HomeMy WebLinkAboutSUB201900149 Checklist - Project Closeout (Administrative) 2020-02-25 SUBDIVISION/SITE PLAN
FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS
CHECKLIST
Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC
and sta el. CDA will forward to the Imaging Center for digital closeout.
SD UB# PROJECT TITL 'Denier' — 1 LA-
FUL -AME OF LEAD REVIEWER $-('&r FINAL ACTION DATE: 2 — '=
Cou View—
Application,Page 2 Data Entered
e , r sessment,or other documents p ac ics"
Hardeopy-File Folder. Closeout: All items listed should be placed in project folder,in reverse
chronological order(latest on top).
Please check each item included in this.folder. To indicate that an item is not applicable to this file,place an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file,please indicate that item on the"Other"lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document; or,if the document is already in digital format,can be saved to LaserFiche. Please provide the.digital
location(path/name)of the document in the space provided.
ion
ion
ication gnature copy)
Scan 0 Saved location •
ondence
Epplicant Correspondence(to/from,memos/etails)
Scan ❑ Saved location
rkee;41_e__telgt of printed Review Comments
Scan ❑ Saved location.
proved plat(signed,or stamped"Approved"with Planner/Engineer name)
Scan 0 Saved location
s ra lye pprov
location
ff Report(include plan/plat presented,PC/BOS Action Letter)
`Q Sean ern
la—SZ"iff--r_TrFdT,Ration
E1 Other lAIA Studie
r — Scan ffj-Saved-lecat en
-6- Scan '-Sayedlocation
❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the
staff report or minutes and lends clarityto the review at a later date. If such plans are included,they should be
clearly marked as unapproved and contain a note clarifying why it was included.
❑ Scan 0 Saved location
Additional Information on this project:
�, ♦ Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary •
• Board of Supervisor Minutes—may be obtained online or by contacting the Clerk of BOS
• Construction Documents—will be added to this folder after completion of project. Prior to completion,
documents may be obtained by contacting the County Engineer.
NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete:
1) Checklist is completed and included in folder;
2) Folder has a typed status label.(same font&label color as project label)placed under the project label to •
:reflect current project status and date;
3) Documents are Acco-fastened(except.plats/plans),and in chronological.order(latest documents on top);. -
4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche.
If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief of
Planning for corrective action.
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012