Loading...
HomeMy WebLinkAboutSDP200600076 Correspondence 2007-02-05 ■ ■ ■ i THE COX COMPANY Planners • Landscape Architects Civil Engineers• Urban Designers February 5, 2007 Mr. Glenn Brooks Albemarle County Department of Community Development Re: WPO 2006-94 Boars Head Inn Meeting Pavilion Engineering Comments Dear Mr. Glenn Brooks: I am transmitting 2 full sized copies of revised plans for the Boars Head Inn Meeting Pavilion to you for review. The plan review comments dated January 8, 2007 are addressed as follows: A. Erosion and Sediment Control Plan 1) Top width for the sediment traps is indicated on the plans for both sediment traps 2) As discussed per our meeting, we have adjusted the sediment traps to provide for a longer distance between the inlets and the outlet weirs 3) The drainage area for ST "A" has been revised. 4) As mentioned during our meeting, the existing ponds on the site provide an extra layer of erosion and sediment control and storm water management. The previously approved E&S plan for the Boars Head allows the ponds to be dredged as needed. If at the conclusion of the construction it is found that sediment has accumulated to the point at which dredging is needed, this will be done in accord with the approved plan. B. Stormwater Management Plan Additional details for the conversion of the sediment traps is provided on the plans. Also, sheet C5.1 provides the planting list for these biofilters. Please do not hesitate to contact me if you have any questions or comments. 434.295.7131 220 East High Street Charlottesville,Virginia 22902 i i �v Mr. Glenn Brooks Re: Boars Head Inn Meeting Pavilion February 5, 2007 Page 2 Sincerely, Harold L. Jones, Jr, PE H LJjr/ajh cc: Mr. Gerald Gatobu, Mr. Mike Stumbaugh, file