HomeMy WebLinkAboutSDP202000036 Review Comments Final Site Plan and Comps. 2021-07-21�� OF A(
4$
O
ul�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Memorandum
To: Steve Krohn (skrohn&resortscompanies.com), Riki Van-Niekerk (riki anroudabush.com)
From: Cameron Langille — Principal Planner
Division: Planning Services
Date: June 17, 2020
First Revision: August 10,2020
Second Revision: October 14, 2020
Third Revision: July 21, 2021
Subject: SDP202000036 — Belvedere Block 5A — Final Site Plan
The Planner for the Planning Services Division of the Albemarle County Department Community Development
will recommend approval of the plan referred to above when the following items have been satisfactorily
addressed. (The following comments are those that have been identified at this time. Additional comments or
conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable
reference to the Albemarle County Code.]
Applicable Comments from Initial Site Plan Action Letter (March 19, 2020):
1. [General Comment] Please revise the legend on Sheet 2 so that the Future Belvedere Phase 5B matches the
coloring/symbology used on the drawing. Rev 1: Comment addressed.
2. [32.5.2 (b)] Please revise the "Proposed Use" note on Sheet 1. Under the R-4 Zoning District, the property can
be developed as either a Standard Level Cluster Development, or a Bonus Level Cluster Development. The lot
sizes and permitted densities are different for these two use types. Please reference Section 18-15.3 for the Area
and Bulk Regulations that apply to each type.
a. Please clarify which use type is being requested, and revise the Proposed Use note so that it specifies
either Standard Level Cluster Development or Bonus Level Cluster Development. Based on the fact that
the density increase is proposed to be gained by maintenance of an existing wooded area, this
development qualifies as a Bonus Level Cluster Development, per Section 18-15.4.1. Rev. 1: Comment
not addressed. Use note has not been revised. Rev. 2: The note has been revised to state this is a Standard
Level Cluster Development. However, the plan says that a density bonus is being sought for preservation
of 1.17 acres of existing wooded area. Section 18-5.4.1 states that a 5% density bonus is granted is an
area between 10-19% of existing wooded area is preserved. This means that 1.5 acres must be preserved.
Therefore, no bonus density can be granted. Please revise the Allowable Density calculation so that it
does not include a 5% bonus. Rev. 3: Per applicant response. 1.5 acres of tree save area are being
preserved which qualifies this a bonus level cluster development. Please revise the proposed use
not so that it states "Bonus Level Cluster Development' instead of Standard Level Cluster
Development.
b. Please add notes to Sheet 1 specifying the minimum lot size permitted, and maximum structure height
permitted. See the Area and Bulk Regulations table in Section 18-15.3 for these standards. Rev. 1:
Comment not fully addressed. Lot size note has not been added. Rev. 2: Comment addressed.
c. [18-2.2.3] In order to be a cluster development, both Standard Level and Bonus Level, a minimum of
25% of the total land area must be common open space. Please provide a note on Sheet 1 stating the
required acreage/sq.ft. of open space, and provide a calculation stating the proposed acreage/sq. ft. of
open space. Rev. 1: Comment not fully addressed. Required and proposed open space acreage note has
not been added. As a reminder, bonus level cluster developments must provide a minimum of 25%
1
common open space. Based on staff s calculation of open space provided, there is a total of 2.13 acres
(92,950 sq. ft.) of common open space provided (this includes Open Space A, Open Space B, Open
Space C, and the tot lot). This does not match the open space provided figures on Sheet 1 (2.07 acres)
and Sheet 20 (2.98 acres). Please verify the total acreage of common open space provided, and revise
the figures as necessary. Rev 2: Comment addressed.
3. [32.5.2 (a)] Please label all setback lines shown on Sheets 4 and 5 on lots 1-14 and 34-43. Rev. 1: Comment not
fully addressed. The rear setback line is not labeled/called out for lots 1-14 and 34-43 on Sheets 4 and 5. Please
revise. Rev. 2: Rear setback lines are not labeled on lots 34 and 43. Please draw setback lines on these lots. Rev.
3: Comment addressed.
4. [32.5.2 (a)] Please identify which lots are SFD and SFA on Sheets 4 and 5. Rev. 1: Comment not addressed.
Lots are not identified as SFA or SFD on Sheets 4 and 5. Rev. 2: Comment addressed.
5. [32.5.2 (f)] According to Albemarle County GIS, a Water Protection Ordinance 100' stream buffer exists on
TMP 62-16D. Please show and label the stream buffer on all applicable drawings and identify the symbology
used to represent the stream buffer limits in the legend on each sheet where visible. Rev. 1: Comment no longer
applicable.
a. Revise the stream buffer note on Sheet 1 so that it states the property is located within a WPO stream
buffer, or provide evidence such as a survey that verifies that no stream buffer is located on TMP 62-
16D. Rev. 1: Comment no longer applicable.
6. [32.5.2 (n] Retaining walls are shown on lots 1-10 and lots 25-29. A note on Sheet 3 states "Prop. Ret.
wall by others." Details of the retaining wall must be provided on the final site plan. Please explain the
note, and provide a construction detail of the retaining wall that specifies the materials and height of the
wall. Rev. 1: See Engineering Division comment #4. Plans for retaining walls over 4' in height must be
provided for review prior to final site plan approval. Rev. 2: Comment addressed, see Engineering
Division comments.
7. [32.5.2 (d) and 32.5.2 (f)] Please show the limits of all areas located within the Preserved Steep Slopes Overlay
District, and the WPO stream buffer on Sheets 3-7 and 17-19. Rev. 1: Comment addressed.
8. [32.5.2 (n)] Please provide the construction detail number/sheet number in the labels for all proposed
improvements where construction details are provided in the plans. Rev. 2: Comment addressed.
9. [32.7.1.11 Please address the following related to notes on Sheet 1 and Sheet 4:
a. [32.7.1.1(b)] Asterisk * on Sheet 1 and Note 5 on Sheet 4: street right-of-way can't be dedicated through
the site plan. ROW dedication must occur as part of recordation of a subdivision application that is
reviewed and approved by the County in accordance with all applicable sections of Chapter 14. Rev. 1:
Comment not addressed. See comment #9b below for revised language for the note that should be on
the plans. Rev. 2: Comment addressed.
b. Please revise the note language so that it states "public street right-of-ways shall be dedicated to
Albemarle County for public use in accordance with all applicable sections of the Albemarle County
Code." Rev. 1: Comment not addressed. Notes on Sheet 1 and Sheet 4 have not been revised. Rev. 2:
Comment addressed.
10. [18-4.7] Please address the following related to open space:
a. [18-4.7 (c)(3)] Please provide documentation and calculations that all open space parcels meet the
limitations on certain features requirements. Per Section 18-4.7 (c)(3), "not more than 80 percent
of the minimum required open space shall consist of the following: (i) land located within the
100 year flood plain; (h) land subject to occasional, common or frequent flooding as defined in
Table 16 Soil and Water Features of the United States Department of Agriculture Soil
Conservation Service, Soil Survey of Albemarle County, Virginia, August, 1985; (in) critical or
preserved slopes; and (iv) land devoted to stormwater management facilities or flood control
devices, except where the facility or feature is incorporated into a permanent pond, lake or other
water feature deemed by the agent to constitute a desirable open space amenity. " Rev. 1:
2
Comment not addressed, no calculations identifying the acreage of these features within the
proposed open space areas has been provided. Rev. 2: Comment addressed.
b. [18-4.7 (d)] Asterisk * * on Sheet 1 and Note 4 on Sheet 4: the site plan can't dedicate the open
space to the HOA, the dedication needs to be done as part of a subdivision application review and
approval, in accordance with Chapter 14. Please be aware that open space in private ownership
shall be subject to a legal instrument ensuring the maintenance and preservation of the open
space that is approved by the agent and the county attorney. Rev. 1: Applicant did not provide a
response to this comment, and the note is still on Sheet 4. Rev. 2: Comment addressed.
c. [18-4.7] How will HOA access be granted to Open Space C? Since existing trees are being
maintained in Open Space C to count toward minimum landscaping requirements, the HOA will
need access to the tree preservation areas in order to maintain the existing trees. See comments # 1
and #8 below for additional information. Rev. 1: Comment not addressed. Applicant did not
provide a response to this comment and it is still unclear how Open Space C will be accessed.
Rev. 2: Comment not fully addressed. Applicant comment response letter states that the phase
line was adjusted so that open space C can be accessed at the end of Fowler Street. However, the
site plan still shows Fowler street and the phase line ending before reaching open space c. Open
space C has no frontage of access as currently shown. Please revise. Rev. 3: Comment
addressed.
i. Since there is no minimum lot size in R-4 bonus level cluster developments, staff
suggests revising the rear and rear corner lot lines of Lot 1 so that Open Space B and C
connect. The connection area should be at least 10-12' wide so that vehicles can be
driven to the open space C area. Otherwise, a private HOA access easement will need to
be created through residential lots so that Open Space C can be accessed for maintenance
purposes. Rev. 1: Comment not addressed. Applicant did not provide a response to this
comment and it is still unclear how Open Space C will be accessed. Rev. 2: Comment
stands, see comment above. Either the phase lines need to be adjusted or a private access
easement needs to be provided. Rev. 3: Comment addressed.
11. [18-4.16] Please address the following related to recreation requirements:
a. [18-4.16.11 A minimum of 200 square feet per unit of recreational area shall be provided in common
area or open space on the site. Therefore, 8,600 sq. ft. of recreation area/open space is required. Please
add a required open space calculation to Sheet 1. State the amount of open space/recreation area
proposed. Rev. 1: Comment not addressed. Calculations stating the minimum required open space and
recreation areas have not been provided on Sheet 1. It appears that only 2, 895 sq. ft. of recreational
areas are provided (the tot lot). This does not meet the minimum 8,600 sq. ft. required. Rev. 2: Comment
not fully addressed. Recreation notes on Sheet 1 state that open space C is being counted as "active
recreation space" with a trail. However, no trail is shown on the site plans. Furthermore, open space C
will be inaccessible based on the phase lines and lot locations. Please show a trail if one will be provided
and identify the trail type with a construction detail. Identify how open space C will be accessed and
used as active recreation space. See comment #10c above for additional information on the open space
C access issue. Rev. 3: Comment addressed.
b. [18-4.16.2.11 An exhibit of the tot lot area must be provided that shows locations of all required facilities.
One tot lot containing the following facilities is required:
i. One swing (four seats)
ii. One slide
iii. Two climbers
iv. One buckabout or whirl
v. Two benches. Rev. 1: Comment not fully addressed. Revise the callout on Sheet 5 so that it
states the correct sheet number (Sheet 23) for the tot lot detail. Additionally, please show the
actual footprint of the facilities within the tot lot on Sheet 5. Rev. 2: Comment addressed.
c. [18-4.16.2.21 One-half court for basketball shall be provided for each 100 units, consisting of a 30-foot
by 30-foot area of four -inch 21-A base and 1'/z inches bituminous concrete surface, and a basketball
backboard and net installed at regulation height. The site plan does not currently show a basketball court
as required by the Zoning Ordinance. Rev. 1: Comment not addressed, the site plan does not show the
required one-half basketball court. Rev. 2: Comment addressed.
d. [18-4.16] Please provide notes on Sheet 1 and Sheet 4 stating who will own and maintain the tot lot.
3
Rev. 1: Comment not addressed, no note is provided. Rev. 2: Comment addressed
e. [18-4.16.2.11 Please provide a construction detail identifying the materials and height of the fence
enclosing the tot lot. Rev. 1: Comment addressed.
f [18-4.16.2.1] Please provide construction details of each tot lot facility mentioned in sub -comment #b.
Rev. 1: Comment addressed.
g. [18-4.16.3.21 Add a note to Sheet 1 stating "Recreational equipment and facilities shall be maintained
in a safe condition and replaced as necessary. Maintenance shall be the responsibility of the property
owner if rental units or a homeowners' association if sale units." Rev. 1: Comment not addressed note
is not provided. Rev. 2: Comment addressed.
h. [18-4.16.3.31 Add a note to Sheet 1 stating "Recreational facilities shall be completed when 50 percent
of the units have received certificates of occupancy." Rev. 1: Comment not addressed, note is not
provided. Rev. 2: Comment addressed.
12. [32.7.2.21 The road plans for Phase 5A SUB201900170, must be approved prior to final site plan approval. Rev.
1: Comment stands, road plans still under review. Rev. 2: Comment stands, road plans still under review. Rev.
3: Comment addressed, road plans approved.
13. [32.7.4.1 (a)] A WPO plan must be submitted, reviewed, and approved prior to final site plan approval. Rev. 1:
Comment stands, WP0202000034 still under review. Rev. 2: Comment stands, WPO not yet approved. Rev. 3:
Comment addressed, WPO approved.
14. [General Comment] An easement plat application must be submitted, reviewed, approved, and recorded prior
to final site plan approval. All proposed easements shown on the final site plan need to be included on the
easement plat. Rev. 1: Comment stands, SUB202000123 easement plat under review. Rev. 2: Comment stands,
SUB202000123 still under review. Rev. 3: Comment addressed.
a. Once the easement plat is approved and recorded, update the drawings as necessary so that all
easements on the site plan include a label stating "existing" easement. Specify the easement type
(public/private) in the label, include the width, and state the recorded instrument number. Rev. 1:
Comment stands. SUB202000123 easement plat still under review. All easement labels will need to be
updated with recorded instrument number prior to final site plan approval. Rev. 2: Comment stands,
SUB202000123 still under review. Rev. 3: Comment addressed.
b. If any new easements will have a separate deed of easement/maintenance agreements recorded with the
plat, the easement labels should also state the deed of easement recorded instrument number. Rev. 1:
Comment stands. SUB202000123 easement plat still under review. All easement labels will need to be
updated with recorded instrument number prior to final site plan approval. Rev. 2: Comment stands,
SUB202000123 still under review. Rev. 3: Comment addressed.
New Comments — Final Site Plan
1. [General Commentl Please provide information on timing/anticipated process for filing a final subdivision plat
application to create lots proposed in Phase 5A. Rev. 1: Comment stands, comment response letter did not
include a response to this comment. Rev. 2: Comment partially addressed. A subdivision application was filed
in August, but the applicant selected the "Final Plat following Site Plan Approval" application type. That
application could not be processed because the final site plan is not yet approved. County staff and the
applicant corresponded and the application was going to be withdrawn and another subdivision application will
be filed following final site plan approval. Rev. 3: SUB202100096 has been submitted and is under review.
a. [32.7.9.9 (d)] An instrument will need to be provided with the final plat demonstrating
required landscaping in open space and private lots will be maintained in accordance with
this Code section. The instrument shall be subject to review and approval by the county
attorney and shall be in a form and style so that it may be recorded in the office of the clerk of
the circuit court of the county. Rev. 1: Comment stands, comment response letter did not
include a response to this comment. Rev. 2: Comment acknowled¢ed by applicant,
instruments will be provided with final plat.
2. [32.7.9.4 (b) and 32.7.9.4 (c)] On Sheets 18 and 19, please provide more information on the types of existing
vegetation present within the tree save area. For example, show existing tree locations and state the species
4
name and caliper for trees larger than 6." Rev. 1: Comment not fully addressed. Sheets 18 and 19 only label a
"Tree Save Deciduous Trees" area. Information on the sizes and species of existing vegetation has not been
provided. Rev. 2: Comment addressed. Applicant provided a supplementary tree exhibit, dated
September 1, 2020 that contains photographs and descriptions of trees.
a. [32.7.9.4 (b)(1)] Show tree protection fencing around the tree save areas on Sheets 7, 18, and 19.
Add a callout that references the sheet and exhibit number for the construction detail of the tree
protection fence. Rev. 1: Comment not addressed. Tree protection fencing is not shown on the
grading and landscape plan sheets. No details for the tree protection fencing is shown on the
construction detail drawings. Rev. 2: Comment addressed.
b. 132.7.9.8 (e)] State the sq. ft. measurement of the tree save area in the label on Sheet 18 so that staff
can verify the total area of the tree save area mentioned in the canopy coverage calculation on Sheet
20. Rev. 1: Comment not addressed, the sq. ft. area of the tree save area on Sheet 18 is not stated in
the label/call-out. Rev. 2: Comment addressed.
3. [32.7.9.5 (d)] Street trees are shown within lots 2, 4, 8, 34, 35, 36, 39 and 43, and not within the 6' planting
strip within the street ROW. Street trees must be provided within the planting strip unless VDOT will not allow
them there. Utilities should be laid out so that the trees can be located within the planting strip. Revise Sheets
13, 17, and 18 as necessary to show proposed trees within the 6' planting strip. Rev. 1: Comment addressed,
street trees are now within the landscaping strip within the ROW.
a. Revise the plant schedule on Sheets 17 and 19 so it states the correct quantities of each species
provided. 16 GT, 10 QC, 12 TC, and 8 ZS trees are shown on Sheet 17. Rev. 1: Comment
addressed.
b. Revise the total tree coverage column in the plant schedule so that the figures are correct based on
the quantity of each species provided. Rev. 1: Comment addressed.
c. Revise the street tree calculation on Sheet 19. 14 trees are needed on each side of Fowler Street, so
28 total are required. 12 trees are required on each side of Fowler Circle, so 24 total are required.
Rev. 1: Comment not addressed. 28 total trees are needed on Fowler Street and only 27 are
provided. Revise the calculation on Sheet 20 and add another tree along Fowler street on Sheet 18.
Fowler Circle requires 22 trees and the calculation only states 21.7, please revise. Rev. 2:
Comment addressed.
d. Not enough trees are currently provided based on what is shown on Sheets 17-18. Please add
additional trees within the planting strip within the ROW as necessary to comply with the
Ordinance. Rev. 1: One additional tree is needed along Fowler Street. Please add this tree to Sheet
18 and update the quantity of trees provided in the applicable column in the table on Sheet 20. Rev.
2: Comment not fully addressed. Only 20 trees are shown on Fowler Circle. Trees have been
removed on this iteration of the site plan. The previous revision had trees in front of lots 21/22 and
26/27. Please add two more trees along Fowler Circle. Rev. 3: Comment addressed.
4. [32.7.9.7 (a)(4)] Lots 15, 33, 34, and 43 are double frontage lots. Please provide screening for these lots.
a. [32.7.9.71 If landscaping will be provided, show how the screening measures on each lot comply
with Section 32.7.9.7 (c) and 32.7.9.7 (d). Rev. 1: Comment not addressed. Not screening measure
are shown on Sheet 18 for these lots. Please identify what screening measures will be provided at
the rear of these lots on the next submittal. Whether landscaping or fencing is provided, the site
plan must provide details of the plant materials or fencing in accordance with Section 32.7.9.7 (c).
32.7.9.7 (d), and/or 32.7.9.7 (e). Rev. 2: Comment not fully addressed. Lots 43 and 34 are still
double -frontage lots. Per the Zoning Ordinance definition of corner lots, a corner lot means a lot
abutting on two or more streets at their intersection. The front of a corner lot shall be deemed to be
the shortest of the sides fronting on streets except where existingdevelopment evelopment ofsuch lot shall
already have defined the front of such lot. The strip of open space provided along adjacent to
Fowler Street results in lots 34 and 43 only having frontage along 1 street. Furthermore, in order
for open space to qualify as a screening measure for double -frontage lots, it must be a minimum of
20' wide and currently it only measures I Y wide. Therefore, the open space needs to be widened
to 20' and landscaping must be provided to screen these lots.
If only landscaping is provided to screen lots 34 and 43, the planting strip shall not be less than 20
feet in depth. If a planting strip is provided, the plant materials shall consist of a double staggered row
5
of evergreen trees planted 15 feet on center, or a double staggered row of evergreen shrubs planted ten
feet on center, or an alternative vegetative screening approved b, t�gent. Rev. 3: Comment
addressed.
b. 132.7.9.7 (e)] If fencing will be installed, please show fencing locations on each lot where required
for screening. Provide a construction detailing demonstrating that the fence is opaque and 6' in
height. Rev. 1: Comment stands, if fencing will be provided, show fencing on Sheet 18 and provide
a detail of the fencing identify height and materials in accordance with Section 32.7.9.7 (e). Rev. 2:
Comment stands pending applicant's re -design of the open space strip and landscaping measures
provided to screen Lots 43 and 34. Rev. 3: Comment addressed.
5. [32.7.9.8 (c)] Please provide more information on how it was determined that the "net site area" is 4.86 acres.
The tree canopy requirement calculation on Sheet 20 should clearly identify the acreage of Phase 5A, and
subtract the features listed under Section 32.7.9.8 (c) that can be excluded from the calculation. Staff cannot
verify that the total canopy area required is correct as stated in the calculation on Sheet 20 without this
additional information. Additional landscaping may be required in order to comply with the minimum 20%
canopy required. Rev. 1: Comment not fully addressed. There is a discrepancy between the acreage of open
space proposed in this phase between notes on Sheet 1 (2.07 acres) and Sheet 20 (2.98 acres). Please verify the
actual net site area so that staff can verify that the tree canopy provided meets the minimum 20% required. Rev.
2: Comment addressed.
a. [32.7.9.8 (a)(4)] Revise the proposed tree canopy figure on Sheet 20 once the plant schedules have
been updated, per earlier comments. Rev. 1: Comment stands. Once an additional tree is added to
Fowler Street, update the canopy provided figure so that it includes the coverage of the new tree.
Rev. 2: Comment addressed.
6. [32.7.91 Revise note on Sheet 16 so that it states "refer to Sheet 19 for additional notes & details." Rev. 1:
Comment addressed.
7. [32.7.9.91 Please add a note to Sheets 17-19 stating "All landscaping shall be installed by the first planting season
following the issuance of the first certificate of occupancy within the development." Rev. 1: Comment
addressed.
8. [32.7.9.91 Please add a note to the Landscape plans stating "Tree preservation areas and screening on private lots
shall be maintained in a healthy condition by the current owner or a property owners' association, and replaced
when necessary. Replacement material shall comply with the approved landscape plan." Rev. 1: Comment not
addressed, this note is not provided on Sheet 20. Rev. 2: Comment addressed.
9. [32.7.9.91 Please add a note to Sheets 17-19 stating "street trees provided within the public right-of-way shall be
maintained in accordance with the requirements of the Virginia Department of Transportation." Rev. 1:
Comment not addressed. This note is not provided on Sheet 20. Note 8 on Sheet 20 should be revised to include
the language quoted in this comment. Rev. 2: Comment addressed.
Please contact Cameron Langille at the Department of Community Development at blanig Ile@albemarle.org or 296-
5832 ext. 3432 for further information.
Comments from Other Reviewers:
Albemarle County Engineering Services (Engineer) — David James, diames2@albemarle.org — No objection, see
attached.
Albemarle County Service Authority — Richard Nelson, melson&serviceauthoritv.org — No objection, see attached.
Rivanna Water and Sewer Authority — Dyon Vega, dvega&rivanna.org — No objection, see attached.
Review Comments for SDP202000036 Final Site Development Plan
Project Name: Belvedere Phase 5A- Final - Digital
Date Completed: Wednesday, July 07, 2021 Department/DivisiorJAgency: Review Status:
Reviewer: David James CDD Enaineerino No Objection
Page: 1� County of Albemarle Printed On: 07/21 /2021
Cameron Langille
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Tuesday, June 15, 2021 10:25 AM
To: Cameron Langille
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Cameron,
I recommend SDP202000036 Belvedere Phase 5A Final Site Plan For approval.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, June 11, 20215:59 PM
To: David James <djames2@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; vfort@rivanna.org; Dyon
Vega <DVega@rivanna.org>
Subject: Transmittal of 5DP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
ICAUTION: This email originated from outside the ACSA. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
The applicant for the Belvedere Phase 5A Final Site Plan has resubmitted a revised plan for review. Attached is a PDF if
the revised site plan, the applicant's comment response letter to our last review comments, and a request letter to
RWSA for a revised capacity certification.
These materials can also be accessed online using the County View system via this link:
https:Hlfwe b.a I bema rle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ne%5d:%5 bAppl icatio n N um ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Friday, July 9, 2021.
Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangiIle@aIbemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902
Cameron Langille
From: Dyon Vega <dvega@rivanna.org>
Sent: Tuesday, July 20, 2021 1:23 PIA
To: Cameron Langille
Cc: vfort@rivanna.org; Richard Nelson
Subject: RE: Transmittal of SDP202000036 Belvedere Phase 5A Final Site Plan - 4th Submittal
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Cameron,
RWSA has reviewed the Belvedere Phase 5A Final Site Plan as prepared by Roudabusch and Gale Assoc. and dated
05/26/21 and consents to the proposed construction. All changes to the proposed work from that shown in the
drawings shall be approved by RWSA in writing prior to construction. RWSA reserves all existing rights associated with its
easement, including but not limited to its rights to access, construction, operation, maintenance, and repair of its
facilities within the easement, and such consent shall not be construed to modify or prohibit any existing easement
rights held by the RWSA, nor modify or increase its obligations, if any, to repair or restore.
Let me know If you have any questions.
Thanks,
Dyon Vega
Civil Engineer
RIVANNA
WAi9t i SEWERauTHORITY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.ore
From: Cameron Langille <blangille@albemarle.org>
Sent: Friday, June 11, 20215:59 PM
To: David James <djames2@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; Victoria Fort
<vfort@rivanna.org>; Dyon Vega <dvega@rivanna.org>
Subject: Transmittal of 5DP202000036 Belvedere Phase 5A Final Site Plan -4th Submittal
Good evening everyone,
The applicant for the Belvedere Phase 5A Final Site Plan has resubmitted a revised plan for review. Attached is a PDF if
the revised site plan, the applicant's comment response letter to our last review comments, and a request letter to
RWSA for a revised capacity certification.
These materials can also be accessed online using the County View system via this link:
https:Hlfwe b.a I bema rle.org/webl i n k/sea rch.aspx?d bid=3&sea rchcom ma nd=%7b%5 bCDD-
P la nni ne%5d:%5 bAppl icatio n N u m ber%5d=%22SDP202000036%22%7d
Please send me any comments or approvals by Friday, July 9, 2021.
Please let me know if you have any questions. Thanks,
Cameron Langille
(pronounced "LAN-JILL")
Principal Planner
Albemarle County
blangilleCc@albemarle.org
434-296-5832 x3432
401 McIntire Road, Charlottesville, VA 22902