Loading...
HomeMy WebLinkAboutWPO201700052 Plan - VSMP 2021-07-14DUNLORA OVERLOOK79 d ��c Donlo�a Or Q�V GENERAL NOTES OWNER/APPLICANT. 06100-00-00-16500 DUNLORA INVESTMENTS, LLC 455 SECOND ST SE, SUITE 400 CHARLOTTESVILLE, VA 22902 ENGINEER: COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE, VA 22902 (434)293-3719 SURVEYOR: CARDINAL SURVEY TAX MAP PARCEL: 06100-00-00-16500 (OB 4657 PG 413) TOTAL PROJECT AREA: 8.62 ACRES TOTAL. ZONING. R-4 RESIDENTIAL (BY -RIGHT) - NO PROFFERS AIRPORT IMPACT AREA (AIA) PROPOSED USE: 15 SINGLE FAMILY ATTACHED UNITS AND 14 SINGLE FAMILY DETACHED UNITS REQUIRED DENSITY: 4 DU/AC PROPOSED DENSITY: 29 00/8.62 AC = 3.36 UNITS/AC OPEN SPACE.• REQ: 2.16 AC OF TOTAL DEVELOPMENT AREA &62 x 259,); AND 207 OF THE REQUIRED OPEN SPACE SHALL BE OUTSIDE OF CRITICAL SLOPES AND THE SWM FACILITY PROV: 3.20 AC TOTAL OPEN SPACE PROVIDED (379e) 1.47 AC PROVIDED OUTSIDE CRITICAL SLOPES AND THE SWM FACILITY (46q OF THE REQUIRED OPEN SPACE) THE OPEN SPACE WILL BE DEDICATED TO THE HOA. BUILDING HEIGHTS: MAXIMUM BUILDING HEIGHTS SHALL NOT EXCEED 35 FEET NON-INFILL SETBACKS: FRONT: 5' MIN AND 25' MAX SIDE. • 10' BUILDING SEPARATION REAR. 20' MIN AND NO MAX SITE AMENITIES 2.63 ACRES OPEN SPACE (PASSIVE RECREATION AREA) SUBDIVISION STREETS: CURB & GUTTER (PARKING ON ONE SIDE ONLY) WATERSHED: THIS PARCEL IS NOT IN A WATER SUPPLY PROTECTED AREA - SITE DRAINS TO MEADOW CREEK (UPPER RIVANNA WATERSHED) AGRICULTURAL/ FORESTAL DISTRICT: NONE TOPO & SURVEY. ON -GROUND SURVEY PROVIDED BY CARDINAL SURVEY IN SEPTEMBER 2016, AND FROM DEEDS AND PLANS OF RECORD. DATUM: NAD 83 EXISTING VEGETATION: PAR77ALLY WOODED WITH EXISTING RESIDENCE STRUCTURES CRI77CAL SLOPES. MANAGED AND PRESERVED STEEP SLOPES ARE SHOWN AND LABELED. LIGHTING: NO LIGH77NG IS PROPOSED PHASING: 517E TO BE DEVELOPED IN A MINIMUM OF ONE PHASE. UTILITIES PUBLIC WATER AND SEWER FIRE & RESCUE. • AS REQUIRED, ALL FIRE FLOWS WITHIN THE DEVELOPMENT SHALL BE A MINIMUM OF 1000 GPM AT 20 PSI. ADDIT70NALLY, FIRE HYDRANTS SHALL BE PROVIDED ALONG THE ROADWAYS FOR FIRE PREVENTION AT A MAXIMUM SPACING OF 500 FT PER TRAVEL WAY. RECREATION: NOT APPLICABLE/NOT REQUIRED PARKING: 2 OFF-STREET PARKING SPACES SHALL BE PROVIDED FOR EACH DWELLING UNIT + 4 ON -STREET GUEST SPACES (MIN) FOR THE ATTACHED UNITS. 6 ON -STREET GUEST SPACES SHALL BE LOCATED ALONG THE ROADWAYS WHERE MARKED. BUILDING SITES: PARCELS 1-29 MAY NOT BE FURTHER DIVIDED. ONLY (1) DWELLING UNIT PER LOT SHALL BE ALLOWED. BURIAL SITES: NONE STREAM BUFFERS/FLOODPLAIN. THERE IS A POR77ON OF A WPO STREAM BUFFER LOCATED AT THE SOUTHEAST CORNER OF THE SITE. THERE IS NO 100-YEAR FLOODPLAIN LIMITS ON THE SUBJECT PARCEL, PER FEMA MAP 51003CO229D; FEBRUARY 4, 2005. OFFSITE DISTURBANCE: NO OFFSITE DISTURBANCE IS PROPOSED WITH THIS PLAN, EXCEPT FOR THE TIE-IN CONNEC77ON TO THE SANITARY SEWER WITHIN EXISTING U77LITY EASEMENT. LANDSCAPING. ALL PROPOSED ROADWAYS SHALL HAVE STREET TREES IN ACCORDANCE WITH ALBEMARLE COUNTY REQUIREMENTS, PER SECTION 32.7.9 OF THE ZONING ORDINANCE. RETAINING WALLS: THREE SEGMENTAL RETAINING WALLS WERE ORIGINALLY APPROVED. SIGNAGE.• NO SIGNAGE CURRENTLY PROPOSED. TRASH COLLECTION: TRASH RECEPTACLES SHALL BE MAINTAINED ON EACH INDIVIDUAL LOT. ALL TRASH SHALL BE COLLECTED BY A DRIVING DUMPSTER SERVICE. DAM INUNDATION: THIS SITE IS NOT WITHIN A DAM INUNDATION ZONE. un STORMWAIER MANAGEMENT. STORMWATER WILL BE CONVEYED TO A �E;EE—N— olG�,FA L--FE,4—..�,TTu 1� DOWNSTREAM DETENTION BASIN ""'^ " ^R" ^"`VTGN A&W SEE SWM PLAN FOR DETAILS IMPERVIOUS AREAS. SEE PROPOSED & APPROVED SWM SHEETS LAND AREAS: OPEN SPACE.• 3.20 AC. (31%) LOTS 4.26 AC. (559e) ROW DEDICATION. 1.16 AC. (14%) TRAFFIC GENERATION: TRIP GENERATION BASED ON /IF GENERA7ON MANUAL (87H EDITION) 29 SINGLE FAMILY UNITS (CODE 210) 278 VPD (139 EN7ER/139 EXIT) AM PEAK. 22 (6 ENTER/16 EXIT) PM PEAK: 29 (19 ENTER/10 EXIT) LEFT/RIGHT LANE TURN WARRANT ANALYSIS• DUNLORA ADT = 2300 ADT VPH = 2300 / 12 hrs X 2 = 400 VPH (WORST CASE) NOTE: THE LOCATION OF THIS ENTRANCE IS BETWEEN (2) ENTRANCES INTO DUNLORA, ONE ENTRANCE FROM RIO ROAD/PARK STREET, AND THE OTHER ENTRANCE FROM RIO ROAD/✓OHN WARNER PARKWAY. WITH THE (2) ENTRANCES SPLIT77NG THE APPROACHING TRAFFIC AND TRAFFIC LEAVING DUNLORA, THE VPH WILL ALSO BE LESS AT THIS ENTRANCE LOCATION. RIGHT TURN WARRANT.- PEAK PM IS THE HIGHEST TRIP PER HOUR WITH 21 ENTERING THE SITE BASED ON THE CHART IN THE VDOT MANUAL ON PAGE F-96, 21 CARS AN HOUR ENTERING 774E SITE WITH AN APPROACHING TRAFFIC VOLUME OF 400 VPH DOES NOT WARRANT A RIGHT 77JRN LANE OR FULL TAPER. A 4: 1 TAPER INTO THE DEVELOPMENT HAS BEEN PROVIDED. LEFT TURN WARRANT.' BASED ON THE CHART IN THE VDOT MANUAL ON PAGE F-78, A VOLUME OF 400 VPH ADVANCING VOLUME AND 400 VPH OPPOSING VOLUME DOES NOT WARRANT A LEFT TURN LANE. THESE VPH VOLUMES ARE A WORST CASE SCENARIO AND DO NOT TRIGGER THE REQUIREMENTS FOR A LEFT TURN LANE. NOTE. EACH LOT AS SHOWN HEREIN SHALL CONTAIN A BUILDING SITE WHICH MEETS THE REQUIREMENTS OF SECT70N 4.2.2(b)l (18-520) VSMP AMENDMENT #3 WPO 201700052 (AMENDMENT #3 TO WPO 201600058) RIO MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA SCALE: 1"=60' OWNER DUNLORA INVESTMENTS, LLC 455 SECOND STREET SE, SUITE 400 CHARLOTTESVILLE, VA 22902 ENGINEER COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 VSMP AMENDMENT #3 PROPOSED CHANGES: , THE PREVIOUSLY APPROVED BIORETENTION BASIN HAS BEEN REMOVED WITH THIS AMENDMENT AND WATER QUALITY REQUIREMENTS WILL NOW BE MET WITH A NUTRIENT CREDIT PURCHASE. THE BIOFILTER's PREVIOUSLY APPROVED DETENTION CELL HAS ALSO BEEN RECONFIGURED WITH THIS AMENDMENT AND NOW MORE CLOSELY MIMICS THE APPROVED / ASBUILT EROSION & SEDIMENT CONTROL BASIN. UTILIZING THE OUTLET STRUCTURES AND THE MAJORITY OF THE ASBUILT GRADING WILL MINIMIZE ADDITIONAL DISTURBANCES. THE DETENTION BASIN WILL CONTINUE TO PROVIDE WATER QUANTITY TREATMENT. APPROVED by the Albemarle County Communit�yy Developpment Department Date 7l14/2011 I�If��JI I�Yllli r[IIIII1tY� Amendment #3 s, p PQ�os k��qa City church A �a Cga rPo ��WilliarrlD Qo 0 rn.none.ree re<hdcel Rnier L Oo� 9 6 'n\In W,W2fne�pa'k�2`I ssi 0 1 0 VICINITY MAP SCALE: 1" = 500' ZL I SCOTTJR. CbLLINSZ ea"AY"" L� LiC. No. 035791 � VV4 05/31/21 Aj ANomonve Bz@ty Pezench �� ",n9 Wlham DI 4"Osbys Reacr ROADS EXISTING CULVERT —...—...— EARTH DITCH O O CULVERT DRIVEWAY CULVERT Q DROP INLET & STRUCTURE NO. BENCH MARK + CURB _ _ _ _ _ CLEARING LIMITS 0 CURB & GUTTER VDOT STANDARD STOP SIGN PROPOSED PAVEMENT a� EXISTING CONTOUR PROPOSED PERM PAVERS PROPOSED CONTOUR EC-3A DITCH 240.55 PROPOSED SPOT ELEVA77ON 6• DEPTH OF EC-3A DITCH m M + M N \ .ti N M N W l 1 t9 Z W W z l7 z w J J 0 U ti M M N M i N O 00 N N Q LU J _J I) LU 0 Q U LU Y LU Lij U) LU C) C] N M z LU G 0 LU G V\/ 0 0 LL LU 0 LL 0 z 0 LU 0 w U ~ Lu w O w a Ln JOB NO. 122071 SCALE AS NOTED SHEET NO. 1 I POST -DEVELOPMENT SCENARIO &BEST MANAGEMENT PRACTICE PRESERVATION EASEME T ( A E OF 11, —-�APPROVED Tc= 0.18 hrs. MANAGED SLOPES `TC-D �) � ( 0 STORMWATER MANAGEMENT NARRATIVE: I////.! 1D0 OF OLF W/ A LLLV.-3.5 .1H hrs.) PRESERVED SLOPES ,,,,j,TH 0 PROPOSED LORA LOTS P AN SEPARATE REVIEW). THE PROVIDES STORMWATER TREATMENT PHPART FOR T RTH CONSTRUCTION O � � ..�// - �♦I — 1 1 87 OF CF W/ A ELEV. DUN=S (TC i 0.01 hrs.) STREAM BUFFER REQUIREMENTS FOR STORMWATER MANAGEMENT. THE SUBMITTAL PACKAGE DOCUMENTS ��. / 47J OF CF @ I4 tt/S �TC i 0.01 hrs.) ASSOCIATED WITH THIS PLAN SHOW WATER QUALITY COMPLIANCE BEING • \ ♦ \ SCOTT R. LLINS'Z SOC O G .�� ♦� THE BEST MANAGEMENT PRACTICE OF OPEN SPACE PRESERVATION, AND 1 i NUTRIENT CREDIT PURCHASE. THIS PLAN ALSO COMPLIES WITH PART IIB R � - — — �• - ♦ - L.� Lie. NO. 035791 THE ATTENUATION OF FLOWS IN THE DETENTION BASIN. PLEASE SEE THE ATTACHED Is \ --- - ♦ 1 APPROVED A STORMWATER MANAGEMENT CALCULATIONS PACKET FOR THE FULL DETAILS OF PLAN -�- — f LIMITS OF TREE �iO 05/31/21 1 COMPLIANCE. � I � \ � �� — — — —s I ♦ � � - CLEARING (TYP.) ♦ I �♦ - �, Watershed Summary � � �♦ � � ', -- — ♦ � APPROVED Pre -Development ♦� \ 1 / CN Area, 1-year 2-year 10-year � / ♦♦ A —� — — � � ac. Flow, cfs Flow, cfs Flow, cfs vv y / ♦♦ A — _ _ A \ \ DA'A' 1 62 4.17 2.41 2.88 7.70 VARICK STREET, MARIN COURT, AND THE �� I, � � � � v \ ♦ A I � � �� ♦, SURROUNDING LOTS ARE NOT PART OF ♦ X�. APPROVED Post- Development V ♦ A \ \ \ ` •. ♦ \ \ \ \ � \' THIS SET OF PLANS. THE PROPOSED SWM / —� \ CN Area, 1-year 2-year 10 year I — - ♦ \ \ \ \ \ v� \ \` FACILITIES &BEST MANAGEMENT ac. Flow, cfs Flow, cfs Flow, cfs / �� ♦♦ V A A� \ \ /� /� \ A PRACTICES ARE PROPOSED WITH THIS DA A 80 4.17 0.70 1.15 7.42 ' ' ' � `� • ♦A A A A ' � � SET OF PLANS &PROVIDE TREATMENT � o / / \ ♦I9* \\ \, FOR THE FUTURE ROADWAYS AND w a AMENDED Post -Development w 1 / \ `� \ \ V♦1♦ A / / ��� A SURROUNDING LOTS. Z Area, 1-year 2-year 10-year / \ �� \ \ \\ A �1♦A % / ) \\ AV ` Q p O EENGV UU) ac. Flow, cfs Flow, cfs Flow, cfs in z DA'A' 80 4.17 0.66 1.12 7.17 -- ---� w V /� L \ �\ VA V / �� A\ V O inCL g wo General Construction notes for Stormwater Management Plans i. All dams and constructed fill to be within %of maximum dry density and z0/o of V / A _ / ♦ \ \ A -� optimum moisture content. All fill material to be approved by a geotechnical engineer. A Q / ♦ / / \ A �\ \ ♦*Lu geotechnical engineer is to be present during construction of dams. V A A VA ♦,� �j\ �, A \ VA \ j z. Pipe and riserjoints are to be watertight within stormwater Management facilities. _ / ♦ _ \ A` \ \ \\\ w -\, / \ \ \ \ w m 3. For temporary sediment traps or basins which are to be converted to permanent �� / ♦ / _ \ \ �C)VED DA A \ \� / \ \\ \ ��/� /` �� A 'V'�E�- _ ) �\\�VA V� \ \ w stormwater management facilities; conversion is not to take place until the site is Q 3 �� \V \ ♦ �. . A V A stabilized, and permission has been obtained from the County erosion control inspector. / / \ \ \ 4-2, dL. \ \ \ \ ♦ \ - � ` •.� \\ \ \ \ ` LU0� i A �� r ` , A A VA \ \ Total Onsite Impervious Areas (Water Quality) /Ce Roadway z9,60o sf /; / \ \ �� TC=�.i8 h r v V ` \ \ V— ♦♦ \ VAA- \� A VA V A \ Sidewalks & Driveways 22110 sf / / / / ♦ A A� A ♦♦ �• \ Buildings 65700 sf ♦ — — A V V ♦ ` \ \ V� �V A V A Total= 117,410sf /'// / ♦ v v �� v ♦♦♦ `� \ VAA`••� A�\\\V A A D.A. 'A' Post -Development Impervious Areas (Water Quantity) g /� / / / \ / �� � A A� �� A / �� V `.♦♦ �� A OVA F0 E§T&OPENSPACE Roadway 29,600 sf / %") / /\ / / i / A \ \ �\ \ \ ��� / \ L A� - ♦j♦- A� EMENf(DB 04967, PG ♦- ♦♦ /A -�� i �i/;, �� \ EASEMENT ENT IS A BEST & Driveways 19300 sf 1�3�23 NAMNE&46650 sf ♦♦Buildin �BITS FUTURE MTotal= 95,550 sf it \ b LOPMENT& rj oo Le) � \ � � � / � A \� v � � � � - �` V A ; ♦ /V � ) � � � \� �DIS RB NCES ��� s �i v` �y ��C' v A ��y /� y yv j �X�♦i♦A ��`� As s \ x� �' �� �� \ \ / v A / V — s�j♦A �� �M� IED S� FER(TvP) �� s O V v \ \ / vv A A� ♦� ��\ \ / d7 A \ /� A \ A \ ♦1 A \ \ i l A A A\ ti L9 / ♦ \ v A \ v � � y � � ram♦ v � A � v A �I / V A A �\v � � � c°w M a \ ♦ ` V A �V A \ /� / V A \ V A� V� '. V �s M �$ LU o L L] N N i \ V A \ / A ♦♦ A A — / _ — — — / / � I Q W zLUCONTRACTOR SHAL INSTALL A V-SHAPED LU ` \ ✓ A \\ A \ �_ j / / RIPRAP LINED CHANNEL W Uj 0 \/ / \ \ \ ♦\ \ DIRECTING RUNOFF INTO J C l A v v THE SWM FACILITY =J G Z \ - Q 0 \ \ \ \ \ \ \\ ♦♦♦ \ r ii ni ui " ® W 1' - -- - - — V Q f va z z LLJ \\ \\ \ �APP�RO E6SL6PES HAVE BEEN �� � \ V\ v \ \ \ � � _ — -- - SWM FACILITY EASEMENT '� � /� � O � \ DE1 ER�V11I\YED TO BE LESS THAN 25/0 \ \ / % \ _ (DB o4967, PG 133 134) O w ( \ BA EU�ONNE\WTOPOGRAPHIC-EXHIIBIT& \ \ \ ♦ \ --- _--- — — � / � Y UI URVEI PROvVIDE"Y-ROUDABUSH,�� A %� �1♦ / W \ \ \ \ Z` E AND ASS6CIATES AS PERMITTED \ \ \ \ G ♦♦ — — \ — — — — �Uf�DE)2SECZON30.7.4b)fa-{TYPICAL) �� V / — ♦ / — A / / / / „M,�_ W Q EXISTING MANAGEDUl cf) > STEEP SLOPES (TYP.) \ v ��� - --� — — — A V v \�� V / / i_ s f-- LU LU \� \\ \ �� — __ -�/ � // �� Q EXISTING PRESERVED \ / — ■�I - _ t — / STEEP SLOPES (TYP.) \ �. - — ----- _n; � — �` LU I ZD Q o Lu I \ - \ __ ♦� ♦ i \ _ -__ — — n1-- - ♦F_ ��II ♦♦,�� o w APPROVED STREAM \ --\\-N.�Vij�1������-N}��� // d m \ BUFFER (TYP.) \ E --- - GRAPHIC SCALE — _ __ JOB No — —__ „o 122071 SWM FOREST& OPEN SPACE SCALE EASEMENT (DB 04967, PG 133-134) \ \ \ IN FEET) COINCIDES WITH PROPERTY LINE \ \ \ - g 1rr=30' 1 inch = 30 ft. \ AMENDED SWM FACILITY TO TREAT \ SHEE ( r No. \ ` WATER QUANTITY NOT QUALITY . EXIST�NG��EV€D \ ) STEEP SLOPE�(TYP.)� BASIN NOTES: 1. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. 2. A CONCRETE FOUNDATION SHALL BE INSTALLED ON THE RISER AS SHOWN & MEETING THE MINIMUM SPECIFICATIONS SET FORTH IN THE VESCH SPEC. #3.14. 3. CONTRACTOR AND CONSTRUCTION SHALL ADHERE TO ALL OSHA REQUIREMENTS. ADDITIONALLY, SPECIAL ATTENTION SHALL BE GIVEN TO THE CONSTRUCTION BASIN's CONVERSION TO A PERMANENT SWM FACILITY. CONTRACTOR SHALL ENSURE THE PERMANENT SWM FACILITY HAS A STABILIZED GROUNDCOVER, SUCH AS 435 435 CONTRACTOR SHALL MAKE THE FOLLOWING MODIFICATIONS TO THE RISER: 1. PLUG THE 04" ESC DEWATERING ORIFICE WATERTIGHT (INV.=4o6.83 AB) 2. DRILL ONE (1) NEW 03.5" LOW -FLOW SWM ORIFICE (INV: 402.00) 3. DRILL FOUR (4) NEW 012" MID -FLOW SWM ORIFICES (INV.=4o8.25) 4. INSTALL A WEIR PLATE OVER THE TOP HALF OF THE BARREL'S OPENING 5. INSTALL TRASHRACKS ON THE LOW -AND MID -FLOW ORIFICES. SEE DETAIL 430 ON THIS SHEET, OR EQUIVALENT. 430 APPRO ED ORIGIN LEXISTI GGRAD y LOT GR DING \ (PRE-C NSTRUC ION) 425 425 420 420 ASBUILT STIR. 1A TOP OF ALL=42 .24 PPROV D 0 8 L. III RCP 10=421.6 (i5''HD E) STAND EW/TR HRACK SHALT. SERVE AS THE RI$ RSTRU URE. ASBUILT 048" RI$ R RIM D - L 12" Q 2= 8. 7 CF ELEV.=4c9.7O'. 415 V=4.8FP 415 RIP 7 Qlo 1t.t3 AP C S ASB ILT 34' 1' GA SLINED E DMo 0 91 FT EMERGENCY PILLWA CREST ELEVA ION=4io. ' ASBUILT GRADING WITH _ GLOP - ° (8'T POF DA ELEV.-412.Do') PROPOSED GRADE CON 'RACTOR S,HALL IN STALLA 410 MODIFICATIONS PROPOSED V-SHAPED V 30T CL. I ' 410 RIPE P-LINED DITCH 2. STONE i r DE TH) WITH FILTER I ABRIC X LINE IERLAYMENTTO CONVEY Q RUN FF TOT ESWM FACILITY� APPROV TEMPO ARY ESC ^' IN TO BE CONVERI ED INTO PERMAN 7NT SWM FACILITY 4Q5 PROVIDI 6 STORMWATER \ 405 UAN ITYTREAT ENT APPROVED FLOOR GRADE E EV.=402 co'. CON -RACTOR POSITIVE SLOPE 0THE RISER ATA LTIMES. TfENSUME 400 400 CONNE SH LLBEFIMLY EM EDDED "INTOA R ETION INFORC 18"THI KCONC ETEFODATIONTHATIS U ' x NDISB RIED BE OWTHE LIMITS O HEBASNGRADI G. . SBUILT i5"RCP ARREL 1 395 140.0',INV.OU 09 =39.90') 395 APPROVED IDOT EC-1 CLASS Al UTLET PR TECTION w/ GE TEXTILE FILTER FABI JC UNDER AYMENT. 392 ASBUILT S:L=16.5,W1=7.4',W2=18.9' 392 WW Vl rl 00 N N M1 00 Op 00 LM"� 00 N OO J J W W M M N IN ~ W H1 N Q1 N N O It IN W I.L 10+50 PROFILE SCALES 11+00 11+50 12+00 12+50 13+00 13+50 13+75 DETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: 1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER, SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYONDTHIS ISOPTIONALAND IS NOTREQUIRED. 2. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 2:1 TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL BE G RADED TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES TO THE RISER STRUCTURE. 3. WOODYVEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEETOFTHETOEOFTHE EMBANKMENTNC WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY STRUCTURE. 4. A VEGETATED BUFFER SHALL BE PROVIDED THAT EXTENDS AT LEAST 25 FEETOUTWARD FROM THE BASIN TOP OF DAM ELEVATION. PERMANENT STRUCTURES (E.G., BUILDINGS, SHEDS, etc.) SHOULD NOT BE CONSTRUCTED WITHIN THE BUFFER AR EXISTING TREES SHALL BE PRESERVED IN THE BUFFER AREA DURING CONSTRUCTION IF AT ALL POSSIBLE. S. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 6. AVOID SPECIES THAT REQUIRE FULLSHADE,ORARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASEOFTREE AND SHRUBS IS STRONGLY RECOMMENDED ASA MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ' ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON ' THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). 3. ALL PLANT MATERIAL SHALL MEETTHE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE, AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFYTHE DESIGNER OF ANY VARIANCE FROM THE PLAN. S. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1-800-552-7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. B. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOTSTOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90% CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION 01 ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVALAND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIALTHAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHEI ACTIVITIES BEYOND THE CONTRACTOR's CONTROL. FACILITY CONSTRUCTION 1. THE DETENTION BASIN MAY SERVE AS A SEDIMENT BASIN AND/OR TRAP DURING PROJECT CONSTRUCTION. IF THIS IS DONE, TH VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED INTO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETEL STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENTTRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. 3. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 4. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALLTHE SPILLWAY PIPE DURING THE ESC PHASE. S. CONTRACTOR SHALLALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND/OR THE BARREL(s) DURING THE ESC PHASE TO ENSUI THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 6. THE CONTRACTOR SHALL THEN CONSTRUCTTHE IMPERVIOUS CLAY CORE EMBANKMENT AND ANY INTERNAL BERMS IN 8 TO 12-INCH LIFTS AND COMPACT THE LIFTS WITH APPROPRIATE EQUIPMENT. 7. UPON COMPLETION OF THE EMBANKMENT GRADING, THE CONTRACTOR SHALL EXCAVATE/GRADE UNTILTHE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 8. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 9. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP APROI PROTECTION. 10. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 11. THE CONTRACTOR SHALLTHEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECTTHE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4. INSPECTTHE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, etc. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLI NG, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES AS APPLICABLE. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(s) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTO WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION BASIN's CONSTRUCTION PROCESS: 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. EXTENDED DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) S. INSTALLATION OF THE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(s). 6. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DIRECTING) 7. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) r JI EMBANKMENT NOTES: THE EMBANKMENT SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN ON THIS SHEET. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 9S% OF MAXIMUM DRY DENSITY AND 2%OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. `S tl90O myd x�ay�° 5/8" dia hole single orifice DEBRIS CAGE STEEL WEIR PLATE TO BE - FASTENED OVER THE 15" OUTLET OPENING, COVERING THE TOP HALF OF THE OUTLET OPENING. SEAL OPENINGS AROUND THE PLATE WITH MORTAR TO CREATE A WATER -TIGHT PLATE OVER THE OPENING. INSTALL STEPS IN EX. RISEF STRUCTURE IF THE STEPS HAVE NOT PREVIOUSLY BEEN INSTALLED. ' 48" RISER e ISO1Tl OI,T'JC 1/2" zinc plated hook attached with 3/8' reetener din. holes HDPR si ruMural pinxtic will - holes and 114" plate OO Dlnnumutured by Mastic Solutions Inc. or equal `•:-C' C 110E Elevation OUTLET PIPE 15" RCP WEIR PLATE DETAIL N.T.S. ' shown with optional plate HDPF sI.-eickirml pinsl.ic with 2-1/8" holes and 1/4' plate manufactured by Plastic Solutions Inc or equal PLASTIC SOLUTIONS INC. P.O. Box '1386 Caches., W 22604 877-877-5727 •ra.Phistw-Mohw.esom Perforated SECTION A-9: TYPICAL GRAPHICAL DETAILS Homogeneous fill 4 ��CDt oft trench,-b' below suil4�lel material Soil air rock L - - _ - __ - - - - - - J TYPICAL HOMOGENEOUS EMBANKMENT >11 "Pipe outlet Coarse filleer D'9Und SIOtS collector Founda'uon drain FOUNDATION DRAIN drtlir 91 x mc# WJM be �7ransition filter CHIMNEY DRAIN Transition fill - Rock or gravel '-Blonket drain BLANKET DRAIN Rode or gravel drain Transition filter TOE DRAIN Figure A -la. Honjogeneous Eurharrkxrents w/Seepage Coull ols StormRax- ROUND SERIES TRASH RACK CONCRETE MANHOLE STANDARD 60 I NCH RACK SHOWN DIMENSIONS IN INCHES PLAN SIDE VIEW StarmlI TM Round SeIles for Concrete Manhole part la ABA Dim mme min Nis00 RS-14 17% 14%1 28 24 30 W36 21i5 14 4D% 3a 43 Rio 2/ 18 54 . 4$ $7 RSW 27'A 18V 6615 80 A WEk Plastic Soluttmn, Inc. 10 W •m 4TB3. V4rclwawr. VA 21°07 M Md2ee VC. YArd, ,VA Lt2ai ,a771e77-5n7phone R10XCT: (s4017t nl9ex hN7JAsww.patra°M4m.mm uw.w,x n LwIIWa.G CONCRETE a7RUCTIIRE DIMENSION$ INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE O1enQNS CROSS BRACING FOR OVERHAND HOPE ANTI -VORTEX PLATE DAZE OPAMHBY All rh OET/L SCOTT/R. CIDLLINS'Z 1` Lic. No. 035791 � 05/31/21�� J to 0 z 0- w o. a k o 0 O U ro f z Z' J W LL C G w O LU ,,moww w r V/ w i H Co > w ��// � Uj Ice 00 Ch N M N M rl N M N W N W W Z 0 z W J J U 0) ti M M 0) N M I N M N N LLl J J U) LLJ 0 _J Q U I LLI Ljj ILLI VJ Llj �Q 0 N J F1 W 0 6 LIJ 0 z Lij LLJ z W Q G 0 In JOB NO. 122071 SCALE AS SHOWN �s 1'1=5, M 1"=5o'(H) BASIN 'A' SHEET NO. 9