HomeMy WebLinkAboutZMA198500033 Approval - County 1989-11-27 a ' << A V e' �r DEPARTMENT of PLANNING and COMMUNITY DEVELOPMENT 401 Mclntlre Road Charlottesville, VA 22901-4596 604 296-5823 June 11, 1986 Earlysville Forest Land Trust CA P. O. Box 2737 D15(0 Charlottesville, VA 22902 t)' `IC) RE: Earlysville Forest Phase A, Section 9 Final Plat: Tax Map 31 , Parcels 31 and 46; Route 743 . Dear Sir: At their meeting on June 10, 1986, the Albemarle County Planning Commission approved ( 4-1) the above-noted final plat. This approval is subject to the following conditions: 1 . The final plat will not be signed until the following conditions have been met: ✓a. County Engineer approval of public road and drainage plans and computations ; ✓b. Virginia Department of Highways and Transportation approval of rodand oofextension to the central drainage and computations; C. County Engineerapproval well system; /c�. Issuance of an erosion control• permit;• erosion control �/ plan to be reviewed by Watershed Management Official; e. Albemarle County Service Authority approval of water lines and appurtenances; f. County Attorney approval of homeowner documents._-.-- it i. Fire Officer approval of : . Hydrant stubs' installed every 800 feet along roadway for future hydrant placement; and b. New hydrant at lake 1 i functional n mode prior to issuance of certificates of occupancy for Section 9 . 3 . No lots in addition to Section 9 , Phase A shall be signed until the existing roads intended to public roads are accepted into the state secondary road system. 4 . Building and septic sites shall be in accordance with Section 9 plat by R. O. Snow, Inc. Copies of septic permits shall be given to plumbers and septic contractors. In order to expedite completion of the above items, please have the appropriate agency or department notify the Planning Department, in writing, that the applicable condition has been met. Be advised that this approval is valid for eighteen ( 18 ) months from the date of the Commission's approval and if the plat is not signed within that time, the approval will be void. Also please note that the Subdivision Ordinance requires that the plat be recorded within six ( 6) months of the date it is signed or the approval will be void. If you have any questions, please do not hesitate to contact me. Sincerely, 4147( gezi#,I. 066 Amelia M. Patterson Planner .AMP/jmm cc: R. O. Snow, Inc. Jesse Hurt F. R. Bowie Steve Pack Jeff Echols • Bill Norris Bill Brent Fred Payne __ 2