Loading...
HomeMy WebLinkAboutSUB202000062 Checklist - Project Closeout (Administrative) 2020-05-20 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of fiinal action,place in folder and forward to CDA FOR QC and sta.. - beel. CDA will forward to the Imaging•Center for digital oseouut. �] SDP/•UB •. 2 U 9 -�e PROJECT ITLE A/Oi€JO( 7 LLC eL% FULL NAME OF LEAD REVIEWER Z FINAL ACTION DATE: 5- -,00-„7-0., !p Coun 'ew- pplication,Page 2 Data Entered in"Does&Pies" Hardcopy-File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document;or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. g o er os-Engineationklocumentation ❑ Scan- ❑ Saved location 0pplication si ature copy) Scan ❑ Saved location -B--Public Notification records/Abutting Owner correspondence Scan 0 Saved location [ -plicant C espondence(to/from,memos/emails) Scan ❑ Saved location Q-C iplete. of printed Review Comments • j ] Scan 0 Saved location. I:kp roved 1 plat(signed,or stamped"Approved"with Planner/Engineer name) Scan 0 Saved location \\ Action Letter(Administrative Approval) ❑ Scan ❑ Saved location ❑ "te Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS Action Letter) MI Scan ❑ Saved.location 0 Ground .ter Assessments` ❑ -• s ❑ Saved location ❑ Other(Please ex. .'' -i.e.Studies) •❑. Scan ❑ Saved location . • ❑ Other(Please explain-i.e. R dies) - ❑ Scan ■ •tied location . . ❑ At the planner's discretion,copies o`•• i approved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity t% 1 e review at a later date. If such plans are included,they should be clearly marked as unapproved and contain note clarifying why it was included. ❑ Scan ❑ Saved location Additional Information on this project: • Planning Commission Minutes-maybe obtained online or by contacting PC Recording Secretary . • Board of Supervisor Minutes—maybe obtained online or by contacting the Clerk of BOS • Construction Documents—will be added to this folder after completion of project. Prior to completion, documents may be obtained by contacting the County Engineer. " NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2). Folder has a typed status label.(same font&label color as project label)placed under the project label to ;reflect current project status and date; 3) Documents are Acco-fastened(except plats/plans),and in chronological.order(latest documents on top);. 4) Documents are sufficiently identified as.to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center,staff will circle the•incomplete item and return folder to the Chief of. Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012