Loading...
HomeMy WebLinkAboutSDP201200063 Other 2012-05-24 • 4 OF A1.@�1 040i Ft „.a ref COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Rd.North Wing Charlottesville,VA 22902 Phone: 434-296-5832 Fax: 434-972-4126 May 24, 2012 Eugene Ryang Water Street Studio 111 Third St. SE Charlottesville,VA 22902 RE: LOR#2 to SDP-2011-082 (Birdwood Golf Practice Tee) Dear Mr. Ryang, This letter approves your submitted Letter of Revision for the above referenced site plan. Since this letter of revision is associated with the original Birdwood Golf site plan,but is included as part of redevelopment occurring on and near the Boar's Head Sports Club complex in conjunction with SDP-2011-082,this letter will be filed with both site plans. The letter of revision proposes the following changes: 1) All grading and drainage changes associated with WPO-2012-044 This is the second(2nd)Letter of Revision for this site. Three(3) Letters of Revision are allowed, after which all required changes must be submitted as a site plan amendment. Since the original site plan number for Birdwood Golf Course is SDP-1981-012,up to 3 Letters of Revision may be submitted for Birdwood Golf Course,but tied to SDP-2011-082. Up to 3 separate Letters of Revision may be submitted for the Boar's Head Sports Club, also tied to SDP-2011-082. A total of 6 Letters of Revision may be tied to SDP-2011-082,but only 3 of these may apply to the Birdwood Golf Course. The other 3 must be tied to the Boar's Head Sports Club. Sincerely, Joanne Tu Purtsezova, Planner 1 Philip Custer From: Philip Custer Sent: Friday, July 20,2012 3.13 PM To: 'Schooley, Christopher(cds7c)', Eugene Ryang, 'Alan Franklin' Cc: Joanne Tu Purtsezova, Mark Hopkins Subject: Boars Head SWM Amendment(WPO-2011-00103) Good afternoon, I have reviewed the SWM plan amendment for Boars Head Squash Facility(WPO-2011-00063), received 12 July 2012. The changes to Biofilter C are approved on the condition that a Minor Site Plan Amendment is approved. At the time that the minor amendment approval is received,3 updated copies of this SWM plan amendment should be provided to me so that I may pass it off to the inspector. In the minor amendment application, please include profiles for the new and revised drainage facilities. If a change in horizontal or vertical direction is necessary for the pipe underneath the sidewalk,a manhole structure will be required A curb and a curb inlet will likely be needed now that the ditch is being removed. This may result in the water line having to be relocated. The site plan will also need to show and label a detectable warning surface at each handicap ramp. Please let me know if you have any questions. Thanks, Phil 296-5832 x3072 1 PROJECT NAME: Boar's Head Sports Club FILE#' WPO-2011-00103 DATE APPROVED: 14-May-12 Item Unit Amount Unit Cost Subtotal , trees&shrubs ball/burlap planted 8 $100.00 $800 (only bonded the minimum planting requireme underdrain stone cubic yard 37 $17.00 $629 biofilter surface area/27*1'depth stone delivery load 4 $45.00 $180 underdrain pipe,6"PVC linear foot 230 $1.35 $311 filter fabric square yard 112 $10.00 $1,120 biofilter surface area/27*1'depth sand/soil mixture cubic yard 74 $20.00 $1,480 biofilter surface area/27*2'depth EC-1 outlet protection each 1 $200.00 $200 class Al rip-rap square yard 341 $30.00 $10,230 48"concrete riser structure each 1 $1,000.00 $1,000 Outlet pipe linear foot 85.00 $25.00 $2,125 EC-3,EC-2 matting square yard 720.00 $10.00 $7,200 Facility A subtotal $25,275 trees&shrubs ball/burlap planted 6 $100.00 $600 (only bonded the minimum planting requireme. underdrain stone cubic yard 26 $17.00 $442 biofilter surface area/27*1'depth stone delivery load 3 $45.00 $135 underdrain pipe,6"PVC linear foot 6 $1.35 $8 filter fabric square yard 93 $10.00 '$930 biofilter surface area/27*1'depth sand/soil mixture cubic yard 52 $20.00 $1,040 biofilter surface area/27*2'depth EC-1 outlet protection each $200.00 $0 class Al rip-rap square yard 37 $30.00 $1,110 48"concrete riser structure each 1 $1,000.00 $1,000 Outlet pipe linear foot 46.00 $25.00 $1,150 EC-3,EC-2 matting square yard 0.00 $10.00 $0 Facility B subtotal $6,415 trees&shrubs ball/burlap planted 9 $100.00 $900 (only bonded the minimum planting requireme underdrain stone cubic yard 40 $17.00 $680 biofilter surface area/27*1'depth stone delivery load 4 $45.00 $180 underdrain pipe,6"PVC linear foot 220 $1.35 $297 filter fabric square yard 190 $10.00 $1,900 biofilter surface area/27*1'depth sand/soil mixture cubic yard 80 $20.00 $1,600 biofilter surface area/27*2'depth EC-1 outlet protection each 1 $200.00 $200 class Al rip-rap ' square yard 223 $30.00 $6,690 48"concrete riser structure each 1 $1,000.00 $1,000 Outlet pipe linear foot 220.00 $25.00 $5,500 EC-3,EC-2 matting square yard 0.00 $10.00 $0 Facility C subtotal $18,947 subtotal $50,637 project management $7,595 subtotal $58,232 10%Contingency $5,823 TOTAL $64,055 _ ROUNDED TOTAL $64,100 min total after reduction $12,820 t t t (slut t t t (s;ut t t t (slut BOND ESTIMATE-EROSION CONTROL Spreadsheet last revised:12-5-01 PROJECT NAME: Boars Head Sports Club PROJECT NUMBER: WPO-2011-00103 DATE OF ESTIMATE: 05/14/12 ESTIMATE BY PBC BASED ON: Plan signed 5/2/2012 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED,FERTILIZE,MULCH ACRE 3.65 1500 5475 SILT FENCE LF 555 5 2775 TREE PROTECTION FENCE LF 120 3 360 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 390 3 1170 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0.82 1000 820 SEDIMENT TRAP 2 ACRES 2 1000 2000 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 10 200 2000 OUTLET PROTECTION EA 3 200 600 EC-2&3 DITCH PROTECTION LF 0 10 0 RIP-RAP LF 300 55 16500 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 3 2000 6000 subtotal 37700.00 project management 5655.00 subtotal 43355.00 CONTINGENCY LS 10% 4335.50 TOTAL 47690.50 BOND AMOUNT REQUIRED 47700.00