Loading...
HomeMy WebLinkAboutSUB202000061 Checklist - Project Closeout (Administrative) 2020-05-07 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please co I 1 1 ete this form within 30 days of final action,place in folder and forward to CDA FOR QC and st:, 1 s a �e11. CDA will forward to the Imaging•Center for 11digital lccloseout. / SD :/SUB' - d-o� -- '/ PROJEC TITLE �A -e__ A 9"l /I/Il ZLC -RC/ FULL NAME OF LEAD REVIEWER Z FINAL ACTION DATE: S-7�,l , Cou new- Application,Page 2 Data Entered [Staff Report,UroundWater Assessment,or other documents placed to"Does&Pics" Hardcopy• -File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document;or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. ❑ Scan ❑ Saved location lication(signature copy) ❑ Scan ❑ Saved.location ' • wner correspondence ❑ Scan 0 Saved location 0---�plicant Correspondence(to/from,memos/etnails) O Scan ❑ Saved location Complete.set of printed Review Comments Ef‘ 0 Scan 0 Saved location. proved plan/plat(signed,or stamped"Approved"with Planner/Engineer name) ❑ Scan 0 Saved location ■ Action Letter(Administrative Approval) ❑ Scan 0 Saved location 0 Whi - Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS Action Letter) hi Scan 0 Saved.location 0 Ground :ter Assessments" ❑ an ❑ Saved location ❑ Other(Please ex. ain-i.e.Studies) ❑ Scan ❑ Saved location • El Other(Please explain- .-. Studies) ❑ Scan • Saved location . . ❑ At the planner's discretion,co s'es of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends 'ty to the review at a later.date. If such plans are included,they should be clearly marked as unapproved an ontain a note clarifying why it was included. ❑ Scan ❑ Saved to tion Additional Information on this:project: • Planning Commission Minutes-may be obtained online or by contacting PC Recording Secretary • Board of Supervisor Minutes-maybe obtained online or by contacting the Clerk of BOS • Construction Documents-will.be added to this folder after completion of project. Prior to completion, documents may be obtained by contacting the County Engineer. - _. NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label.(same font&label color as project label)placed under the project label to ;reflect current project status and date; , 3) Documents are:Acco-fastened(except.plats/plans),and in Chronological order(latest:documents on top);. 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche, If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief of. Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012