Loading...
HomeMy WebLinkAboutSDP202100065 Study 2021-07-26SHIMP ENGINEERING, P.C. Design Focused Engineering July 26, 2021 Adam Moore Virginia Department of Transportation 701 Vdot Way Charlottesville, Virginia 22911 RE: Albemarle Business Campus — Block 1— Final Site Plan Turn Lane Warrant Analysis Dear Mr. Moore, Please find attached a warrant analysis for Albemarle Business Campus — Block 1. The final site plan proposes 128 multifamily units, with an entrance on Route 875 Country Green Road. This multifamily development is part of a Neighborhood Model District, Albemarle Business Campus. However, as the residential portion of the development is located on one side of Route 780 Old Lynchburg Road, while commercial and office uses are on the other, this turn lane warrant analysis treats the residential use as a separate entity. The following items are included with this report: • VDOT 2019 Traffic Data • ITE Trip Generation Summary • Warrant Analysis Exhibits The attached analysis shows that turn lanes are not warranted for the residential portion of Albemarle Business Campus. If you have any questions, you may contact me at justingshimp-en ing eering com or by phone at 434- 953-6116. Regards, Justin Shimp Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com 1. VDOT 2019 Traffic Data The following table provides VDOT 2019 traffic data on the 0.31-mile segment of Route 875 from Route 631 Old Lynchburg Road to Route 781 Sunset Avenue Extended. The speed limit on Country Green Road is 30-mph. Route 875 Country Green Road 2-lane road 0.31-mile segment 30-m h AADT 2019 1300 K 0.108 D 0.71 Peak Hour Total 140 Peak Hour Direction A 100 Peak Hour Direction B 40 2. ITE Trip Generation Summary The following trip generation was provided by ITE Trip Generation, 10'h Edition. From the estimated trips into the site, it is assumed that 80% of turns would come from the 51 Street and Old Lynchburg Road direction and 10% of trips would come from Sunset Avenue Extended. Use ITE Code Independent Variable AM PM In Out FTotal In Out Total Multifamily 221 128 Units 12 34 46 34 22 56 Housing Mid -Rise Turns In Advancing Opposing % Morning Right 10 50 - - Morning Left 2 102 50 2% Evening Right 27 127 - - Evening Left 7 47 127 14% The evening scenario was analyzed as the highest number of right and left turns occurred in the evening. 3. Warrant Analysis Exhibits With the existing background traffic and the new trips generated by the new multifamily units, turn lanes are not warranted. F-79 Appropriate Radius required at al Intersections and Entrances (Commercial or Prf ate). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Right Turns For posted speeds at or under 45 mph. PHV right turns > 40. and PHV tot. 1, 000. Adjusted right turns = PHV Right Turns - 20 If PHV H not known use formula'. PHV = ADT x K x D K = the percent of AADT occurring in the peak hour D = the percent of tic in the Peak direction of flow Note An average of 11%for K x D will suffice When right turn facilities are warranted. see Figure }I for design crileria- FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Rev. 1/15 800 a700 w 600 i 500 O C0 400 Z o 300 a a 200 O 0 1127 > 100 VA ADVANCING VOLUME (VPH) FIGURE 3-6 WARRANT FOR LEFT TURN STORAGE LANES ON TWO LANE HIGHWAY