Loading...
HomeMy WebLinkAboutWPO201700048 Plan - VSMP 2021-07-22GENERAL NOTES OWNER: DEVELOPER: ENGINEER: TAX MAP NO.: SUBDIVISION ZONING: TOTAL ACREAGE: SUBDIVISION STREETS: DRAINAGE DISTRICT: DRAINAGE: AI WATERSHED: TOPO & SURVEY: Al UTILITIES: LIGHTING: PHASING: COUNTY OF ALBEMARLE VIRGINIA 401 MCINTIRE ROAD CHARLOTTESVILLE, VA 22902 BEIGHTS DEVELOPMENT CORPORATION 5380 GOLF DRIVE, SUITE 103 CROZET, VA 22932 COLLINS ENGINEERING 200 GARRETT ST., SUITE K. CHARLOTTESVILLE, VIRGINIA 22902 TELEPHONE: 434.293.3719 FAX: (434)-245-0300 CONTACT: MR. SCOTT COLLINS, P.E. EMAIL: SCOTT@COLLINS-ENGINEERING.COM PORTION OF: 055EO-04-00-000BO R-1 RESIDENTIAL, BONUS LEVEL (CLUSTER DEVELOPMENT) 13.43 ac. (BOUNDARY LIMITS PRIOR TO SUBDIVISION) CURB & GUTTER SLABTOWN BRANCH TO THE LICKINGHOLE DRAINAGE BASIN THE DEVELOPER PREVIOUSLY CONTRIBUTED TO A REGIONAL STORMWATER BASIN FUND. WATER QUALITY COMPLIANCE WILL BE ACHIEVED THROUGH THIS PRIOR PRO-RATA SHARE CONTRIBUTION, AND THROUGH A NEW NUTRIENT CREDIT PURCHASE. WATER QUANTITY COMPLIANCE WILL BE ACHIEVED THROUGH THE INSTALLATION I VERIFICATION OF CONSTRUCTION OF THE APPROVED ADEQUATE RIPRAP LINED CHANNEL. THE APPROVED PLAN ANALYZED THE MS-19 X-SECTION (i.e. THE RIPRAP LINED CHANNEL) FOR EROSION (2-YEAR) AND CAPACITY (10-YEAR) TO THE POINT WHERE THE SITE'S CONTRIBUTING SUBAREA IS LESS THAN 1% OF LICKINGHOLE CREEK'S OVERALL WATERSHED. THIS DESIGN AND METHODOLOGY IS NOT CHANGED WITH THIS AMENDMENT, THOUGH CALCULATIONS HAVE BEEN PROVIDED SHOWING THE APPROVED MS-19 X-SECTION (i.e. RIPRAP LINED CHANNEL) REMAINS ADEQUATE. LICKINGHOLE CREEK JENNINGS-STEPHENSON, PC. PROVIDED TOPOGRAPEJY LN 2006. BASED ON FIELD RUN AND UPDATED IN 2011..E l SEWER - ALBEMARLE COUNTY - AVAILABLE ON THE SITE WATER`: ALBEMARLE COUNTY - AVAILABLE ON THE SITE NO STREET LIGHTING IS PROPOSED. CREEKSIDE II, PHASE II CONSISTS OF 3 PHASES: A, B & C, AS SHOWN ON THE APPROVED SITE PLAN. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON THE IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON PLANS, IF THERE APPEARS TO BE A CONFLICT AND UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THE PLANS. COLLINS ENGINEERING SHALL NOT HAVE AUTHORITY OVER CONTRACTOR'S WORK, SAFETY PRECAUTIONS, SCHEDULES, OR COMPLIANCE WITH LAWS AND REGULATIONS. COLLINS ENGINEERING SHALL NOT ASSUME RESPONSIBILITY FOR ANY CONSTRUCTION BEGUN PRIOR TO PLAN APPROVAL. OLD TRAIL CREEKSIDE Ilk PHASE II WPO 201700048 (AMENDMENT #1 TO WPO 201200008) WHITEHALL DISTRICT ALBEMARLE COUNTY, VIRGINIA SHEET LAYOUT SCALE: 1" = 100' j r 1 lei f-3 15 Ig 13 61 OLD TRAIL OLD TRAIL CREEPHASE IIIIDD PRASE & 2,T UPPER LLARD FIELD ALZARIO FIELD CIA Hb 9 H 0 F SCOTT R. LINS'Z U Lic. No. 035791,E a 7/14/21 E�Ol C b .p G t1 J Q O TO CHARLOTT SOLLE a —. o0 zti aQ T0= ESBORO Rom' 25 o � z O J w z a �O O U o 2 N W U 00 AFTpNz O z Q o o 0 T o� /NTFRSTghq\�TS�CCF O U z z � F^ o LU 0 0 7 W o k W a VICINITY MAP ce cc U) > U) Uj SCALE: 1" = 2,000' Sheet List Table Sheet Number Sheet Title T-1 COVER SWM-1 STORMWATER MANAGEMENT PLAN N TOTAL NUMBER OF SHEETS VSMP PLAN AMENDMENT #1 PROPOSED CHANGES: 1� THIS PLAN PROPOSES THE REMOVAL OF A BIORETENTION BASIN CONVERSION. THE NECESSARY STEPS TO MITIGATE THIS MODIFICATION HAVE BEEN TAKEN, INCLUSIVE OF PURCHASING NEW NUTRIENT CREDITS, UTILIZING THE EXISTING PAYMENT TO THE LICKINGHOLE CREEK BASIN FUND AND ENSURING THE APPROVED MS-19 X-SECTION OUTFALL REMAINS ADEQUATE. APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT COLLINS ENGINEERING IS NOT RESPONSIBLE OR LIABLE FOR ANY CONSTRUCTION OR DAMAGES TO THIS PROJECT PRIOR TO ALL FINAL PLAN APPROVALS. ti ® M M N ® M i O WN (N W L z _j __J U) W z= U W' Y W H Ul j I— ZLU W U) J w JQ 0 N -1r1 z LU 0 z w U) F1 F1 LU LU Q O 2 0— LU I —I I —I I —I w U W J I w O W a Ln JOB NO. 112068 SCALE N/A SHEET NO. T-Y Water Qu4ty Volume RequirejEents BIORETENTION FOREBAY RECI ENTS: Minimum Forebay e= 0.25 inche pervious square acre Forebay Depth to ran 4'-6' Impervious Area= 137,859 sf Minimum Forebay Volume 2,872 cf Fo ebay Volume Provided= 6,457 Of Minimum Bioretention FI a a O= 3,446 sf Bioretention Floor Are ded= 4,954 sf First Flush (1/2" o ff) Volume Requi 5,744 cf First Flush (1/2" notf) Volume Provide 6,320 Of (Before initial ou ntro'strucure at Elev.=701. 10') LEVEL SPREADER CROSS SECTION UTE SpR OR Ea vPRVBLE (MN. STAPLED T) BURIED r MIN. a MIN. euRiEo a ad LEVEL UP OF SM ER 20 OR FlAT2R MIN. 6• LEVEL SPREADE VEGETATED LIP S SECT VDOT 03• /357. /5, 056 OR /57 COARSE MORE ATE IN viuiva E (NI . LVANIZED WIRE NESH aA5 SECURE WIRE ME5R TO TIME n FILTER CLOTN 6X6 T TED TIMBER SECURE WINE TO G 6 MIN— — 'MTH WERE STAPLES — Z er..e m I ' MIN 6• LEVEL SPREADER WITH RIGID LIP • MN. PHYSICAL REOUIRENENIS Of ROPER OLOnI Ko ea N go. k SPEC. 3.19, MPHP ource: Va. DSWC and N.C. Erosion and Sediment Control Planning and Design Manual Plate 3.22� FIGURE 3.01 - la Homogeneous Embankments w/Seepage Controls mogeneous rill I ul off trench-4 below suitable material Sail or rack L_-_________J TYPICAL HOMOGENEOUS EMBANKMENT Transition fill ock or grovel —Pipe outlet Coors fit r Perforated collector arouned slogs ,Blanket in Foundation drain FOUNDATION DRAIN BLANKET DRAIN ChhNq drain Sand: gravel a rack dmin outkl Rack or gravel Rack to dr01R Transition filter Tmnsdlon filter CHIMNEY DRAIN TOE DRAIN c:\3_01-1a EI f F b Area of BTnFTT TER _2 Bill ore By a Elevation retention B olume (cf) (ft)ours (sf) cf) ntours 3 0 700 0 701 1,164 701 5,631 702 1 2,618 702 12,517 704 6,457 704 O,1 30,005 706 0 6,457 706 12,91 52,966 707.5 0 57 707.5 15,126 73,975 Note: F y surface area at ion 700'is 20% of the overa ter surface area at ion 700' 2499CG3 III A4w0X ORNNNF•tN-0p 6aN /avwaX W'aDxr wml NME • IMUX l6a 8T__ O O Oho IS oQ BIOFILTER #2 PLANT LIST KEY Only. BOTANICAL NAME COMMON NAME MINIMUM INSTALLED SIZE ROOT TYPE REMARKS CHV CHIONANTHUS IICUS FRINGET Af 2" CAL. B&B LE STEM COS 10 RNUS S A RED -TWIG DOG 18"-24" SPREAD 'WONT. ENSE/FULL HVI IGL S 19 I%WVIRGINIANA IL A COMMON WITCHHAI INKBERRY HOLLY Am V HEIGHT T-W HT. IF imDENSE/FULL SINGLE LEADER LST 7AW IDA STYRACIFLUA TUNDIL ROTUNDILOBA GUM 2" CAL. &B INGLE LEADER MYPN MYRICA PENS CA NORTHERN RRY 18"-24" SPREAD CONT. /FULL NSY NYSSA SYLVATICA BLACK 2" CAL. B&B SI ADER VBDN 10 VIBURNUM DENTATU ARROW OOD VIBURNUM 34 HT. B&B DENSE FULL AN 3 ANDROPOGON GERARDI BIG BLUESTEM 4" POT CONT. PV 74 ANICUM VIRGATUM SWITCH GRASS 4" POT CONT. NTS �TH 0F� 3" OF PEA GRAVEL FOREBAY EMBANKMENT & 5' WDEALRAPIZOIDAL FOREBAY SPILLWAY SHALL BE SHALL BE PLACED O DRAINAGE BETWEEN THE FlL TE CONSTRUCTED OF GABION BASKS TH VDOT iy3 COARSE AGGREGATE ON THE UPHILL � OUTLET MEDIA AND THE SIDE OF THE WEIR & CLASS I P ON THE DOWNHILL SIDE OF THE WEIR. GE07EX77LE SCOTT R. LINSZI FILTER FABRIC UNDERLAYMEN LL BE INSTALLED. 6' WIDE FOREBAY DAM ELEV.=704' UNDERDRAIN MEDIA & WEIR CREST ELEV.=702'- )x6'(L)x2'(D) U Lic. No. 035791,E \ FIRST FLUSH CLEAN-OUT 4- 015" CL. IV RCP BARRELS SHALL SERVE AS '-0po� 7/14/21 \ WATER F AN EMERGENCY OVERFLOW (20 LF ® 1.09 INV. DISCHARGE APRONS \ SURFACE OUT CAP ELEV.= 700.5 (TYP. IN= 704.75, INV. OUT= 704.55). PIPES SHALL ,�, `ti SSIONAL ECG Z \ 075 HAVE 6" OF HORIZONTAL SEPARA77ON & SHALL BE SHALL PROVIDE PROPER ELEV.= 701.02' O-yr WSE=704 ENCASED IN CONCRETE IN ACCORDANCE w/ w SCOUR PR07EC77ON PRIOR 6' OF FREEB COUNTY, STA7E & VDOT REGULA77ONS & TO RELEASING RUN-OFF SPECIFICATIONS. CONCRE7E VAULT HOUSING PIPES z ONTO 7HE FILTER MEDIA 0 0% A DA" A�^� SHALL BE A MINIMUM OF 2.25'Dx7.5'Wx20'L. N SLOPE T 701 1'� 15 ADS PIPE., z W (63.5 LF,• 0.5OX INVIN=694.31} INV.OUT=694.0) REPAIR & REPLACE , SASIN's BARREL SHALL OUTFALL INTO PROPOSED o AS NECESSARY, THE VDOT STD. EC-1, CL. 11, TYPE A RIP -RAP w/ ¢ w ENERGY DISSIPATER, CLASS /RIP -RAP 2' ELEV.= 700' EOTEXTILE FABRIC UNDERLAYMENT (9'Wx50'Lx2'D). O DEPTH W/ FILTER 2 5' ROPOSED RIPRAP CHANNEL SHALL EXTEND TO EXISTING BANK OF LICKINGHOLE CREEK. of a N FABRIC MIN. \ ¢ n U UNDERLAYM£NT, \ p W=21' & L=35'^ <-• .0 MIN. LICKINGHOLE CREEK BANK Z w W V) 3 O Genera) Biofilter Co ion Notes: AW o 1. Biofilters shall not talled and site is determined to be adequately General construction notes for Stormwater Management plans ZO Lu w stabilized by the eros/o rot an er resources inspectors, i. All dams and constructed fill to be within 9S%of maximum dry density and 2%of BOTTOM OF B/OF/L TE 1 MIN. Q °C 2 Q 2. The water resources in or inspect the under -drain installation and optimum moisture content. All fill material to be approved by a geotechnical engineer. MIX ELEV. = 696.5' STA 0VED M1X /A a k O 0 axi O 0 approve the soil mix prior g the biofilter, and approve the completed A geotechnical engineer is to be present during construction of dams. " " w A T EV.= MIN. 8' WIDE @ TOP & V of rJ 0 4 —6 RFORATED SCHEDULE / Q installation. Therefore the fo note will be added to the stormwater/BMP z. Pipe and riserjoints are to be watertight within stormwater management facilities. 700' (T -7H= 12' DEEP IMPERVIOUS Ln ro z m y p plan: 3. For temporary sediment traps orbasinswhich areto beconvertecto permanent UNDERDRAIN GRAVEL 40 PIPE OR EQUIVALENT Z LU 6RLm OHS O Contractor shall contact th ources inspector 24 hours prior to stormwater management facilities; conversion is not to take place until the site is (AASHTO M43 MIN. Al 1.0.- SLOPE (MIN.) TO DI 2.5' SLOPE o% CORE w A CUTOFF o back8lling the biofilter a ues spection and approval of the stabilized, and permission has been obtained from the County erosion control I' ABOVE & BELOW OR STORM DRAIN PROVIDE TRENCH & 1: 1 SIDE O p ¢ Z o L under -drain installation he soi inspector. UNDERDRAIN PIPE) ACROSS ENTIRE WIDTH ® SLOPES. SEE DETAIL ON N (n t � 0 3 20' O.C. THIS SHEET FOR w z ¢ o LXMENRwMARE FpIRErEABIDEOILY ADDITIONAL INFORMATION. a o xHBPNNTDWUP BUNccTWTreRPw H 6uwxN Ex Name NwWXNNAXE ACNPI WEX&ONSANYVMY raT. 1..npwRiama m[I¢¢w- WtYW WwXIE N LU NMEHNO OA Njooss PIf0BB:6RVX4f MIBnPoNf00N WTCW SLR wrt axa OIwRILxMI MXIIp MINI GMIEMEE181L]YLCM MTIG Eg1XFGV.XFMWTMIAEn" E W. RM�W EN EiRRNJYWE s1 '�61we 1[Ntl�u"m _SCAM > O d O ouwrr'. MnTeRweeHaicaxrawnroesTMauwaR,oErotom STORMWATER MANAGEMENT AMENDMENT #1 NARRATIVE: rI EMNr'. GbTIHOBPAEfYPHBHF➢4MIHAwACNPNNr ;xwTµpoxw[w.gT"wXE,G+UUG:.wv "� / r \ ¢ Ln U LOOwxa GENCEAVNU&E UFCw REWEBr9EF OR4WINRwJ. urtCUIdVROlA ra0.TxEaaC108uiEromxFAe Nx,EwNWOwYrtMlrv.TRE OVERALL: LU z w TminlooN MRBIDDN, WVTINIIE.NcwIm ^yam HWM, nw a. 1st RAaxa, .1.1 IW a ^'° THE APPROVED W PO 201200008 PLANS SPECIFY FOR THE CONVERSION OF A SEDIMENT BASIN TO A \ `- O .. 0 / - BIORETENTION BASIN. HOWEVER WITH THIS AMENDMENT, AND THE STABILIZED SITE AND BASIN, THE to o - / SEE C NNEL AD UACY EXHI R ORT PROPOSED CONVERSION IS NO LONGER NECESSARY AND LIMITED MODIFICATIONS TO THE FACILITY ARE / \ > > " _ w FOR ADDJTIONAL DE S/CA CULATIO S NEEDED. THESE MODIFICATIONS INCLUDE PROPER INSTALLATION & MAINTENANCE OF THE RIPRAP LINED �= \ \ j-- 0 / 1 ` � OUTFACE CHANNEL, CONVERTING THE RISER TO HAVE AN INLET TOP AND STABILIZING THE SEDIMENT BASIN M "\ � \ � � � / / // /✓ / /� I I I I I \ RI P DITCH T A 7 og c NWITH POSITIVE DRAINAGE TO THE NEW INLET. THIS PLAN ALSO SHOWS CONTINUED COMPLIANCE WITH \ \ \ STORMWATER REQUIREMENTS. PLEASE SEE THIS SHEET AND THE ATTACHED CALCULATIONS FOR ADDITIONAL \ \ =1' (WORSARID- INFORMATION. \_ \ ASSU NOT ROU71N(;9'1 \ \ \ \ D ft.;'n'=o.o8B;�_i.3% WATER QUALITY: Ot 7 AL\ SHALL DRAI%T60 PROPOSED CHANNEL{' / / THE APPROVED PLAN ACHIEVED WATER QUALITY COMPLIANCE THROUGH A CONTRIBUTION TO THE LICKINGHOL 1 \ CONSISTINOF VDOT SM-EC--I;CLTYPE A \� / / BASIN FUND AND A BIOFILTER TREATING THE FIRST Z" OF RAINFALL. THIS AMENDMENT HOWEVER PROPOSES TO o R11� RAP w GEOTEXTILE FABRIC UNDER ENT. /Tj6 ELIMINATE THE CONVERSION TO A BIOFILTER AND ACHIEVES WATER QUALITY COMPLIANCE THROUGH THE / \ \ \ ^ o ,y / l( I CHANNEL SHALL 7fE ,(9'Wx20 Lx2'D). PROED '�s \ / / PREVIOUSLY PAID CONTRIBUTION TO THE LICKINGHOLE BASIN FUND & THROUGH A NEW NUTRIENT CREDIT / l \ \ 1 \ \rq � ,(\� RIPRAP CHANNEL SHALL AND TO EXISTIN¢ BANK. ) \ / // PURCHASE. / I \ ¢Q ^ o WATER QUANTITY: / / I I I o THE APPROVED PLANS UTILIZED AN ADEQUATE RIPRAP LINED CHANNEL THAT WAS NOT EROSIVE DURING THE / I / 2-YEAR DESIGN STORM AND WAS CONTAINED WITHIN ITS BANKS DURING THE 10-YEAR DESIGN STORM. THIS CHANNEL, LABELED WS-19 X-SECTION' ON THE APPROVED PLANS, EXTENDS TO THE LICKINGHOLE CREEK BANK x WHERE THE ANALYSIS ENDS SINCE THE SITE'S CONTRIBUTING DRAINAGE AREA IS 1% OF THE CREEK'S OVERALL E WATERSHED. THIS METHODOLOGY IS PER THE APPROVED PLANS AND THIS AMENDMENT DOES NOT MODIFY THE ADEQUATE CHANNEL OR THE CONCEPT. THIS AMENDMENT DOES HOWEVER CONFIRM THE APPROVED 'MS-19 o X-SECTION' CONTINUES TO NOT BE EROSIVE DURING THE 2-YEAR DESIGN STORM AND CONTINUES TO NOT OVERTOP DURING THE 10-YEAR DESIGN STORM. THIS DESIGN ALSO REMOVES THE EXISTING TEMPORARY SEDIMENT BASIN BY MODIFYING ITS RISER TO HAVE AN INLET TOP AND TO ENSURE THE FACILITY REMAINS DRY, / STABILIZED &SLOPED TOWARDS THE NEWLY INSTALLED INLET TOP. / EXISjING VAR.441DT � � � > PLEASE NOTE, THIS PROJECT HAS AN APPROVED STORMWATER QUANTITY WAIVER DATED 9/26/05. THOUGH THIS / / / GR ING & DRAINAGE WAIVER WAS NOT UTILIZED WITH THE APPROVED PLAN, THIS WAIVER WILL NO LONGER BE VALID WITH THE ES T. / co w c APPROVAL OF THIS AMENDMENT SINCE THE WAIVER RELIED PARTIALLY ON THE INSTALLATION OF A BIOFILTER. THIS IS IN ACCORDANCE WITH PRIOR COUNTY ENGINEERING DIRECTION DATED 3/30/17. / / IN KEEPING WITH THE APPROVED PLAN, WATER QUANTITY COMPLIANCE FOR THIS AMENDMENT WILL BE w / \ \ ADDRESSED THROUGH THE USE OF THE RIPRAP LINED CHANNEL (i.e. MS-19 X-SECTION). CHANNEL PROTECTION / i EXISTINCGRAD�D IS MET THROUGH 9VACCTION -66, SUBSECTIONS HE F AND USE AND FLOOD PROTECTION IS MET THROUGH / i EAR HEN�,4CCESS / co 3 I fff yyyy 9VAC25-870-66, SUBSECTIONS C.2.a AND C.3.a. THE FLOWS USED IN THESE ANALYSES WERE TAKEN FROM THE � � APPROVED POST -DEVELOPMENT INFLOW HYDROGRAPHS AND ASSUMED ZERO ATTENUATION OCCURS ONSITE. AD// o // / SEE THIS PLAN AND THE ACCOMPANYING STORMWATER MANAGEMENT CALCULATIONS PACKET FOR DETAILS. �2A' / / 1'J _ ' L n \ I 2� 1 / /— /S / CN w o J I /w \ / �5 _ — /� / I / / / / / -RE A!R'& REPL�I CE, AS 0 z — FESSA SHE E R l a z =146.96' .... j �_—RAP/ / > w Q o _ (TOP MA OLE �� / _ / � � � /2 � W��IL TER FABRIC C c /R/AYMEINT, W=21 & L=35' / J G o \ — / EXISTING / / E CONTRACTOR SHALL D THE TEMPORARY SEtiJIF1E T / " J C' �n _ BASIN UTILIZING 77B, .FIL� ` � -o CONTRAE ORSFALL VERIF TH�FkONSTRUCTION ' o CONTRACTOR HDPEOUTF(11=6g ). HE -- / /- ,�� / -RAILWAY W a �9� / CONTRACTOR SHALL N H 0z " HDPE RISER w a STRUCTURE TO E P RVED R EINLET TOE / \ II `" � / / �� / LOCATED AT A IN's LO DINT. THE CONTRACTOR / // -74 Uj / SHALYF� THE FLOOR ELE ATIONSASSN�EEDEDTO � / / EN�SGREP TIVEhL'OPES TO TH NEWLY INSTALLED�ET / // — / O > �^ 1 I I I` / -� •� �� 7 / TO O�IiRACTOR SHALL --THE LY PERMANENT / / j / J Q L 1 T / ryA _ STA IL ATION MEASURES TO THE ARREN S�Dl S&EN RE / — AP LINEDCHANNEL OUTFA L HAS BEEN INS / / < �� J PER THE APPROVE ANS. / / / \\ N Q Lu 2 I l/ �J l / / / �STINGIVAR. WlDT�7�/ / / // / \ I TIE—IN TO U U) Q� o / L /GRADING & D AINAGE „ / / / ) EXISTING 1 Q W 14 RIPRAP DI CH / ESM / / / / / / III TRAIL WAY �l Y S D=1y / / / /�Ir / / / / / / / PROPOSED Q o 17 \� /�/ , TRAIL WAY LU 1 E \ �Lo BASIN'S BARREL SHALL 0 TF L I9y(�•,0 /'c�" / / o I2I \ \ BENTS\A K \\ %\\\ PROPOSTYPE A ED VDOTRAP TU. EG N w L.'Nh / —�` /� / / / / �/ / , \ Lfi F ~_ O Z GEOTEXTILE FABRIC NT / / / / �l \ O W w ~ w CHANNEL SHALLPEX7ENDE�O I�STIN� ��� ��� / a �✓ ®/ / \' O O 0 z BANK OF LICKI GHOLE CR E / / �/-1 ° O Jul w 10 10 ck� 100 YR Q FLOODPLAIN U ELEV. i of \ / / �° ° \ _ / �IMITS OF 100' / I N / y t� STREAM But- "t / I i \ O / \ \ / O IN ACCOR NC WITH APPROVEfI �HEET10F2, F E "LICKINGH�CREEK REPRESENTS WHERE THE SITE's o / / / O / CONTRIBUTING DRAINAE AREIS APPROXIMATELY 1% O = o \ ° ° fHE CHANNEL's CONTRIBUTING DRAINAGE AREA." IL ul / LEASE SEE THIS AMENDME)�SWMCALCULATIONS PACKET JOB NO. As o o° / / \ FOR CONFIRMATQNTH TTHE MS-19 X-SECTION_-- /// CONTINUESTO BEADEQFON 0 STORMWATER Qt7ANT(T ° O 112068 OMPL0 3/ / sk' / � ALE �0 \�EXISTING (�A WIDTH / CAN O O SCALE BASIN'S BARREL SHALL OUTFALL IN / \N O PROPOSED VDOT STD. EC-1, CL. ll, / / j / / /�/ RAGING & DRAINAGE /\C� R���� 0 AS SHOWN TYPE A RIP CHANNEL w \ �" \ 9� / o ° / o ESMT. / / C / Do 0 GEOTEXTILE FABRIC UNDERLA MEN- `\ o ° o ° / // O SHEET NO. n (9'Wx8O'Lx2'D). PROPOSED RIPR \\ e / o p o o ° ° SCALE: '� / P OPOS D SW / / /�� o n _ ' / / / EAS MEN- / / / @ SWM-1 M CHANNEL LICKINGHOLE CRO ISTIN G �� 2 �j���//�/ / 0 0 0 0 1 -100 �.�/ / E�PANSION l