 50-100 KENTUCKY 31 FESCUE 128 /� IPv p1 1 +P� ���4 �2 P�+ 149� 37 LF OF 15 �2.2 p�+ �� � 37 LF OF 15" � ��, .2 p�+ � � � " � � m �- HDPE PIPE � 1.4% � HDPE PIPE � 1.17 � �'e� w O) � ANNUAL RYE GRASS 60-100 RED TOP GRASS 2 � I 0 .� P� 501 5 ��.6 p� � 501 � ��� v 0�� �, \ v O I� O GERMAN MILLET 50 SEASONAL NURSE CROP* 20 I , � 0�.9 P + 23.0' � + p1.6 P�+ G Ol� P�+ 01 9 +P O20 . � \_ .. � � (n TOTAL 160-250 TOTAL 150 � � V� i � � �.. PROPOSED +Pv Pv ~ kUSE SEASONAL NURSE CROP AS INDICATED BELOW � ���� P� _i - a g a - - j.p� 0�? '� � ��� I � N � � TOP-500.3 HDPE PIPE � 1.2% 5o P06LTRY HOUSE 15" HDPE INLET OR EQUIV. q � . ❑ SEPT. 1st - FEB. 15th ,� ANNUAL RYE & CEREAL RYE ❑ MAR. - MAY 15th ANNUAL RYE � l a � N 75.0' - 90 LF OF 15" TOP-500.3- �' V ��' � �- � 15' HDPE INLET OR EQUIV. 90.5 LF OF 15' i, I HDPE PIPE � 1.1% 15" INVERT-496.4 �I +P ❑ FEB. 16th - APR. 30th ANNUAL RYEGRASS ❑ MAY 16th - AUG. 15th FOXTAIL MILLEf I ��� 01.7 p�i�_ 15' INVERT-496.1 FFE-502f 15° INVERT-496.3 �P� 01� � � �p: � Pv p1.1 � 15' INVERT=496.0 , � pV �� ❑ MAY 1st - AUG. 31st GERMAN MILLET ❑ AUG. 16th - OCT. ANNUAL RYE , I ' � O 9 HEIGHT ^' � �J O� 9 TEMPORARY DIVERSION ❑ NOV. - FEB. WINTER RYE � -�'� +P- 1 DIKE TO BE REMOVED AT � 4�. p8 �� �4 � �� THE END OF PROJECT FERTILIZER: 10-10-10 � 450 LBS/ACRE (10 LBS/1,000 SF) FERTILIZER: 10-20-10 � 500 LBS/ACRE (12 LBS/1,000 SF) � � � I ���0 P� . .____ 97'2 INV+ 500 5 ��'� NP+ ..�____ � 97'2 INV+ 500 ._-__ __._. ��'� Hp+ ' � _ __-- PULVER2ED AGRICULTURAL LIMESTONE: 2 TONS/ACRE (90 LBS/1,000 SF) PULVERIZED AGRICULTURAL LIMESTONE: 2 TONS/ACRE (90 LBS/1,000 SF) � _ � � _ � �� � � �� - - - � .--- � � � � - - � 504 � � \ \ � � TEMPORARY DITCH TO BE �._ _ ORGANIC MULCH MATERIALS AND APPLICATION RATES �_- -� - � VESCH TABLE 3.35-A � � - - � � � i � \ � ` � FMPROJECT THE END � , ' - -� _.. . ---- . � / .. � � \ - - - - / \ I MULCHES PER ACRERATES PER 1000 SF NOTES � ` �� / / ���� � � � ����'� � � , ��� i - � � 1� - 2 TONS 70 - 90 Ibs. FREE FROM WEEDS AND COARSE MATTER. MUST BE ANCHORED. ���� _ � � � � � � � � � _ � - � \� � , LITTER STRAW OR HAY (MIN. 2 TONS FOR SPREAD WITH MULCH BLOWER OR BY HAND " � �- � �� , /� STORAGE ���'S Drawing NO. WINTER COVER) 51 k _ _ _ 'SO4 .- �\ � , BUILDING ,�.pV �' DO NOT USE AS MULCH FOR WINTER COVER OR DURING HOT, DRY EXTRA NOTES: 502 � � , ,.,� �. 5O� X 5O� � FIBER MULCH MINIMUM 35 Ibs. pERIODS.* APPLY AS SLURRY � \ \\ , � �ISTING `9-` FFE=504.5 ... 1500 Ibs. 1. THE OWNER AND CONTRACTOR MAY NEED TO MAKE MODIFICATIONS TO THE PLANS TO MATCH FIELD CONDITIONS. THE � - - - - 1 CONTRACTOR SHALL VERIFY THAT EXISTING TOPO LINES ON PLANS GENERALLY DISPLAY FIELD CONDITIONS. IF A 500 � � � \ � \� , ,� � � I � � � �� BUILDING Soa CORN STALKS 4 - 6 tons 185 - 275 Ibs. CUT OR SHREDDED IN 4-6" LENGTHS. AIR DRIED. DO NOT USE SIGNIFICANT DISCREPANCY IS FOUND. CONTRACTOR SHALL NOTIFY ENGINEER. . � � _ _ �� - - � \ � � � � r4y� '�'� - IN FINE TURF AREAS. APPLY WITH MULCH BLOWER OR BY HAND. _ 498 � � \ � � APPROX SO'X35� � GRAPHIC SCALE 2. TOPO INFORMATION WAS OBTAINED FROM BLACKWELL ENGINEERING ON MARCH 3, 2021. � � � � _ _ �� �� � � \ / FREE OF COARSE MATTER, AIR-DRIED. TREAT WITH 12 Ibs. � "- - - - - � � � � �� �� 50' 0 50' 100' Of 4 Sheets WOOD CHIPS 4 - 6 tons 185 - 275 Ibs. NITROGEN PER TON. DO NOT USE IN FINE TURF AREAS. APPLY 3. PROPERTY LINE OBTAINED FROM COUNTY GIS. TO BE USED AS A GENERAL REFERENCE ONLY. � _ - 496 � � - � � � \ \ � WITH MULCH BLOWER, CHIP HANDLER, OR BY HAND. � � �� \ � � � _ � -- - 4. EROSION SEDIMENT CONTROL MEASURES TO BE INSTALLED FIRST, GRADING OF BUILDING PAD TO PROCEED ONCE - - - - - BARK CHIPS OR FREE OF COARSE MATTER. AIR-DRIED. DO NOT USE IN FINE TURF MEASURES ARE IN PLACE AND STABILIZED WITH SEED/MULCH. ROAD TO BE GRAVELED, AND OPEN AREAS TO BE SEEDED / � � 494 � � \ � \\ \� �� /� / SCALE: 1"=50' SHREDDED BARK 50 - 70 c.y. 1 - 2 c.Y. AREAS. APPLY WITH MULCH BLOWER, CHIP HANDLER, OR BY HAND ONCE GRADING ALLOWS. CONSTRUCTION OF BUILDINGS TO COMMENCE. ESC MEASURES TO BE REMOVED AND SEEDED � \ \� � - � ONCE COUNN ADMINISTRATOR ALLOWS. // � - � 4'92 - - � � \ \ _ - - � � � �� � � �� � , �� _ _ , - - Job No. 2888 * WHEN FIBER MULCH IS THE ONLY AVAILABLE MULCH DURING PERIODS WHEN STRAW SHOULD 5. SLOPES GREATER THAN 3:1 ARE TO BE TREATED AS CRITICAL AREAS. � qgp BE USED, APPLY AT A MINIMUM RATE OF 2000 Ibs./ac. OR 45 Ibs./1000 sq. ft. EXISTING DRAINAGE AREAS ESC DRAINAGE AREAS � PROPOSED DRAINAGE AREAS Date: 3/21/21 1.5 ADDITIONAL ACRES TO SWALE � CROSS SECTION i �� � Scale: AS NOTED (CROP LAND) 1.95 ADDITIONAL ACRES TO POND Designed by: NHK 1.09 ACRES-MANAGED TURF 490 .50 ACRES TO DI #1 .86 ACRES IMPERVIOUS .17 ACRES-MANAGED TURF 490 � 33 ACRES IMPERVIOUS Drawn by: BWK �� � 0 � .50 ACRES TO DI #2 0 0 0 � � � / �_ .17 ACRES-MANAGED TURF � 0 � 0 `�' y,� .33 ACRES IMPERVIOUS Checked b NHK a � ��' a � ��' p�` � �� 5�� �� o e `r R 0 o e " a 0 y,�`� 5�� y,�`� 7.09 ACRES TO SEDIMENT BA 5�� � �� �� , � �g0 ��p �g� ��p kg� � / 80 �8� � �� �8� 2.54 ADDITIONAL ROSS S�CTION�� � %� o � k o .85 ACRES CULVERT #1 ,�0 - o 0 �� � (CROP LAND) � `� .52 ACRES-MANAGED TURF � � � �o � / .33 ACRES IMPERVIOUS 0 � � �� 450 � � � � � E � i � � � o 450 y 450 b. �\ � , j .50 ACRES TO DI #3 h � °�° p � 7% / - .17 ACRES-MANAGED TURF � � �'� � h� � �6� � � .33 ACRES IMPERVIOUS � Q � kb� kb� / ,�/'/`�'�--_ / / � � � v N � � J k�Q � � �� .50 ACRES TO DI #4 a v '� v"�i v /� � .17 ACRES-MANAGED TURF � ,� �n N Y k�� \ k�� � - 0 /� �� .33 ACRES IMPERVIOUS � = v j m u 6.08 ACRES � � �i Y � `-° 0 0 �o �^m k� \ k� p9� � l 62 ACRES TO CULVERT #2 d � � � � p�0 1 p�0 p � � � .36 ACRES-MANAGED TURF � _ � o "m � � � h� / .26 ACRES IMPERVIOUS �� w .` v - c �@ h�� � 5�� � p � W `�,° i a w h� / h10 � \ h10 h�o h rn 00 p 450 h'`� o 0 0 p 45� y'`� o 0 0 p 45� I � � h�� �`6 h a � k�0 b6 h a h� ��0 kb h�0 1.63 ACRES TO DITCH #1 h�� GRAPHIC SCALE h�� GRAPHIC SCALE 0.37 ACRES IMPERV OUSURF GRAPHIC SCALE 200' 0 200' 400' 200' 0 200' 400' 0.75 ACRES-CROP 200' 0 200' 400' WPO BUFFER (FROM GIS) `_ WPO BUFFER (FROM GIS) `` SCALE: 1"=200' WPO BUFFER (FROM GIS) `_ SCALE: 1"=200' SCALE: 1"=200' CRITICAL SLOPES (FROM GIS) �� CRITICAL SLOPES (FROM GIS) CRITICAL SLOPES (FROM GIS) ����� � �� J�� � ��1� � o ; �W WATER QUALITY MASTER PLAN LIMITS OF ANALYSIS `� � �� ¢ _; � z� � a � � � Hsc B HYDROLOGIC � ��j "� �_ � � �o ;� oti`�' SOIL GROUP � � ��Vp� z 4� 0 B MANAGED TURF � • � B OPEN SPACE � { � f/ � IMPERVIOUS _ - __ +• '- �. � -• 3�I / PROJECT AREA __ __ � ' � Revision Dates OPEN SPACE = 17.50 ACRES - w ' 7/6/21 PER C� / MANAGED TURF = 4.62 ACRES (58.48 7 OF DIST. AREA) IMPERVIOUS = 3.28 ACRES (41.52 % OF DIST. AREA) � � r � _ i � � fi � � / ;' / . _ HSG B I � � . ... . � . _. / // � � _ / ��/ / � � � �' � � � >1000 ACRES / '� � HSG D / *' ' ' � " ` " POINT A / / .�/ 7.09 ACRES FROM SITE � 116.72 ADD. ACRES FROM EASTERN STREAM 128.32 ACRES FROM WESTERN STREAM � � � ' � APPROXIMATELY 250 ACRES TOTAL \ -+ � HSG B � � �� � Q � W O / i� � - _ -� � 1 / � �' ' *'� J N a � " � - � �� � � � � � /� � � � � � I � J N / / / ` � J � ` � � CONTROL POINT FOR SURVEY W � O � a N89 46'i 6°E ..\ ::......�� � ` I / � / '� � �- J � „ 420.31� J, � `..............._. . � � /\ - - � Q Q ~ � J r' �r' �" � � � � � � � � � � - � � U � J 2���: �� / I � � J � J � � cn / � _` / � � °o � w a° r � � X � O /� Ss3. � / / / � O M U 3 ?643, TR UTARIES TO TOTIER CREEK < � �' � N / '3>6 F \ � � H / / / � \ DISTURBED AREA 7.90 ACRES / / \ � CONTROL POINT w / 1 FOR SURVEY � �M I � � � d � N / \ � '• � / � tl / w ` / • Drawing No. � � o � ` � M m o ` � o 901.63� N N88'52'07'�W 200� GRAPHIC S2oo LE aoo' � � - ' � h� � 500• GRAPHIC S5oo LE i000� of 4 Sheets BOUNDARY LINE OBTAINED FROM COUNTY GIS. � � TO BE USED AS A GENERAL REFERENCE ONLY � � � / . SCALE: 1"=200� � i SCALE: 1°=500' Job No. 2888 Section 6. Pollution Prevention Plan. (reference Counry Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (}��U� ...� :i �:��UCCG � �V�� �.;0�)A ��, ., �ITC �;��lll C)il li.u„ii :i�� (i�. I:1C fU��C)VAIhfl .tUTR�IIV� �OCUCIOII� �ll� C�C�Ii���� marked. Kee�tliis plan u�-to-date with ongoing site changes and inspections.) Rev I 1/2020 PAGE 8 � 6 B. Sources of Pollutants,locations,and qrevention practices No sources of pollution expected beyond what is mentioned in section C. C. Sources of Pollutants, continued. Common activities and minimum control and prevention ractices Pollutant, or Pollutant Location on site Preveution Practices, Geuerating Activity Control Measures Follow Erosion and Sediment Control Clearing grading,excavating,and un- Land diswrbance area �'�aa Dtspose of clearing debris at stabtlfzed areas acceptable disposal sites_Seed and mulch, or sod wrthin 7 days oCland clearing Cover storm drain inlets and use drip Paving operations Roads and driveways pans and absorbenUoil dry fi�r all paving machines to Itmft leaks and spills Direct concrete wash water into a leak- Concrete washout Current location and detail shown proof contafner or leak-proof'seWtng and cement waste on plan bastn that is designed so that no overElows can occur Enclose or cover material storage areas. Mix pafnt tndoors fn a containment area or StmcWre constmc6on,stuccq tn a flat unpaved area_Prevent the painttng and cleaning Stmctures discharge of soaps,solvents,detergents and wash water,paint,form release oils and curine compounds_ Water shall be filtered,settled or similazly Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on plan. Designated areas for matenal deltvery Material delfvery and storage Designated area shown on plan and storage_Placed near constmction entrances,away froro waterways and drainage paths Follow manufacturer's instmctfons Material use during buflding process Buflding areas _MSDS's attached_ waste collection area will not recefve a substamial amount of mnoft�from upland Solid waste disposal Current designated container areas areas and does not drain directly to a on plan waterway_Containers have lids covered before periods of rain,or are in a covered area.Scheduled collection to prevent Pollutant,or Pollutant Location on site prevention Practices, Generating Activity Coutrol Measures overCilling_MATERIALS NOT TO BE BUR[ED ON-SITE Convenient and well-maintained portable sandary faciGties will be Sanaary waste Current locations shown on plan provided,and located away from waterways or inlets. Such facilities shall be regularly matntained_ Apply fertilfzers in accordance with Landscaping operations Landscape areas shown on plan manufacturers recommendations and not dunng rainfall events To be treated tn a sedfinent basin or better control as specified on plan_ Wash Waters Wash areas shown on plan Minimize the discharge of pollutants from equipment and vehicle washing Designated areas and details shown on Provfde containment and tiltenng for all Vehicle and equipment washing p�an wash waters per the plan Minimication ofexposure to precipitation and storrmvater. Minimize the exposure of building materials,building products, conshuction wastes,trash,Iandscape materials, fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials present on the site to precipitation and to stormwater. Rev 1 I/2020 PAGE 9 � 6 (Idci�tifi� all non-storim��itcr dischar�zcs to occur on ��our sitc I�ccp this plai� up-to-datc icith on<aoin�� sitc ri::: ,�_.:: and in��,cctioits_ Scc C(il' "` `.' � �: � �,�ti; �i_ ,.��.> D. Non-stormwater dischar es Discharge Pollutants or Pollutaot Location on Site Coustituents Rev 1 I/2020 PAGE 10 I E. Persons responsible for pollution prevention practices � ��;VA�,�.�t'TIIC 17�1111CS FIIIC{ COII[f1CT lllfUfll7£1TIOIl tOf flI� (7CI�OI75 fCS�i.�1]SIIIIC IOJ� ����A��t1ifU11 �lJ�;iClltii :i< I I�l '.I t1hOCC.) Owner(s): Andrew Crider PO Box 212 Harrisonburg, VA, 22803 P Contractor(s): Company Name: Contact: Address: City, State,Zip: Telephone: FaY: Company Name: Contact: Address: City, State, Zip: Telephone: Fax: Sub - Contractor(s): Company Name: Contact: Address: City, State, Zip: Telephone: Fax: This SWPPP Was Prepared By: Blackwell Engineering 566 East Market Street Hazrisonburg, VA 22801 P 540-432-9555 F 540-434-7604 BE Job# 2204-2020 Rev 1I/2020 PAGE 11 I Response and reporting practices Minimi=e discharges from spills and leaks.Minimize the discharge of pollutants from spills and leaks and implement chemical spill and Ieak prevention and response procedures as follows. Respond to all spills,leaks and discharges as follows; Report all spills,leaks and discharges as follows; 1 Pi � � c ��iEt I�u ,c,�� u , .L .;.�.�1 rcportin�� ��racticcs accordin�� to 9VtAC'_�-880-70. Part IL scction �A-4 c l Erosion and Sediment Control Administrator Albemarle Counry: (434)972-4126 Ciry of Charlottesville: (434)970-3182 Augusta County: (540)245-5700 City of Harrisonburg (540)432-7700 Bath Counry: (540) 839-7236 Ciry of Staunton: (540) 332-3862 Frederick County: (540)665-5643 Ciry of Waynesboro: (540) 942-6604 Greene County: (434)985-5282 Highland County: (540)463-2323 Madison County: (540) 948-6102 Nelson Counry: (434) 263-7082 Orange Counry: (540)672-4347 Page County: (540)743-I324 Rockbridge County: (540)464-9662 Rockingham Counry: (540) 564-3047 Shenandoah County: (540)459-6190 Warren Counry: (540)636-3354 Department of Environmental Quality Tidewater Regional Office Virgi�ia Beach (757) 518-2000 Piedmont Regional O�ce Richmond/Glen Allen (804) 527-5020 Northem Regional O�ce Woodbridge (703) 583-3800 Valley Regional Office Harrisonburg (540)574-7800 Blue Ridge Regional Office Lynchburg/Roanoke (434) 582-5120 Southwest Regional Office Abington (276) 676-4800 Other DEQ Locations: Central Office Richmond (804)698-4000 Air Monitoring Richmond (804) 698-4424 Surface Water Investigations Chazlottesville (434) 293-1020 Rev 1I/2020 PAGE 12 I When to Report an Oil Spill �L �PILL IS THE SPILL T� �� NAlI1�ABLE Y�ATERS �Fi f�aJ�ll'+IIF*1� SH�R ELI h1ES? � I1M7 ��ULa Y�ATER QIIALIIY �� SYAF+IaAl2aS BE VI�LATEa� Q� .� �r�rr � � � THE REY�R�T7NG E]�]]41P71�F+� APPLY# ��ULa HE �PILL �AUS 1fES A FILM, •SHEEF+1,• �12 y� 1 S��L�RATI�F# �� ��ULa THE �PILL CAUSE ` �� A �1 IIf3C�F C31? Rev 1I/2020 PAGE 13 I F. Pollution Prevention Awareness (UC�Ci , . .. ,Ci� .t'::l'�iU 2� . ��1�0 .��1 .lA�Llt�l t» :Ill�t �i' il ��1:1R� �. t01 ,711 ,I ��3i1)!C> I',1 (iili GOCL ' ... � ;l:li�a.:. il`_tiC. .. � �� !]CI7 ��. 'I. _. . � i � . ., BMP Description: Spill Prevention and Control Procedures 1. Employee Training: All employees will be trained in spill prevention and control procedures during specified training sessions II. Vehicle Maintenance: Vehicles and equipment will be maintained off-site. All vehicles and equipment including subcontractor vehicles will be checked for leaking oil and fluids. Vehicles leaking fluids will not be allowed on-site. Drip pans will be placed under all vehicles and equipment that are parked overnight. Ill. Hazardous Material Storage: Hazardous materials will be stored in accordance with Section 3, Part 1 and federal and municipal regulations. IV. Spill Kits: Spill kits will be within the materials storage area and concrete washout areas. V. Spills: All spills will be cleaned up immediately upon discovery. Spent absorbent materials and rags will be hauled off-site immediately after the spill is cleaned up for disposal. Spills large enough to discharge to surface water will be reported to the National Response Center at 1-800-424-8802. VI. Material safety data sheets, a material inventory, and emergency contact information will be maintained at the on-site project trailer. InstnZlrUion Sehedule: The spill prevention and control procedures will be implemented once constructio� begins on-site. Maintenanee and Inspeetion: All personnel will be instructed regarding the correct procedures for spill prevention and control. Notices that state these practices will be posted, and the individual who manages day-to-day site operations will be responsible for seeing that these procedures are followed. Responsible Staff Rev 1 I/2020 PAGE 14 I Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. (P:oc,�:� rle� , �_� ...�. > iur �;�In . ,� �i��1DLi Description of receiving waters: Blacks Run Waterway Pollutants: Blacks Run: Mercury, Fecal Coliform, Sediment, Phosphorus, PCB Due to these pollutants: • Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site; • Nutrients (eg., fertilizers) shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; • Inspections shall be conducted at a frequency of(i) at least once every four(4) business days ar (ii) atleast once every (5) business days and no later than 48 hours following a measurable storm event. ln the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day Rev 1I/2020 PAGE IS I Section 8. Qualitied personnel The following personnel are responsible for inspections; (��iJ ..t' T�Ili ' .�_ Ti�i:���lllllC RU il i.,�_ �.';_ . , li�!C_1TIOR� pf t�1C llU,i�itlC(� �lCC�OIIIIC� CUIIC�IICTII]�1 Ill��)C�TIOII�. � BMP Description: Outlet Protection Structurally lined aprons or other acceptable energy dissipating devices placed at the outlets of pipes or paved channel sections used to prevent scour at stormwater outlets, to protect the outlet structure, and to minimize the potential for downstream erosion by reducing the velocity and energy of concentrated stormwater flows. Applicable to the outlets of all pipes and engineered channel sections. The structurally lined aprons at the outlets of pipes and paved channel sections shall be constructed as shown on the plans. [nstallation Seliedule: Maintenanee anrt Inspection: The lined apron at the ouUets of pipes and paved channel sections shall be inspected weekly and/or after each rainfall to ensure the allowance of continuous and uninhibited water flow. lf the outlet is blocked, the debris shall be removed. Responsible Staff BMP Deseription: Temporary Diversion Dike An earthen perimeter control usually consists of a dike or a combination dike and channel constructed along the perimeter of and within the disturbed part of a site. An earthen perimeter control is a ridge of compacted soil, often accompanied by a ditch or swale with a vegetated lining, at the top or base of a sloping disturbed area. Depending on its location and the topography of the landscape, an earthen perimeter control can achieve one of two goals. When on the upslope side of a site, earthen perimeter controls help to prevent surface runoff from entering a disturbed construction site. An earthen structure located upslope can improve working conditions on a construction site. It can prevent an inerease in the total amount of sheet flow runofftraveling across the disturbed area and thereby lessen erosion on the site. Earthen perimeter control structures also can be located on the downslope side of a site. They divert sediment-laden runoff created onsite to onsite sediment-trapping devices, preventing soil loss from the disturbed area. These control practices are called temporary diversion dikes, earth dikes, and interceptor dikes. No matter what they are called„ all earthen perimeter controls are constructed in a similar way with a similar objective--to control the velocity or route(or both) of sediment-laden stormwater runoff. Instnllation Sehedule: Rev 1 I/2020 PAGE 16 I Mnintennnee and Inspection: Inspect earthen diversion dikes after each rainfall to ensure continued effectiveness. Maintain dikes attheir original height. Repair any decrease in height due to settling or erosion immediately. To remain effective, earth dikes must be compacted at all times. Regardless of rainfall frequency, inspect dikes at least once every 2 weeks for evidence of erosion or deterioration. Responsible Staff BMP Description: Temporary Seeding The establishment of a temporary vegetative cover on disturbed areas by seeding with appropriate rapidly growing annual plants used to reduce erosion and damage from sediment runoff. Applicable where exposed soil surfaces are not to be fine-graded for periods longer than 14 days. Such areas include denuded areas, soil stockpiles, dikes, damn, sides of sediment basins, temporary road banks, etc. A permanent vegetative cover shall be applied to areas that will be left dormant for a period of more than a year. The seeding shall be used as shown on the plans. ❑ Permnnent � Temporary Installation Sehedule: Maintenanee and Inspeetion: The seeding shall be inspected each week or after each rainfall to make sure that erosion is not occurring. The plants shall be watered daily and mowed frequently unless otherwise directed. Responsible Stnff. BMP Deseription: Permanent Seeding The establishment of perennial vegetative cover on disturbed areas by planting seed used to: 1. Reduce erosion and decrease sediment yield from disturbed areas. 2. Permanently stabilize disturbed areas in a manner that is economical, adaptable to site conditions, and allows selection of the most appropriate plant materials. 3. Improve wildlife habitat. 4. Enhance natural beauty. Applicable where: 1. Disturbed areas where permanent, long-lived vegetative cover is needed to stabilize the soil. 2. Rough-graded areas which will not be brought to final grade for a year or more. Re� "^^'^ PAGE 17 I � Permnnent ❑ Temporary Installation Sehedule: Maintenanee and Inspeerion: High maintenance areas will be mowed frequently, limed and fertilized frequently and either receive intense use or require maintaining to an aesthetic standard. Grasses used for these situations must be fine-leaved and attractive in appearance, able to form fight sod, and be long-lived perennials. They must be well-adapted to the geographic area where they are planted, because constant mowing puts turf under great stress. Low maintenance areas will be mowed infrequently or not a all; lime and fertilizer may not be applied on a regular basis; the areas will not be subjected to intense use, nor required to have a uniform appearance. These plants must be able to persists with little maintenance over long periods of time. Responsible Staff BMP Description: Mulching Application of plant residues or other suitable materials to the soil surface used: 1. To prevent erosion by protecting the soil surface from raindrop impact and reducing the velocity of overland flow. 2. To foster the growth of vegetation by increasing available moisture and providing insulation against extreme heat and cold. Applicable: 1. Areas which have been permanently seeded should be mulched immediately following seeding. 2. Areas which cannot be seeded because of the season should be mulched to provide some protection to the soil surface. Organic mulch should be used, and the area then seeded as soon weather or seasonal conditions permit. It is not recommended that fiber mulch be used alone for this practice; at normal application rates it just simply does not provide the protection that is achieved using other types of mulch. 3. Mulch may be used together with plantings of trees, shrubs, or eertain ground covers which do not provide adequate soil stabilization by themselves. 4. Mulch shall be used in conjunetion with temporary seeding operations. � Permnnent ❑ Temporary Installation Sehedule: Maintenanee and 1 S All mulches and soil coverin s should be ins ected eriodical] PAGE 18 I (particularly after rainstorms)to check for erosion. Where erosion is observed in mulched areas, additional mulch should be applied. Nets and mats should be inspected after rainstorms for dislocation or failure. If washouts or breakage occur, re-install netting or matting as necessary after repairing damage to the slope or ditch. Inspections would take place up until grasses are firmly established. Where mulch is used in conjunction with omamental plantings, inspect periodically throughout the year to determine if mulch if maintaining coverage of the soil surface; repair as needed. Responsible Staff. BMP Description: Surface Roughening Providing a rough soil surface with horizontal depressions created by operating a tillage or other suitable implement on the contour, or by leaving slopes in a roughened condition by not fine- grading them. Used to aid in establishment of vegetative cover with seed, to reduce runoff velocity and increase infiltration, and to reduce erosion and provide for sediment trapping. Applicable where: 1. All slopes steeper than 3:1 require surface roughening, either stair-step grading, grooving furrowing or tracking if they are to be stabilized with vegetation. 2. Areas with grades less steep than 3:1 should have the soil surface lightly roughened and loose to a depth of 2 to 4 inches prior to seeding. 3. Areas which have been graded and will not be stabilized immediately may be roughened to reduce runoff velocity until seeding takes place. 4. Slopes with a stable rock face do not require roughening or stabilization. The surface roughening practice shall be constructed and used as shown on the plans. ❑ Permanent � Tempornry Instnllation Sehedule: Mnintennnee and Lnspeetion: The surface roughening location shall be inspected at least once a week or after every rainfall to ensure continued erosion control. lf the measure is ineffective, the surface shall be roughened again or a new measure shall be taken. Responsible Staff. BMP Description: Topsoiling Methods of preseroing and using the surface layer of undisturbed soil often enriched in organic Rev 11/2020 PAGE 19 I matter, in order to obtain a more desirable planting and growth medium. Applicable where: 1. The preservation or importation of topsoil is determined to be the most effective method of providing a suitable growth medium. 2. The subsoil or existing soil presents the following problems: a. The teature, pH, or nutrient balance of the available soil cannot be modified by reasonable means to provide an adequate growth medium. b. The soil material is too shallow to provide an adequate root zone and to supply necessary moisture and nutrients for plant growth. a The soil contains substances potentially toxic to plant growth. 3. High-quality turf is desirable to withstand intense use or meet aesthetic requirements. 4. Ornamental plants will be established. 5. Only on slopes that are 2:1 or flatter unless other measures are taken to prevent erosion and sloughing. The topsoil will be used as shown on the plans. � Permanent ❑ Tempornry Instnllation Sehedule: Mnintennnee and Inspeetion: The topsoil shall be inspected after every rainfall or at least once a week to ensure the surface layer of the soil is being preserved. If this method is ineffective, another measure shall be taken. Responsible Staff. BMP Deseriptzon: Culvert Inlet Protection A sediment filter located at the inlet to storm sewer culverts. Used to: 1. To prevent sediment from entering accumulating i�ar�d being transferred by a culvert and associated drainage system prior to permanent stabilization of a disturbed project area. 2. To provide erosion control at culvert i�lets during the phase of a project where elevation and drainage pattems change, causing original control measures to be ineffective or in need of removal. Applicable where culvert and associated drainage system is to be made operational prior to permanent stabilization of the disturbed drainage area. Different types of structures are applicable to different conditions. [nstallation Seliedule: Maintenanee and InSpeClZon: 1. The structure shall be inspected after each rain and repairs made as needed. 2. Aggregate shall be replaced or cleaned when inspection reveals that clogged voids are causi�g pondi�g problems which interfere with on-site construction. 3. Sediment shall be removed and the im ou�dment restored to its pAGE 20 I original dime�sio�s when sediment has accumulated to one-half the design depth. Removed sediment shall be deposited in a suitable area and in such a manner that it will not erode and cause sedimentation problems. 4. Temporary structures shall be removed when they have served their useful purpose, but not before the up slope area has been permanently stabilized. Responsible Staff. BMP Description: Storm Drain Inlet Protection A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet used to prevent sedime�t from entering storm drainage systems prior to permanent stabilization of the disturbed area. Applicable where storm drain inlets are to be made operational before permanent stabilization of the corresponding disturbed drainage area. Different types of structures are applicable to different conditions. Instnllnlion Sehe�lule: Mnintennnee and Inspeetion: 1. The structure shall be inspected after each rain and repairs made as needed. 2. Sediment shall be removed and the trap restored to its original dimensions when the sediment has accumulated to one half the design depth of the trap. Removed sediment shall be deposited in a suitable area and i� such a manner that it will not erode. 3. Structures shall be removed and the area stabilized when the remaining drainage area has been properly stabilized. Responsible Staff. BMP Deseription: Silt Fence A temporary sediment barrier consisting of a synthetic filter fabric stretched across and attached to supporting posts and entrenched used to: 1. To intercept and detain small amounts of sediment from disturbed areas during construction operations in order to prevent sediment from leaving the site. 2. To decrease the velocity of sheet flows and low-to-moderate level channel flows. Applicable: 1. Below disturbed areas where erosion would occur in the form of sheet and rill erosion. 2. Where the size of the drainage area is no more than one quarter acre per 100 feet of silt fence length; the maximum slope length behind the barrier is 100 feet; and the maximum gradient behind the barrier is 50 percent(2:1). 3. In minor swales or ditch li�es where the maximum contributing drainage area is no greater than 1 acre and flow is no greater than I cfs. 4. Silt fence will not be used in areas where rock or some other hard surface prevents the full and uniform depth anchoring of the barrier. [nstallation Selzedule: PAGE 21 I � Mnintennnee and Inspeetion: 1. Silt fences shall be inspected immediately after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately. 2. Close attention shall be paid to the repair of damaged silt fence resulting from end runs and undercutting. 3. Should the fabric on a silt fence decompose or become ineffective prior to the end of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly. 4. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one- half the height of the barrier. 5. Any sediment deposits remaining i� place after the silt fence is no longer required shall be dressed to conform with the existing grade, prepared and seeded. Responsible Staff BMP Deseripkon: Temporary Sediment Basin A temporary barrier or dam with a controlled stormwater release structure formed by constructing an embankment of compacted soil across a drainage way used to detain sediment-laden runoff from disturbed areas in`weP' and "dry"storage long enough for the majority of the sediment to settle out. Applicable below disturbed areas where the total contributing drainage area is equal to or greater than three (3) acres. There must be su�cient space and appropriate topography for the constmctio� of a temporary impoundment These structures are limited to a useful life of 18 months unless they are designed as permanent impoundments. It is recommended that these measures, by virtue of their potential to impound large volumes of water, be designed by a qualified professional. Instnllntion Sehedule: Mnintennnee and Inspeetion: The basin embankment should be checked regularly to ensure that it is structurally sound and has not been damaged by erosio� or construction equipment. The emergency spillway should be checked regularly to ensure that its lining is well established and erosion-resistant The basin should be checked after each runoff-producing rainfall for sediment cleanout. When the sediment reaches the clean-out level, it shall be removed and properly disposed of. Responsible Staff Rev 1 I/2020 PAGE 22 I BMP Descriptlon: Construction Road Stabilication The temporary stabilization of access roads, subdivision roads, parking areas, and other onsite vehicle transportation routes with stone immediately after grading. Used: 1. To reduce the erosion of temporary roadbeds by construction traffic during wet weather. 2. To reduce the erosion and subsequent regrading of permanent roadbeds between the time of initial gradi�g and final stabilization. Applicable wherever stone-base roads or parking areas are constructed, whether permanent or temporary, for use by construction traffic. Installntion Schedule: Maintenanee nnd Lnspeetion: Both temporary and permanent roads and parking areas may require periodic top dressing with new gravel. Seeded areas adjacent to the roads and parking areas should be checked periodically to ensure that a vigorous stand of vegetation is maintained. Roadside ditches and other drainage structures should be checked regulazly to ensure that they do not become clogged with silt or other debris. Responsible Stnff. BMP Descriptlon: Ha=ardous Waste Materials All hazardous waste materials such as oil filters, petroleum products, paint, and equipment maintenance fluids will be stored in structurally sound and sealed shipping containers, within the hazardous materials storage area. Hazardous waste materials will be stored in appropriate and clearly marked containers and segregated from other non-waste materials. Secondary containment will be provided for all waste materials in the hazardous materials storage area and will consist of commercially available spill pallets. Additionally, all hazardous waste materials will be disposed of in accordance with federal, state, and municipal regulations. Hazardous waste materials will not be disposed of into the on-site dumpsters. All personnel will be instructed, during tailgate training sessions, regarding proper procedures for hazardous waste disposal. Notices that state these procedures will be posted i�the office trailer and the individual who manages day-to-day site operations will be responsible for seeing that these procedures are followed. Instnllation Sehedule: Shipping containers used to store hazardous waste materials will be installed once the site materials storage area has been installed. Mnintenanee nnd Inspection: The hazardous waste material storage areas will be inspected weekly a�d after storm events. The storage areas will be kept clean,well organized, and equipped with ample cleanup supplies as appropriate for the materials being stored. Material safety data sheets,material inventory, and emergency contact numbers will be maintained in the office trailer. Responsible Staff Rev I I/2020 PAGE 23 I BMP Description: Recycling Wood pallets, cardboard boxes, and other recyclable construction scraps will be disposed of in a designated dumpster for recycling. The dumpster will have a secure wateRight lid, be placed away from stormwater conveyances and drains and meet all local and state solid-waste management regulations. Only solid recyclable construction scraps from the site will be deposited i�the dumpster. All personnel will be instructed, during tailgate training sessions, regarding the correct procedure for disposal of recyclable construction scraps. Notices that state these procedures will be posted in the office trailer, and the individual who manages day-to-day site operations will be responsible for seeing that these procedures are followed. Installruion Sehedule: Designated recycling dumpsters will be installed once the combined staging area has been established. Mnintennnee and InSpeCtion: The recycling dumpster will be inspected weekly and immediately after storm events. The recycling dumpster will be emptied weekly and taken to an approved recycling center. If recyclable constmction wastes are exceedi�g the dumpster's capacity,the dumpsters will be emptied more frequently. Responsible Staff BMP Deseription: Sanitary Waste Temporary sanitary facilities (portable toilets)will be provided at the site throughout the construction phase. The toilets will be in the staging area. The poRable toilets will be located away from a concentrated flow paths and traffic flow and will have collection pans underneath as secondary containment. Installation Sehedule: The portable toilets will be brought to the site o�ce the staging area has been established. Maintenanee nnd Inspeetion: All sanitary waste will be collected from the portable facilities a minimum of three times per week The portable toilets will be inspected weekly for evidence of leaking holding tanks. Toilets with leaking holdi�g tanks will be removed from the site and replaced with new portable toilets. Responsible Staff. BMP Description: Waste Materials All waste materials will be collected and disposed of into trash dumpsters in a designated materials storage area. Dumpsters will have a secure watertight lid, be placed away from stormwater comeyances and drains, and meet all federal, state, and municipal regulations. Only trash and construction debris from the«yNi���g(�ieposited in the dumpster. No construction materials will be buried on-site. All personnel pAGE 24 I will be instructed, during tailgate training sessions, regarding the correct disposal of trash and construction debris. Notices that state these practices will be posted in the office trailer and the individual who manages day-today site operations will be responsible for seeing that these practices are followed. Installation Sehedule: Trash dumpsters will be installed once the materials storage area has been established. Mnintennnee and InSpeCtion: The dumpsters will be inspected weekly and immediately after storm events. The dumpster will be emptied weekly. If trash and construction debris are exceedi�g the dumpster's capacity,the dumpsters will be emptied more frequently. Responsible Staff BMP Deseription: Materials Storage Area Construction equipment and maintenance materials will be stored at the combined staging area and materials storage areas. Gravel bag berms will be installed around the perimeter to designate the staging a�d materials storage area. A watertight shipping container will be used to store hand tools, small parts, and other construction materials. Nonhazardous building materials such as packaging material (wood, plastic, and glass), and construction scrap material (brick,wood, steel, metal scraps, and pipe cuttings)will be stored in a separate covered storage facility adjacent to the shipping container. All hazardous-waste materials such as oil filters, petroleum products, paint, and equipment maintenance fluids will be stored in structurally sound and sealed containers under cover within the hazardous materials storage area. Very large items, such as framing materials and stockpiled lumber,will be stored in the open in the materials storage area. Such materials will be elevated on wood blocks to minimize contact with runoff. [nstallntion Seherlule: The materials storage area will be installed after grading and before any infrastructure is constructed at the site. Mnintennnee and Inspeetion: The storage area will be inspected weekly and afrer storm events. The storage area will be kept clean,well organized,and equipped with ample cleanup supplies as appropriate for the materials being stored. Perimeter controls, containment structures,covers, and liners will be repaired or replaced as needed to maintain proper function. Responsible Staff. BMP Descripkon: Conevete Washout A designated temporary,above-grade concrete washout area will be constructed with a recommended �tc�i1' PAGE 25 I minimum length and minimum width of 10 feet, but with sufficient quantity and volume to contain all liquid and concrete waste generated by washout operations. The washout area will be lined with plastic sheeting at least 10 mils thick and free of any holes or tears. Signs will be posted marking the location of the washout area to ensure that concrete equipment operators use the proper facility. Concrete pours will not be conducted during or before an anticipated storm event. Concrete mixer tmcks and chutes will be washed in the designated area or concrete wastes will be properly disposed of off-site. When the temporary washout area is no longer needed for the construction project,the hardened concrete and materials used to construct the area will be removed and disposed of according to the maintenance section below, and the area will be stabilized. Instnllation Seherlule: The washout area will be constructed before concrete pours occur at the site. M(dntennhee a/td The washout areas will be i�spected daily to ensure that all concrete lnSpeClton: Washing is bei�g discharged into the washout area, no leaks or tears are present,and to identify when concrete wastes need to be removed. The washout areas will be cleaned out once the area is filled to 75 peroent of the holding capacity. Once the area's holding capacity has been reached,the concrete wastes will be allowed to harden; the concrete will be broken up, removed, and disposed of properly. The plastic sheeting will be replaced if tears occur during removal of concrete wastes from the washout area. Responsible Staff BMP Descrip6on: I/ehicle/Equzpment Fueling and Maintenance Several types of vehicles ar�d equipment may be used on-site throughout the project, including graders, scrapers, excavators, loaders, paving equipment,rollers,trucks and trailers, backhoes, and forklifts. All major equipment/vehicle fueling and maintenance will be performed off-site. A small,20-gallon pickup bed fuel tank will be kept on-site in the combined staging area. When vehicle fueling must occur on-site, the fueling activity will occur in the staging area. Only minor equipment maintenance will occur on-site. All equipment fluids generated from maintenance activities will be disposed of into designated drums stored on spill pallets in accordance with PaR 3.L Absorbent, spill-cleanup materials and spill kits will be available at the combined staging ar�d materials storage area. Drip pans will be placed under all equipment receiving maintenance and vehicles and, when necessary, equipment parked ovemight. Installruion Sehedule: BMPs implemented for equipme�t and vehicle maintenance and fueling activities will begin at the start of the project. Mnintennnee and InSpeCtion: Inspect equipment/vehicle storage areas and fuel tank weekly and after storm events. Vehicles and equipment will be inspected on each day of use. Leaks will be repaired immediately, or the problem vehicle(s)or equipment will be removed from the project site. Keep ample supply of spill-cleanup materials on-site and immediately clean up spills and dispose of materials properly. Responsible Staff. Rev 1 I/2020 PAGE 26 I BMP Description: All equipment and vehicle washing will be performed off-site. Installation Sehedule: N/A Maintennnee and N/A Inspection: Responsible Staff. Rev 1 I/2020 PAGE 27 I Section 9. Signed Certification (Provide certification according to 9VAC25-870-370) CF,RTIFICATION "I certify under penalry of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information � submitted. Based on my inquiry of thc person or persons who managc the system, or those persons directly responsib]e fot , gathering the information, the information submittcd is, to the best of my knowledge and belief, true, accurate, and complete. I am awaze that therc aze significant penalties for submitting false information, including the possibiliry of fine and imprisonment for knowing violations." Operator Name: '�fU� I}��`� , Company: }�I C`�e1� � �kkH�S -� nL 4 , TIYIe: fcS��cy�� l,e9V�� � Signature: ��� Date: -7-(y - dj '' Section 10. Delegation of authority. i f�.UA 1��2 TitC � u_.P!'.i i , . . � . ' lil,�t�U)i ItV� li'� �I �:l ILI��'i�_I.C�S'�li ;C���1,Li l�f Ct: IilO�,ltV� tIl- ..Y011l,lAl;i`lQi ��PIIUlIU�'? ��LCi�I1Utr1] ii�.itl � i�C:tlltll �.,1�.:�.1 � I.,�EltiO❑ i t1Ltf?OI itV� i� II�C��C�i.) Delegation of Au[hority I, (name),hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements,including the Constmction General Permit, a[the constmc[ion site.The designee is authorized to sign any reports, stormwater pollution prevention plans and alI other documents required by the permit. (name of person or position) (company) (address) (city,state,zip) (phone) By signing this authorization,I confirm that I meet the requirements to make such a designation as set forth in the Constmction General Permit(CGP),and that the designee above meets the definition of a"duly authorized representative". Operator Name: Company: Title: Signature: Date: Rev 1 I/2020 PAGE 29 I Section ll. General permit copy (P�� -�.Ut' �l Corn i 'ti1C ..0 ,ICl ��n _cilCl�a� �`�Ct11it `��'. .1C'��_:��!)� Rev I 1/2020 PAGE 30 I CHAPTER880 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES 9VAC25-880-1. Definitions. The words and terms used in this chapter shall have the meanings defined in the Virginia Stormwater Management Act (Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia), this chapter, and 9VAC25-870 unless the context clearly indicates othenvise, except as othenvise specified in this section. Terms not defined in the Act, this chapter, or 9VAC25-870 shall have the meaning attributed to them in the federal Clean Water Act (33 USC § 1251 et seq.) (CWA). For the purposes of this chapter: "Business day" means Monday through Friday excluding state holidays. "Commencement of land disturbance" means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities (e.g., stockpiling of fill material). "Construction site" means the land where any land-disturbing activity is physically located or conducted, including any adjacent land used or preserved in connection with the land-disturbing activity. "Final stabilization" means that one of the foliowing situations has occurred: 1. All soil disturbing activities at the site have been completed and a permanent vegetative cover has been established on denuded areas not othenvise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform (e.g., evenly distributed), mature enough to survive, and wili inhibit erosion. 2. For individual lots in residential construction, final stabilization can occur by either: a. The homebuilder completing final stabilization as specified in subdivision 1 of this definition; or b. The homebuilder estabiishing temporary soil stabilization, including perimeter controls for an individual lot prior to occupation of the home by the homeowner, and informing the homeowner of the need for, and benefits of, final stabilization. 3. For construction projects on land used for agricultural purposes , final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface waters, and areas that are not being returned to their preconstruction agricultural use must meet the final stabilization criteria specified in subdivision 1 or 2 of this definition. "Immediately" means as soon as practicable, but no later than the end of the next business day, following the day when the land-disturbing activities have temporarily or permanently ceased. In the context of this general permit, "immediately" is used to define the deadline for initiating stabilization measures. "Impaired waters" means surface waters identified as impaired on the 2012 § 305(b)/303(d) Water Quality Assessment integrated Report. "Infeasible" means not technologically possibie or not economically practicable and achievable in light of best industry practices. "Initiation of stabilization activities" means: 1. Prepping the soil for vegetative or nonvegetative stabilization; Page 1 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) 2. Appiying mulch or other nonvegetative product to the exposed area; 3. Seeding or planting the exposed area; 4. Starting any of the above activities on a portion of the area to be stabilized, but not on the entire area; or 5. Finalizing arrangements to have the stabilization product fully installed in compliance with the applicable deadline for completing stabilization. This Iist is not exhaustive. "Measurable storm evenY' means a rainfall event producing 0.25 inches of rain or greater over 24 hours. "Stabilized" means land that has been treated to withstand normal exposure to natural forces without incurring erosion damage. 9VAC25-880-10. Purpose. This general permit regulation governs stormwater discharges from regulated construction activities. For the purposes of this chapter, these discharges are defined as stormwater discharges associated with large construction activity, and stormwater discharges associated with small construction activity. Stormwater discharges associated with other types of industrial activity shall not have coverage under this general permit. This general permit covers only discharges through a point source to surface waters or through a municipal or nonmunicipal separate storm sewer system to surface waters. Stormwater discharges associated with industrial activity that originate from construction activities that have been completed and the site has undergone final stabilization are not authorized by this general permit. 9VAC25-880-15. Applicability of incorporated references based on the dates that they became effective. Except as noted, when a regulation of the United States set forth in the Code of Federai Regulations is referenced and incorporated herein, that regulation shall be as it exists and has been published in the July 1, 2013, update. 9VAC25-880-20. Effective date of general permit. This generai permit is effective on July 1, 2014. The general permit will expire on June 30, 2019. This general permit is effective for any covered operator upon compliance with all provisions of 9VAC25-880-30. 9VAC25-880-30. Authorization to discharge. A. Any operator governed by this general permit is authorized to discharge to surface waters of the Commonwealth of Virginia provided that: 1. The operator submits a complete and accurate registration statement, if required to do so, in accordance with 9VAC25-880-50 and receives acceptance of the registration by the board; 2. The operator submits any permit fees, if required to do so, in accordance with 9VAC25-870-700 et seq.; 3. The operator complies with the applicable requirements of 9VAC25-880-70; 4. The operator obtains approval of: Page 2 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) a. An erosion and sediment control plan from the appropriate VESCP authority as authorized under the Erosion and Sediment Control Regulations (9VAC25-840), unless the operator receives from the VESCP an "agreement in lieu of a plan" as defined in 9VAC25-840-10 or prepares the erosion and sediment control plan in accordance with annual standards and specifications approved by the department. The operator of any land-disturbing activity that is not required to obtain erosion and sediment control plan approval from a VESCP authority or is not required to adopt department-approved annual standards and specifications shall submit the erosion and sediment control plan to the department for review and approval; and b. A stormwater management plan from the appropriate VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), unless the operator prepares the stormwater management plan in accordance with annual standards and specifications approved by the department. The operator of any land-disturbing activity that is not required to obtain stormwater management plan approval from a VSMP authority or is not required to adopt department-approved annual standards and specifications shall submit the stormwater management plan to the department for review and approval; and 5. The board has not notified the operator that the discharge is not eligible for coverage in accordance with subsection B of this section. B. The board will notify an operator that the discharge is not eligible for coverage under this general permit in the event of any of the following: 1. The operator is required to obtain an individual permit in accordance with 9VAC25- 870-410 B; 2. The operator is proposing discharges to surface waters specifically named in other board regulations that prohibit such discharges; 3. The discharge causes, may reasonably be expected to cause, or contributes to a violation of water quality standards (9VAC25-260); 4. The discharge violates or would violate the antidegradation policy in the Water Quality Standards (9VAC25-260-30) ; or 5. The discharge is not consistent with the assumptions and requirements of an applicable TMDL approved prior to the term of this general permit. C. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphait batch plants, equipment staging yards, material storage areas, excavated material disposai areas, borrow areas) located on-site or off-site provided that: 1. The support activity is directly related to a construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; 2. The support activity is not a commercial operation , nor does it serve multiple unrelated construction activities by different operators; 3. The support activity does not operate beyond the completion of the last construction activity it supports; 4. The support activity is identified in the registration statement at the time of general permit coverage; 5. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and 6. All appiicable, state, federal, and local approvais are obtained for the support activity. D. Support activities located off-site are not required to be covered under this general permit. Discharges of stormwater from off-site support activities may be authorized under Page 3 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) another state or VPDES permit. Where stormwater discharges from off-site support activities are not authorized under this general permit, the Iand area of the off-site support activity need not be included in determining the total land disturbance acreage of the construction activity seeking general permit coverage. E. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this generai permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges compiy with all applicable state and VPDES permit requirements. F. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Water used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water source, including uncontaminated wateriine flushings; 6. Routine external building wash down where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash water where spills or leaks of toxic or hazardous materials have not occurred (or where ali spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similariy treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated groundwater or spring water; 10. Foundation or footing drains where fiows are not contaminated with process materials such as solvents; 11. Uncontaminated, excavation dewatering, including dewatering of trenches and excavations that have been fiitered, settled, or similarly treated prior to discharge; and 12. Landscape irrigations. G. Approval for coverage under this general permit does not relieve any operator of the responsibility to comply with any other applicable federal, state or local statute, ordinance or regulation. H. Continuation of general permit coverage. 1. Any operator that was authorized to discharge under the general permit issued in 2009 and that submits a complete and accurate registration statement on or before June 30, 2014, is authorized to continue to discharge under the terms of the 2009 general permit untii such time as the board either: a. Issues coverage to the operator under this general permit or b. Notifies the operator that the discharge is not eligible for coverage under this general permit. 2. When the operator is not in compliance with the conditions of the expiring or expired general permit the board may choose to do any or all of the following: Page 4 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) a. Initiate enforcement action based upon the 2009 general permit; b. Issue a notice of intent to deny the new general permit. If the general permit is denied, the owner or operator wouid then be required to cease the activities authorized by the continued general permit or be subject to enforcement action for operating without a state permit; c. Issue a new state permit with appropriate conditions; or d. Take other actions authorized by the VSMP Regulation (9VAC25-870). 9VAC25-880-40. Delegation of authorities to state and local programs. A board-approved VSMP authority is authorized to administer requirements of this general permit, including but not limited to: (i) registration statement acceptance; (ii) fee collection; (iii) stormwater management plan review and approval; and (iv) permit compliance and enforcement dependent upon conditions established as part of the board approval. 9VAC25-880-50. General permit application (registration statement). A. Deadlines for submitting registration statement. Any operator seeking coverage under this general permit, and that is required to submit a registration statement, shall submit a complete and accurate general VPDES permit registration statement in accordance with this section, which shali serve as a notice of intent for coverage under the general VPDES permit for discharges of stormwater from construction activities. 1. New construction activities. a. Any operator proposing a new stormwater discharge from construction activities shall submit a complete and accurate registration statement to the VSMP authority prior to the commencement of land disturbance. b. Any operator proposing a new stormwater discharge from construction activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment is authorized to discharge under this general permit, provided that: (1) The operator submits a complete and accurate registration statement to the VSMP authority no later than 30 days after commencing land disturbance; and (2) Documentation to substantiate the occurrence of the public emergency is provided with the registration statement. c. Any operator proposing a new stormwater discharge associated with the construction of a single-family residence separately buiit, disturbing less than one acre and part of a larger common plan of development or sale, is authorized to discharge under this general permit and is not required to submit a registration statement or the department portion of the permit fee, provided that the stormwater management plan for the larger common plan of development or sale provides permanent control measures (i.e., stormwater management facilities) encompassing the single family residence. 2. Existing construction activities. a. Any operator that was authorized to discharge under the general permit issued in 2009 and that intends to continue coverage under this general permit shall: (1) Submit a complete and accurate registration statement to the VSMP authority on or before June 1, 2014; and Page 5 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) (2) Update its stormwater pollution prevention plan to comply with the requirements of this generai permit no later than 60 days after the date of coverage under this general permit. b. Any operator with an existing stormwater discharge associated with the construction of a single-family residence separately built, disturbing less than one acre and part of a larger common plan of development or sale, and that intends to continue coverage under this general permit, is authorized to discharge under this general permit and is not required to submit a registration statement or the department portion of the permit fee, provided that: (1) The stormwater management plan for the larger common plan of development or sale provides permanent control measures (i.e., stormwater management facilities) encompassing the singie-family residence; and (2) The operator updates its stormwater pollution prevention pian to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. 3. For stormwater discharges from construction activities where the operator changes, the new operator must submit a complete and accurate registration statement or transfer agreement form to the VSMP authority prior to assuming operational control over site specifications or commencing work on-site. 4. Late notifications. Operators are not prohibited from submitting registration statements after commencing land disturbance. When a late registration statement is submitted, authorization for discharges shall not occur untii coverage under the general permit is issued. The VSMP authority, department, board, and the EPA reserve the right to take enforcement action for any unpermitted discharges that occur between the commencement of land disturbance and discharge authorization. B. Registration statement. The operator shall submit a registration statement to the VSMP authority that shall contain the foliowing information: 1. Name, contact, mailing address, telephone number, and email address if available of the construction activity operator. No more than one operator may receive coverage under each registration statement. NOTE: General permit coverage will be issued to this operator, and the certification in subdivision 11 of this subsection must be signed by the appropriate person associated with this operator; 2. Name and location if available of the construction activity and all off-site support activities to be covered under this general permit, including city or county, and latitude and longitude in decimal degrees; 3. Status of the construction activity: federal, state, public, or private; 4. Nature of the construction activity (e.g., commercial, industrial, residential, agricultural, oil and gas, etc.); 5. Name of the receiving water(s) and HUC ; 6. If the discharge is through a municipal separate storm sewer system (MS4), the name of the municipal separate storm sewer system operator; 7. Estimated project start date and completion date; 8. Total land area of development and estimated area to be disturbed by the construction activity (to the nearest one-hundredth of an acre); 9. Whether the area to be disturbed by the construction activity is part of a larger common plan of development or sale; Page 6 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) 10. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Stormwater Discharges from Construction Activities prior to submitting the registration statement. By signing the registration statement the operator certifies that the SWPPP has been prepared ; and 11. The following certification: "I certify under penalty of law that I have read and understand this registration statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properiy gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." C. The registration statement shall be signed in accordance with 9VAC25-880-70, Part III K. 9VAC25-880-60. Termination of general permit coverage. A. Requirements. The operator of the construction activity shall submit a notice of termination to the VSMP authority after one or more of the following conditions have been met: 1. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a notice of termination; 2. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; 3. Coverage under an alternative VPDES or state permit has been obtained; or 4. For residential construction only, temporary soii stabilization has been completed and the residence has been transferred to the homeowner. The notice of termination should be submitted no later than 30 days after one of the above conditions being met. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 2 through 4 of this subsection unless othenvise notified by the VSMP authority or the department. Termination of authorizations to discharge for the conditions set forth in subdivision 1 of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 of this subsection have been met or 60 days after submittal of the notice of terminations, whichever occurs first. B. Notice of termination. The notice of termination shall contain the following information: 1. Name, contact, mailing address, telephone number, and email address if available of the construction activity operator. 2. Name and location if available of the construction activity covered under this general permit, including city or county, and latitude and longitude in decimal degrees. 3. The general permit registration number. 4. The basis for submission of the notice of termination, pursuant to subsection A of this section. 5. Where applicable, a list of the on-site and off-site permanent control measures (both structural and nonstructural) that were installed to comply with the stormwater Page 7 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) management technical criteria. For each permanent control measure that was installed, the following information shall be included: a. The type of permanent control measure installed and the date that it became functional as a permanent control measure; b. The location if available of the permanent control measure, including city or county, and latitude and longitude in decimal degrees; c. The receiving water of the permanent control measures; and d. The number of total and impervious acres treated by the permanent control measure (to the nearest one-tenth of an acre). 6. Where applicable, the following information related to participation in a regional stormwater management plan. For each regional stormwater management facility, the following information shall be included: a. The type of regional facility to which the site contributes; b. The location if available of the regionai facility, including city or county, and latitude and longitude in decimal degrees; and c. The number of total and impervious site acres treated by the regional facility (to the nearest one-tenth of an acre). 7. Where applicable, the following information related to perpetual nutrient credits that were acquired in accordance with § 62.1-44.15:35 of the Code of Virginia: a. The name of the nonpoint nutrient credit generating entity from which perpetual nutrient credits were acquired; and b. The number of perpetual nutrient credits acquired (Ibs. per acre per year). 8. The following certification: "I certify under penalty of law that I have read and understand this notice of termination and that this document and all attachments were prepared in accordance with a system designed to assure that qua�ified personnel properiy gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." C. The notice of termination shall be signed in accordance with 9VAC25-880-70 Part III K. D. Termination by the board. The board may terminate coverage under this general permit during its term and require application for an individual permit or deny a general permit renewal application on its own initiative in accordance with the Act, this chapter, and the VSMP Regulation, 9VAC25-870. 9VAC25-880-70. General permit. Any operator whose registration statement is accepted by the board will receive the following general permit and shall comply with the requirements contained therein and be subject to all requirements of 9VAC25-870. Page 8 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) General Permit No.: VAR10 Effective Date: July 1, 2014 Expiration Date: June 30, 2019 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth herein. PARTI DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. 1. During the period beginning with the date of coverage under this general permit and lasting until the general permiYs expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on-site or off-site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multipie unrelated construction activities by different operators ; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All appiicable state, federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post-construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit Page 9 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) registration, has undergone final stabilization. Post-construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. 4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment-related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP that minimizes the pollutants of concern and, when appiicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations. In addition, the operator shall implement the following items: a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be appiied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been estabiished and approved prior to the term of this general permit. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previousiy covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator implements the following: a. The exceptional water(s) shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and Page 10 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalis discharging to exceptional waters. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, I C and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents , or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to Page 11 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) washing); where soaps, solvents, or detergents have not been used ; and where the wash water has been filtered, settled, or simiiariy treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as soivents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met: a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When appiicable, long term responsibility and maintenance requirements shall be recorded in the local land records prior to the submission of a notice of termination; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For residential construction only, temporary soil stabilization has been completed and the residence has been transferred to the homeowner. 2. The notice of termination should be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection are met. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice of termination, whichever occurs first. 3. The notice of termination shall be signed in accordance with Part III K of this general permit. G. Water quality protection. 1. The operator must select, install, implement and maintain control measures as identified in the SWPPP at the construction site that minimize poliutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have reasonabie potential to cause, or are contributing to an excursion above any applicabie water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II B to adequately address the identified water quality concerns; Page 12 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter must include a signed certification consistent with Part I II K. PART II STORMWATER POLLUTION PREVENTION PLAN A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, inciuding any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common pian of development or sale and disturb less than one acre may utiiize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. The SWPPP requirements of this general permit may be fuifilled by incorporating by reference other plans such as a spiil prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain ali of the required elements of the SWPPP, the operator must develop the missing elements and include them in the SWPPP. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items: 1. General information. a. A signed copy of the registration statement for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., Iow density residential, shopping mall, highway, etc.); e. A legible site plan identifying: (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; Page 13 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to fiiter, settie, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; (5) Locations where concentrated stormwater is discharged; (6) Locations of support activities, when applicable and when required by the VSMP authority, inciuding but not limited to (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and (7) When applicable, the location of the on-site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection purposes. 2. Erosion and sediment control plan. a. An erosion and sediment control plan approved by the VESCP authority as authorized under the Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain erosion and sediment control plan approval from a VESCP authority or does not adopt department-approved annual standards and specifications shall submit the erosion and sediment control pian to the department for review and approval. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications, that adequately: (1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; (3) Minimizes the amount of soii exposed during the construction activity; (4) Minimizes the disturbance of steep slopes; (5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless infeasible; Page 14 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) (7) Minimizes soil compaction and, unless infeasible, preserves topsoil; (8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing, grading, excavating, or other land-disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and (9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. 3. Stormwater management plan. a. New construction activities. A stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain stormwater management plan approval from a VSMP authority or does not adopt department-approved annual standards and specifications shall submit the stormwater management plan to the department for review and approval. b. Existing construction activities. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall ensure compliance with the requirements of 9VAC25- 870-93 through 9VAC25-870-99 of the VSMP Regulation, including but not limited to the water quality and quantity requirements. The SWPPP shall include a description of, and all necessary calculations supporting, all post-construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be piaced on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant-generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant-generating activities and the pollutant that is expected to be exposed to stormwater; b. Describe the location where the potential pollutant-generating activities will occur, or if identified on the site plan, reference the site plan; c. identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. identify the person responsible for implementing the pollution prevention practice or practices for each pollutant-generating activity (if other than the person Iisted as the qualified personnei); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spilis, leaks, and other Page 15 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part ill G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicie fueling and maintenance activities (e.g., providing secondary containment such as spili berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) coilection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these poilutants); (4) Minimize the discharge of pollutants from vehicie and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak-proof container or leak-proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes inciuding (i) building products such as asphalt seaiants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materiais, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, and sanitary wastes; and (8) Address any other discharge from the potential pollutant-generating activities not addressed above; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. 5. SWPPP requirements for discharges to impaired waters, surface waters with an applicabie TMDL wasteload allocation estabiished and approved prior to the term of this general permit, and exceptional waters. The SWPPP shall: a. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and exceptional waters identified in 9VAC25-260-30 A 3 c, when applicable; b. Provide clear direction that: (1) Permanent or temporary soil stabilization shali be applied to denuded areas within seven days after final grade is reached on any portion of the site; Page 16 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part I B 4orPartlB5. 6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 7. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part III K, to sign inspection reports or modify the SWPPP. 8. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. B. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shail be compieted no Iater than seven calendar days following approval. Implementation of these additional or modified control measures must be accomplished as described in Part II G. 3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP no later than seven days following any modification to its impiementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Majorgrading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and where modified as soon as possible; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements appiy; d. Ail properties that are no longer under the Iegal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and Page 17 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) g. Measures taken to address any evidence identified as a result of an inspection required under Part II F. 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. D. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. 2. The operator shall make the SWPPP and all amendments, modifications, and updates availabie upon request to the department, the VSMP authority, the EPA, the VESCP authority, Iocal government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on-site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location must be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP availabie for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part i F. 1. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II F identifies a control measure that is not operating effectively, corrective action(s) shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II F identify an existing control measure that needs to be modified or if an additional control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as estabiished by the VSMP authority. F. SWPPP Inspections. 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for insuring that the qualified personnel conduct the inspection. Page 18 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) 2. Inspection schedule. a. Inspections shail be conducted at a frequency of: (1) At least once every five business days; or (2) At least once every 10 business days and no Iater than 48 hours foliowing a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted no later than the next business day. b. Where areas have been temporarily stabilized or land-disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges iikely, the operator shall immediately resume the regular inspection frequency. c. Representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the report required by Part II F. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (� Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; Page 19 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similariy treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabiiization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department-approved annuai standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge , or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this generai permit; (e) Required stabilization has not been initiated or completed on portions of the site; (� Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that aliow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper impiementation, maintenance and effectiveness of the procedures and practices; (9) Identify any pollutant generating activities not identified in the pollution prevention plan; and (10) Identify and document the presence of any evidence of the discharge of poliutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s) of prohibited discharges; d. The location(s) of control measures that require maintenance; Page 20 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) e. The location(s) of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s) where any evidence identified under Part II F 3 a (7) exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the SWPPP that are necessary ) as a resuit of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized representative. The inspection report and any actions taken in accordance with Part il must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. G. Corrective actions. 1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as weil as obtain all appiicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator must comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). Page 21 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) 3. The operator shall periodicaliy caiibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that wiil ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date, exact place, and time of sampling or measurements; b. The individual(s) who performed the sampling or measurements; c. The date(s) and time(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of ali reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. 1. The operator shali update the SWPPP to include the resuits of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, Iocation, parameter, method, and resuit of the monitoring activity are included. 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of ineasurements shall utilize an arithmetic mean unless othenvise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this general permit or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compiiance schedule of this general permit shall be submitted no later than 14 days following each schedule date. Page 22 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1- 44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and Iocation of the discharge; 2. The cause of the discharge; 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or"upseY', as defined herein, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part Iil I 2. Unusual and extraordinary discharges include but are not limited to any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surFace waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The foilowing shall be included as information that shall be reported within 24 hours under this subdivision: Page 23 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case-by-case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part III I 1 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part III I 2. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892. 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility inciuding having the Page 24 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part III K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy must be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properiy gathered and evafuated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsibie for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit Page 25 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shali submit a new registration statement at least 90 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shali not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Ciean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upseY' (Part III �, nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preciude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act. Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any poliutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. "Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for Page 26 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in PartIIlU3a. V. Upset. 1. An "upset," as defined in 9VAC25-870-10, means an exceptionai incident in which there is unintentional and temporary noncompliance with technology-based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment faciiities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology-based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a finai administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to estabiish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause(s) of the upset; b. The permitted facility was at the time being properly operated; Page 27 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) c. The operator submitted notice of the upset as required in Part III I; and d. The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as othenvise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. For purposes of this section, the time for inspection shall be deemed reasonabie during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permits. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the titie to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part II I Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Page 28 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. 9VAC25-880-80. (Repealed.) 9VAC25-880-82. (Repealed.) 9VAC25-880-84. (Repealed.) 9VAC25-880-86. (Repealed.) 9VAC25-880-88. (Repealed.) 9VAC25-880-90. (Repealed.) 9VAC25-880-100. Delegation of authority. The director, or his designee, may perform any act of the board provided under this chapter, except as limited by § 62.1-44.14 of the Code of Virginia. FORMS (9VAC25-880) Deqartment of Environmental Qualitv Construction Activitv Oqerator Permit Fee Form (rev. 01/2014) Notice of Termination - General VPDES Permit for Discharqes of Stormwater from Construction Activities (VAR10) (rev. 01/2014) Re4istration Statement - General VPDES Permit for Discharqes of Stormwater from Construction Activities (VAR10) (rev. 01/2014) Transfer Apreement - General VPDES Permit for Discharpes of Stormwater from Construction Activities (VAR10) (rev. 01/2014) Page 29 of 29 9VAC25-880 (adopted 12/17/2013 - published 2/24/2014 - effective 7/1/2014) Section 12. Inspection logs ( ��rOG I�1C TCllll � t�: , ., A�t'lil Illi`�� !Uilti. �tti� i1�C:i1�..1 ,.1�:� �1 �rC: Il} �)1 ��.L,� ` �i� ��l'.l i � >CCiI�` � ts I'�: �-. ) Rev I 1/2020 PAGE 31 I Inspection Report - Top Soiling Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - Top Soiling (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Temporary Seeding Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - Temporary Seeding (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Permanent Seeding Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - Permanent Seeding (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Mulching Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - Mulching (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Soil Stabilization Blankets and Matting Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - Soil Stabilization Blankets and Matting (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Inspection Report - Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson Inspection Report - (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res ousible erson TakeuBes onsible erson Corrective Action Log Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc if an lanned date/res onsible erson TakenBes onsible erson Corrective Action Log (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Inspection Inspector Location/ Description of Discharge or Corrective Action Needed (including Date Action Date Name s Weather Deficienc (if an lanned date/res onsible erson TakenBes onsible erson SWPPP Amendment Log Project Name: Troxell Poultry House SWPPP Contact: Amendment No. Description of the Amendment Date of Amendment Amendment Prepared by Name s and Title SWPPP Amendment Log (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Amendment No. Description of the Amendment Date of Amendment Amendment Prepared by Name s and Title Grading and Stabilization Activities Log Project Name: Troxell Poultry House SWPPP Contact: Date Description of Grading Activity Date Grading Date When Description of Stabilization Measure and Grading Activity Ceased Stabilization Location Activity (Indicate Measures are Initiated Temporary or Initiated Permanent Grading and Stabilization Activities Log (CONTINUED) Project Name: Troxell Poultry House SWPPP Contact: Date Description of Grading Activity Date Grading Date When Description of Stabilization Measure and Grading Activity Ceased Stabilization Location Activity (Indicate Measures are Initiated Temporary or Initiated Permanent