Loading...
HomeMy WebLinkAboutSUB201900018 Correspondence 2019-04-05 Christopher Perez From: Christopher Perez Sent: Friday,April 05, 2019 3:01 PM To: Bart Svoboda Cc: Amelia McCulley; Francis MacCall Subject: SUB201900018 Rio Vista - Final Subdivision Plat Attachments: Building Site section.pdf Bart, SUB201900018 Rio Vista-Final Subdivision Plat I am reviewing a two lot division in the R-4 Zoning, along Rio Road(plat below).Lot 1 has an existing duplex and then there is a residue lot(not sure of the proposed use other than residential). The property is highly encumbered by preserved slopes,the flood hazard overlay district, and a stream buffer.Prior to plat approval I am requiring the surveyor depict the building site on the plat to ensure each lot has one. I have a mental red flag being brought up in my head about required parking needing to be located in a building site. Section 4.2.2(b)(1)does not permit me to require parking be calculated within the building site,unless it is a parking bay. I do not want us to get into a Willow Pond incident where the lots are approved without meeting the required parking spaces on the lot, and then they are forced to park on street.This section of Rio Road is not the place for such on street spaces(at a wild curve and very dangerous). My comments are due by Thursday of next week.If we can talk this over before I finalize these comment that would be great:Notably,this is the Rio Vista property we made the super adjacent zoning determination on with regard to the preserved slopes and the cantilevered,buildings over the slopes. Attached is the plat. Let's discuss next week. The Two Lot Subdivision Plat I'm reviewing 1 c RICE ROA r W r BiARLEn WIDTH Rio / N/2727.38" E 69.55' N 35»23'5 4^ z PP N 27"90°4S E 1--°..2, tn. °T aQ7.48' "' 49 a7'CQ" �'r d .. N 2&`46°fir' E-- l3.38' f.:a 0 :v. 5I. cr ''`—... „„ .� —` .. •.,, * ._I �ss 25° EI.S:L. -- Zoy- ��. r S, "' a �d?%� 2oNE;4x.e- Q,�. 25' H. 9. ��' Pr ' " G ti S� '- PROS 10 `'" � �f .'e:�,� �- �.° —. .� 4�, � roc. .......," 2.142 ACRES ''-. LESS LOT 1: 0.55 ACRES ' SEW ACREAGE 1.492 ACRES IMP 61A-2-36 ''R , 45"3�6'°,'.., SHED Wai7rtWEA I'......° e .. _ LARD ,. TWO LOT DIVISION SO'RVE I SURVZYJNG, lC. TMP 61-191 1434 GREEN BIER PLACE CREATING LOT CHAF?LOflESVILLE VIRGINIA 22901 ALBEMARLE COUNTY. VIRGI PH: 434-97.E-0613 . ' SCALE. 1"Y ,Eao" JANU Christopher Perez I Senior Planner Department of Community Development!County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent: Friday,April 05, 2019 2:42 PM To: MelodyBAH@aol.com; 'hkhproperties@gmail.com' <hkhproperties@gmail.com> Subject:SUB201900018 Rio Vista- Final Subdivision Plat Steve, SUB201900018 Rio Vista-Final Subdivision Plat I received a call from the applicant seeking a status update.I hope to have this first review finished up by Thursday of next week. 2 Christopher Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 3