HomeMy WebLinkAboutSDP200800140 Checklist 2008-09-16 Minor Site Plan Amendment Revisions to SDP 2006-76 and SDP 2007-68
AThe stairway from the service road to the drop off area has been deleted. The large
retaining walls have also been deleted. The seating wall is now 7 feet longer.
AA small retaining wall has been added between the service drive and the seating wall.
The height is less than 3 feet tall and the length is approx. 14 ft long.
AA portion of the sidewalk has been revised and a crosswalk was removed accordingly.
4 A new light pole has been added near the east stairs beside Ednam. Bollards near the
drop off area were changed to small pole fixtures with lamps of less than 3000 lumens.
AA short section of sidewalk was realigned. Bollards were adjusted accordingly.
/6\ Storm pipe material changed to HDPE as noted per as-built information.
The material change was approved by the County Engineering.
ALandscape plan has changed. Please refer to planting schedule above and on sheet L1.1.
Revised calculations are found on sheet L1.3.
/ Light fixture types have changed. Please refer to schedule and Photometric
E\i Exhibit on sheet L2.0. Details are on on sheet C10.1.