HomeMy WebLinkAboutSDP202100038 Plan - Revision 2021-07-12RIVANNA WATER &SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA WATER & SEWER AUTHORITY MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIERS AND LIME SILO DEMOLITION CIVIL C01 - GENERAL NOTES AND LEGEND CO2 - EROSION AND SEDIMENT CONTROL NOTES CO3 - LOCATION INFORMATION C10 - OVERALL SITE PLAN C11 - EXISTING SITE AND YARD PIPING PLAN C12 - EROSION AND SEDIMENT CONTROL PLAN C13 - DEMOLITION PLAN C14 - FINAL SITE PLAN C15 - FINAL YARD PIPING PLAN C16 - STORMWATER CALCULATIONS - VRRM C17 - STORMWATER CALCULATIONS - PEAK FLOWS CD1 - EROSION AND SEDIMENT CONTROL DETAILS CD2 - STANDARD DETAILS TOTAL SHEETS: 14 ISSUED FOR CONSTRUCTION of Virginia a 1-64 —• Exit 120 Q' 631 44 HAZE N N 0.31442-008 JUNE 2021 UChad 1-64 Exit 12 �/ 388 L YA •- _ 20 250 te' ')ms - ; 20 LOCATION MAP NOT TO SCALE Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 � e 250 / • I Monticello MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ALBEMARLE COUNTY CDD PROJECT #: SDP202100038 WP0202100027 DATE REVISION SET 7/12/2021 REVISION PER COUNTY COMMENTS APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARTMENT OF TRANSPORTATION GENERAL NOTES: SITE INFORMATION SITE SEEDING SCHEDULE AND NOTES 1. SITE INFORMATION HAS BEEN TAKEN FROM HAZEN AND SAWYER RECORD DRAWINGS FROM PROJECT #31037-039 TITLED "MOORES CREEK WASTEWATER TREATMENT PLANT NUTRIENT REMOVAL IMPROVEMENTS", DATED SEPTEMBER, 2014. 2. HORIZONTAL CONTROL IS REFERENCED TO NAD 83, VIRGINIA SOUTH ZONE, AND VERTICAL CONTROL IS REFERENCED TO NAVD 88. 3. FLOOD PLAIN ELEVATIONS FROM FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) FLOOD INSURANCE RATE MAP FIRM PANEL 0289D MAP NUMBER 51003CO289D DATED FEBRUARY 04, 2005 THE PROJECT IS LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD. 4. CONTRACTOR SHALL VERIFY FIELD CONDITIONS BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS AND DIMENSIONS WHERE NEW WORK WILL MATCH EXISTING. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO THE COMMENCEMENT OF WORK. 5. CONTRACTOR SHALL OBTAIN ALL THE NECESSARY CONSTRUCTION PERMITS FROM THE APPROPRIATE AUTHORITIES, DEPARTMENTS, AND/OR AGENCIES HAVING JURISDICTION PRIOR TO COMMENCING WORK. OWNER AND ENGINEER HAVE OBTAINED DESIGN PERMITS TO COMPLETE WORK INCLUDING A MINOR SITE PLAN AMENDMENT AND A WATER PROTECTION ORDIANCE (WPONSMP) FROM ALBEMARLE COUNTY. 6. CONTRACTOR SHALL TAKE CARE TO AVOID DAMAGE TO EXISTING PAVEMENT, TREES, VEGETATION, STRUCTURES, AND UTILITIES THAT ARE NOT INDICATED TO BE DEMOLISHED OR REMOVED. ANY DAMAGE TO EXISTING PAVEMENT, TREES, VEGETATION, STRUCTURES, AND UTILITIES NOT INDICATED TO BE DEMOLISHED OR REMOVED SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 7. UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORD INFORMATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THEIR EXACT LOCATION AND TO AVOID DAMAGE TO THEM. THE CONTRACTOR SHALL CONTACT VIRGINIA 811 AT PHONE NUMBER 811 OR 1-800-552-7001 TO REQUEST UNDERGROUND UTILITY LOCATION MARK -OUT AT LEAST THREE (3) WORKING DAYS BUT NO MORE THAN TEN (10) WORKING DAYS PRIOR TO BEGINNING EXCAVATION, INCLUDING SOIL DRILLING. THE CONTRACTOR SHALL ALSO CONTACT AND REQUEST UTILITY LOCATION MARK -OUT FROM BURIED UTILITY OWNERS WITH UTILITIES ON THE PROJECT SITE THAT ARE NOT PARTICIPANTS OF VIRGINIA 811. 8. WHERE PROPOSED WORK IS IN THE VICINITY OF UTILITY POLES, SUCH THAT SUPPORT OF THE POLE(S) WILL BE REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE UTILITY OF THE WORK. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE UTILITY FOR SUPPORT OF THE POLE. ALL PAYMENTS ASSOCIATED SHALL BE INCLUDED IN CONTRACTORS LUMP SUM BID. 9. WHERE OVERHEAD POWER LINES ARE PRESENT, CONTRACTOR MUST CONTACT THE UTILITY PRIOR TO CONSTRUCTION ACTIVITIES TO DETERMINE THE MINIMUM REQUIRED EQUIPMENT CLEARANCE (MEC) DISTANCE BASED UPON LINE STRENGTH. 10. DURING EXCAVATION AND PLACEMENT OF UTILITIES THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY REGULATIONS AND SHALL SUBMIT TO THE ENGINEER FOR REVIEW SHEET PILING, SHORING AND/OR BRACING DESIGNS AS MAY BE NECESSARY TO COMPLY WITH THESE REGULATIONS. 11. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL EXCAVATION SUPPORT AT LOCATIONS AS MAY BE SUGGESTED ON CONTRACT DRAWINGS OR FOR THEIR OWN CONVENIENCE. CONTRACTOR SHALL SUBMIT ALL NECESSARY CALCULATIONS, DRAWINGS, ETC. PREPARED BY A PROFESSIONAL ENGINEER REGISTERED IN THE COMMONWEALTH OF VIRGINIA AS NECESSARY FOR REVIEW BY THE ENGINEER PRIOR TO INSTALLATION. REQUIREMENTS FOR EXCAVATION SUPPORT DESIGN MAY BE FOUND IN SPECIFICATION SECTION 31 00 01 EARTHWORK. 12. GROUNDWATER FROM ALL DEWATERING OPERATIONS SHALL BE DISCHARGED TO AN ENVIRONMENTALLY ACCEPTABLE LOCATION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, OR AS DIRECTED BY THE ENGINEER. 13. ALL TEMPORARY FACILITIES ARE SUBJECT TO THE SAME HEALTH AND SAFETY REQUIREMENTS AS PERMANENT FACILITIES, AS SPECIFIED IN THE CONTRACT DOCUMENTS AND HEALTH SAFETY PLAN (HASP). 14. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS GENERATED DURING THE PROJECT OFF SITE AT A PROPERLY PERMITTED DISPOSAL FACILITY. IF REQUIRED BY DISPOSAL FACILITY, CONTRACT OR SHALL OBTAIN CHAIN OF CUSTODY FORMS TO BE SIGNED BY ALL PARTIES. 15. CONTRACTOR SHALL BE ADVISED THAT ALL WORK WILL TAKE PLACE ON AN ACTIVE WASTEWATER TREATMENT PLANT, AND OPERATIONS SHALL BE MAINTAINED THROUGHOUT WORK. ALL PRESSES SHALL BE MAINTAINED AND CONTRACTOR SHALL COORDINATE ALL PROPOSES SHUTDOWNS OR UTILITY DISTURBANCES WITH OWNER A MINIMUM OF 2 WEEKS PRIOR. LEGEND STRUCTURES/SURFACES PROJECT DESCRIPTION: THE RIVANNA WATER AND SEWER AUTHORITY IS PROPOSING DEMOLITION OF THE TWO IN -PLANT CLAIFIERS AND LIME SILO AND OTHER RELATED STRUCTURES. ALL YARD PIPING ASSOCIATED WITH THE CLARIFIERS WILL BE DEMOLISHED AND CAPPED AND FILLED AS SHOWN ON THE DRAWINGS. THERE WILL BE REROUTING OF EXISTING YARD PIPING WHERE APPROPRIATE. WHERE SHOWN, EXISTING SIDEWALK WILL BE REPLACED, AND ASPHALT WILL BE MILLED AND OVERLAID WITH SURFACE COURSE. THIS PROJECT WILL RESULT IN APPROXIMATELY 57500 SF OF LAND DISTURBANCE. EXISTING SITE CONDITIONS: THE PROJECT IS AT THE MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY (MCAWRRF) LOCATED AT 695 MOORES CREEK LANE, CHARLOTTESVILLE VA 22902. THE PROPERTY IS LOCATED IN UNINCORPORATED ALBEMARLE COUNTY. THE PROPOSED DISTURBANCE WILL BE LOCATED ADJACENT TO THE PRIMARY DIGESTERS AND THE SOLIDS HANDLING BUILDING. TOPOGRAPHY IN THESE THREE AREAS ARE GENTLY SLOPED ALONG THE EXISTING INFRASTRUCTURE, RANGING IN ELEVATIONS FROM 325 FT TO 355 FT. THE NEAREST BODY OF WATER IS MOORES CREEK, WHICH IS APPROXIMATELY 500 FT DOWNSTREAM FROM THE NEAREST GROUND DISTURBING ACTIVITY. NO LAND DISTURBANCE WILL TAKE PLACE IN THE FEMA FLOODPLAIN OR 100' MOORES CREEK STREAM BUFFER. MOORES CREEK ULTIMATELY DISCHARGES TO THE RIVANNA RIVER. ACCORDING TO THE 2016 TMDL REPORT, MOORES CREEK STREAM SEGMENT IS SEVERELY IMPACTED FOR ITS AQUATIC LIFE USE. SEDIMENT WAS SELECTED AS THE MOST PROBABLE STRESSOR. THE PROJECT IS LOCATED IN ZONE X, AREA OF MINIMAL FLOOD HAZARD. THE COMBINED MCAWRRF PARCELS ARE BOUND TO THE SOUTH BY THE 1-64 CORRIDOR. TO THE WEST AND NORTH ARE MULTIPLE OPEN PARCELS, ZONED RURAL AND LIGHT INDUSTRIAL. OFF -SITE AREAS: CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SELECT BACKFILL FROM AN OFFSITE LOCATION. ANY VPDES PERMIT REQUIRED IN SUPPORT OF OFFSITE ACTIVITIES SHALL BE OBTAINED BY THE CONTRACTOR SOILS: SOIL TYPES FOUND AT THE MCAWRRF SITE WERE IDENTIFIED BASED ON INFORMATION OBTAINED FROM THE UNITED STATES DEPARTMENT OF AGRICULTURE (USDA), NATURAL RESOURCE CONSERVATION SERVICE (NRCS). THE PROJECTS LIMITS OF DISTURBANCE IS COMPOSED SOLELY OF RABUN CLAY LOAM, 15 TO 25 PERCENT SLOPES. RABUN CLAY LOAM IS IN HYDROLOGIC SOIL GROUP (HSG) A. ADJACENT SOIL TYPES ARE SHOWN ON THE LEGEND BELOW AND ON C12 FOR BOUNDARY CLARIFICATION ONLY. SOIL UNIT LEGEND MAP UNIT SYMBOL MAP UNIT NAME HSG SITE AREA 71D RABUN CLAY LOAM, B 100% 15 TO 25% SLOPES 71C RABUM CLAY LOAM, B 0% 7 TO 15% SLOPES 83 COLVARD FINE SANDY LOAM, A 0% 0 TO 2% SLOPES, OCCASIONALLY FLOODED 23B YADKIN CLAY LOAM, B 0% 2 TO 7% SLOPES 23C YADKIN CLAY LOAM, B 0% 7 TO 15% SLOPES 12E CATOCTIN SILT LOAM, 15 TO B 0% 25% SLOPES, VERY STONY NEW/OTHER EXISTING STORMWATER RUNOFF CONSIDERATIONS: QUALITY THE VIRGINIA RUNOFF REDUCTION METHOD (VRRM) SPREADSHEET FOR RE -DEVELOPMENT WAS USED TO DETERMINE THE NUTRIENT REDUCTION REQUIREMENTS. BECAUSE OF THE REMOVAL OF IMPERVIOUS SURFACES, THE PROPOSED PROJECT IS EXCEEDING THE PHOSPHORUS LOAD REDUCTION BY 0.04 LBS/YR. QUANTITY THE PRE -DEVELOPMENT PEAK FLOWS FOR THE 2-YR AND 10-YR 24-HR STORMS FOR EACH DRAINAGE AREA (DA) ARE AS FOLLOWS: 2-YR, 24-HR 10-YR, 24-HR DA1 0.1 CFS 0.4 CFS DA2 1.0 CFS 2.1 CFS DA3 0.9 CFS 1.9 CFS DA4 0.2 CFS 0.5 CFS THE POST -DEVELOPMENT PEAK FLOWS FOR THE 2-YR AND 10-YR 24-H5 STORMS FOR EACH DRAINAGE AREA ARE AS FOLLOWS: 2-YR, 24-HR 10-YR, 24-HR DA1 0.1 CFS 0.4 CFS DA2 0.6 CFS 1.5 CFS DA3 0.7 CFS 1.6 CFS DA4 0.2 CFS 0.5 CFS UNDER PRE -DEVELOPMENT CONDITIONS, RUNOFF FROM THE PROJECT AREA SHEET FLOWS DOWNHILL AWAY FROM THE CLARIFIERS, DOWN A STEEP HILL AND INTO THE NEAREST STORMWATER INLET. NO CHANGE IN OVERALL DRAINAGE PATTERNS IS PROPOSED POST -DEVELOPMENT. EACH DRAINAGE AREA EITHER EXPERIENCES NO CHANGE OR A DECREASE IN PEAK FLOW. AT THE POINT OF OUTFALL THE DRAINAGE AREA OF MOORES CREEK IS APPROCIAMTELY 35.1 SQUARE MILES. THERE WILL BE NO CHANGE IN PRE AND POST RUNOFF CONDITIONS AS A RESULT OF THIS PROJECT AS ALL EXISTING DRAINAGE PATTERNS WILL REMAIN. DUE TO PROJECT DEMOTION, THERE WILL BE A DECREASE IN PEAK FLOW FOR THE PROJECTS AFFECTED DRAINAGE AREAS AND AS SUCH NO IMPACT ON MOORES CREEK AS IT RELATES TO EROSION OR FLOODING. ABBREVIATIONS NEW DEMO EXISTING 300 CONTOUR 300� CONTOUR EDP EDGE OF PAVEMENT G GAS n n x FENCE BUILDING/STRUCTURE III�III YARD INLET LOD LIMITS OF DISTURBANCE SS SANITARY SEWER -- PROPERTY LINE CONCRETE CURB OHE OVERHEAD ELECTRIC W WATER �r AND GUTTER EASEMENT EXCAVATION SUPPORT �a ............................. STORM DRAIN LINE FOC FIBER OPTIC CABLE R PROPERTY LINE .. CONCRETE PAD/SIDEWALK 77777777 A e SOIL TYPE BOUNDARY QO MANHOLE LP LIGHT POLE rt CENTER LINE - - - - - - YARD PIPING co YARD INLET UGE UNDERGROUND MILL AND OVERLAY + + + + POWER POLE ELECTRIC PP POWER POLE PROJECT ENGINEER: DESIGNED BY: DRAWN BY: CHECKED BY: 1 CONSTRUCTION 06/2021 gyp M THIS BAR DOES NOT MEASURE 1"THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE :m1•l:armt A. MARCH A. MARCH B.EDWARDS 0 1/2" 1" ISSUED FOR CONSTRUCTION Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 APPLICATION RATES IN POUNDS/ACRE SEED PLANTING STRAW MIXTURE SEASON SEED LIME* FERTILIZER** MULCH*** COMMENTS PREFERED SEASONS: P FEB 15 - APR 30 200 4000 1000 4000 SEPT 1 - SEPT 30 SEPT 1 - OCT 31 FEB 15 - MARCH 30 OVERSEED WITH TYPE P TW SEPT 1 - FEB 15 100 * 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON OVERSEED WITH TYPE P TSP FEB 16 - APR 30 100 * 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON OVERSEED WITH TYPE P TSU MAY 1 - AUG 31 50 * 600 4000 SEED MIXTURE DURING NEXT PLANTING SEASON RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA P - 190 LB/AC KENTUCKY 31 TALL FESCUE 5 LB/AC PERENNIAL RYEGRASS 5 LB/AC KENTUCKY BLUEGRASS TW - 50 LB/AC ANNUAL RYEGRASS 50 LB/AC CEREAL (WINTER) RYE TSP - 100 LB/AC ANNUAL RYEGRASS TSU - 50 LB/AC GERMAN MILLET SEED MIXTURES TO BE USED ON THE PROJECT FOR PERMANENT (P), TEMPORARY WINTER (TW), TEMPORARY SPRING (TSP) AND TEMPORARY SUMMER (TSU) SHALL BE AS FOLLOWS (ACCEPTABLE SUBSTITUTES PER SECTION 6.24 OF THE NC EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL MUST BE APPROVED BY ENGINEER) SEEDBED PREPARATION NOTES: 1. SCARIFY 2" DEPTH OF SUBGRADE PRIOR TO PLACING TOPSOIL. 2. TOPSOIL SHALL BE SPREAD AT 4" INCH CONSOLIDATED DEPTH 3. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, OF HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. IN FINE SOILS, SEEDS SHOULD BE DRILLED 1/4 -1/2 INCH. IN COARSE, SANDY SOILS, SEEDS SHALL BE PLANTED NO DEEPER THAN 3/4 INCH. COVER BROADCAST SEED BY LIGHTLY RAKING OR CHAIN DRAGGING; THEN FIRM SURFACE WITH A ROLLER OR CULTIPACKER TO PROVIDE GOOD SEED CONTACT. 4. ON CUT AND FILL SLOPES 2:1 OR STEEPER ADD 20 LBS/AC OF WEEPING LOVEGRASS TO THE P SEED MIXTURE IN THE SPRING AND ADD 20 LBS/AC ANNUAL RYEGRASS IN FALL AND WINTER. * LIME SHALL BE APPLIED AT A MINIMUM OF 2 TONS PER ACRE WITH 3 TONS PER ACRE IN CLAY SOILS. APPLICATION RATES AND/OR CHEMICAL ANALYSIS SHALL BE CONFIRMED OR ESTABLISHED BY SOIL TEST. TACK MULCH BY APPLYING AT 0.10 GAL/YD2. RATE REQUIREMENTS FOR TEMPORARY SEEDING SHALL BE BASED UPON A pH TEST AS SUCH: <4.2 3 TONS/ACRE 4.2-5.2 2 TONS/ACRE 5.2-6.0 1 TON/ACRE ** FERTILIZER SHALL BE 10-20-10 MIX OR EQUIVALENT NUTRIENTS. *** ALTERNATIVE METHODS OF MULCHING MAYBE UTILIZED. ALTERNATIVE METHODS SHALL CONFORM TO REQUIREMENTS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. TEMPORARY SEEDING: 1. LIMING: AN EVALUATION SHOULD BE CONDUCTED TO DETERMINE IF LIME IS NECESSARY FOR TEMPORARY SEEDING. SEE ABOVE NOTES TO DETERMINE THE NEED AND APPLICATION OF LIME FOR TEMPORARY SEEDING. 2. FERTILIZER: SHALL BE APPLIED AT 600 LBS/AC OF 10-20-10 OR EQUIVALENT NUTRIENTS. LIME AND FERTILIZER SHALL BE INCORPORATED INTO THE TOP 2 TO 4 INCHES OF THE SOIL. 3. SEEDING: SEEDING SHALL BE APPLIED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER OR HYDROSEEDER. SMALL GRAINS SHALL BE PLANTED NO MORE THAN ONE INCH DEEP. GRASSES AND LEGUMES SHALL BE PLANTED WITH NO LESS THAN 1/4" SOIL COVER. FOR SEED SELECTION AND RATES SEE TABLE 3.31-B (THIS SHEET). 4. MULCHING: SEEDING MADE IN FALL FOR WINTER COVER AND DURING HOT AND DRY SUMMER MONTHS SHALL BE MULCHED ACCORDING TO MULCHING STD. & SPEC 3.35 (TABLE 3.35-A PROVIDED THIS SHEET), EXCEPT THAT HYDROMULCHES (FIBER MULCH) WILL NOT BE CONSIDERED ADEQUATE. STRAW MULCH SHOULD BE USED DURING THESE PERIODS. TEMPORARY SEEDING MADE UNDER FAVORABLE SOIL AND SITE CONDITIONS DURING OPTIMUM SPRING AND FALL SEEDING DATES MAY NOT REQUIRE MULCH. PERMANENT SEEDING: 1. LIMING & FERTILIZER: LIME AND FERTILIZER SHALL BE APPLIED PER SOIL TESTS. SOIL TEST MAY BE PREFORMED BY THE COOPERATIVE EXTENSION SERVICE SOIL TESTING LABORATORY AT VPI&SU, OR BY A REPUTABLE COMMERCIAL LABORATORY. INFORMATION CONCERNING THE STATE SOIL TESTING LABORATORY IS AVAILABLE FROM COUNTY EXTENSION AGENTS. IF SOIL TESTS ARE NOT POSSIBLE, DUE TO UNUSUAL CONDITIONS, SEE THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION 3.32 FOR LIMING AND FERTILIZER NEEDS. 2. SEEDING: SEEDING SHALL BE APPLIED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. SEED DEPTH SHOULD BE 1/4 TO 1/2 INCH. FOR SEED SELECTION AND RATES SEE TABLE 3.32-D (THIS SHEET). 3. MULCHING: ALL PERMANENT SEEDING SHALL BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION. REFER TO MULCHING, STD. & SPEC. 3.35 (TABLE 3.35-A PROVIDED THIS SHEET). MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION NOTES CIVIL GENERAL NOTES AND LEGEND FITTWE HAZEN NO. CONTRACT NO.: DRAWING NUMBER: 1111011=1l060 31442-008 1 C01 1 9VAC25-840-40. MINIMUM STANDARDS. A VESCP MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 300 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH PROJECT ENGINEER: DESIGNED BY: DRAWN BY: CHECKED BY: CONSTRUCTION 06/2021 gyp IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING ISSUED FOR DATE gY IS NOT TO FULL SCALE THIS CHAPTER. f. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS. (b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION. d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THEIMPROVEMENTS. e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. h. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. j. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. rA1•l:ar11111:4 A. MARCH ISSUED FOR CONSTRUCTION B.EDWARDS 0 1/2" 1" k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. I. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS. n. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION. STATUTORY AUTHORITY § 62.1-44.15:52 OF THE CODE OF VIRGINIA. HISTORICAL NOTES FORMER 4VAC50-30-40, DERIVED FROM VR625-02-00 § 4; EFF SEPTEMBER 13, 1990; AMENDED, VIRGINIA REGISTER VOLUME 11, ISSUE 11, EFF. MARCH 22, 1995; VOLUME 29, ISSUE 4, EFF. NOVEMBER 21, 2012; AMENDED AND RENUMBERED, VIRGINIA REGISTER VOLUME 30, ISSUE 2, EFF. OCTOBER 23, 2013. EROSION AND SEDIMENT CONTROL - LOD- LOD- LIMITS OF DISTURBANCE ® IP INLET PROTECTION SCE GRAVEL CONSTRUCTION ENTRANCE SF SF SILT FENCE B/M SOIL STABILIZATION BLANKETS TS TEMPORARY SEEDING PS PERMANENT SEEDING DC DUST CONTROL Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION OVERALL EROSION & SEDIMENTATION CONTROL NOTES 1. THE CONTRACTOR IS ENCOURAGED TO PHASE CONSTRUCTION TO MINIMIZE EXPOSED SOIL AREAS THROUGHOUT THE PROJECT. 2. ALL ONSITE ACTIVITIES SHALL BE MANAGED TO INSURE NO ADVERSE IMPACTS TO WATER QUALITY OCCUR DURING AND AFTER CONSTRUCTION. THE ACTIVITIES, AS DESCRIBED IN SPECIFICATION SECTION 31 25 00, AND OTHERS, REQUIRE OVERSIGHT THROUGHOUT THE CONSTRUCTION AND DEVELOPMENT PROCESS TO ASSURE THAT ALL WATER QUALITY STANDARDS ARE PROTECTED. SEE SPECIFICATION SECTION 31 25 00 FOR FURTHER REQUIREMENTS. 3. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EROSION CONTROL MEASURES WHETHER OR NOT SHOWN ON THE PLANS TO PROTECT ADJACENT CREEKS, RIVERS, ROADWAYS, ETC. FROM SILTATION AND EROSION. 4. EACH EROSION AND SEDIMENTATION CONTROL MEASURE SHALL BE INSPECTED AT LEAST ONCE EVERY FOUR BUSINESS DAYS OR AT LEAST ONCE EVERY FIVE BUSINESS DAYS AND NO LATER THAN 48 HOURS FOLLOWING A MEASURABLE STORM EVENT. IN THE EVENT THAT A MEASURABLE STORM EVENT OCCURS WHEN THERE ARE MORE THAN 48 HOURS BETWEEN BUSINESS DAYS, THE INSPECTION SHALL BE CONDUCTED ON THE NEXT BUSINESS DAY. 5. ALL PIPE WORK SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD CONSTRUCTION TECHNIQUES. ONLY THE LENGTH OF TRENCH IN WHICH PIPE CAN BE INSTALLED IN ONE DAYS TIME SHALL BE OPEN AT ANY TIME, WITH SPOIL MATERIAL PLACED ON THE UPHILL SIDE OF THE TRENCH. PIPING SHALL BE CAPPED AT THE END OF EACH WORK DAY TO PREVENT SEDIMENT FROM ENTERING PIPE. TRENCH SHALL BE BACKFILLED AT END OF EACH WORKDAY AND DISTURBED AREA SEEDED WITH TEMPORARY SEEDING MEASURES, AS APPROPRIATE. 6. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE, PERMANENT VEGETATION IS ESTABLISHED ON ALL DISTURBED AREAS, AND APPROVAL BY THE ENGINEER IS GIVEN. AREAS WHERE EROSION AND SEDIMENTATION CONTROL MEASURES ARE REMOVED SHALL BE REGRADED AND SEEDED TO MATCH ORIGINAL SITE CONDITIONS. EROSION & SEDIMENTATION CONTROL CONSTRUCTION SEQUENCING 1. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. CONTRACTOR SHALL INSTALL SILT FENCE AS SHOWN ON THE DRAWING FOR TEMPORARY PERIMETER EROSION CONTROL. 2. ONCE THE SITE HAS BEEN CLEARED AND GRUBBED, AND ALL SILT FENCE HAS BEEN INSTALLED, ALL APPROPRIATE UTILITY REROUTING SHALL COMMENCE. ONCE ALL PERMANENT UTILITIES HAVE BEEN ROUTED, THE EXCAVATION SUPPORT SYSTEM MAY BE FURBISHED. ALL MAJOR EXCAVATION AND DEMOLITION ACTIVITIES MAY OCCUR AFTER SUPPORT SYSTEM HAS BEEN VERIFIED BY THE ENGINEER. 3. TEMPORARY SEEDING MEASURES SHALL BE EMPLOYED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES ON ANY AREA WHICH WILL REMAIN UNDISTURBED FOR MORE THAN 7 WORKING DAYS OR 14 CALENDAR DAYS, WHICHEVER IS SHORTER. ALL SLOPES STEEPER THAN 3HA V SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS. ALL OTHER SLOPES OF 3HAV OR FLATTER, EXCEPT THOSE GREATER THAN 50 FT IN LENGTH, SHALL BE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR OTHER STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 14 CALENDAR DAYS. 4. PERMANENT SEEDING SHALL BE INSTALLED, IN THE PROPER PLANTING SEASON, FOR ALL AREAS REACHING FINAL GRADE WHICH WILL NOT BE DISTURBED AGAIN. IF PLANTING SEASON IS NOT APPROPRIATE FOR PERMANENT SEEDING CONTRACTOR SHALL RE -SEED AREA WITH PERMANENT SEEDING WHEN SEASON ALLOWS. 5. UPON COMPLETION OF FINAL GRADING, PERMANENT STRUCTURAL OR VEGETATIVE STABILIZATION SHALL BE ESTABLISHED. 6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES AND THE SITE HAS BEEN PERMANENTLY STABILIZED WITH STRUCTURAL AND/OR PERMANENT VEGETATIVE MEASURES. 7. CONTRACTOR SHALL PERFORM SITE INSPECTION AND MAINTENANCE ONCE EVERY5 BUSINESS DAYS AND WITHIN 48 HOURS AFTER MEASURABLE STORM EVENT. 8. ONCE PERMANENT STABILIZATION HAS OCCURRED, TEMPORARY SEDIMENT CONTROL MEASURES MAY BE REMOVED UPON APPROVAL FROM THE ENGINEER AND ALBEMARLE COUNTY. ANY AREAS DISTURBED BY THE REMOVAL OF EROSION CONTROL MEASURES SHALL BE RETURNED TO THE ORIGINAL, OR BETTER, CONDITION BEFORE SEEDED, MULCHED, AND FERTILIZED. EROSION AND SEDIMENT CONTROL MEASURES: TEMPORARY MEASURES: • CONSTRUCTION ENTRANCE PER STD 3.02 • SILT FENCE PER STD 3.05 • GRAVEL DROP INLET SEDIMENT FILTER PER STD 3.07-2 • CURB INLET SEDIMENT FILTER PER STD 3.07-6 • TEMPORARY SEEDING PER STD 3.31 PERMANENT MEASURES: • SOIL STABILIZATION BLANKETS PER STD 3.36 • PERMANENT STABILIZATION: AREAS OF THE SITE THAT WILL NOT BE PAVED WILL BE SEEDED AND MULCHED ACCORDING TO THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK REQUIREMENTS PER STD 3.32 EROSION AND SEDIMENT CONTROL MAINTENANCE NOTES: IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AFTER EACH RAINFALL OR WEEKLY, WHICHEVER IS MORE FREQUENT, AND SHOULD BE CLEANED AND REPAIRED ACCORDING TO THE FOLLOWING SCHEDULE: 1. EROSION AND SEDIMENT CONTROLS WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION AND BUILDUP OR CLOGGING WITH SEDIMENT. CORRECTIVE ACTION SHALL BE TAKEN IMMEDIATELY. 2. FREQUENT INSPECTIONS AND CLEANING OF MUD AND DEBRIS FOUND OUTSIDE OF THE LIMITS OF DISTURBANCE IS REQUIRED, ALONG WITH ANY OTHER REMEDIES REQUIRED BY THE COUNTY. 3. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND OF GRASS IS MAINTAINED. AREAS SHALL BE RESEEDED AS NEEDED. TEMPORARY STABILIZATION WILL BE USED AS REQUIRED BY THE COUNTY. r.JTWE HAZEN NO. CIVIL CONTRACT NO. EROSION AND SEDIMENT CONTROL NOTES DRAWING NUMBER: JUNE 2021 31442-008 1 CO2 REV MAIN PLANT ENTRANCE PROPERTY LINE, TYP. - CITY OF CHARLOTTESVILLE LIMITS 100 YEAR FLOODPLAIN, TYP. 1 �OpyR FLOODWAY. TYP. 100' STREAM BUFFER, TYP. i : ............ o....�t..........' .Cp.................. g PROPOSED USE: INDUSTRIAL (UTILITY) OWNER: RIVANNA WATER & SEWER AUTHORITY PROPERTY: MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY TOTAL PROPERTY SIZE: 89.46 ACRES TAX MAP/PARCEL: 077-40A ZONING: LI (LIGHT INDUSTRIAL); ENTRANCE CORRIDOR (EC) MAGISTERIAL: SCOTTSVILLE COUNTY: ALBEMARLE STATE: VIRGINIA ENGINEER: HAZEN AND SAWYER 4011 WESTCHASE BLVD SUITE 500 RALEIGH NC 27607 NO SURVEY CONDUCTED FOR THIS PROJECT; SITE TOPOGRAPHY IS FROM BASE FILES FROM PREVIOUS PLANT IMPROVEMENT SURVEYS. DATUM: HORZ: NAD83 VIRGINIA SOUTH ZONE VERT: NAVD88 THIS SITE IS SUBJECT TO THE ALBEMARLE COUNTY FLOOD HAZARD OVERLAY DISTRICT. THIS SITE IS NOT LOCATED WITHIN THE WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. 100 YEAR FLOODPLAIN ELEVATION: 324.00' REFERENCE: FEMA MAP # 51003CO289D, EFFECTIVE 2/4/2005 AND LOMR 16-03-1107P, EFFECTIVE 2/6/2017. WAIVERS FOR DETENTION, TRAVELWAY WIDTH AND LANDSCAPE PLAN REQUIREMENTS HAVE BEEN GRANTED UNDER THE MAJOR AMENDMENT REVIEW OF SDP200800100. SETBACKS (MET OR N/A) FRONT MINIMUM: 10' FROM THE R-O-W OR EXTERIOR EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE OF R-O-W FRONT MAXIMUM: NONE SIDE AND REAR MINIMUM: 50' BETWEEN PUBLIC R-O-W, RURAL AREAS, OR THE MONTICELLO HISTORIC DISTRICT AND STRUCTURE; 30' BETWEEN OFF-STREET PARKING AND THE DISTRICT BOUNDARY. SIDE AND REAR MAXIMUM: NONE l 100`fR �. GRIT REMOVAL FACILITY IMPROVEMENTS, SDP2015-145 CLARIFIER COVER CONSTRUCTION, SDP2015-145 �� WTERSTATE 64 CORRIDOR ADJACENT PARCELS NO. OWNER TAX MAP PARCEL NO I DB-PG ZONING USE 1 RIVANNA WATER AND SEWER AUTHORITY 77 38B 5111 - 166 LIGHT INDUSTRY INDUSTRIAL 2 RIVANNA WATER AND SEWER AUTHORITY 78 22A 5125-573 LIGHT INDUSTRY INDUSTRIAL 3 ELEMENTAL ECOTECH LLC 77 40B 495-325 LIGHT INDUSTRY OPEN 4 TREM COMMERICAL RENTALS LLC 77 40N 2893-653 LIGHT INDUSTRY WAREHOUSE 5 LACY MECHANICAL INC 77 40P 3655-442 LIGHT INDUSTRY GARAGE 6 BROADWAY CENTER LLC 77 40P1 4436-471 LIGHT INDUSTRY WAREHOUSE 7 WOOLEN MILLS 78 21B 639-193 C1 COMMERCIAL COMMERCIAL LIMITS OF DISTURBANCE:57500 SF (1.32 AC) 150' 75' 0 150' SCALE: 1" = 150' CIATED SITE PLANS: SDP20800100 (APPROVED JAN 2009) SITE PLAN SUBMITTAL FOR THE EXPANSION OF MOORES CREEK WWTP WITH REGARDS TO THE NUTRIENT REMOVAL IMPROVEMENT PROJECT. ASSOCIATED SITE PLAN REVISIONS: SDP2010-82 (APPROVED JAN 2011) SITE PLAN SUBMITTAL FOR IMPROVEMENTS TO THE EXISTING MOORES CREEK PUMP STATION AND ITS ASSOCIATED PROPOSED FORCE MAIN. SDP2012-40 (APPROVED OCT 2012) ir SITE PLAN SUBMITTAL FOR DIGESTER IMPROVEMENTS AT THE EXISTING MOORES CREEK WWTP SDP2013-33 (APPROVED SEPT 2013) SITE PLAN FOR CONSTRUCTION OF NEW RIVANNA PUMP STATION AND INTERCEPTOR TUNNEL. SDP 2015-145 (APPROVED SEPT 2015) MINOR SITE PLAN AMENDMENT FOR ODOR CONTROL IMPROVEMENTS. SDP 2020-015 (APPROVED OCT 2020) MINOR SITE PLAN AMENDMENT FOR ENGINEERING TRAILER ADDITION AND PARKING LOT EXPANSION PROJECT ENGINEER: B. PORTER ISSUED FOR CONSTRUCTION - HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA NOTES CIVIL LOCATION INFORMATION DATE: JUNE 2021 DESIGNED BY: A. MARCH HAZEN NO.: 31442-008 DRAWN BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION CHECKED BY: B. EDWARDS DRAWING NUMBER: CO3 MIF THISBARDOESNOT 0 1 " MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE 1 CONSTRUCTION 06/2021 gyp REV ISSUED FOR DATE BY 000 MAIN PLANT ENTRANCE PROPERTY LINE, TYP. dQ` / �1 \p� / o / ' w6 \` / 1 a 8 I,r"i \ f-- I C 1-cls / +r \ ob, r �2 0 9� i I ABANDONED CONIDITONING TANK TO BE DEMOLISHED / IN -PLANT CLARIFIERS TO BE DEMOLISHED 1 LIME SILO AND ELECTRICAL SHED TO BE DEMOLISHED LIMITS OF DISTURBANCE, TYP. / VA001 2" MILL AND OVERLAY, TYP. t1A001 sF\ IF } 1 / � - i/ 00 LIMITS OF DISTURBANCE:57500 SF (1.32 AC) g g4 CORRIDOR �_ -- TERS TE — --_ �i IOW TA _—_ CONSTRUCTION ISSUED FOR PROJECT ENGINEER: B. PORTER DESIGNED BY: A. MARCH DRAWN BY: A. MARCH CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE 06/2021 BYP DATE BY -/- PLAN �— SCALE: 1" = 150' ISSUED FOR CONSTRUCTION Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLITION SITE CIVIL OVERALL SITE PLAN DATE: JUNE 2021 HAZEN NO.: 31442-008 CONTRACT NO.: 1 C10 2LVV / XT w \ LEI/� IN \\ SECONDARY PRIMARY PRIMARY PRIMARY DIGESTER DIGESTER NO. 1 DIGESTER NO. 2 DIGESTER NO. 3 r7 �L---------- ---- 4 G-------------------- - 3—G SL DISCH `� E 3" HER 1 �= I I / 8" DS SU N 3 HE 6" SUPERNATANT 1 / 3:1 ELECTJ Box w1 RETURN TO MH \ SLUDGE STORAGE 00 -----------------` ---4"------- Ste— — — — — — — 10 --� \ I` ILCD \ \\\---- I DG -- — 1 ------ O a -----------------�---1 I rr 4L-�r------------------- -- - — 2174---- � _� =_____ ---------- ASPHALT PAVEMENT —------_ �l=—=---- — — ASPHALT PA4EMQiT 1--------------------4 = — nr7 jC� �G I/ /i---------- N / 1/4 P \ L/4_' Pw / /� �5 , —---------- ABND 12 SS 1 �I =1 =11r—=1 =====� �1— I----- \\---------------------------- / /i i —�1 \\ -- �k/�� `�2 --- CONCRETE WALKWAY 7 --- c — T — —� 4„ DG 1 \,\ 6" DG 1 1L11 _�' -- -->--- —-------- Z1L4 EW------- 4„ EW I p— —---------------------------I---�I I I j1 II ® rii k: / .. 1 1 •' •! "�. 1 11 I _ 16" :. CURB 1 r BOILER FACILITY ni 1 I I — _ 1L'_Pw ---- JJ I ------- ❑ r:------. � . — -- }rP ------ ---- I I 2. �� 2 E" I '/ Ew 2" E S -- _ \ I 1 1 GENERATORS }� 1 NI } o I I .c. wl::; \ ——1--------T2L PE ABANDON --- — �I rn I� m I i I 1 0- rn ABANDONED JUNCTION BOX 1 1 I I I I I I I I 2" PW / 1 1 I 1 m D I II 1 11 1 1 IN IN -PLANT a I I 3 EW L---------------- I -.. co1 1 I I L------------------------- TERTIARY yy1AREA fy 1 1 1 1 111 CONDITIONING I CLARIFIER CLARIFIER 1 I FILTERS N1 1 I I I I a TANK STRUCTURE 11 p I I I III (ABANDONED) �II I I I II w I 4„ PW J I I 111 I I 1 �j .. I� L op,coi�IrR� 'P$ 16 FM I I / 10 11 I I , --- Y—__--____ IccIII ❑... — � _ _—�`�= —--��—_—_ ❑❑." I II I �I 6— — ==�LLli� is ==-1 __= 24 ML------� I I I I I �j I I I I IIII LLI I II _BW—_— II II I 8" Ps . G-11 j1---------rt— RAVEL ROAD — CONC. RETAINING WALL � cn \\ O\\ \ 100YEAR FLOODPLAIN Ii i I �� �� • �� I I I I --------------- I I 1 3" EW ��_—� ❑p�t3 \\ `r \ / — ---------18' PE ----- —��---------------- _=------------------------- L==_____________ —= r EW ---- II_ ! �p --—-------------- — �s----------------- r -----\�-- --- EW 1—--------------- -- — ——----------------- 3„ EW —_ 2„ Pw� 1 1 1 \�\ 100' STREAM BUFFER r //Q II 3 EW—_—_—__ _— _--=_1=A@APdB(�P�=_ _�� _———______2ABJ>l9AI-- __ 1$'�YPASS ABANDON —_—_—_—__ I I 1 I 1 \\ \ \\ \ //co I1 ❑ 18" BYPASS ABANDON f8 B —� I I I ---- cA '� \I I y 10 r \ {� 1\ .. I \ /j — — — — — — ---� 8, DS --- —�--- — — -- — �►--------- --at ----- -- — — — — — — Z-- — N ----------------�— —� ---� ,. ,, ... J00YR �_ \ \ \ \\ � 1--.':.. is 'i'. '.'� .r +,.{ 1: ?t 'i ter: J:' r-. _yy: 'Z:i. i'J:�•.f•..: .iY..•.�:: Y:. ..�:. :, a•. ..t :�•. . ..y.:.. C/IN ''.''' 's i�;,� 1 �\ \\ \l oo Too da SWALE INLET a' ,00m C I a I iooyR �_,00vR A� III I I I \ \ LIMO SILO °� YARD INLET LLJQp I I \\C'�1d� a °' /' � I I I I °WALKWAY INLET ri ,... , 111I �I I _I24BWW_ \\ \ \ I FLOOD WAY ]�_ = i 1 \� I V) ' r:' 1 I ° 4 III 1 � N1 — BACKWASH WASTE \\ \ ==J \ 1 • 11 CONCRETE a SOLIDS HANDLING I1LLJ 1 I 1 w1 RECLAIM BASIN PLATFORM ELECTRICAL SHED 1 BUILDING I1� 1 111 1 m1 1 a \ \\ \\ 1 1I \Ig II ° I1 I I11 II I \\\ \& ABOVE GROUND a N , - 4 OUTFALL PIPE ASPHALT PAYOAQIT ° 3: 111 I I1�� N o--------3-py ------------- \\ \\ \\ MI11 \\ \-------_— _— _— _ �---------------- I�---------_�_�_— _-- — — — _— _—_ -- I 1 I 1 1 _----�-- ------------------_—_—_—_—_—_—_—_—_—_—_—_—_—_—_—_ \ O \ 2�4' BWW—L��=__ --- -- \ -- — --- ----- — 1AE1Yft --- -- --------------------------------------- --- — ---- —-------------------------- — ------$------ ---- �— \---- ��/— 6„ A — — 6„ A— — • �•a�ro-- � 6„ A � ZZ----�A----- - 1 1 . `� . I 15 1 ASPHALT PAVEMENT ytA �9 \ �_ — \ \\\ / ❑ III o ^ -— . �. \ �==ate ------ - ��� � ❑ � - �C —tom— �-----� — 4„ DG \\\ 1 \\ '-E�------------�---- ------ ^ --- 4 ��P-------- PLAN 20 10 0 20' SCALE: 1" = 20' SCALE: 1" = 20' PROJECT ENGINEER: B. PORTER DATE: RIVANNA WATER & SEWER AUTHORITY DESIGNED BY: A. MARCH CHARLOTTESVILLEaze7 SITE VIRGINA HAZENNO.: 31442-008 DRAWN BY: A. MARCH ISSUED FOR CONTRACT NO.: 1 CONSTRUCTION - MOORES CREEK ADVANCED WATER RESOURCE CIVILDRAWING EXISTING SITE AND YARD PIPING PLAN NUMBER: CHECKED BY: B. EDWARDS HAZEN AND SAWYER IF THIS BAR DOES NOT 0 1/2" 11. 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY 1 CONSTRUCTION 06/2021 BYP MEASURE 1" THEN DRAWING RALEIGH, NORTH CAROLINA27607 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION C11 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE LICENSE NO.: C-0381 SECONDARY _ DIGESTER wwmw� � � � � � � — PRIMARY PRIMARY PRIMARY DIGESTER NO. 1 DIGESTER NO. 2 DIGESTER NO. 3 NOTES: 1. SEE DRAWING CO2 FOR EROSION AND SEDIMENT CONTROL NOTES, AND STANDARD SYMBOLS. ^s T 10 ik IP 9M9=!—mmmwk1 Mime 10 SLUDGE STORAGE LOD SOIL TYPE BOUNDARY, TYP. SEE SOIL CHART. C01 «.oj+Nr EXCAVATION SUPPORT SYSTEM BY ASPHALT PAVEMENT CONTRACTOR, SEE NOTE 1, DRAWING C13 LOD LOD r O 0 t r O 0 METHANE SCRUB BOXES BOILER FACILITY GENERATORS 1 }ti I7 ASPHALT PAVEMENT A D LOD LOD LOD r ' y rn CURB INLET PROTECTION, I IN -PLANT IN -PLANT 0 TERTIARY 55 AREA rnn SEE DETAIL 3.07-6, CDI I III "' I CLARIFIER CLARIFIER FILTERS I LIMITS OF DISTURBANCE CONDITIONING ' TANK STRUCTURE rV (ABANDONED) I g ' I STOCKPILE/CONTRACTOR 0 SILT FENCE, I CONTROL LAYDOWN AREA IP \ SEE DETAIL 3.05, CD1 !� HN QSOIL STABILIZATION BLANKETS �i O 0 GRAVEL CONSTRUCTION ENTRANCE,Cwc.PAD �� 4 PS SEE DETAIL 3.02, CD1 11 TS r LOD L DC � O CE o 0 ZZ ,F1A1A+ o SF o 100YEAR FLOODPLAIN SF SF SF SF SF SF — SF SF SF SF SF SF SF — pB-13 DROP INLET PROTECTION, Ol OOl OOl OOl OOl r OOl OOl OOl OOl OOl SEE DETAIL 3.06-2, CD1 r0 ' I-'lew_13 O 00 � C 100' STREAM BUFFER Wet I (10-1l "A CCONC. SWALE TA CONC. SWALE lip N Qy� - F. ... JG "� PLATFORM [_ \'„/IIt.i .'�.•. .t' is♦, Y: .l 'i ter: J: .. 'i :` :i v,•,f. .lY...i�: Y:. ..�.:�.. ..F. - ', �i/�'a• .s ram'. 1OOY I YR A4 : A 100)R - IUUTK . I 1 J as A e 100)R a 100 LIMO SILO Q 1� 100 4 Q A . �. ,a 4 . e ; A , , . ccc I I FLOODWAY . t.,�: A ' , 4 A CONCRETE PLATPoRM a I BACKWASH WASTE CONCRETE 4 SOLIDS HANDLING RECLAIM BASIN _ >.. 4 PLATFORM a LECTRICAAL SHED BUILDING 4 A ° 4 Al A 4 4/ f. \ ; �.. e 4 A \ 4 a A ASPHALT PAVEMENT \ No , A A a 4 I I \ I I 0� \ 100\R 71t)I / \ 83 \ \ ASPHALT PAVEMENT py.15 �- Q CCc I I '� C) PLAN 20 10 0 20' SCALE: 1" = 20' SCALE: 1" = 20' PROJECT ENGINEER: B. PORTER DATE: RIVANNA WATER & SEWER AUTHORITY DESIGNED BY: A. MARCH HazeCHARLOTTESVILLE, VIRGINA SITE HAZENNO.: 31442-008 DRAWN BY: A. MARCH ISSUED FOR CONTRACT NO.: 1 CONSTRUCTION _ CIVIL CHECKED BY: B. EDWARDS HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE EROSION AND SEDIMENT CONTROL PLAN NDRAWING UMBER: IF THIS BAR DOES NOT 0 1/2" ill 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY 1 CONSTRUCTION 06/2021 BYP MEASURE 1 "THEN DRAWING RALEIGH, NORTH CAROLINA27607 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION C12 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE LICENSE NO.: C-0381 I o RET. REROUTE 2 4 PW SEE NOTE 3 REROUTE 1 4" EW 'I r II SEE NOTE 3 DEMOLISH ABANDONED CONDITIONING TANK IN ITS ENTIRETY I � I I DEMOLISH AND CAP 16" FM DEMOLISH AND CAP 24" RAS I � DEMOLISH AND CAP MS I 1� I REROUTE 8" TS, SEE NOTE 3 \ I I REROUTE 8" IDS, SEE NOTE 3 \J i DEMOLISH AND CAP 8" HWS ----- DEMOLISH AND CAP 8" HWR DEMOLISH AND CAP 6" A �I DEMOLISH AND CAP (2) 8" PS --- \\� —-DEMOLISH SIDEWALK ------ I\ � 1 1 CONSTRUCTION REV ISSUED FOR SECONDARY DIGESTER SLUDGE STORAGE 47— LOD PROJECT ENGINEER: B. PORTER DESIGNED BY: A. MARCH DRAWN BY: A. MARCH ISSUED FOR CONSTRUCTION CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" 06/2021 BYP MEASURE 1" THEN DRAWING DATE BY IS NOT TO FULL SCALE PRIMARY DIGESTER NO. 1 PRIMARY DIGESTER NO. 2 0 — IE :.: I I I PRIMARY DIGESTER NO. 3 DEMOLISH 12" SD SEE NOTE 2 4'a \ 1 REROUTE 4" / 1 a EW, SEE NOTE 3 I \\ PLUG SS MANHOLE ASPHALT PAVEMENT ---- ALT PA 7- DEMOLISH 1 4" EW--------�---I I ------_ _-------- — — — — — — — —,I � ----------- ------------�--- --- DEMOLISH SIDEWALK,TYP. I I _ I ID = DEMOLISH 12" SS, LOD — SEE NOTE 4 �— -� ---- -- — — — o ------------------- ------------------- I--01 BOILER FACILITY DEMOLISH (2) 24" PE _ t I SEE NOTE 4 { \ I II _RA }ti PLLSGtAULT ENETORS II \ —-----------__—_—_— _ fl DEMOLISH IN -PLANT CLARIFIERS IN THEIR ENTIRETY I I I` ILOD LOD —L LOD LOD II III I L--------------- --- ------ EXCAVATION SUPPORT SYSTEM I i SEE NOTE 1 O I I r R �I p II cow DEMOLIS " D ° II DE ISH 8" SD LIMITS OF DISTURBANCE, TYP. p I I DEMOLISH (3) 24" ML l Zma 01:1 DEMOLISH 18" BYPASS �;\������� I f •1 DEMOLISH SIDEWALK AND STAIRS I I I i —LOD— DEMOLISH SD MH l DEMOLISH AND CAP 12" FM DEMOLISH AND CAP 2" EW I II •PLUG SS MANHOLE •• •• •• I •• •• •• •• ■ ..t' i., ". .1. .. . L • • .i. as sa : .. n 4' ' cool•. }.; a a . a I / a 6 / I.I ,a .,' _AA a. 4 CONCRETE F a PLATFORM a it II a III 41 A / / c I III / I a a a e a a q a ° A \1A a - DEMOLISH LIME SILO,'OON'R SEE NOTE 5 - DEMOLISH ELECTRICAL SHED SOLIDS HANDLING BUILDING - DEMOLISH ABOVE GRADE OUTFALL PIPE, SEE NOTE 5 �f-----------------------------:_ -_ % / ❑�•. ASPHALT PAVEMENT � a COG -—`— — — — — — — — — — --- SCALE: 1" = 20' Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 A/C RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION --------- /_—_NOTES: LOD T / 1. EXCAVATION SUPPORT SYSTEM IS SHOWN / PICTORIALLY ONLY FOR CONTRACTOR REFERENCE / AND SHALL NOT BE CONSIDERED TO INCLUDED ALL REQUIRED EXCAVATION SUPPORT TO PERFORM THE REQUIRED WORK. CONTRACTOR SHALL BE / EXCLUSIVELY RESPONSIBLE FOR EXCAVATION / SUPPORT SYSTEM DESIGN AND INSTALLATION / INCLUDING VIBRATION MONITORING AND A VIBRATION MONITORING PLAN. CONTRACTOR SHALL SUBMIT DRAWINGS AND DESIGN CALCULATIONS FOR PROPOSED EXCAVATION SUPPORT SYSTEM SEALED BY A CURRENTLY REGISTERED PROFESSIONAL ENGINEER IN THE COMMONWEALTH OF VIRGINIA. CONTRACTOR SHALL REFERENCE CONTRACT SPECIFICATION SECTION 31 00 01 - EARTHWORK. EXCAVATION io SUPPORT SYSTEM SHALL BE REMOVED IN IT'S ENTIRETY AT COMPLETION OF CONSTRUCTION ACTIVITIES. _-----_-- _= 2. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY REROUTING STORMWATER FROM 12" SD DURING EXCAVATION ACTIVITIES. SEE C15 �\ FOR RECONNECTION DETAILS OF 15" SD AFTER DEMOLITION ACTIVITIES ARE COMPLETE. FOR — \�\ CONTRACTOR INFORMATION, THE 2 YEAR STORM FOR THIS 12" SD IS 1.0 CFS. 3. EXISTING 212" PW, 1 4" EW, 8" TS, AND 8" IDS �.r SHALL BE REROUTED BEFORE EXCAVATION ACTIVITIES, AS SHOWN ON C15. CONTRACTOR SHALL EXERCISE EXTREME CAUTION AROUND THE REROUTED PIPES DURING EXCAVATION. CONTRACTOR SHALL COORDINATE WITH OWNER FOR ANY REROUTING THAT WILL CAUSE A PROCESS DISTURBANCE TO THE PLANT. THE 8" TS AND 8" IDS LINES WILL ONLY BE ALLOWED OUT OF SERVICE FOR A MAXIMUM DURATION OF 24 HOURS. CONTRACTOR SHALL SUBMIT DETAILED PLAN TO OWNER AND ENGINEER FOR REVIEW PRIOR TO PROCEEDING WITH WORK. 4. (2) 24" PE AND 12" SS LINES SHALL BE DEMOLISHED PRIOR TO MAJOR EXCAVATION ACTIVITIES TO AVOID CONFLICT WITH EXCAVATION SUPPORT. 5. DEMOLITION OF LIME SILO SHALL INCLUDE REMOVAL OF ALL STRUCTURES AND ASSOCIATED EQUIPMENT ABOVE CONCRETE PAD, CONTRACTOR SHALL RESTORE AND FILL ANY DAMAGES OR HOLES LEFT BY DEMOLITION ACTIVITIES. SEE DRAWINGS S20-S23 FOR STRUCTURAL DETAILS OF LIME SILO. 6. CONTRACTOR SHALL LIMIT ALL VEHICULAR TRAFFIC A MINIMUM OF 10 FEET FROM RETAINING WALL. CONTRACTOR SHALL BE RESPONSIBLE FOR — LOD LOD — PROVIDING ANY TEMPORARY SHORING OF RETAINING WALL AS REQUIRED TO COMPLETE WORK. OOl OOl OOl OOl OOl ------------------ -------------------III II !M II A" I I AlT PAYE]AENT ------------------------�� II BACKWASH WASTE RECLAIM BASIN \ 100)7� _______________________� x _II_____________ ________________________ — ZZ------------ ------------ I � 20 10 0 20' SCALE: 1" = 20' DATE: JUNE 2021 HAZEN NO.: 31442-008 SITE CONTRACT NO.: 1 CIVIL DRAWING DEMOLITION PLAN NUMBER: C13 x In55 AREA IA O 1 CONSTRUCTION REV ISSUED FOR SECONDARY DIGESTER SLUDGE STORAGE #?�0 LOD i '� . LOD \ 356 DROP INLET, SEE C15 �® 100 YEAR FLOODPLAIN - 340 100'STREAM BUFFER \ FLOODWAY 1 -'�}-100YR / M M I PROJECT ENGINEER: B. PORTER DESIGNED BY: A. MARCH DRAWN BY: A. MARCH ISSUED FOR CONSTRUCTION CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" 06/2021 BYP MEASURE 1" THEN DRAWING DATE BY IS NOT TO FULL SCALE PRIMARY DIGESTER NO. 1 354 � 358 1 360 PRIMARY DIGESTER NO. 2 ASPHALT PAVEMENT 9D LOD - LOD r 0 0 A REPLACE 4' SIDEWALK, TYP. C-32-0520 ICJ �s / CONTROL 34B Ill V - REPLACE 4' CONC. STAIR / C-32-0521 OOl '35n_ PRIMARY DIGESTER NO. 3 0 BOILER FACILITY LOD LOD OOl 0Ol LOD GENERATORS r 0 0 OOI� r OOl C7 RESTORE CURB AND GUTTER AS NECESSARY TO MATCH EXISTING - TL LL LOD OOl OOl OOl NOTES: 1. CONTRACTOR SHALL MATCH THE EXISTING GRADE AND DRAINAGE PATTERNS OF THE ASPHALT PAVEMENT. SEE C10 FOR FULL EXTENT OF 2" MILL AND OVERLAY. 0 TERTIARY FILTERS TYPICAL PAVEMENT JUNCTION as Aa : ° A. °• 100YR IFIRAW p�0 hP\ 100YR�toorR 9 100 a a A , A. 4 'a , 4 a CONCRETE ,•""_ 4. i I BACKWASH WASTE r. PLATFORM 326 SOLIDS HANDLING RECLAIM BASIN �:a: '.• .a A ° BUILDING a °a . A a I 2" MILL AND OVERLAY, TYP. 001jP � . ° . I SEE NOTE 1 41 / e - ° 4 A 6 •. 4 + 324 + + + + + + + + + + + + + O+ + + + + + + + + + + + + + + + ®+ TYPICAL PAVEMENT JUNCTION + + + + � +� +— �+ + + + +. + + + + + + + + + C-32-0555R + n+�+ • 1£,S_y T + + + + + + + + + + + + + + + -+yy� ' ' + + + + + + + I \ + + + + + + + + + + + + + +I (�%� + + "T + + '+ + + ++ + + I ryl pg-14'� + + + + + + + + + + + + + + + + + + + Q ` + + + + + + x 322 X I + + + + + + + + + +� SCALE: 1 = 20 ALL VALVES AND BOXES SHALL MATCH NEW PAVEMENT ELEVATION, TYP. SCALE: 1" = 20' RIVANNA WATER & SEWER AUTHORITY Haze CHARLOTTESVILLE, VIRGINA HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY RALEIGH, NORTH CAROLINA27607 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION LICENSE NO.: C-0381 SITE CIVIL FINAL SITE PLAN 20 10 0 20' DATE: J U N E 2021 HAZEN NO.: 31442-008 CONTRACT NO.: 1 Li 1 1 CONSTRUCTION REV ISSUED FOR RET. SECONDARY DIGESTER SLUDGE STORAGE ' PLUG MANHOLE CAP 8" HWR CAP 8" HWS 4" EW 2 4' PW 8" DS 8" TS CAP 16" FM CAP 6"A CAP (2) 8" PS PRIMARY / \PRIMARY PRIMARY DIGESTER NO. 1 DIGESTER NO. 2 / \ DIGESTER NO. 3 ElEC7J BOX \\\ \�\ _-- _ EX. DROP INLET III \\\ TOP: 355.00' 1 I I I \\\\ INV OUT:352.15' }� 30 LF, 12" DIP SD @ 6.83% --- - - - - - -------------�---I ---- ASPHALT PAVEMENT--------�--- __---- — _ -- DROP INLET ..--�IIE TOP: 353.80' /`ll INV IN: 350.10' INV OUT: 349.07' I r I BOILER FACILITY { C-22-0302 PLUG VAULT I I I GENERATORS T� I I I —1—_— _—L------- -- — I I —�— ---- — f— — — — — — — --- 141 LF, 15" DIP SD @ 13.4% I� II I I I �` IIII I L---------------- I IIII - L------------------------- PROJECT ENGINEER: B. PORTER DESIGNED BY: A. MARCH DRAWN BY: A. MARCH ISSUED FOR CONSTRUCTION CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" 06/2021 BYP MEASURE 1" THEN DRAWING DATE BY IS NOT TO FULL SCALE PLUG MANHOLE CAP 6" A CAP 6" DISCHARGE CAP 2" EW --------------- =_� -- _=______====ter EX. DROP INLET C II TOP:333.55' O INV IN: 330.15' ,RET. WALL INV OUT: 329.65' --------------------- ------------ A`o1�iLi}lj'^,� _r= - mill m CAP 18" FM == - ----------- ..: •.,: .. { � .M. .� t < .%!'. +.: ��( i - v4r :r': , .; -.L". ���.'�. -'•' : •.t, :: '.t �•� � �-• :.,y .:1. : �y.:: '•.. y: .5 9y.• 44 A Aa . A a '. r —1o0YR — p�C 0°)R ��tooYR a 'a I . A a Q A ,A ... a. - - A .. a CONCRETE a { SOLIDS HANDLING a PLATFORM a A ' A I BUILDING A _ Aa a' a� f. a ,. -.'a A A - A a A. A - A a A —77 f---// /�/------- - - - - - - - - - - - - - - -- - -- \\\ /� ASPHALT PAVEMENT �14 Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 50 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 NOTES: 1. CONTRACTOR SHALL FILL LINES WITH FLOWABLE FILL TO EXTENT POSSIBLE PRIOR TO INSTALLATION OF CAPS. FLOWABLE FILL SHALL BE PROVIDED IN LINES WHICH REMAIN UNDER ROADWAYS OR OTHER AREAS WHERE COLLAPSE OF LINE WILL IMPACT PLANT OPERATIONS. ----- —�— ------------------------ I 04 1 r �-- �L_____ ___________ } -------------------n j _ I 100 I I 4W 100YR IIII1 �I � 'I I I III IIII I I I I I I IIII IIII I I I �IIuI II IIII I I I RIB--------------------------�� I I I I III IIII I I IL--------------------------� II I I II� �Q��•. j I I PLAN SCALE: 1" = 20' RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE o RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION SITE CIVIL FINAL YARD PIPING PLAN TERTIARY FILTERS BACKWASH WASTE I RECLAIM BASIN 20 10 0 20' SCALE: 1" = 20' DATE: J U N E 2021 HAZEN NO.: 31442-008 CONTRACT NO.: 1 DRAWING NUMBER: Li Virginia Runoff Reduction Method Worasheet NOTES: a: DEQVlrglnla Runoff Reducdon Method Rai -Development Compliance Spreadsheet - Version 3.0 aMP Design SpeclJicodons list: 2013 Draft Stds & Specs Site Summary Project Title: MCAW RRF IN -PLANT CLARIFIER AND LIME SILO DEMOLITION Date: 44308 Total Rainfall (in): 43 Total Disturbed Acreage: 1.32 Site Land Cover Summary Pre-ReDevelopment Land Cover (acresl Asolls Bsolls CSolls DSolls Totals %of Total Forest/Open(acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turt (acres)1 0.00 1.03 0.00 0.00 1.03 78 Impervious Cover (acres) 1 0.00 0.29 0.00 0.00 0.29 22 1.32 100 Post-ReDevelopment Land Cover (acres) Asoils Bsolls CSolls DSoils Totals %of Total Forest/Open(acres) 0.00 0.00 0.1 0.00 0.00 0 Managed Turf (acres) 0.00 1 1.18 0.00 0.00 1.18 89 Impervious Cover (acres) 0.00 0.14 0.00 0.00 0.14 21 1.32 100 Site Tv and Land Cover Nutrient Loads Final Post -Development Post- Adjusted Pre- (Post-ReDevelopment Post-ReDevelopment ReDevelopment Development ReDevelopment & New Impervious) p ) (New Impervious) Site Rv 0.28 0.28 -- 0.36 Treatment Volume(ff) 1,339 1,339 -- 1,748 TP Load (lb/yr) 0.84 0.84 - 1.10 Total TP Load Reduction Required (lb/yr) -0.04 -0.04 0 Final Post -Development Load (Post-ReDevelopment & New Impervious) Pre- ReDevelopment TN Load (lb/yr) 1 6.02 7.86 ---------------------------------------------------------------------------------------- Site Compliance Summary Maximum% Reduction Required Below 20% Pre-ReDevelopment Load Total Runoff Volume Reduction (ft) 0 Total TP Load Reduction Achieved(lb/yr) 0.00 Total TN Load Reduction Achieved (lb/yr) 0.00 Remaining Post Development TP Load (lb/yr) 0.84 Remaining TP Load Reduction (lb/yrl Required 0.00 " TARGET TP REDUCTION EXCEEDED BY 0.04 LB/YEAR •a -------------------------------------------------------------------------------------- Drainage Area Summary D.A. A D.A. B D.A. C DA. D DA. E Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 1 0.00 Managed Turf (acres) 0.23 0.49 0.41 0.05 0.00 1 1.28 Impervious Cover (acres) 0.01 0.02 0.11 0.00 0.00 0.14 Total Area (acres) 0.24 0.51 OS2 0.05 0.00 1.31 Drainage Area Compliance Summary DA. A D.A. B D.A. C DA. D DA. E Total TP Load Reduced tlblwl 1 0.00 1 0.00 0.00 1 0.00 0.00 1 0.00 TN Load Reduced (lb/yr) 1 0.00 1 0.00 0.00 1 0.00 0.00 1 0.00 Pre Final Post -Development Post-ReDevelopment TP ReDevelopment TP Load per acre Load per acre TP Wad per acre (lb/acre/yr) (lb/acre/yr) h acre r 0.83 0.64 0.64 _-----------------_-._.-------------------_.-_--_-._-._.._.-_--_-._.----_ --_-._.-_--_-._.---- Runoff Volume and CN Calculations arstorm z-yearstorm 10-year sl 3.03 3.66 5.54 Drainage Areas RV&CN Drainage Arl Drainage AreaB Drainage AreaC Drainage Area Drainage Am CN 62 62 69 61 0 RR (ft) 0 0 0 0 0 1-year return period Be wo RR(.4n) 0.41 0.41 0.69 0.38 0.00 RV w Rut (.-in) 0.41 0.41 0.69 0.38 0.00 (yadju,ned 62 62 69 61 0 2-year return period RVwo Rith,e4n) 0.69 0.69 1.05 0.0 0.00 RV RR Iwo-Inl 0.69 0.69 1.05 0.65 0.00 Ulad)usted 62 62 69 fil 0 10-year return period RVwo RR(ws-In) 1.78 1.78 2.36 1.70 0.00 RV w RR(ws-Inl 1.]8 1.78 2.36 1.M 0.W CNadjusted 62 62 69 61 0 NALT SCALE: 1" = 50' LEGEND ® IMPERVIOUS AREA (EXISTING) ® IMPERVIOUS AREA (REMOVED) OPEN SPACE DIRECTION OF SURFACE FLOW SCALE: 1" = 50' 1 1 / PROJECT ENGINEER: B. PORTER ISSUED FOR CONSTRUCTION HazeCHARLOTTESVILLE, _ HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY VIRGINA SITE CIVIL STORMWATER CALCULATIONS - VRRM DATE: DESIGNED BY: A. MARCH HAZENNO.: 31442-008 DRAWN BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION CHECKED BY: B. EDWARDS NDRAWING UMBER: C16 IF THIS BAR DOES NOT 0 1/2" ill MEASURE 1 "THEN DRAWING IS NOT TO FULL SCALE 1 LREV CONSTRUCTION 06/2021 BYP ISSUED FOR DATE BY PRE -DEVELOPMENT: DA-1 =114a]a19mlts]ilddml Ykm Ld 1 REV COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.01 1.0 LAWN A 39 0.00 0.0 B 61 0.23 14.0 TOTALS 0.2 15 COMPOSITE CN 63 TIME OF CONCENTRATION, tc (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) 2 10 3.66 5.54 0.72 1.82 0.1 0.4 POST -DEVELOPMENT: DA-1 0.04 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.01 0.5 LAWN A 39 0.00 0.0 B 61 0.24 14.6 TOTALS 0.2 15 COMPOSITE CN 62 TIME OF CONCENTRATION, t. (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) 2 10 3.66 5.54 0.68 1.76 0.1 0.4 PRE -DEVELOPMENT: DA-3 m COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.41 40.2 LAWN A 39 0.00 0.0 B 61 0.70 42.7 TOTALS 1.1 83 COMPOSITE CN 75 TIME OF CONCENTRATION, t. (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.39 2.86 0.9 1.9 POST -DEVELOPMENT: DA-3 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.30 29.4 LAWN A 39 0.00 0.0 B 61 0.81 49.4 TOTALS 1.1 79 COMPOSITE CN 71 TIME OF CONCENTRATION, t. (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.17 2.53 0.7 1.6 PROJECT ENGINEER: DESIGNED BY: DRAWN BY: CHECKED BY: IF THIS BAR DOES NOT CONSTRUCTION 06/2021 BYP MEASURE 1" THEN DRAWING ISSUED FOR DATE BY IS NOT TO FULL SCALE COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.32 31.4 LAWN A 39 0.00 0.0 B 61 0.39 23.8 TOTALS 0.7 55 COMPOSITE CN 78 TIME OF CONCENTRATION, t, (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.60 3.14 1.0 2.1 POST -DEVELOPMENT: DA-2 0.04 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.17 16.7 LAWN A 39 0.00 0.0 B 61 0.54 32.9 TOTALS 0.7 50 COMPOSITE CN 70 TIME OF CONCENTRATION, L, (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) 2 10 3.66 5.54 1.10 2.43 0.6 1.5 PRE-DEVELOPMENT: DA-4 m COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.05 4.9 LAWN A 39 0.00 0.0 B 61 0.41 25.0 TOTALS 0.5 30 COMPOSITE CN I65 TIME OF CONCENTRATION, tc (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF,Q PEAK FLOW (CFS) 2 10 3.66 5.54 0.84 2.02 0.2 0.5 POST -DEVELOPMENT: DA-4 COVER DESCRIPTION HSG CN Area CN x Area IMPERVIOUS A 98 0.00 0.0 B 98 0.05 4.9 LAWN A 39 0.00 0.0 B 61 0.41 25.0 TOTALS 0.5 30 COMPOSITE CN 65 TIME OF CONCENTRATION, t, (HOURS) STORM FREQUENCY (YR) RAINFALL (IN) RUNOFF, Q PEAK FLOW (CFS) B. PORTER A. MARCH A. MARCH B. EDWARDS 0 1/2" 1" 2 10 3.66 5.54 0.84 2.02 0.2 0.5 ISSUED FOR CONSTRUCTION M Hazen PLAN SCALE: 1" = 50' RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA HAZEN AND SAWYER MOORES CREEK ADVANCED WATER RESOURCE 4011 WESTCHASE BOULEVARD, SUITE 500 RECOVERY FACILITY RALEIGH, NORTH CAROLINA27607 IN -PLANT CLARIFIER AND LIME SILO DEMOLTION LICENSE NO.: C-0381 LEGEND IMPERVIOUS AREA (EXISTING) IMPERVIOUS AREA (REMOVED) OPEN SPACE DIRECTION OF SURFACE FLOW SCALE: 1" = 50, SITE CIVIL STORMWATER CALCULATIONS - PEAK FLOWS oarE: JUNE 2021 HAZEN NO.: 31442-008 CONTRACT NO.: 1 DRAWING NUMBER: C17 1992 3.02 STONE CONSTRUCTION ENTRANCE 70' MIN. EXISTBIG GROUND RE.n. ue�w w.uauc ......�. ... ..•.. ] MIN. 0 .,.oUo..w 10, MIN. SECTION A —A SECTION B—B Source: Adapted from 1983 Maryland Standards for Soil Erosion and Sediment Control, and Va. DSWC III - 9 BERM Plate 3.02-1 1992 3,07 Source: Va. DSWC III - 36 Plate 3.07-2 1992 3.05 CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A rXr 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. � I f FLOW III 3. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE FENCE AND EXTEND R INTO THE TRENCH. EXCAVATED SOIL FLO W EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. FILTER FABRIC III IliWI RE ffrJR I Source: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood and Wyant III - 24 Plate 3.05-1 1992 3.07 GRAVEL CURB INLET SEDIMENT FILTER 1 / GRAVEL FILTER � T�¢at� r4* ° -••N1, _ llllliu���� S+.i�L! - - ' _ _IIII��IIII� IIII� 1 THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. ' GRAVEL SHALL BE VDOT g3, #357 OR 5 COARSE AGGREGATE. Source: Va. DSWC III-41 Plate 3.07-6 T YPI CAL TREA TMENT - 2 SOIL STABILIZATION MATTING SLOPE INSTALLATION FILL SLOPE SECTION SOIL STABILIZATION MATS SHOULD / BE INSTALLED VERTICALLY DOWNSLOPE FOR BEST RESULTS. TOE MAINTAIN SLOPE ANGLE SLOPE LINING (WET SLOPE TREATMENT - 2 POLYPROPELYENE NON -WOVEN (NEEDLE PUNCHED) GEOTEXTILE FILTER Ftl R C CLOTH (BEHIND 4'TP 0`1 TREATMENT - 2) r 0 SOIL Ag�E BOTTOM OF CUT SLOPE 5' r� OTE: SLOPE SURFACE SHALL BE SMOOTH AND FREE OF ROCKS, LUMPS OF DIRT, GRASS AND STICKS. MAT SHALL BE PLACED FLAT ON SURFACE FOR PROPER SOIL CONTACT. f 2 DIRT SHALL BE TAMPERED PRIOR TO LAYING TOP LAP OVER BERM TRENCH INTO BERM AND PROGRESS DOWNSLOPE SLOPE LINING TOP OF CUT. SLOPE (DRY SLOPE)OF TREATMENT - 2 BOTTOM OF FILL SLOPE BOTTOM OF CUT SLOPE SOURCE: VDOT ROAD AND BRIDGE STANDARDS DETAIL 1 SCALE: N.T.S. CD1 21 - OR SHOULDER BREAK POINT PLATE: 3.36-5 PROJECT ENGINEER: B. PORTER ISSUED FOR CONSTRUCTION HazeCHARLOTTESVILLE, _ HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY VIRGINA DETAILS CIVIL EROSION AND SEDIMENT CONTROL DETAILS DATE: DESIGNED BY: A. MARCH HAZENNo.: 31442-008 DRAWN BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION CHECKED BY: B. EDWARDS NDRAWING UMBER: CD1 FTHISBARDOESNOT o 1 2.. MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE 1 CONSTRUCTION 06/2021 BYP REV ISSUED FOR DATE BY NOTES: 1. CONTRACTOR SHALL REFERENCE SPECIFICATIONS FOR SUBGRADE PREPARATION REQUIREMENTS. V X T cs W COMPACTED BACKFILL SELECT BACKFILL MATERIAL (NO MATERIAL LARGER THAN 2") TYPE A IN EARTH C-01-0100 in TYPE A IN ROCK C-01-0101 CTED BACKFILL ROCK BACKFILL AL OR CRUSHED 1/8 PIPE OD BELOW IN 6") AND MIN OF R TOP OF PIPE la FINISHED GRADE W TYPE B C-01-0102 SLOPE VARIES 11" #4 NOSING BAR, TYP 1" 9" WIDE SIDEWALLS CUT EXISTING SURFACE COURSE COMPACTED 11" TREAD BACKFILL SIDEWALK "v w 244 IN SIDEWALLS cl) ASPHALT SURFACE 2-#4 DOWELS @ COURSE, 2" MIN 18" OC IN SIDEWALLS TACK COAT z SELECT BACKFILL #4 BARS TO EXTEND ti v MATERIAL (NO INTO SIDEWALLS, P SIDEWALK N MATERIAL LARGER SPACED AT 12" OC THAN 2") #4 BARS @ 12" 12" NOTE: CRUSHED STONE - 1/8 YARD STEPS HAVING MORE THAN THREE RISERS PIPE OD BELOW PIPE SHALL HAVE HANDRAILS IN THE SIDEWALLS. THE (MIN 6") AND UP TO WIDTH OF THE YARD STEPS TREAD SHALL BE THE PIPE MIDPOINT SAME AS THE ADJACENT SIDEWALK. EXISTING SURFACE COURSE; WHERE VERTICAL DIFFERENCE BETWEEN SIDEWALK REPAIR HOLES, CRACKS, ETC. ELEVATIONS IS GREATER THAN 12'-0", AN INTERMEDIATE BEFORE APPLYING TACK COAT LANDING IS REQUIRED, SEE DETAIL AND NEW ASPHALT FRAME AND GRATE, EAST JORDAN IRON WORKS V5660, NEENAH R-1878-137G, OR EQUAL CONCRETE YARD STEPS C-32-0521 BACK OF CURB EXIST BASE COURSE 2" MILL AND OVERLAY OF EXISTING PAVEMENT C-32-0555R 12" 2,-6„ X\ FINISHED MIN GRADE 6„ CONCRETE CURB #4 BARS CONTINUOUS WITH Z g AN D GUTTER ASPHALT 18" LAP AT CORNERS N PAVEMENT- 1 1/2" SLOPE TYPICAL CONTRACTION JOINT CLASS A CONCRETE co )v 48' MAX SPACING BETWEEN 0 1/2" EXPANSION JOINTS 41 8" CONCRETE BLOCK OR BRICK WALL fO �O %0 Q #4 DOWELS �� 4" THICK CONCRETE WALK @ 16" OC7 w 0 PIPE SIZE VARIES FILL WITH VARIES, SEE NON -SHRINK CONCRETE Rz PLAN FOR WIDTH GROUT 1'-6'MIN 1/2" EXPANSION JOINT MATL WHEN WIDTH OF SIDEWALK, PAD, ETC NOTES: REQUIRED WHEN WALK ABUTS EXCEEDS 6', LONGITUDINAL CONTRACTION PIPE JOINT 24" 1. CONTRACTION JOINTS SHALL BE PLACED AT 10 FOOT INTERVALS, OR 15 RIGID STRUCTURES JOINTS SHALL BE PLACED AS REQUIRED MAX FOOT INTERVALS WHEN A MACHINE IS USED TO PLACE THE CURB. 2. EXPANSION JOINTS SHALL BE PLACED AT 90 FOOT INTERVALS AND „ ADJACENT TO ALL RIGID OBJECTS. TYPICAL CONCRETE WALKWAY VT'yP CURB AND GUTTER C-32-0520 BEND AS NECESSARY " co C-32-0530 TO CLEAR PIPE PROJECT ENGINEER: B. PORTER DESIGNED BY: A. MARCH DRAWN BY: A. MARCH CHECKED BY: B. EDWARDS IF THIS BAR DOES NOT 0 1/2" 1" 1 CONSTRUCTION 06/2021 BYP MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE ISSUED FOR CONSTRUCTION CLASS A CONCRETE FLOOR SLAB GROUT CATCH BASIN INVERT TO ELEV OF EFFLUENT PIPE INVERT Hazen a '�--#4@12" EW NOTE: YARD INLET YARD INLET MAY BE PRECAST CONCRETE - SEE SPECIFICATIONS C-22-0302 HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY CHARLOTTESVILLE, VIRGINA MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY IN -PLANT CLARIFIER AND LIME SILO DEMOLTION DETAILS CIVIL STANDARD DETAILS DATE: JUNE 2021 HAZEN NO.: 31442-008 CONTRACT NO.: 1 CD2