Loading...
HomeMy WebLinkAboutSDP199000033 Correspondence 2021-07-13Engineering • Surveying • Planning July 5, 2021 Chris Perez Senior Planner 401 McIntire Road Charlottesville, VA 22902 MERIDIAN PLANNING GROUP, LLC 440 Premier Circle, Suite 200 Chazlottewille, VA 22901 Phone: 434.882.0121 www.meric imwbe.com RE: FIRST LETTER OF REVISION FOR SDP 1990-00033 THE DAILY PROGRESS SITE PLAN AMENDMENT Dear Chris; Attached are four copies of the Letter of Revision for the Daily Progress building, and the Application for Letter of Revision. The approved plan that this change applies to is titled `The Daily Progress Site Plan Amendment' SDP1990-00033. The purpose of this revision are as follows: 1. Add a loading ramp from the side of the building. 2. Add a new concrete channel to redirect stormwater flow under the proposed ramp through a 2' X 6" block -out. 3. Add a new dumpster pad in front of the proposed ramp. Please let me know if you have any questions or need additional information. Sincerely, Timothy Miller, P.E., L.S. Principal